W912L826QA017 Questions and Answers 2.pdf

PDF 31 KB Posted

Attached to
Fiber Optic Installation
Solicitation number
W912L826QA017
Issued by

About this file

This is a Questions and Answers document for federal contract W912L826QA017 concerning a fiber optic installation project.

The document addresses two key inquiries regarding the fiber optic installation. The first question pertains to the distance of the fiber run, and the answer provides detailed routing information: the conduit extends approximately 180 feet from OPS Room 1220 to a manhole near the southeast corner of the OPS building, continues 313 feet west to a hand hole near Sapper Lane, turns south for approximately 270 feet to a hand hole adjacent to building 204, and finally turns east for 252 feet to enter Annex 242B. The total length of the run is approximately 1,015 feet, with the contractor responsible for verifying all measurements. The second question concerns the acceptability of gel-free fiber optic cable as an alternative to gel-filled cable. The government's response establishes a firm requirement that only gel-filled fiber cables will be accepted, eliminating any alternative material options for contractors bidding on this project.

View the file

Other files

File Type Posted
W912L826QA017 Questions and Answers.pdf PDF
Solicitation - W912L826QA017.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912L826QA017, Fiber Optic Installation Questions and Answers

Q- Can you provide the distance of this Fiber Run

A- From OPS Room 1220 the conduit extends approximately 180’ to a manhole near the southeast corner of the OPS building. From this manhole the conduit continues 313’ west to a hand hole near Sapper Lane. From this handhole the conduit turns south extending approximately 270’ to a hand hole adjacent to building 204. From here the conduit turns east and extends 252’, entering Annex 242B.

Total length of run is approximately 1,1015 feet. Contractor is responsible for verifying all measurements.

Q-Would the government accept a gel-free rather than gel-filled fiber optic cable?

A- Gel filled fiber cables will only be accepted.