B801_16-Q-1102_QUESTION_AND_ANSWERS_II_(002)_720_Responses.pdf

PDF 108 KB Posted

Attached to
Video Teleconference Upgrade and Install
Solicitation number
W912L7-16-Q-1102
Issued by

View the file

Other files

File Type Posted
B720_AS_BUILT.pdf PDF
B720_Equipment_list.pdf PDF
Symposia_January_edited.pdf PDF
W912L7-16-Q-1102_QUESTION_AND_ANSWERS_I.pdf PDF
NASHVILLE_810_2_EOC.dwg DWG drawing
B810_SOW.pdf PDF
B720_SOW_CAT_SIPR_VTC.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912L7-16-Q-1102 QUESTION AND ANSWERS II

Building 810

1. There is quite a bit of ceiling noise in the meeting room. There was discussion of mitigating this with the help of the Guard contractor, and the AV Contractor. Will the AV portion be included in this response?

a. The contractor will be responsible for providing a fully functional VTC. The site visit was very beneficial for those that attended concerning the ambient noise. Please include the AV portion in the proposal.

2. Section 1.1 mentions 12 PC sources and 4 desktop AV connection points. Also, Section 2.1 mentions auto-switching wall plates. Please provide quantity and locations for these sources.

a. There will be 10 laptops on the main desk in the center of the room and 1 laptop on a desk in the back right of the room for the monitor of the meeting. So 11 laptops in total will be connected.

3. What type of connections are to be included in the “Desktop AV Connection Points”?

a. The desktop connection points on the desk will be HDMI connecting to the laptops.

4. Also, the number of listed sources is greater than the number of inputs on the 16x16 matrix that is specified. Please clarify the number of sources or if we should specify a larger matrix.

a. With the amount of computers were connecting will we still need a larger matrix than the current 16x16.

5. Section 2.3 mentions an AMX NI-3100. This product is EOL and has been replaced by the NX-3200. Is this an acceptable substitution?

a. As long as this meets or exceeds the specs of the previous model it will be acceptable.

6. Section 2.3. There is a mention of 4 touch panels, but also states only one is required. How many touch panels are we to provide?

a. Only one touch panel is required for the control of the video wall.

7. Section 2.7 mentions a Converge Pro 840T with built-in telephone hybrid. Will the telephone hybrid functionality be utilized in this system? If so, will there be a POTS line furnished at the rack location?

a. Yes it will and a POTS line will be provided by base COMM.

W912L7-16-Q-1102 QUESTION AND ANSWERS II

Building 720

1. Can we get a line drawing and/or an equipment list for the existing system in Building 720? We need to know what inputs and outputs are available on the current system, as well as to be able to determine if any input or output cards need to be added to accommodate the addition of the codec.

Please see as builts and equipment listing. Govt has not changed any input or output devices from the original design.

2. Multisite license. Section 2.1 mentions “associated control and multisite software options for integration”, but the asked and answered questions mentions that multisite is not required. Please clarify.

For budgetary planning, request that MultiSite licensing be quoted as an option for the NIPR and SIPR codecs.

3. There is mention of a SIPR codec as well as an unclassified codec. Should there be a quantity of (2) SX80’s, or is there an OFE codec we will also be integrating? There was talk on site about an EOL Cisco C40.

Govt requires the capability for VTC on the NIPR and SIPR networks. This project does not intend to replace the existing C40 due to pricing/budgetary requirements.

Government requirement does not specifically require two SX80’s, but will consider all quotes that meet the minimum requirements.

4. What are the physical separation requirements of the secure equipment?

Pending further clarification, 3 meter or approximately 39” of separation will be required between classified/unclassified equipment. Government will provide power and data connection at any location required to accommodate this requirement.