W912L7-16-Q-1102_QUESTION_AND_ANSWERS_I.pdf
PDF 98 KB Posted
- Attached to
- Video Teleconference Upgrade and Install
- Solicitation number
- W912L7-16-Q-1102
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B801_16-Q-1102_QUESTION_AND_ANSWERS_II_(002)_720_Responses.pdf | ||
| B720_AS_BUILT.pdf | ||
| B720_Equipment_list.pdf | ||
| Symposia_January_edited.pdf | ||
| NASHVILLE_810_2_EOC.dwg | DWG drawing | |
| B810_SOW.pdf | ||
| B720_SOW_CAT_SIPR_VTC.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912L7-16-Q-1102 QUESTION AND ANSWERS I
Building 810
1. Can you provide a spec sheet on the table for this room?
Please See Attached
2. Can you schedule another site visit for an audio evaluation of the ambient noise in this room? Also electrical needs.
Scheduled for the 6th
3. Do you have a room drawing with dimensions?
Please See Attached
4. There was discussion of 2 additional inputs to the system. Is this confirmed? And if so, location & type?
No confirmation of these will continue with the original plans.
Building 720
1. Will Copper or Fiber connections be provided for the Codec?
Fiber
2. Is Mulitpoint software required for the Codec?
No
3. Need to confirm rack location for SIPR equipment. Can you provide floor plan with location?
Can provide floor plan at next site visit. Pending any unforeseen government requirements, cabinet to be installed along left wall (Center).
4. TN ANG will provide power, and connections at rack location?
Yes
5. Do you have a wood sample of the table color for matching?
No sample, can provide color from vendor
6. Do you require fiber isolation on the Input and output video and audio signals of the unclass CODEC when the unclass CODEC is never powered on at the same time as the SIPR CODEC?
A: Unsure, but request a quote for both options
File details come from the government source that posted it. Updated .