SCOPE OF WORK

Demolish Bldgs. 137, 261 and Q-hut

AQRC: 142003

1. CONTRACTOR RESPONSIBILITIES: Work consists of furnishing all labor, equipment, and materials necessary to perform all work listed in this Scope of Work (SOW). The Contractor shall submit to the Base Civil Engineer (BCE), for approval, all catalog cuts, drawings, or brochures of any materials to be used on this project. These submittals must be submitted within ten days of the Notice to Proceed. It is the contractor’s responsibility to ensure compliance with requirements briefed at the Pre-Construction meeting (i.e. Environmental, Safety, Fire Department, Security, etc.).

2. PROJECT DESCRIPTION: Demolish buildings 137, 261 and Q-hut. Restore site as indicated below:

Demolish Bldg 137 The building has been vacant and not maintained for years. Roof leaks have developed and the presence of mildew/mold is visible. Contractor shall mitigate and/or take proper personnel protection as deemed necessary to proceed with demolition.

Floor tile within the facility has been identified to contain asbestos mastic (2% Chyrsotile) and shall be removed and recycled separately.

All utility connections (see attachment 1) shall be cut and capped. Steam and water shall be cut 15’ from the perimeter of the building, capped and abandoned in place. All electrical lines from the transformer to the building shall be removed. Transformer and existing power supply feeding the flight line guard shack shall remain in place. Contractor shall submit a set of as-built drawings reflecting the location of all utilities capped off.

Contractor shall remove the building, foundations, sidewalks and all attached equipment in their entirety. All debris shall be removed off site and disposed of by the contractor.

Contractor shall provide temporary traffic barriers, caution tape and flashing yellow lights as required to prevent accidental access to the site during demolition.

Any remaining depressions/voids resulting from the building demolition shall be filled with backfill up to 6” below surrounding surface. Final 6” shall be topsoil. All disturbed areas shall be restored with seed and mulch. Contractor shall maintain watering to establish new grass.

Contractor demolish the transformer adjacent to bldg. 137. Transformer shall be disconnected from the supplying transformer located at building 241 and the underground line shall be abandoned in place.

Contractor shall re-route the flight line guard shack’s power line from its existing location at bldg. 137 transformer to bldg. 241 main distribution panel.

The new power line shall be capable of carrying 60 amps and shall be installed in conduit. (see attachment 2)

Demolish Bldg 261 Contractor shall remove the building, foundations, sidewalks and all attached equipment in their entirety. All debris shall be removed off site and disposed of by the contractor.

Contractor shall disassemble the adjacent water storage tank in its entirety, EXCEPT the concrete base/footing shall remain in place. All concrete pipe footings located in the grass shall be removed. All concrete pipe footings located in the concrete base/footing shall be removed flush with surrounding area. Any remaining bolts or protrusions from concrete base/footing shall be removed flush.

Any remaining depressions/voids resulting from the building demolition shall be filled with backfill up to 6” below surrounding surface. Final 6” shall be topsoil. All disturbed areas shall be restored with seed and mulch. Contractor shall maintain watering to establish new grass.

Contractor shall provide temporary traffic barriers, caution tape and flashing yellow lights as required to prevent accidental access to the site during demolition.

Demolish Q-Hut (Warren Grove Range) Contractor shall remove pre-fabricated metal building and all attached equipment to its entirety. The concrete base/footing shall remain in place. All debris shall be removed off site and disposed of by the contractor.

Building has been identified to have lead based paint. Contractor shall mitigate and/or take proper personnel protection as deemed necessary to proceed with demolition.

All Utility connections shall be cut and capped. All electrical lines from the substation to the building shall be removed.

Any remaining depressions/voids resulting from the building demolition shall be filled with backfill to match existing surrounding area.

3. CONTRACTOR MANPOWER REPORTING & ANTI-TERRORISM / OPSEC

Contractor Manpower Reporting: The contractor will report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the New Jersey National Guard via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: https://cmra.army.mil, and then click on “Department of the Army CMRA” or the icon of the DoD organization that is receiving or benefitting from the contracted services. Reporting inputs will be for the labor executed during the period of performance during each Government FY, which runs from October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk by clicking on “Send an email” which is located under the Help Resources ribbon on the right side of the login page of the applicable Service/Component’s CMR website at https://cmra.army.mil. As part of its submission, the contractor will also provide the estimated total cost (if any) incurred to comply with this reporting requirement.

AT OPSEC:

1. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

1.1. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 31-101 and AFI 10-245), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

2. All contractor employees, to include subcontractor employees, requiring access to Government Installations, Facilities and Controlled Access areas shall complete AT Level I awareness training within 10 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Certificates of completion for each affected contractor employee and subcontractor employee will be maintained by the COR or Antiterrorism Representative. AT level I Awareness Training is available through ADLS by completing the Force Protection CBT.

4. APPLICABLE CODES AND STANDARDS: Applicable Codes and Standards shall include, but not be limited to, all pertinent requirements of the following organizations most current standards:

API – American Petroleum Institute NFPA – National Fire Protection Association UL – Underwriters Laboratory, Inc.

ASTM – American Society for Testing and Materials ACI – American Concrete Institute ANSI – American National Standard Institute AIEE – American Institute of Electrical Engineers ASME – American Society of Mechanical Engineers ASCE – American Society of Civil Engineers CRSI – Concrete Reinforcing Steel Institute IPCEA – Insulated Power Cable Engineers Association NBS – National Bureau of Standards IEEE – Institute of Electrical and Electronic Engineers, Inc.

NEC – National Electric Code NBFU – National Bureau of Fire Underwriters NEMA – National Electric Manufacturers Association OSHA – Occupational Safety and Health Administration NAPHCC – National Association of Plumbing – Heating – Cooling Contractors National Standard Plumbing Code ARI – Air Conditioning and Refrigeration Institute ASHRAE – American Society of Heating, Refrigeration and Air-Conditioning Engineers AMCA – Air Movement and Control Association NRCA – National Roofing Contractors Association UBC – Uniform Building Code NFC – National Fire Code NJDOT – Standard Specifications for Road and Bridge Construction – New Jersey

Department of Transportation

5. TRASH DISPOSAL: It is the Contractor’s responsibility to dispose of all trash and debris incurred during project construction, off base at an authorized disposal site in accordance with local, state and federal requirements.

6. WORK WEEK AND HOURS OF OPERATION: BCE workweek is Monday through Friday, 0700 to 1530. The Contractor must make arrangements in advance to work outside of normal duty hours.

7. RESTRICTED AREAS: There are numerous areas that are restricted and access to these areas must be coordinated through the BCE Office. The Contractor shall coordinate, three days in advance, for arrangements required to work in these areas. Contactors working in restricted areas shall be required to provide the BCE with a list of names and social security numbers for all personnel expected to work in these areas.

8. MEASUREMENT VERIFICATION: It shall be the Contractors responsibility to verify all measurements, sketches, and descriptions of work for the project.

9. PROJECT DURATION: Duration of this project is 180 Calendar days after Contractor's receipt of the Notice to Proceed. The completion time includes inspections and final clean up of the premises.

10. ENVIROMENTAL IMPACT: Under NO CIRCUMSTANCES shall any waste materials, cleaning fluids, solvents, paints, etc. be poured into the base storm drains, sewer/septic systems, or discharged onto the ground. Contractor shall adhere to all Federal, State and Local Regulations.

All materials on the job will be accompanied by a MSDS (Material Safety Data Sheet). All containers shall be marked clearly and legibly as to the contents inside. All containers shall have lids firmly affixed. All collections of waste will be disposed of properly following IAW State and Federal Regulations to include proper manifesting. Provide the Base Engineer with quantities of recyclable materials discarded such as metals, concrete, etc.

11. SAFETY REQUIREMENTS: The Contractor shall abide by all State, Local, and OSHA safety requirements relevant to the items described in this SOW. If the Contractor is found to be in violation of any applicable safety regulations on the job site, the Government representative shall stop all work until the unsafe practice has been ceased and corrected.

12. FINAL ACCEPTANCE / COMPLETION OF PROJECT: When the job is completed, the

Contractor must notify the BCE and make arrangements for a final inspection.

The project WILL NOT be accepted by the Government until:

The site is returned to original or better condition according to applicable codes and standards.