Company Surveillance Plan for (requirements adjusted for each contract) Page ___ of___ QASP for
Contractor:
Contract Number:
Construction, Services or Supplies Contractor is to Provide: Architect and Engineering
COR Name:
Date:
Standard Language / Specific PWS Requirement
Requirement Link Method of Surveillance
Frequency Performed by Whom?
Accepta ble Quality Level
Was the Requireme nt Met?
Yes or No/ Date completed
Comments/ Remarks to Contracting Officer iWATCH Training
Has the Contractor provided iWATCH training to all personnel within 30 calendar days of contract award?
http://www.tradoc.army .mil/pao/Web_specials/ iWATCH_2010/index.
html http://www.myarmyone source.com/familyprogr amsandservices/iwatch program/default.aspx http://www.myarmyone source.com/cmsresourc es/Army%20OneSourc e/Family%20Programs %20and%20Services/i Watch%20Program/Sel f- Help_Guide_Antiterrori sm_Sep_2010.pdf
Training report from the prime contractor
One time at mbeginning of contract within 30 calendar days of contract award (new contract employees)
Performed by Contractor & sent to COR NLT 5 calendar days after completion by all contract employees.
100%
Standard Installation or Facility Access
AF131-601
AR715-30
DFARS209.104-1
Executive Order 12829 (Reference (d)) and paragraph
3.2. of DoD Directive 5220.22
Has the contractor followed installation or facility access procedures?
N/A Incident Reporting
Once a month
Performed by Contractor Reviewed by
COR
No more than one incident every six months.
Company Surveillance Plan for (requirements adjusted for each contract) Page ___ of___ QASP for
Contract Number:
Construction, Services or Supplies Contractor is to Provide: Architect and Engineering
AT level 1 training
AR715-30
FAR 52.204,
FAR52.204 AltI or AltII provided AT level 1 training to all personnel within 30 calendar days of contract award?
https://atlevel1.dtic.mil/ at.
Training Certificates submitted by Contractor
One time
Performed by Contractor Reviewed by
COR
Information Assurance / Information technology training
DFARS 224.103,
DoD 5400.11/ 52.204-9
DFARS 252.239-
7001 IA for contractors
Has the contractor required all personnel complete the DoD IA awareness training?
DoD IA awareness training at the Fort
Gordon site.
https://ia.signal.army.m il/DoDIAA/default.asp
Training Certificates submitted by Contractor
Within 30 calendar days of contract award and then
ANNUALLY
Performed by Contractor Reviewed by
Company OPSEC SOP/Plan Army Regulation 530-1, Operations Security and
AR 380-5
52.204-2 Alt I or II or III
DFARS252.204-
7000Disclosure of Information supplied a company SOP Plan for review within 15 days and approved by 30 days?
Information to aid Contractor (not inclusive):
http://www.armystudyg uide.com/content/army _board_study_guide_to pics/security_and_intell igence/an-operational-security-o.shtml http://www.opsecprofes sionals.org/training/basi c_training.rar http://www.opsecprofes sionals.org/training/OP SEC_Training.pdf http://www.opsecprofes sionals.org/training/DO C_OPSEC.ppt http://www.defencetalk.
com/army-releases-new-opsec-regulation- 11152/
One Final Draft approved
OPSEC
SOP/Plan submission by Contractor within 15 days award for draft and approved by 30 days
Performed by Contractor Reviewed by
COR/KO/ AT LI
approver
E-Verify 52.222-54
EXECUTIVE
ORDER 12989 with
DFARS
252.212-7001 (dev) supplied proof of contract employee submissions and or contractor enrollment?
http://www.uscis.gov/U SCIS/Verification/E- Verify/E- Verify%20from%20Co ntrolled%20Vocabulary /FAR_Supplemental_G uide_REVISED_FINA L.pdf
Verification employee Submissions
One time at beginning of contract within 30 calendar days of contract award (new contract employees) and or Company
Performed by Contractor Reviewed by
Company Surveillance Plan for (requirements adjusted for each contract) Page ___ of___ QASP for
Contract Number:
Construction, Services or Supplies Contractor is to Provide: Architect and Engineering submittal.
Finger printing, and NAC for Contractor Verification System.
A) HSPD-12
Implementation Guidance for Federal Departments and Agencies
B) HSPD-12 Policy for a Common Identification Standard for Federal Employees and Contractors
C) DoD Directive 5200.2-R supplied outcome of contract employee Finger printing, and company filled out NAC information before issuance of network access?
http://www.opm.
gov/e-qip/
Letter/ email supplied from contractor addressing each contractor.
Copy of finger prints
One time at beginning of contract within 30 calendar days of contract award (new contract employees) Prior to CVS application!
Performed by Contractor Reviewed by
Contractor Manpower Reporting (CMR) – Performed by Contract Employer (company).
Army Regulation 25-2 completed Contactor Manpower Reporting
Technical Specification 9.0 https://contractorm anpower.army.pen tagon.mil https://cmra.army.
mil/Login.aspx http://www.asamra .army.mil/scra/doc uments/ProductSer viceCodes.pdf https://cmra.army.
mil/
Data is input by Contractor by October 1 after the fiscal year services were provided. Input will not be later than 31 October every contracting period that is applicable.
Annually by October 1 every year
Performed by Contractor Reviewed by
Federal Funding Accountability and Transparency Act (FFATA) and
Subcontracting completed
FFATA
requiremetns?
https://www.FSRS.
gov www.esrs.gov
Register and update as applicable for awards over $25000.
Within 30 days of Award
Performed by Contractor
Reviewed by
Company Surveillance Plan for (requirements adjusted for each contract) Page ___ of___ QASP for
Contract Number:
Construction, Services or Supplies Contractor is to Provide: Architect and Engineering
Note: Updated information and web links may be available; your company is responsible for the updated information needed by law, act, regulation and by this contract. Reporting to the Contracting Officer’s Representative (COR) and Contracting Officer is a requirement to be completed in a timely manner.
End of Company Surveillance sheet