Text version
W912L7-16-B-0002
F7X3186092AW01
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Purpose of this amendment is to include questions and answ ers (1-41) and description of addendum 1 and addendum 1 to section 08800 Glazing, as w ell as including as builts. All other terms and conditions remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 10
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 03-Sep-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912L7-16-B-0002
X 9B. DATED (SEE ITEM 11)
05-Aug-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
03-Sep-2016
CODE
(40) USPFO TN ARNG CONTRACTING
USPFO-TN ARNG PURCHASING & CONTRACTING
PO BOX 41502
NASHVILLE TN 37204-1502
W912L7 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The following have been modified:
SECTION 00010 NOTES
TABLE OF CONTENTS
SOLICITATION, OFFER, AND AWARD SF 1442 and SF 1442 BACK
SECTION 00010 - BID SCHEDULE, NOTES
SECTION 00100 - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
SECTION 00600 – REPRESENTATIONS & CERTIFICATIONS
SECTION 00700 - CONTRACT CLAUSES
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
ATTACHMENT 1 – PLANS AND SPECIFICATIONS
DRAWINGS: PSXE102033 134th ARW Repair Building 406 , 95 Sheets: dated 23 June 2016 SPECIFICATIONS: PSXE102033 134th ARW , totaling 528 pages including inside and outside cover; dated 23 June 2016, Addendum 1 description and Addendum 1 Section 08800 Glazing dated 2 Sept 2016.
SPECIFICATIONS: Division 01, Section 010000 General Requirements
ATTACHMENT 2- WAGE DETERMINATION(S)- to be inserted at award. See section 00100 Notes of solicitation.
SECTION 00010 NOTES
NOTES
1. All questions and requests for information regarding this Invitation For Bids (IFB) must be received NOT
LATER THAN close of business five days prior to bid date in order to minimize the need to extend the bid opening date. Questions shall be emailed to: jonathan.d.forren.mil@mail.mil
2. Offeror’s attention is invited to the insurance requirement contained in this solicitation (Contract Clause FAR
52.228-5). Certification of the required coverage for the prime contractor shall be furnished prior to beginning work on this contract, and the Contracting Officer may request evidence of the required insurance at any time during the life the contract.
3. Reference Contract Clause 252.236-7008, CONTRACT PRICES – BIDDING SCHEDULES (DEC 1991). The prices shown in the Bidding Schedule must reflect ALL costs involved in performing the work, as described in the plans and specifications.
4. The term “Bidding Schedule” shall also be construed to mean “Offer Schedule” or “Schedule”. The terms “bid” and “offer”, and “bidder” and “offeror” shall be construed as having the same meaning in this solicitation and resulting contract.
5. All information relating to this IFB, including pertinent changes/amendments and information will be posted on web site: http://www.fbo.gov.
6. Facsimile transmission of bid is not authorized.
7. Government reserves the right to include additive bid items taken at time of award in the Base CLIN to facilitate and simplify schedule and payment processing.
8. All information relating to this IFB, including pertinent changes/amendments and information will be posted on web site: http://www.fbo.gov. For security reasons, all potential offerors, plan rooms and printing companies are required to be registered in the GSA System for Award Management (SAM) database. Firms can register via the SAM internet site at https://www.sam.gov/portal/public/SAM/. Interested bidders are required to submit their representations and certifications at the same site. You will need your DUNS number and MPIN in order to log in to the Online Representations and Certifications Application (ORCA) website. The solicitation and associated information and the plans and specifications will be made available only from the Federal Business Opportunities (FedBizOpps) website on-line at https://www.fbo.gov/
9. FedBizOpps is a web-based dissemination tool designed to safeguard acquisition-related information for all
Federal agencies. Interested bidders/offerors must register with FedBizOpps before accessing the system.
FedBizOpps registration requires the following information: 1) Central Contractor Registration (CCR) Marketing Partner Identification Number (MPIN), 2) DUNS Number and CAGE Code, 3) Telephone Number,
4) Email address. Registration instructions can be found on the FedBizOpps website at https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf. Contractors who do not already have a MPIN are advised that the normal processing is 15-30 business days to obtain a MPIN password that will give them access to the plans and specifications, which are located in the controlled access location on FBO. (PLAN ACCORDINGLY). Reference paragraph 4.4 of the Vendor Guide for instructions to retrieve the specification and drawing documents for this project. DISCLAIMER: The official plans and specifications are located on the official government webpage and the Government is not liable for information furnished by any other source.
Amendments, if/when issued will be posted to https://www.fbo.gov/ for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offerors responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible due to various reasons. Reference paragraph 4.7 of the Vendor Guide for instructions to obtain a MPIN to retrieve the specification and drawing documents. Bidders/offerors who have registered with FedBizOpps must access the data for this solicitation with their MPIN. Bidders/Offerors cannot log into the FedBizOpps home page and search for data
10. RESERVED
11. RESERVED
12. A complete bid package must contain the following:
(a) Offer, Standard Form (SF) 1442 front and back signed
(b) Section 00010 Line Items- all items must be priced
(c) A valid Bid Bond. Standard Form 24.
(d) Section 00600, Representations and Certifications, completed and return only additional certifications found in this section In addition, the offeror must have entered current and complete data within the past year in Online Representations and Certifications (ORCA), is http://orca.bpn.gov.
(e) When completing the “Offeror” portion of the SF 1442 (Blocks 14 – 20), an official having the authority to contractually bind the company must sign the SF 1442 in accordance with FAR 4.102.
One copy of the SF1442 is required to have an original signature.
(f) All amendments to the solicitation must be acknowledged.
(g) Mark the front of the envelope with the following: “BID No. W912L7-16-B-0002”, and the Name and
Address of Bidder. See Block 13A of SF 1442 for required number of copies.
13. A single award is contemplated. Prospective bidders must bid on all items to be considered for award. See explanation of how low bid will be determined in section 00100 of the solicitation.
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been added by full text:
QUESTIONS AND ANSWERS
1. Spec 12492 Horizontal Louver Blinds
There is no product data regarding blinds (slat size, manufacturer, etc), only that Sunland Shutters – Polycore Shutters are to be the manufacturer.
a) Please advise if horizontal louver blinds are to be included or if Poly plantation shutters are to be included?
b) If blinds, please advise at minimum, a general spec (1” aluminum, 2” aluminum, 2” faux wood blinds, etc)
c) If shutters, will alternate manufacturer’s be accepted?
1. Answer:
o Basis of design is Polycore Shutters as manufactured by Sunland Shutters. Requirements are as follows:
Co-extruded aluminum reinforced louvers, rails & stiles Self-tensioned louver pins (no tension screws) Flame spread and smoke developed rating of Class A Registered Flame Resistant Product (F-59401) Moisture resistant Non-corrosive Assembled with screws for superior strength (not glued together) All finishes contain no lead Water based paint for shutter coating meets all US AQMD requirements with a
VOC rating of zero or near zero. The top coat shall have a VOC rating of virtually zero
Paint contains UV inhibitors 100% recyclable and can be recycled to product other PVC products GREENGUARD Indoor Air Quality Certified GREENGUARD Children & Schools Certified 3½” wide louvers Wall mounted frame with powder coat All Polycore Shutter materials & components shall be from a single source Final color selections to be approved by the Government during the submittal process. Color shall be Pearl White Panels hinge mounted to the frame One piece casing around opening o Regarding product substitutions:
Insert paragraph 1.7 to specification section 01300 reading as follows: “1.7 SUBSTITUTIONS
A. Should the Contractor wish to substitute some product other than the one specified, Contractor shall request permission in writing from the Contracting Officer giving the following information in a letter of request:
1. The name, manufacturer, model number, and shop drawings/submittal for the specified product;
2. The name, manufacturer, model number, and shop drawings/submittal date for the product the Contractor wishes to substitute; and
3. Complete descriptive and specification data illustrations, etc., of the product the Contractor wishes to substitute and the reasons for the substitution.
B. The burden of proof shall rest with the Contractor to prove to the satisfaction of the Contracting Officer that the proposed substitute is equal to the specified material or article. Decisions made concerning equivalency on other projects shall not be considered as precedents; and, shall have no bearing on the question of equivalency for this project.”
Spec Section 01600 para 1.5 A.2. states "References to approved equal or similar terms mean that approval of the Contracting Officer is required. It shall be the sole responsibility of the Contractor to provide a comparative matrix for products proposed which are not manufacturers named in the contract documents. No evaluations of potential equal products shall be made during the bidding process."
Spec Section 01600 para 1.6 A. 1-2 states " Wherever in the specifications or on the drawings a material or article required is specified or shown by using the name of a proprietary product of a manufacturer or vendor, the item named is intended to set standard of design, substance, performance, and quality for such material or article. Contractor may propose equal substitutions for all products called for in any section of this specification, whether or not the section so states, and is encouraged to do so when a substitution would result in a savings to the Government with no sacrifice of quality or design intent."
2. Does drywall on new furring or new metal studs need to go to deck or just above ceiling?
2. Answer: Run to metal deck
3. 136A calls for type H door. Please define type H door.
3. Answer: Replace door type designation “H” with “F”
4. Was the intent to have furring and gyp in bedrooms. Details 1/A7/1 and 1/A7.2 do not call it out, but it looks like it is drawn on A1.1, etc.
4. Answer: Yes. (1) layer 5/8” impact resistant gyp board up to 4’ AFF and 5/8” gyp board above. 1½” furring channel at 16” OC to be installed vertically to the maximum extent possible.
5. Is there any hazardous material/abatement in this project.
5. Answer: There are no known hazardous materials that require abatement as a part of this project
6. The following door show demo of door only, frame remaining, but on the door schedule A8.1, the frames are not listed as existing. 102A, 102B, 203A, 204A, 205A, 303A, 304A, 305A
6. Answer: Replace doors only for doors labeled 102A, 103A, 203A, 204A, 206A, 303A, 304A and 305A. New door and frame for door labeled 205A. No door is labeled or scheduled for door 102B
7. Spec 12492 Horizontal Louver Blinds: There is no product data regarding blinds (slat size, manufacturer, etc), only that Sunland Shutters – Polycore Shutters are to be the manufacturer.
Please advise if horizontal louver blinds are to be included or if Poly plantation shutters are to be included?
If blinds, please advise at minimum, a general spec (1” aluminum, 2” aluminum, 2” faux wood blinds, etc)
If shutters, will alternate manufacturer’s be accepted?
7. Answer: See response #1
8. Please confirm who will be responsible for moving the furniture out of the building.
8. Answer: All of the furniture will be removed prior to the NTP
9. If the alternate is accepted and the gypsum and insulation are removed from the building, is there anything else left in the building that can sustain water damage while the roof is temporarily off?
9. Answer: It will be the contractor’s responsibility to protect the building from water damage including potential moisture problems, mold, etc resulting from water entering the building. No additional compensation will be made for moisture problems that result from moisture getting into the building during construction. Particular attention should be paid to the electrical panels in the building, all other finishes are scheduled for demolition.
10. The door schedule on A8.1 calls for Full Glass Aluminum doors, but the spec 08120 is for Flush Aluminum doors. Which is correct?
10. Answer: Provide full glass aluminum doors as specified in section 08120.
QUESTIONS 11-18 REFERING TO CABINETS:
11. On the finish schedule it has a manufacturer for the cabinets as being “S&W Cabinets Inc.” (looks like wood stained) golden Hickory (not sure what that is – maybe a stain color)
11. Answer: S&W Cabinets Inc. is a manufacturer and “Golden Hickory” is one of the stain colors available.
Contractor shall submit color samples for final selection by the Government
12. The Specs are vague as to what is acceptable. It makes reference that they want only 1) manufacturer to be involved.
12. Answer: Spec section 06410 provides specific requirements for the quality of the components. Contractor may select a manufacturer that provides the same or better quality than the basis of design.
13. These are not “Box Type Cabinets”. There’s no such configuration.
13. Answer: There is no reference to Box Type Cabinets
14. Are these Wood face frame cabinets (typically not seen in this commercial type usage)?
14. Answer: Yes
15. They are asking for 5) knuckle hinges which wouldn’t be able to mount to the edge of a face frame type cabinet very well.
15. Answer: The 5 knuckle institutional hinge specified will mount to the cabinetry. It is ANSI/BHMA 156.9 grade 1 compliant. Provide industry standard 2-3/4” five knuckle hinge
16. Will they accept frameless?
16. Answer: No
17. Would they accept wood grained laminate with 3mm edging (very durable and easier to keep clean)?
17. Answer: No
18. There is a plastic laminate listed in specs but it is only shown on the vanities. Is this correct?
18. Answer: Yes, on the under sink cabinet in standard rooms and the under sink apron in the accessible rooms
19. On A6.3, Storage room 304 has the hash mark for ACT but it says "Open". Please clarify which one to use.
19. Answer: Install the suspended acoustic tile & grid system at 8’-0”. The open is for the roof hatch
20. Questions pertaining to the roof on the walkway between the buildings and the stairs on the West end (see attached drawing)
a. AD5.1 note 17 says to demo the standing seam metal roof and trim in these areas. A2.1 points this same roof out as "to remain" and A5.1 points at the center area roof as "to remain". Please clarify which is correct.
b. If this roof is to be replace in base bid, are we removing and replacing the sheathing and the underlayment?
c. AD5.1 ABI#1 does not say to remove existing metal trusses in these areas but on ABI#1 on S1/4, these areas are shown as having new trusses. If we remove the trusses, then the metal panel ceiling would have to be removed and A6.3ABI#1 labels it as existing. Please clarify.
d. In ABI#1, are we removing and replacing the sheathing and underlayment?
e. Some detail on 2/A4.2 call for 1/2" CDX plywood sheathing and 4/A4.2 calls for 3/4" Fire Rated plywood sheathing. Please clarify which one to use.
20. Answer:
a. Roof to Remain
b. Roof to Remain
c. If ABI#1 is accepted, then new trusses would be provided and aluminum soffit panels beneath replaced.
This will include accommodating existing can lights
d. See Note #16 & #17 sheet AD5.1 – ABI#1
e. Use ½” CDX plywood at those locations. ¾” plywood to remain as roof sheathing
21. Specs call for mineral fiber insulation in metal stud walls, plans do not specify what metal stud walls insulate other than a W8-A. Please clarify what metal walls insulate and also what walls in AB1#1 would need insulation.
21. Answer: The mineral fiber insulation is an acoustic batt. It will be installed in interior walls labeled W6-
A, W6-B AND W4-A
22. I have not found any sort of water tight system to protect the 1 story elevator equipment room. Please clarify how this room with be covered.
22. Answer: It is covered by the concrete floor slab of the main level. Reference wall section 2/A4.2
23. What type of material is to be used for the 5/8" sheathing on 3/A5.1AB1#1?
23. Answer: Use exterior gypsum board sheathing
24. There is a note at the bottom right of A7.2 that reads At Interior base edges: Schluter-dilex-eke profile, Finish as approved. My confusions lies in that the base for the floor product is coved. This schluter product is normally used when there is no base and we cut tile for base. Basically these two have the same function?
24. Answer: The Schluter “EKE” base trim is used in the shower stall only and the standard tile cove base outside the shower stall.
25. PB on A1.0, A0.2 and A0.3 implies an automatic door but I could not find one on the door schedule.
Please clarify.
25. Answer: Doors are opened automatically with ABA pushbutton. Contractor shall add a door opener device to the hardware set. Power shall be provided as required.
26. Detail 9/A5.2 shows an empty space between the blocking and the underlayment on the side. What is in this space? See attached. Where is this detail called out?
26. Answer: 2x Pressure Treated wood blocking
27. Note 1 on FP1.1 says to paint concealed piping, but painting schedule note 11 says not to paint concealed piping. Please clarify.
27. Answer: Fire sprinkler piping is required to be painted. Note 11 in spec 09900 Painting and Coatings addresses typical pipes, ducts, etc.
28. Mechanical drawings show new exhaust louvers but the building elevations do not show them. Will these require a W7-A wall patch similar to other patches?
28. Answer: Yes. Contractor shall patch all holes left by demolition of any type with wall section to match wall schedule
29. No note to demo existing communications but it looks like we are providing new. Please clarify.
29. Answer: all existing communications items shall be demolished back to the service entrance
30. C1.1 shows 4" and 6" HDPE lines to connect the downspouts, but there are no downspouts in the base bid.
Should this work only be included in ABI#1?
30. Answer: The underground storm sewer on C1.1 shall be included as part of ABI #1. Note that there is an additional downspout location on the south stairwell of Dorm 406B that is not shown on C1.1. This downspout shall be taken underground and routed plan south to the new 4” HDPE storm.
31. Presumably all questions won't get answered until Friday afternoon. Considering this is a holiday weekend, can the bid date be moved to Thursday 9/8?
31. Answer: Bid Opening has been moved to Thursday, 09/08/2016 at 1 PM Central
32. Is it possible to get as-builts on Building 406?
32. Answer: The contractor is provided the building reference drawings. These are provided as information only and are not to be considered as representing as-built conditions. The Government shall not be responsible for discrepancies between these drawings and actual existing building conditions. Contractor shall be responsible for field verification.
33. Please provide a detail section of the soffits on the exterior stairwells.
33. Answer: See the reference drawings
34. Please provide a detail section of the center stairwell/walkway where the two roofs overlap each other.
34. Answer: See the reference drawings
35. In Rm 135, the open air mechanical room there is a set of pipes along the wall where we would be cutting for the new opening. What is currently in this pipe and where would we need to move it to? See attached photo.
35. Answer: This communication piping will be intercepted and re-routed to accommodate the new door opening. See Note F on IT2.1 and Detail A1 on IT4.1
36. In Section 00010, Item 3 is for Communications. Are you asking for the price for communications separate from the base bid?
36. Answer: YES. However this will be evaluated along with base bid. Only ABI for roof will be additive.
37. In Section 00010, item 4 Contractor Manpower Reporting. Are we suppose to fill anything in here? If so, please clarify what you are looking for?
37. Answer: Instructions in line item 0004 specifically state that you will report manpower through the ECMRA. If you charge for this service, then include on your bid. Once again, this is not an ABI and will part of base bid evaluation.
38. In Section 00010, 12, (d) mentions ORCA website. I believe this website is no longer used. Is this the information in SAM?
38. Answer: SAM.gov is the site.
39. I don't see the Bid Bond Standard Form 24. Please supply the form or direct me to it.
39. Answer: http://www.gsa.gov/portal/forms/download/115982
40. Question 26 did not get fully answered. Where is detail 9/A5.2 called for on the drawings? I can't figure out where this detail occurs on the building.
40. Answer: Detail 1/A4.1 ABI#1 includes a reference to the Roof Detail 3/A5.1 ABI#1 which is incorrect.
This detail reference shall be changed to detail 9/A5.2
41. Note 5 on sheet S1.4 tells us that existing walkway roof framing is to be removed and replaced. New framing is to be attached to the existing structure in a similar manner to existing or current attachment.
Response 20c clarifies that if ABI#1 is accepted we are to provide new roof trusses and soffets at existing exterior walkways and stairs
Responses 33 & 34 refers us to the "building reference drawings" for details of new work associated with the cladding the new roof trusses and soffets at exterior walkways and stairs.
These directives indicate that the existing construction is to be removed and replaced with new roof trusses and cladded using the same details from the original design.
However, the "building reference drawings" provided show steel roof purlins, not trusses in these locations.
Reference the following sheets from the "building reference drawings" S2.3, S4.2, A6.2.
It is not possible to remove steel roof purlins, replace them with light gauge trusses and attach them in a similar manner using the same cladding details.
Please clarify further.
41. Answer: this response overrides all previous bid question responses related to this question
Base Bid: the existing standing seam metal roof shall remain ABI #1: demolish the existing standing seam metal roof & insulation. Install new 1½” batt insulation, new HT underlayment and new standing seam metal roof. The existing purlins shall remain.
(End of Summary of Changes)