Text version

147th Reconnaissance Wing FWJH152260 Ellington Field JRB, Houston, TX 1056 – Renovate for SG/DSI/HG

Page 1 of 6 22 July 2016

STATEMENT OF WORK:

A. Furnish all investigations, engineering, design, materials, equipment and supervision necessary to complete the scope of work as described and specified below to renovate Building 1056 for State Guard, DSI, and Honor Guard.

PART 1 GENERAL:

1.1. All work performed under this contract must be in accordance with the general conditions and technical specifications provided.

A. The Contractor shall abide by the General Condition which is a part of this Scope of Work and the templates can be provided by the Base Civil Engineer.

SECTION DESCRIPTION

01001 Ellington Field General Requirements 01019 Contract Considerations 01039 Coordination and Meetings 01105 Hazardous Material Procedures 01300 Submittals 01400 Quality Control 01420 Environmental Protection 01430 Operation and Maintenance Data 01600 Material and Equipment 01640 Manufacturer’s Services 01650 Start of Systems 01700 Contract Closeout AF 3000 Material Submittal Form AF 3052 Construction Cost Estimate Policy Letter Contractor/Visitor Access Procedures SF 1413 Statement and Acknowledgment Texas ANG Transmittal of Shop Drawing, Equipment Data Material Samples, or Material

Certificate of Compliance

B. The Contractor shall abide by the Technical Specifications which are a part of this Scope of Work and may be obtained from the Contracting Officer.

SECTION DESCRIPTION

02221 Building Demolition 06100 Rough Carpentry 06402 Interior Architectural Woodwork 08211 Flush Wood Doors 08305 Access Doors 08710 Door Hardware 09255 Gypsum Board Assemblies

Page 2 of 6 22 July 2016

09310A Ceramic tile 09310B Porcelain Tile 09651 Resilient Tile Flooring and Accesories 09680 Carpet 09900 Painting 10155 Toilet Compartments 10801 Toilet Room Accessories 15440 Plumbing Fixtures

1.2. DESIGN STANDARDS, CODES AND CRITERIA: As required, but not limited to:

The design shall comply with the base specific General Design Guidelines and the Architectural Compatibility Guidelines of that base.

Specific codes, standards and criteria referenced throughout this Statement of Work (SOW).

Where there is a conflict between the SOW and building codes, the most stringent shall apply.

When codes are in conflict, the most stringent shall apply. This list is not intended to be a complete list. All work shall be designed and constructed to meet all state and federal codes, standards and laws. Reference other sections of this SOW and the specifications referenced for use for other standards and references not listed below.

ABA Architectural Barriers Act AFDS Air Force Design Guide, current edition ANSI American National Standards Institute Standards ASCE American Society of Civil Engineers, Minimum Design Loads for Buildings and Other

Structures, Latest edition.

ASHRAE American Society of Heating, Refrigeration and Air Conditioning Engineers ASTM American Society for Testing and Materials BOCA Building Officials and Code Administrators DCID Director of Central Intelligence Directive 6/9, Physical Security Standards for

Sensitive Compartmented Information Facilities EIA Electronic Industries Association ETL Engineering Technical Letters IBC International Building Code IEEE Institute of Electrical and Electronics Engineers IES Illuminating Engineering Society Lighting Handbook IFC International Fire Code IMC International Mechanical Code IPC International Plumbing Code MILHDBK Military Handbooks NEC National Electrical Code, current edition NEMA National Electrical Manufacturer's Association NESC National Electrical Safety Code NFPA National Fire Protection Association Codes and Standards, most current edition OSH Occupational Safety and Health Administration SMACNA Sheet metal & Air Conditioning Contractors National Association TI’s Technical Instructions TM’s Technical manuals

Page 3 of 6 22 July 2016

UL Underwriter's Laboratories

The Contractor shall also follow all current national and state codes, regulations and specifications involving civil, architectural, interior design, structural, mechanical, electrical, and environmental disciplines which are applicable to the engineering design and construction industry, including OSHA Safety and Health Standards.

Use of the most current versions of the National Fire Codes and Life Safety Codes, published by the National Fire Protection Association (NFPA), and the International Building Code (IBC). In case of conflict between code requirements, the most stringent criteria shall apply.

A. NEC National Electrical Code B. ANG ETL 01-1-1 Air National Guard Design Policy March 2004, Section 10 and 16 C. ASHRAE Handbooks – Latest Edition D. ASHRAE Standard 62.1-2004 – Ventilation for Acceptable Indoor Air Quality E. ASHRAE Standard 90.1-2004 – Energy Standard F. ETL 83-1 Design of Control Systems for HVAC G. FC 3-600-01: Fire Protection Engineering for Facilities H. SMACNA Guidelines – Sheet Metal and Air-conditioning Contractors' National Association I. Ellington JRB Design Standards J. SMACNA HVAC Duct Const Stds, HVAC Duct Construction Standards - Metal and Flexible

Standard for Wet Chemical Extinguishing Systems, 2009 Edition K. R-102 Fire Suppression System Specifications

1.4 GENERAL: The purpose of the project is to renovate Building 1056.

A. ATTACHED PROJECT SKETCHES

1. 1056 - Site Plan

1.5 OBJECTIVE: Clean/Paint each room to include hallways/ceilings and install carpet squares in the facility EXCEPT Starbase area. Install door similar to Base Standard in chaplain area as annotated in . Also, renovate/replace bathroom sinks, fixtures, toiletries, partitions, ceiling/walls and tiles in bathrooms.

1.6

A. BASE BID:

1. Site Work (ALL INTERIOR FINISHES SIMILAR TO BASE DESIGN STANDARD

PROVIDED)

a. Repair any holes or damage in walls in all areas. Clean/Paint each room (State

Guard, DSI Contractor, Union, Honor Guard, ESGR, USO) to include hallways/ceilings. Paint frames of each door to match throughout facility.

Demolish carpet throughout each room; install new carpet squares throughout facility EXCEPT Starbase area.

b. Remove Water fountain in hallway. Carpet and paint behind it. Reinstall water fountain.

c. Refinish/stain ALL office doors throughout.

Page 4 of 6 22 July 2016

d. Demolish/Replace bathroom sinks, fixtures, toiletries, partitions and tiles in bathrooms. Demolish floor and wall tile to include all bathroom fixtures, sinks, partitions and toiletries. Demolish drop ceiling and install new gypsum board ceiling like Standard Finish Schedule & Colors PT-2. Install new ceramic tile wall in bathroom 5’ up wall and paint the remaining height, Same as above paint specification.

Partition type and counter top example

1) Bathroom fixtures, Toileteries, Partitions, stainless steel (similar to Bldg1256)

2) Install exhaust fans as required for bathrooms

3) Demolish and replace flush mount light fixtures in men’s/women’s restrooms.

e. Install Wood door similar to wood door specifications in base design standards, as noted in Site Plan in the Chaplains office. Include associated door hardware.

1.6 LICENSING AND CERTIFICATION

A. The contractor shall employ certified personnel and / or sub contractors with appropriate licenses and will provide their credentials to COR at the pre-construction conference.

1.7 QUALITY ASSURANCE

A. The facility shall pass and be regulatory compliant with all environmental laws for Federal, State, and Local criteria.

B. See Section 01400 of the General Conditions

1.8 SUBMITTALS:

Contractor will submit:

A. Product Data: Provide manufacturer’s data on systems.

a. Counter top

b. Toileteries (Urinals, commodes)

c. Sinks

d. Stainless Steel Partitions

e. Ceramic tile

f. Carpet

g. Rubber base

Page 5 of 6 22 July 2016

h. Porcelain Tile

i. Wood Door

j. Door Hardware

B. Color Submittals: Provide manufacturer color sample for color selection for all painted surfaces.

1. Provide manufacturer color sample for:

a. Counter top

b. Toileteries (Urinals, commodes)

c. Sinks

d. Stainless Steel Partitions

e. Ceramic tile

f. Carpet

g. Rubber base

h. Porcelain Tile

i. Wood Door

j. Door Hardware

C. Provide manufacturer’s data sheets, installation instructions, wiring diagrams and all other publications that are required for a complete and fully functional system.

D. Contractor shall not order or begin any construction until the submittal has been approved by the Contracting Officer

E. See section 01300 Submittal of the General Conditions.

F. In additions to the number of copies under section 01300, provide one electronic copy to the COR of all submittals, operating manuals etc.

1.9 WARRANTY:

A. System including all equipment and devices shall have a minimum of a 1 year full Materials and Labor Warranty.

PART 2 PRODUCTS:

2.1 EQUIPMENT:

A. Any reference to a particular make and model are being used for example only. An equivalent or equal will be accepted for all items under this contract. These shall be approved by the COR during the submittal process.

PART 3 EXECUTION

3.1 INSTALLATION

Page 6 of 6 22 July 2016

A. Equipment and materials shall be installed in an approved manner and in accordance with equipment manufacturers’ installation requirements.

3.2 FIELD QUALITY CONTROL

A. See section 01400 Quality Control of the General Conditions.