Date: RFI No.

RFP Reference (Sect/Para/Page) QUESTION GOVERNMENT RESPONSE

3/4/2019 1 Please clarify line item number 9 in the SOW? Which utilites must be located by the contractor.

1. See new line item #9 in the SOW below.

The contractor is responsible for marking and locating all underground utilities. All base underground utilities are not covered by the Call OKIE service. The only utilities that Call OKIE service will mark is Natural gas and Cox communications. All other utilities to include base communications fiber optic lines, electric, sewer and water will be the contractor’s responsibility to mark.

Contractor must have all utilities marked in an area before a dig permit is issued. If a utility is damaged, the contractor will repair per current code specifications if it is shown on the base utility maps or it is the PIV circuit for the building.

3/4/2019 2 There was difficulty getting a vistors pass at the east gate at the time of the site visit. Is there any way to expedite the process.

Yes, please pre enroll in the DBIDS system.

https://dbids-global.dmdc.mil/enroll#!/

3/4/2019 3 Your striping does not have handicap spots. Is this correct?

No, the spot to the south of the hatched area of the walkway shall be a handicapped spot. The spot shall have the handicapped symbol painted on the concrete and have a sign on the curb standard to a lot of our sinage on base designating other reserved spots.