Update INIC Video Wall Purchase Description (06-12).docx

DOCX document 18 KB Posted

Attached to
INARNG Video Wall
Solicitation number
W912L926Q9003
Issued by

About this file

This is a Purchase Description for a commercial Audio-Visual (AV) system procurement for the Indiana Intelligence Center (INIC). The Government seeks to procure, deliver, and install a complete, turnkey AV presentation and control system consisting of specific hardware components and incidental installation services. Key equipment includes a Direct View LED video wall (approximately 5.5' H x 20' W with 1.25mm or finer pixel pitch in 32:9 aspect ratio), a video wall controller capable of processing ~4800x1340 resolution, a 4K AV matrix switcher with minimum 8 inputs, a dual-lens PTZ camera, two 55-inch 4K confidence monitors, two 55-inch status monitors, articulating wall mounts, a TAA-compliant audio system kit with DSP/amplifier and ceiling-mounted microphones and speakers, a JITC-certified control system hardware kit with wall-mount and tabletop touch panels, a 44RU equipment rack with caster base, a 1500VA rack-mountable UPS, a rack-mountable PDU, and all necessary plenum-rated cabling and connectors.

The procurement is structured as a Firm-Fixed-Price (FFP) Request for Quotations (RFQ) under solicitation number W912L9-26-Q-9003, designated as a Total Small Business Set-Aside. The contract vehicle is a commercial supply procurement with CLIN 0001 for the complete turnkey AV system. Incidental labor includes decommissioning of existing equipment, installation, system programming to manage power and source routing across NIPR, SIPR, and JWICS enclaves, testing and commissioning, and one one-hour on-site familiarization training session. All delivered products must be TAA-compliant, and network-connected AV control hardware must be JITC-certified. The period of performance for delivery, installation, and commissioning shall not exceed three months from contract award. The final system design is due within 30 days of award, hardware delivery and installation within 90-120 days or 30 days of equipment receipt (whichever is sooner), and system commissioning and training within 120-150 days or 30 days of installation completion (whichever is sooner). The place of performance is the Indiana Intelligence Center (INIC), Building #7, Stout Field, Indianapolis, IN. The response deadline is June 29, 2026, at 5:00 PM EDT, with a site visit available on June 15, 2026, at 10:00 AM EDT. The contact point is Brian Williams at brian.williams132.civ@army.mil.

View the file

Other files

File Type Posted
Updated INIC Video Wall Diagram 06-08-2026.pdf PDF
Video Wall Q-A Take 1.docx DOCX document
INIC Video Wall Evaluation Document.docx DOCX document
INIC Video Wall Purchase Description.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Purchase Description (PD) Indiana Intelligence Center (INIC) Audio-Visual (AV) System Requirement

1.0. Scope - The purpose of this acquisition is to procure, deliver, and install a complete, turnkey Audio-Visual (AV) presentation and control system for the Indiana Intelligence Center (INIC). This is a commercial supply procurement. While the requirement includes engineering, installation, and programming, these services are incidental to the procurement of the physical hardware.

2.0. Bill of Materials - The Contractor shall provide new, commercial-off-the-shelf (COTS) equipment that meets or exceeds the following technical specifications. All items must be fully compatible and integrate into a single, functional system.

Qty
Item
Minimum Salient Characteristics
1
Direct View LED Video Wall
Approx. Dimensions: 5.5’ (H) x 20’ (W); Pixel Pitch: 1.25mm or finer; Aspect Ratio: 32:9.
1
Video Wall Controller
Capable of processing signals for a ~4800x1340 resolution wall and managing multiple windowing layouts.
1
AV Matrix Switcher
4K capable; configurable for a minimum of 8 inputs and multiple outputs.
1
Dual-Lens PTZ Camera
Pan-Tilt-Zoom camera providing both audience and presenter views in a single housing.
2
Confidence Monitors
55-inch 4K TAA-compliant displays.
2
Status Monitors
55-inch displays for classification level indicators.
4
Articulating Wall Mounts
Sized to support 55-inch displays.
1
Audio System (Kit)
Must include: (1) DSP/Amplifier, (4) flush-mount ceiling microphones, and (8) flush-mount ceiling speakers. Must be TAA compliant.
1
Control System Hardware (Kit)
Must be JITC-certified. Includes: (2) 10" wall-mount touch panels, (2) 7" scheduling panels, (1) 10" tabletop touch panel. Microphones, WiFi, and Bluetooth must be physically removed or permanently disabled.
1
Equipment Rack
44RU with caster base, locking front door, and integrated fan top for cooling.
1
Uninterruptible Power Supply (UPS)
1500VA, rack-mountable.
1
Power Distribution Unit (PDU)
Rack-mountable.
Lot
Cabling & Connectors
All necessary plenum-rated signal cabling (CAT6 or better), power cords, and connectors for a complete installation.

3.0. Incidental Labor & Installation Instructions - The Contractor shall provide the necessary incidental services to ensure the AV supplies are fully operational. The period of performance for delivery, installation, and commissioning shall not exceed three (3) months from the date of contract award.

Phase
Labor Instructions & Requirements
Decommissioning
Remove existing video wall and mounts. Relocate decommissioned equipment to a designated on-site storage area.
Installation
Deliver all equipment to the INIC facility. Mount the DVLED wall, displays, and cameras. Install all rack-mounted equipment and route all cabling in accordance with approved schematics.
System Programming
Program the JITC-certified control system to manage power, source routing (NIPR, SIPR, JWICS), camera controls, and audio levels securely.
Testing & Commissioning
Conduct a full system functional test to demonstrate that all equipment operates as an integrated system without defect.
Familiarization Training
Provide one (1) 1-hour on-site training session for INIC personnel on the full operation of the installed system.

4.0. Security & Compliance Directives

Requirement
Description
Trade Agreements Act (TAA)
All delivered end-products and primary components (including displays, cameras, and processors) MUST be TAA compliant.
JITC Certification
Network-connected AV control hardware must be on the JITC Approved Products List (APL).
Facility Access
All contractor personnel must complete AT Level 1 training and comply with local security and access procedures for the INIC.

5.0. Delivery & Acceptance

Deliverable
Timeline
Acceptance Criteria
Final System Design
Within 30 days of Award
Government approval of technical schematics.
Hardware Delivery & Install
Within 90-120 days of Award or within 30 days of receipt of equipment. Whichever is sooner.
Visual inspection of hardware and mounting integrity.
System Commissioning & Training
Within 120-150 days of Award or within 30 days of the completion of hardware installation. Whichever is sooner.
Successful demonstration of enclave switching and user sign-off.