W912L7-19-B-5001_QA__8-9.pdf
PDF 161 KB Posted
- Attached to
- Add-Alter Squadron Operations Building 720 Federal contract opportunity
- Solicitation number
- W912L7-19-B-5001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Attendance_Roster.pdf | ||
| 19B5001_Abstract_of_Bids.pdf | ||
| W912L7-19-B-5001_QA__1-7.pdf | ||
| Add-Alter_B720_-_Addendum_1_Spec_28_31_76.pdf | ||
| Add-Alter_B720_-_Addendum_1_Drawings.pdf | ||
| W912L7-19-B-5001-001-Add-Alter_SQ_OPs_B720_Solicitation_Amnd_1.pdf | ||
| Preproposal_Minutes-Slides-Signin_Sheet.pdf | ||
| J&A-ALC_1.pdf | ||
| Add-Alter_B720_-__Addendum_1_Spec_21_13_18.00_10.pdf | ||
| 11_-_BKTZ172003_Drawings_Package_3.pdf | ||
| W912L719B5001_Add-Alter_Sq_Ops_B720_Draft_Solicitation_05-31-2019.pdf | ||
| 10_-_BKTZ172003_Specifications_Package_1.pdf | ||
| 10_-_BKTZ172003_Specifications_Package_3.pdf | ||
| 11_-_BKTZ172003_Drawings_Package_2.pdf | ||
| 11_-_B720_Geotechnical_Report.pdf | ||
| 10_-_BKTZ172003_Specifications_Package_2.pdf | ||
| 11_-_BKTZ172003_Drawings_Package_1.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912L7-19-B-5001
QUESTIONS & ANSWERS 8-9
3 JULY 2019
8. QUESTION- This question is in regards to how the footing is to be constructed. Both sheets 29 and 30 make reference to a concrete stem wall that actually connects the CMU and brick to the footer. Sheet 32, A-502 Detail 6 instructs you to See Structural for footing and foundation details. The actual footing detail on Sheet 17, S-501
Detail 4 makes no mention of a stem wall, and appears to show the CMU sitting directly on the footer. It also seems to show maybe two courses of 4 inch CMU sitting under the brick. Could you please advise on the proper construction of the footer and foundation?
8. ANSWER- The contractor is to build the foundation and bearing walls as shown on the STRUCTURAL drawings, specifically for this inquiry Detail 4 on S-501.
9. QUESTION- Due to the July 4th Week most of the sub-contractors are not available. Is it possible to extend the bid date?
9. ANSWER- Over 40 days have been given to develop bids. Sufficient time has been given to develop bid, bid opening will not be delayed another week. Amendment 1 moved bid due date to 9 July 2019 at 9:00am CST to accommodate 4th of July week.