MATOC__EXHIBIT_E__Oct__2012.docx

DOCX document 26 KB Posted

Attached to
Construction Indefinite Delivery-Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) for Southern California
Solicitation number
W912LA-13-R-0001
Issued by

About this file

EXHIBIT E PROTOTYPICAL PROJECT PROPOSAL PRICE FORM

View the file

Other files

File Type Posted
SMATOC_Amendment__Proposal_Acceptance_Extension.pdf PDF
MEMO_FOR_OFFERORS.pdf PDF
Amendment_2-_time_extension_2.pdf PDF
Time_Extension.pdf PDF
FILLABLE_EXHIBIT_B.docx DOCX document
FILLABLE-EXHIBIT_A_____PERFORMANCE_RELEVANCY_QUESTIONNAIRE.docx DOCX document
FILLABLE_EXHIBIT_C1-_C2.docx DOCX document
FILLABLE_EXHIBITS_D-F_.docx DOCX document
FILLABLE_EXHIBIT_G.docx DOCX document
SMATOC_CONTRACTING_RESPONSE_RFI_Log_12-30-12.pdf PDF
SOLICITATION_W912LA-13-R-0001.pdf PDF
Exhibits_A-D_F-G_.doc DOC document
Exhibit_E_Prototypical_Project.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP W912LA-13-R-0001

EXHIBIT E PROTOTYPICAL PROJECT

NOTICE OF PROPOSED PROJECT, SOLICITATION

Date: 1/2/13

PROJECT TITLE AND NO.: 060432

PROJECT DESCRIPTION: CONSTRUCT BUILDING 55 RENOVATION

All work shall be in strict accordance with the ( x ) Plans/drawings and Specifications dated 6/12/12

MAGNITUDE OF PROJECT: $500,000 - $1,000,000.

PERFORMANCE PERIOD: 260 Days, after receipt of Notice to Proceed

SITE VISIT: A site visit will not be conducted in conjunction with the MATOC pre-proposal meeting. See Section 00100 of the solicitation for details.

PERFORMANCE & PAYMENT BONDS: In accordance with FAR 28.102-1 and Contract Clause 52.228-15, Contractors are reminded that any amount awarded over $30,000 shall require Payment Bonds, and awards exceeding $150,000 shall require both Payment and Performance Bonds. All bonds are due no later than 10 days after award.

PROJECT SAFETY: In accordance with FAR 52.236-13, Accident Prevention, construction contractors are required to use the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1. To view this manual click here http://www.usace.army.mil/CESO/Pages/EM385-1-1.aspx

WAGE DETERMINATION: Currently, General Decision Number CA120035, Modification 16, dated 12/21/2012 is applicable to this task order. Rates can be found at http://www.wdol.gov/wdol/scafiles/davisbacon/CA35.dvb?v=9

PROPOSAL DUE DATE: All offers are due with proposal for MATOC basic contract. Failure to provide a price will make offer noncompliant, eliminated from the competition and offeror ineligible for a basic contract award. Basis for award is in the Solicitation.

The Following Provisions/Clauses if marked [X] are applicable to this task order

[ X] Availability of funds (FAR Clause 52.232-18) Funds are not presently available for this procurement.

[ ] Contract Clause 52.211-12 LIQUIDATED DAMAGES If applicable, the following amounts will be applicable to this TASK ORDER.

[X ] Contract Clause 52.246-21 Warranty of Construction, is applicable to this task order.

[ X ] 52.204-10 REPORTING: Executive Compensation and First Tier Subcontract Awards (Jul 2010) Is applicable to this order. The following are the codes needed to accomplish the reporting TAS_21 2020 , Agency Army_____________

[ ] Alternate proposal. The government at its option will accept and evaluate alternate proposals; however offerors must also price the project as specified. Alternate proposals should include enough detail for the Government to understand the alternate as well as its benefits. Costs and or credits shall be listed separately. Offerors who do not provide alternate proposals may not be notified in the event the government elects to accept an alternate proposal from another offeror.

[ ] DFARS 252.236-7006 COST LIMITATION (JAN 1997)

(a) Certain items in this solicitation are subject to statutory cost limitations. The limitations are stated in the Schedule.

(b) An offer which does not state separate prices for the items identified in the Schedule as subject to a cost limitation may be considered nonresponsive.

(c) Prices stated in offers for items subject to cost limitations shall include an appropriate apportionment of all costs, direct and indirect, overhead, and profit.

(d) Offers may be rejected which—

(1) Are materially unbalanced for the purpose of bringing items within cost limitations; or

(2) Exceed the cost limitations, unless the limitations have been waived by the Government prior to award.

[ ] PERFORMANCE OF SERVICES DURING CRISIS DECLARED BY THE NATIONAL COMMAND AUTHORITY. (September 2002) This special contract clause IS APPLICABLE TO THIS TASK ORDER.

[ ] FAR 52.217-5 Evaluation of Options applies to this solicitation

[ ] FAR 52.217-7 Option for Increased Quantity- Separately Priced Line Item applies to award when option(s) not taken at time of award. The Government reserves the right to award option individual line items at time of basic line item award or after award, but not later than 260 days after initial award. Performance period upon award of options will not be extended.

EXHIBIT E PROTOTYPICAL PROJECT PROPOSAL PRICE FORM

Include this form completed with your proposal

PROJECT NO. 060432

BLDG 55 RENOVATIONS

PROJECT DESCRIPTION: Project provides for the furnishing of all plant, labor, material, equipment, appliances and supervision necessary to Construct the Barracks Rehab, Bldg 55 in accordance with the plans and specification dated 6/12/12. This project is for a Firm Fixed Task Order.

Item Number
Description
Quantity
Unit
Amount
0001
Contractor to provide all plant, labor, materials, transportation, equipment, appliances, supplies, services, permit, insurance and supervision necessary to construct the Barracks Rehab Bldg. 55. All work shall be completed in accordance with the plans and specifications dated 6/12/12.
1
Job
0002
Remove and Dispose Existing Decking
1
Job
0003
Aluminum Sun Shades
1
Job

Total

Company Name

Name and title of person authorized to sign image1.emf

File details come from the government source that posted it. Updated .