RFI 007 Answered.pdf
PDF 367 KB Posted
- Attached to
- RTI Carpet Replacement Amendment 001 Closed Abstract Posted Federal contract opportunity
- Solicitation number
- W912L8-20-B-0003
About this file
This document contains a request for information and answers related to a federal contract opportunity for carpet replacement at the Regional Training Institute at Camp Dawson in Kingwood, West Virginia. The work includes removing and replacing approximately 63,000 square feet of carpeting, rubber wall baseboard, and carpet transitions across one wing at a time to minimize disruption. The contractor will be responsible for moving and resetting furniture, providing storage for materials on site during work, and disposing of waste. A total small business set-aside applies to the project, which is valued between $500,000 and $1,000,000. Responses to the request for information indicate the contractor will not be provided lodging on base and must provide their own dumpster.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract Construction RTI Carpet.pdf | ||
| RFI 006 Answered.pdf | ||
| RFI 005 Answered.pdf | ||
| RFI 004 Answered.pdf | ||
| Request For Information FORM AMEND 001.pdf | ||
| W912L8-20-B-0003-0001.pdf | ||
| Wage Determinations RTI Carpet 11 SEP 2020.docx | DOCX document | |
| SOW - Original RTI Lodging Carpet Replacement.pdf | ||
| RFI 003 Answered.pdf | ||
| W912L8-20-B-0003 Pre-Bid Sign In Sheet.pdf | ||
| RFI 002 Answered.pdf | ||
| RFI 001 Answered.pdf | ||
| RTI Carpet Drawing to scale.pdf | ||
| W912L8-20-B-0003.pdf | ||
| Request For Information FORM.docx | DOCX document | |
| RTI Carpet JA.pdf | ||
| RTI Carpet Model Drawing.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
9/ 1 412020
SOしICITATION: W912L8-20-B-0003-000 1
JOB T町しE: RTI Ca「pet RepIacement
Camp Dawson Kingwood, VW 26537
Requests for Inf○○mation - Questions and Answers
RF重 擁 �Date �Question �Answer
1. � � �
之. � � �
3。 � � �
4. � � �
与, � � �
6. � � �
7. � � �
8. � � �
9, � � �
10. � � �
11. � � �
1之. �漢書漢書■■
9/17/2020 Will the owners allow contractor to stay in Lodging room in the RTI?
Is owner moving and resetting the furniture?
How many rooms at a time is the owner willing to shutdown for install?
Will there be a storage area for the material and tools provided in one of the rooms?
Will the owner provide a dumpster to dispose of old carpet and other waste?
9/17/2020
9/17/2020
9/17/2020
9/17/2020
Per Camp Dawson SOP, Contractors will not be authorized to stay on Post
Contractor will be responsible to move and reset all furniture
Government will close down one wing at a time for installation. If occupancy allows, more areas will closed as necessary.
When one wing is closed, it is in Maintenance status and within areas of construction. Contractor may store materials in that area but must be moved when wing reopens. No longterm storage is provided.
Contractor will provide dumpster for proper disposal.