Pre-Bid_Questions_11-31.pdf

PDF 27 KB Posted

Attached to
134th ARW Repair Building 406
Solicitation number
W912L7-16-B-0002
Issued by

View the file

Other files

File Type Posted
Addendum_02_Description.pdf PDF
W912L7-16-B-0002-0004.pdf PDF
Pre-Bid_Questions_40-41.pdf PDF
Addendum_01_Description.pdf PDF
W912L7-16-B-0002-0003.pdf PDF
Addendum_1_-_08800_BSD-Glazing.pdf PDF
Pre-Bid_Questions_11-31_Existing_roof_trusses_to_remain.pdf PDF
24 S2.1 Foundation floor Plans - Lower Level Bldg A B.pdf PDF
48 E1 Electrical Site Plan.pdf PDF
49 E2 Electrical Plans bldg A.pdf PDF
7 A2.2 Floor Plans Main Level Bldg A B.pdf PDF
33 P3 Plumbing Plans Upper Level.pdf PDF
19 A6.2 Miscellaneous.Details.pdf PDF
13 A3.1 Bldg Elevations.pdf PDF
46 MP3 HVAC Piping Upper Level.pdf PDF
29 S4.2 Sections Bldg A B.pdf PDF
44 MP1 HVAC Piping Lower Level.pdf PDF
10 -A2.5 Reflected Ceiling Plans Lower Level Bldg A B.pdf PDF
2 - A0.2 Sheet Index Miscellaneous.pdf PDF
40 M4 Enlarged Plans.pdf PDF
31 P1 Plumbing Plans Lower Level.pdf PDF
4 A1.2 Rough Grading Plan.pdf PDF
5 A1.3 Landscape Plan.pdf PDF
27 S2.4 Roof Plans Bldg A B.pdf PDF
45 MP2 HVAC Piping Main Level.pdf PDF
11 A2.6 Reflected Ceiling Plans Main Level Bldg A B.pdf PDF
1 - SU1 Site Utilities Plans Details.pdf PDF
3 A1.1 Site Plan.pdf PDF
26 S2.3 Floor Plans - Upper Level Bldg A B.pdf PDF
8 A2.3 Floor Plans Upper Level Bldg A B.pdf PDF
21 A7.2 Door Schedules.pdf PDF
22 A7.3 Room Finish Schedules.pdf PDF
Pre-Bid_Questions_32-39.pdf PDF
35 P5 Enlarged Plans Diagrams.pdf PDF
9 A2.4 Roof Plans.pdf PDF
32 P2 Plumbing Plans Main Level.pdf PDF
43 M7 HVAC Details Schedules.pdf PDF
12 A2.7 Reflected Ceiling Plans Upper Level Bldg A B.pdf PDF
39 M3 HVAC Plans Upper Level.pdf PDF
15 A4.1 Wall Sections Details.pdf PDF
38 M2 HVAC Plans Main Level.pdf PDF
34 P4 Enlarged Plans Riser Diagrams.pdf PDF
20 A7.1 Door Schedules.pdf PDF
25 S2.2 Foundation Floor Plans - Main Level Bldg A B.pdf PDF
50 E3 Electrical Plans bldg B.pdf PDF
30 S4.3 Sections Bldg A B.pdf PDF
41 M5 HVAC Schedules.pdf PDF
18 A6.1 Miscellaneous.Details.pdf PDF
6 A2.1 Floor Plans Lower Level Bldg A B.pdf PDF
37 M1 HVAC Plans Lower Level.pdf PDF
Show 40 more

Latest 50 of 70 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS 11-18 REFERING TO CABINETS:

11. On the finish schedule it has a manufacturer for the cabinets as being “S&W Cabinets Inc.” (looks like wood stained) golden Hickory (not sure what that is – maybe a stain color)

11. Answer: S&W Cabinets Inc. is a manufacturer and “Golden Hickory” is one of the stain colors available.

Contractor shall submit color samples for final selection by the Government

12. The Specs are vague as to what is acceptable. It makes reference that they want only 1) manufacturer to be involved.

12. Answer: Spec section 06410 provides specific requirements for the quality of the components. Contractor may select a manufacturer that provides the same or better quality than the basis of design.

13. These are not “Box Type Cabinets”. There’s no such configuration.

13. Answer: There is no reference to Box Type Cabinets

14. Are these Wood face frame cabinets (typically not seen in this commercial type usage)?

14. Answer: Yes

15. They are asking for 5) knuckle hinges which wouldn’t be able to mount to the edge of a face frame type cabinet very well.

15. Answer: The 5 knuckle institutional hinge specified will mount to the cabinetry. It is ANSI/BHMA 156.9 grade 1 compliant. Provide industry standard 2-3/4” five knuckle hinge

16. Will they accept frameless?

16. Answer: No

17. Would they accept wood grained laminate with 3mm edging (very durable and easier to keep clean)?

17. Answer: No

18. There is a plastic laminate listed in specs but it is only shown on the vanities. Is this correct?

18. Answer: Yes, on the under sink cabinet in standard rooms and the under sink apron in the accessible rooms

19. On A6.3, Storage room 304 has the hash mark for ACT but it says "Open". Please clarify which one to use.

19. Answer: Install the suspended acoustic tile & grid system at 8’-0”. The open is for the roof hatch

20. Questions pertaining to the roof on the walkway between the buildings and the stairs on the West end (see attached drawing)

a. AD5.1 note 17 says to demo the standing seam metal roof and trim in these areas. A2.1 points this same roof out as "to remain" and A5.1 points at the center area roof as "to remain". Please clarify which is correct.

b. If this roof is to be replace in base bid, are we removing and replacing the sheathing and the underlayment?

c. AD5.1 ABI#1 does not say to remove existing metal trusses in these areas but on ABI#1 on S1/4, these areas are shown as having new trusses. If we remove the trusses, then the metal panel ceiling would have to be removed and A6.3ABI#1 labels it as existing. Please clarify.

d. In ABI#1, are we removing and replacing the sheathing and underlayment?

e. Some detail on 2/A4.2 call for 1/2" CDX plywood sheathing and 4/A4.2 calls for 3/4" Fire Rated plywood sheathing. Please clarify which one to use.

20. Answer:

a. Roof to Remain

b. Roof to Remain

c. If ABI#1 is accepted, then new trusses would be provided and aluminum soffit panels beneath replaced. This will include accommodating existing can lights

d. See Note #16 & #17 sheet AD5.1 – ABI#1

e. Use ½” CDX plywood at those locations. ¾” plywood to remain as roof sheathing

21. Specs call for mineral fiber insulation in metal stud walls, plans do not specify what metal stud walls insulate other than a W8-A. Please clarify what metal walls insulate and also what walls in AB1#1 would need insulation.

21. Answer: The mineral fiber insulation is an acoustic batt. It will be installed in interior walls labeled W6-

A, W6-B AND W4-A

22. I have not found any sort of water tight system to protect the 1 story elevator equipment room. Please clarify how this room with be covered.

22. Answer: It is covered by the concrete floor slab of the main level. Reference wall section 2/A4.2

23. What type of material is to be used for the 5/8" sheathing on 3/A5.1AB1#1?

23. Answer: Use exterior gypsum board sheathing

24. There is a note at the bottom right of A7.2 that reads At Interior base edges: Schluter-dilex-eke profile, Finish as approved. My confusions lies in that the base for the floor product is coved. This schluter product is normally used when there is no base and we cut tile for base. Basically these two have the same function?

24. Answer: The Schluter “EKE” base trim is used in the shower stall only and the standard tile cove base outside the shower stall.

25. PB on A1.0, A0.2 and A0.3 implies an automatic door but I could not find one on the door schedule. Please clarify.

25. Answer: Doors are opened automatically with ABA pushbutton. Contractor shall add a door opener device to the hardware set. Power shall be provided as required.

26. Detail 9/A5.2 shows an empty space between the blocking and the underlayment on the side. What is in this space? See attached. Where is this detail called out?

26. Answer: 2x Pressure Treated wood blocking

27. Note 1 on FP1.1 says to paint concealed piping, but painting schedule note 11 says not to paint concealed piping. Please clarify.

27. Answer: Fire sprinkler piping is required to be painted. Note 11 in spec 09900 Painting and Coatings addresses typical pipes, ducts, etc.

28. Mechanical drawings show new exhaust louvers but the building elevations do not show them. Will these require a W7-A wall patch similar to other patches?

28. Answer: Yes. Contractor shall patch all holes left by demolition of any type with wall section to match wall schedule

29. No note to demo existing communications but it looks like we are providing new. Please clarify.

29. Answer: all existing communications items shall be demolished back to the service entrance

30. C1.1 shows 4" and 6" HDPE lines to connect the downspouts, but there are no downspouts in the base bid.

Should this work only be included in ABI#1?

30. Answer: The underground storm sewer on C1.1 shall be included as part of ABI #1. Note that there is an additional downspout location on the south stairwell of Dorm 406B that is not shown on C1.1. This downspout shall be taken underground and routed plan south to the new 4” HDPE storm.

31. Presumably all questions won't get answered until Friday afternoon. Considering this is a holiday weekend, can the bid date be moved to Thursday 9/8?

31. Answer: Bid Opening has been moved to Thursday, 09/08/2016 at 1 PM Central