32. Is it possible to get as-builts on Building 406?
32. Answer: The contractor is provided the building reference drawings. These are provided as information only and are not to be considered as representing as-built conditions. The Government shall not be responsible for discrepancies between these drawings and actual existing building conditions. Contractor shall be responsible for field verification.
33. Please provide a detail section of the soffits on the exterior stairwells.
33. Answer: See the reference drawings
34. Please provide a detail section of the center stairwell/walkway where the two roofs overlap each other.
34. Answer: See the reference drawings
35. In Rm 135, the open air mechanical room there is a set of pipes along the wall where we would be cutting for the new opening. What is currently in this pipe and where would we need to move it to? See attached photo.
35. Answer: This communication piping will be intercepted and re-routed to accommodate the new door opening. See Note F on IT2.1 and Detail A1 on IT4.1
36. In Section 00010, Item 3 is for Communications. Are you asking for the price for communications separate from the base bid?
36. Answer: YES. However this will be evaluated along with base bid. Only ABI for roof will be additive.
37. In Section 00010, item 4 Contractor Manpower Reporting. Are we suppose to fill anything in here? If so, please clarify what you are looking for?
37. Answer: Instructions in line item 0004 specifically state that you will report manpower through the ECMRA. If you charge for this service, then include on your bid. Once again, this is not an ABI and will part of base bid evaluation.
38. In Section 00010, 12, (d) mentions ORCA website. I believe this website is no longer used. Is this the information in SAM?
38. Answer: SAM.gov is the site.
39. I don't see the Bid Bond Standard Form 24. Please supply the form or direct me to it.
39. Answer: http://www.gsa.gov/portal/forms/download/115982 http://www.gsa.gov/portal/forms/download/115982