LEED_Companion_Sheet.pdf

PDF 121 KB Posted

Attached to
REPAIR HANGARS B301 & B302 Federal contract opportunity
Solicitation number
W912KC-17-R-0001
Issued by
Department of the Army Pennsylvania Army National Guard

About this file

Leed Companion Sheet

View the file

Other files for this federal contract opportunity

Other files attached to REPAIR HANGARS B301 & B302, newest first.
File Type Posted
AMENDMENT_4_-_W912KC-17-R-0001_-_REPAIR_B301-B302.pdf PDF
AMENDMENT_2_-_W912KC-17-R-0001-0001_-_REPAIR_B301-B302.pdf PDF
20120309-135148.PDF PDF
20120309-140019.PDF PDF
20120314-104233.PDF PDF
20120309-135755.PDF PDF
20120314-111039.PDF PDF
20120309-135905.PDF PDF
20120309-135615.PDF PDF
20120309-133712.PDF PDF
20120314-110802.PDF PDF
20120309-135023.PDF PDF
20120314-104643.PDF PDF
20120309-140829.PDF PDF
AMENDMENT_1_-_W912KC-17-R-0001-J-0001_-_REPAIR_B301-B302.pdf PDF
PA_ANG_301_-_Kitchen.pdf PDF
QA_Master_Document_20170413.pdf PDF
Sign_In_Roster_2_W912KC-R-17-0001.pdf PDF
Q&A_Master_Document_20170407.pdf PDF
AMENDMENT_4_W912KC-17-R-0001.pdf PDF
AMENDMENT_4_W912KC-17-R-0001.pdf PDF
AMENDMENT_3_RFI_FINAL.PDF PDF
ASK-001.pdf PDF
ATFP_Plan.pdf PDF
Ansulite_3__AFFF_(AFC-5-A)_SDS.PDF PDF
Amendment_2_W912KC-R-0001.pdf PDF
171st-AC_Air_Permit_and_Requirements.pdf PDF
Site_Visit_20170206.pptx PPTX presentation
Amendment_1__W912KC-17-R-0001.pdf PDF
B302_Part_5_Drawings.pdf PDF
B302_Part_9_Drawings.pdf PDF
B302_Part_10_Drawings.pdf PDF
B301_Part_2_Drawings.pdf PDF
B301_Part_4_Drawings.pdf PDF
B301_Part_9_Drawings.pdf PDF
B301_Part_1_Drawings.pdf PDF
B302_Part_1_Drawings.pdf PDF
B301_Part_5_Drawings.pdf PDF
B301_Part_8_Drawings.pdf PDF
B302_Part_6_Drawings.pdf PDF
B302_Part_7_Drawings.pdf PDF
B302_Part_8_Drawings.pdf PDF
B301_Part_7_Drawings.pdf PDF
PAANG_301_302_Combined_Specs_Vol.1.pdf PDF
BLDG_301_Specs_&_Drawings_Part_2.pdf PDF
BLDG_302_Specs_&_Drawings_Part_2.pdf PDF
BLDG_301_Specs_&_Drawings_Part_1.pdf PDF
EXHIBIT_C_B301_B302_Hangar_Repairs.pdf PDF
BLDG_302_Specs_&_Drawings_Part_1.pdf PDF
Solicitation_W912KC-17-R-0001.pdf PDF
Show all 50

REPAIR HANGARS B301 & B302 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Categories

Prereq 1 Construction Activity Pollution

Prevention

USGBC

Prereq X $0 $0

A-E Comment:

Credit 1 Site Selection 1 1 This is an existing building renovation, so this credit will not be available to us.

Credit 2 Development Density & Community

Connectivity 5 5

This credit will not be obtained due to the project site not being located within ½ mile of a residential zone or neighborhood with an average density of 10 units per acre net AND within ½ mile of at least 10 Basic Services AND with pedestrian acres between the building and the services.

Credit 3 Brownfield Redevelopment 1 1

This credit will not be obtained due to the site for this project not being documented as contaminated (by means of an ASTM E1903-97

Phase II Environmental Site Assessment or a local Voluntary Cleanup Program) OR on a site defined as a brownfield by a local, state, or federal agency.

Credit 4.1 Alternative Transportation, Public Transportation Access 6 6

This credit will not be obtained due to the project site not being located within ½ mile of an existing

– or planned and funded – commuter rail, light rail or subway station OR located within ¼ mile of one or more stops for two or more public or campus bus lines usable by building occupants.

Sustainable Sites Possible Points: 26

Project

Design

Points

(Goals)

ANG

Req.

Points Credit

Project Num:

Project Title:

JLSQ132013 & JLSQ132014

Repair Hangars B301 & B302

All Point

Cost

Estimates

Design Status:

642810545165720

LEED

- AP Project Comments:

Project

Design

Point Cost

Estimates

Air National Guard Sustainable Design and Energy Conservation Score Sheet

Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1) Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation

Date:Base: Pennsylvania International Airport

Points and Point Cost Impact

USGBC Project Registration Access #:

11-Mar-16 Type B.2 (95%)

USGBC Project Title: Repair Hangars B301 & B302

Credit Description

Program FY:

Other

Design

Points Points

Non

Achiev able

Points

Project

Design

Points

(Goals)

ANG

Req.

Points Credit

Project Num:

Project Title:

JLSQ132013 & JLSQ132014

Repair Hangars B301 & B302

All Point

Cost

Estimates

Design Status:

642810545165720

LEED

- AP Project Comments:

Project

Design

Point Cost

Estimates

Air National Guard Sustainable Design and Energy Conservation Score Sheet

Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1) Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation

Date:Base: Pennsylvania International Airport

Points and Point Cost Impact

USGBC Project Registration Access #:

11-Mar-16 Type B.2 (95%)

USGBC Project Title: Repair Hangars B301 & B302

Credit Description

Program FY:

Other

Design

Points Points

Non

Achiev able

Points

ANG Recommended. A-E must evaluate feasibility and achieve if applicable by project scope.

This credit will be achieved by providing secure bicycle racks and/or storage (within 200 yards of a building entrance) for 5% of all building users

(measured at peak periods), AND, shower and changing facilities for at least 0.5% of the Full-

Time Equivalent (FTE) occupants.

Credit 4.3 Alternative Transportation, Low-

Emitting & Fuel-Efficient Vehicles 3 3

The current project does not include alteration of existing parking; However, if site improvements are added, this credit may be feasible.

Credit 4.4 Alternative Transportation, Parking Capacity 2 2

The current project does not include alteration of existing parking; However, if site improvements are added, this credit may be feasible.

Credit 5.1 Site Development, Protect or Restore Habitat 1 1

This credit will not be achieved because 50% of the site area (excluding the building footprint) will not be restored or protected with native or adaptive vegetation.

Credit 5.2 Site Development, Maximize Open Space 1 1

This credit will not be achieved because a high ratio of open space to development footprint will not be provided to promote biodiversity.

$10,000

ANG

Recom.

(1 point)

Credit 4.2 Alternative Transportation, Bicycle Storage & Changing Rooms 1 $10,000 1

Project

Design

Points

(Goals)

ANG

Req.

Points Credit

Project Num:

Project Title:

JLSQ132013 & JLSQ132014

Repair Hangars B301 & B302

All Point

Cost

Estimates

Design Status:

642810545165720

LEED

- AP Project Comments:

Project

Design

Point Cost

Estimates

Air National Guard Sustainable Design and Energy Conservation Score Sheet

Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1) Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation

Date:Base: Pennsylvania International Airport

Points and Point Cost Impact

USGBC Project Registration Access #:

11-Mar-16 Type B.2 (95%)

USGBC Project Title: Repair Hangars B301 & B302

Credit Description

Program FY:

Other

Design

Points Points

Non

Achiev able

Points

ANG Requirement. EISA 07 Section 438. A-E must ensure project achieves this point.

This is an existing building renovation that does not include stormwater design, so this credit will not be available to us.

ANG Requirement. EISA 07 Section 438. A-E must ensure project achieves this point.

This is an existing building renovation that does not include stormwater design, so this credit will not be available to us.

ANG Recommended. A-E must evaluate project feasibility and achieve if applicable by project scope and budget.

This is an existing building renovation, so this credit will not be available to us.

ANG Required. A-E must ensure project achieves this point.

The previous renovation project involved replacing the roof on the entire facility. We will take advantage of this since the new roof meets the criteria for this credit.

Credit 8 Light Pollution Reduction 1 1

Due to the fact that this existing facility is on an airfield, we do not anticipate that we will be able to meet the criteria for this credit. Existing exterior lighting was recently installed and is not being replaced with new.

ANG

Required

Credit 7.1 Heat Island Effect, Non-Roof

ANG

Recom.

(1 point)

Credit 6.2

Credit 7.2 Heat Island Effect, Roof 1 $0

ANG

Required

Credit 6.1 Stormwater Design, Quantity Control

ANG

Required

Stormwater Design, Quality Control

1 $0

Project

Design

Points

(Goals)

ANG

Req.

Points Credit

Project Num:

Project Title:

JLSQ132013 & JLSQ132014

Repair Hangars B301 & B302

All Point

Cost

Estimates

Design Status:

642810545165720

LEED

- AP Project Comments:

Project

Design

Point Cost

Estimates

Air National Guard Sustainable Design and Energy Conservation Score Sheet

Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1) Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation

Date:Base: Pennsylvania International Airport

Points and Point Cost Impact

USGBC Project Registration Access #:

11-Mar-16 Type B.2 (95%)

USGBC Project Title: Repair Hangars B301 & B302

Credit Description

Program FY:

Other

Design

Points Points

Non

Achiev able

Points

Prereq 1 Water Use Reduction

USGBC

Prereq X $0 $0

This credit will be achieved by employing strategies that in aggregate use 20% less water than the water use baseline calculated for the building (not including irrigation) after meeting the Energy Policy Act of 1992 fixture performance requirements. This could be done by providing waterless urinals, low flow fixtures, and infrared faucets.

Credit 1 Water Efficient Landscaping 2 to 4 points

ANG Requirement. EPAct 2005 - Water

Conservation. E.O. 13423 - Reduce Water

Consumption. Federal Sustainable Buildings

MOU. A-E must ensure project achieves this point.

This project does not include site work or landscaping, so this credit will not be available to us.

ANG Recommended. Avoid use of irrigation systems as project, location and climate allow.

This project does not include site work or landscaping, so this credit will not be available to us.

Credit 2 Innovative Wastewater

Technologies 2 2 $50,000 2 $50,000

This credit will be obtained by reducing potable water use for building sewage conveyance by

50% through the use of water-conserving fixtures

(water closets, urinals) or non-potable water

(captured rainwater, recycled grey water, and on-site or municipally treated wastewater).

Water Efficiency Possible Points: 10

Reduce by 50% 2

ANG

Required

ANG

Recom.

(2 points)

No Potable Water Use or Irrigation

Project

Design

Points

(Goals)

ANG

Req.

Points Credit

Project Num:

Project Title:

JLSQ132013 & JLSQ132014

Repair Hangars B301 & B302

All Point

Cost

Estimates

Design Status:

642810545165720

LEED

- AP Project Comments:

Project

Design

Point Cost

Estimates

Air National Guard Sustainable Design and Energy Conservation Score Sheet

Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1) Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation

Date:Base: Pennsylvania International Airport

Points and Point Cost Impact

USGBC Project Registration Access #:

11-Mar-16 Type B.2 (95%)

USGBC Project Title: Repair Hangars B301 & B302

Credit Description

Program FY:

Other

Design

Points Points

Non

Achiev able

Points

Credit 3 Water Use Reduction 2 to 4 points

ANG Requirement. EPAct 2005 - Water

Conservation. E.O. 13423 - Reduce Water

Consumption. Federal Sustainable Buildings

MOU. A-E must ensure project achieves this point.

This credit will be achieved by employing strategies that in aggregate use 30% less water than the water use baseline calculated for the building (not including irrigation) after meeting the Energy Policy Act of 1992 fixture performance requirements. This could be done by providing waterless urinals, low flow fixtures, and infrared faucets.

ANG Recommended. A-E must evaluate project feasibility and achieve if applicable by project scope and budget.

This credit will be achieved by employing strategies that in aggregate use an additional 5% less water than the water use baseline (35% total reduction).

40% Reduction 1 1 $10,000 1 $10,000

This credit will be achieved by employing strategies that in aggregate use an additional 5% less water than the water use baseline (40% total reduction).

30% Reduction

ANG

Required

(2 points) 2 2 $35,000

ANG

Recom.

(2 points)

35% Reduction

$35,000

1 $10,000 1 $10,000

Project

Design

Points

(Goals)

ANG

Req.

Points Credit

Project Num:

Project Title:

JLSQ132013 & JLSQ132014

Repair Hangars B301 & B302

All Point

Cost

Estimates

Design Status:

642810545165720

LEED

- AP Project Comments:

Project

Design

Point Cost

Estimates

Air National Guard Sustainable Design and Energy Conservation Score Sheet

Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1) Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation

Date:Base: Pennsylvania International Airport

Points and Point Cost Impact

USGBC Project Registration Access #:

11-Mar-16 Type B.2 (95%)

USGBC Project Title: Repair Hangars B301 & B302

Credit Description

Program FY:

Other

Design

Points Points

Non

Achiev able

Points

Prereq 1 Fundamental Commissioning of

Building Energy Systems

USGBC

Prereq X $40,000 $40,000

The intended commissioning plan for this building will satisfy the requirements for this prerequisite. The building’s energy related systems will be verified that they are installed, calibrated and perform according to the owner’s project requirements, basis of design, and construction documents.

Prereq 2 Minimum Energy Performance

USGBC

Prereq X $0 $0

The project will be designed in accordance with

ASHRAE 90.1 - 2007.

Prereq 3 Fundamental Refrigerant

Management

USGBC

Prereq X $0 $0

The selected and installed HVAC&R equipment for the building will not use CFC refrigerants.

Credit 1 Optimize Energy Performance 1 to 19

Points

ANG Provisional Requirement. EPAct 2005 -

30% Energy Use Reduction. Federal

Sustainable Buildings MOU. A-E to ensure project achieves this point, as necessary for project to meet EPAct 30% reduction.

See summary comment below.

ANG Provisional Requirement. EPAct 2005 -

30% Energy Use Reduction. Federal

Sustainable Buildings MOU. A-E to ensure project achieves this point, as necessary for project to meet EPAct 30% reduction.

See summary comment below.

Energy & Atmosphere Possible Points: 35

12% New Buildings or 8%

Existing Building Renovations

ANG

Prov.

Required (1 point)

14% New Buildings or 10%

Existing Building Renovations

$0

$0 1

ANG

Prov.

Required (1 point)

1 $0

Project

Design

Points

(Goals)

ANG

Req.

Points Credit

Project Num:

Project Title:

JLSQ132013 & JLSQ132014

Repair Hangars B301 & B302

All Point

Cost

Estimates

Design Status:

642810545165720

LEED

- AP Project Comments:

Project

Design

Point Cost

Estimates

Air National Guard Sustainable Design and Energy Conservation Score Sheet

Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1) Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation

Date:Base: Pennsylvania International Airport

Points and Point Cost Impact

USGBC Project Registration Access #:

11-Mar-16 Type B.2 (95%)

USGBC Project Title: Repair Hangars B301 & B302

Credit Description

Program FY:

Other

Design

Points Points

Non

Achiev able

Points

ANG Provisional Requirement. EPAct 2005 -

30% Energy Use Reduction. Federal

Sustainable Buildings MOU. A-E to ensure project achieves this point, as necessary for project to meet EPAct 30% reduction.

See summary comment below.

ANG Provisional Requirement. EPAct 2005 -

30% Energy Use Reduction. Federal

Sustainable Buildings MOU. A-E to ensure project achieves this point, as necessary for project to meet EPAct 30% reduction.

See summary comment below.

ANG Provisional Requirement. EPAct 2005 -

30% Energy Use Reduction. Federal

Sustainable Buildings MOU. A-E to ensure project achieves this point, as necessary for project to meet EPAct 30% reduction.

See summary comment below.

ANG Provisional Requirement. EPAct 2005 -

30% Energy Use Reduction. Federal

Sustainable Buildings MOU. A-E to ensure project achieves this point, as necessary for project to meet EPAct 30% reduction.

See summary comment below.

1$0

$01 1

$0 1

ANG

Prov.

Required (1 point)

20% New Buildings or 16%

Existing Building Renovations

18% New Buildings or 14%

Existing Building Renovations

22% New Buildings or 18%

Existing Building Renovations

ANG

Prov.

Required (1 point)

ANG

Prov.

Required (1 point)

$0 16% New Buildings or 12%

Existing Building Renovations

ANG

Prov.

Required (1 point)

$0

$0

$0

Project

Design

Points

(Goals)

ANG

Req.

Points Credit

Project Num:

Project Title:

JLSQ132013 & JLSQ132014

Repair Hangars B301 & B302

All Point

Cost

Estimates

Design Status:

642810545165720

LEED

- AP Project Comments:

Project

Design

Point Cost

Estimates

Air National Guard Sustainable Design and Energy Conservation Score Sheet

Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1) Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation

Date:Base: Pennsylvania International Airport

Points and Point Cost Impact

USGBC Project Registration Access #:

11-Mar-16 Type B.2 (95%)

USGBC Project Title: Repair Hangars B301 & B302

Credit Description

Program FY:

Other

Design

Points Points

Non

Achiev able

Points

ANG Provisional Requirement. EPAct 2005 -

30% Energy Use Reduction. Federal

Sustainable Buildings MOU. A-E to ensure project achieves this point, only as necessary for project to meet EPAct 30% reduction.

See summary comment below.

ANG Provisional Requirement. EPAct 2005 -

30% Energy Use Reduction. Federal

Sustainable Buildings MOU. A-E to ensure project achieves this point, only as necessary for project to meet EPAct 30% reduction.

See summary comment below.

ANG Provisional Requirement. EPAct 2005 -

30% Energy Use Reduction. Federal

Sustainable Buildings MOU. A-E to ensure project achieves this point, only as necessary for project to meet EPAct 30% reduction.

See summary comment below.

ANG Provisional Requirement. EPAct 2005 -

30% Energy Use Reduction. Federal

Sustainable Buildings MOU. A-E to ensure project achieves this point, only as necessary for project to meet EPAct 30% reduction.

See summary comment below.

$0

1 $0

ANG

Prov.

Required (1 point)

$0

26% New Buildings or 22%

Existing Building Renovations

ANG

Prov.

Required (1 point)

1 $0

24% New Buildings or 20%

Existing Building Renovations

$0 1 28% New Buildings or 24%

Existing Building Renovations

ANG

Prov.

Required (1 point)

$01

30% New Buildings or 26%

Existing Building Renovations

ANG

Prov.

Required (1 point)

$0

Project

Design

Points

(Goals)

ANG

Req.

Points Credit

Project Num:

Project Title:

JLSQ132013 & JLSQ132014

Repair Hangars B301 & B302

All Point

Cost

Estimates

Design Status:

642810545165720

LEED

- AP Project Comments:

Project

Design

Point Cost

Estimates

Air National Guard Sustainable Design and Energy Conservation Score Sheet

Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1) Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation

Date:Base: Pennsylvania International Airport

Points and Point Cost Impact

USGBC Project Registration Access #:

11-Mar-16 Type B.2 (95%)

USGBC Project Title: Repair Hangars B301 & B302

Credit Description

Program FY:

Other

Design

Points Points

Non

Achiev able

Points

32% New Buildings or 28%

1 1 $0 1 $0

See summary comment below.

34% New Buildings or 30%

1 1 $450,000 1 $450,000

This project will meet the requirements of EPAct

2005, thus achieving a minimum 30% energy cost savings for the building as compared to the baseline building performance rating per

ASHRAE / IESNA Standard 90.1 – 2007. This credit will be achieved.

36% New Buildings or 32%

1 1

See above comment.

38% New Buildings or 34%

40% New Buildings or 36%

42% New Buildings or 38%

44% New Buildings or 40%

46% New Buildings or 42%

48% New Buildings or 44%

1 1

See above comment.

Credit 2 On-Site Renewable Energy 1 to 7

Points

ANG Recommended. EPAct 2005. A-E must evaluate feasibility of project achieving this point as base bid item or option. Provide

LCC analysis.

On site renewable energy is cost prohibitive and not anticipated to be pursued.

ANG

Recom.

(1 point) 1 1% Renewable Energy

Project

Design

Points

(Goals)

ANG

Req.

Points Credit

Project Num:

Project Title:

JLSQ132013 & JLSQ132014

Repair Hangars B301 & B302

All Point

Cost

Estimates

Design Status:

642810545165720

LEED

- AP Project Comments:

Project

Design

Point Cost

Estimates

Air National Guard Sustainable Design and Energy Conservation Score Sheet

Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1) Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation

Date:Base: Pennsylvania International Airport

Points and Point Cost Impact

USGBC Project Registration Access #:

11-Mar-16 Type B.2 (95%)

USGBC Project Title: Repair Hangars B301 & B302

Credit Description

Program FY:

Other

Design

Points Points

Non

Achiev able

Points

ANG Recommended. EPAct 2005. A-E must evaluate feasibility of project achieving this point as base bid item or option. Provide

LCC analysis.

On site renewable energy is cost prohibitive and not anticipated to be pursued.

ANG Recommended. EPAct 2005. A-E must evaluate feasibility of project achieving this point as base bid item or option. Provide

LCC analysis.

On site renewable energy is cost prohibitive and not anticipated to be pursued.

ANG Provisional Recommendation. EPAct

2005. A-E must evaluate feasibility of project achieving this point as base bid item or option. Provide LCC analysis.

On site renewable energy is cost prohibitive and not anticipated to be pursued.

ANG Provisional Recommendation. EPAct

2005. A-E must evaluate feasibility of project achieving this point as base bid item or option. Provide LCC analysis.

On site renewable energy is cost prohibitive and not anticipated to be pursued.

ANG Provisional Recommendation. EPAct

2005. A-E must evaluate feasibility of project achieving this point as base bid item or option. Provide LCC analysis.

On site renewable energy is cost prohibitive and not anticipated to be pursued.

7% Renewable Energy ANG Prov.

Recom.

(1 point)

1 11% Renewable Energy ANG Prov.

Recom.

(1 point)

5% Renewable Energy

ANG

Recom.

(1 point)

9% Renewable Energy ANG Prov.

Recom.

(1 point)

3% Renewable Energy

ANG

Recom.

(1 point)

Project

Design

Points

(Goals)

ANG

Req.

Points Credit

Project Num:

Project Title:

JLSQ132013 & JLSQ132014

Repair Hangars B301 & B302

All Point

Cost

Estimates

Design Status:

642810545165720

LEED

- AP Project Comments:

Project

Design

Point Cost

Estimates

Air National Guard Sustainable Design and Energy Conservation Score Sheet

Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1) Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation

Date:Base: Pennsylvania International Airport

Points and Point Cost Impact

USGBC Project Registration Access #:

11-Mar-16 Type B.2 (95%)

USGBC Project Title: Repair Hangars B301 & B302

Credit Description

Program FY:

Other

Design

Points Points

Non

Achiev able

Points

ANG Provisional Recommendation. EPAct

2005. A-E must evaluate feasibility of project achieving this point as base bid item or option. Provide LCC analysis.

On site renewable energy is cost prohibitive and not anticipated to be pursued.

ANG Recommended. EPAct 2005 - Energy

Conservation. E.O. 13423 - Energy

Conservation. Federal Sustainable Buildings

MOU. A-E must evaluate feasibility of project achieving this point as base bid item or option.

This credit will be achieved by providing an independent commissioning agent (CxA) that will be involved with the design of the project at the earliest stages. This will be in addition to the responsibilities of the CxA under fundamental commissioning.

ANG Recommended. E.O. 13423 - Reduction of Toxic and Hazardous Materials Acquired.

Federal Sustainable Buildings MOU. A-E must evaluate feasibility of project achieving this point as base bid item or option.

This credit may be achievable if we are able to select refrigerants and HVAC&R that minimize or eliminate the emission of compounds that contribute to ozone depletion and global warming.

Credit 3 Enhanced Commissioning

ANG

Recom.

(2 points)

Credit 4 Enhanced Refrigerant Management

ANG

Recom.

(2 points)

$10,0002

$0

1 13% Renewable Energy ANG Prov.

Recom.

(1 point)

$0

$10,000

Project

Design

Points

(Goals)

ANG

Req.

Points Credit

Project Num:

Project Title:

JLSQ132013 & JLSQ132014

Repair Hangars B301 & B302

All Point

Cost

Estimates

Design Status:

642810545165720

LEED

- AP Project Comments:

Project

Design

Point Cost

Estimates

Air National Guard Sustainable Design and Energy Conservation Score Sheet

Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1) Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation

Date:Base: Pennsylvania International Airport

Points and Point Cost Impact

USGBC Project Registration Access #:

11-Mar-16 Type B.2 (95%)

USGBC Project Title: Repair Hangars B301 & B302

Credit Description

Program FY:

Other

Design

Points Points

Non

Achiev able

Points

ANG Requirement. EPAct 2005 - Metering of

Utility with Smart Metering. Federal

Sustainable Buildings MOU. A-E must ensure project achieves this point.

This credit will be achieved by providing for the ongoing accountability of building energy consumption over time. A Measurement &

Verification (M&V) plan will be developed and implemented. The M&V period will cover a period of no less than one year of post-construction occupancy.

Credit 6 Green Power 2 2 Green Power will not be purchased for this project, therefore this credit will not be achieved.

Also E.O. 13423 - Waste Prevention and

Recycling Programs in Facilities.

An area will be established to store recyclables as necessary to satisfy Prerequisite 1.

Credit 1.1 Building Reuse, Maintain Existing

Walls, Floors & Roof

1 to 3

Points

Maintain 55% of Existing Walls, Floors

& Roof 1 1 $0 1 $0

The renovations to be performed within the existing facility will comply with the requirements of this credit.

Maintain 75% of Existing Walls, Floors

& Roof 1 1 $0 1 $0

The renovations to be performed within the existing facility will comply with the requirements of this credit.

Prereq 1 Storage & Collection of Recyclables

USGBC

Prereq X $0

Materials & Resources Possible Points: 14

Credit 5 Measurement & Verification

ANG

Required.

(3 Points) 3$50,000

$0

$50,000

Project

Design

Points

(Goals)

ANG

Req.

Points Credit

Project Num:

Project Title:

JLSQ132013 & JLSQ132014

Repair Hangars B301 & B302

All Point

Cost

Estimates

Design Status:

642810545165720

LEED

- AP Project Comments:

Project

Design

Point Cost

Estimates

Air National Guard Sustainable Design and Energy Conservation Score Sheet

Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1) Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation

Date:Base: Pennsylvania International Airport

Points and Point Cost Impact

USGBC Project Registration Access #:

11-Mar-16 Type B.2 (95%)

USGBC Project Title: Repair Hangars B301 & B302

Credit Description

Program FY:

Other

Design

Points Points

Non

Achiev able

Points

Maintain 95% of Existing Walls, Floors

& Roof 1 1 $0 1 $0

The renovations to be performed within the existing facility will comply with the requirements of this credit.

Credit 1.2 Building Reuse, Maintain 50% of

Interior Non-Structural Elements 1 1

The renovations to be performed within the existing facility will not comply with the requirements of this credit.

Credit 2 Construction Waste Management 1 to 2

Points

ANG Requirement. E.O. 13423 - Increase

Diversion of Solid Waste. Federal

Sustainable Buildings MOU. A-E must ensure project achieves this point.

This credit will be achieved by recycling and/or salvaging at least 50% of non-hazardous construction and demolition.

ANG Recommended. E.O. 13423 - Increase

Diversion of Solid Waste. Federal

Sustainable Buildings MOU. A-E must evaluate feasibility and achieve if applicable by project scope and project budget.

This credit will be achieved by requiring the contractor to recycle and/or salvage an additional

25% beyond MR Credit 2.1 (75% total) of non-hazardous construction and demolition debris.

Credit 3 Materials Reuse 1 to 2

Points

Reuse 5% 1 1 $15,000 1 $15,000 Since this is an existing facility renovation, we will pursue this credit.

Reuse 10% 1 1 10% materials reuse is probably not achievable.

Divert 50% from Landfill

ANG

Required.

(1 point)

ANG

Required.

(1 point) $30,000

Divert 75% from Landfill $15,0001 $15,000

$30,000

Project

Design

Points

(Goals)

ANG

Req.

Points Credit

Project Num:

Project Title:

JLSQ132013 & JLSQ132014

Repair Hangars B301 & B302

All Point

Cost

Estimates

Design Status:

642810545165720

LEED

- AP Project Comments:

Project

Design

Point Cost

Estimates

Air National Guard Sustainable Design and Energy Conservation Score Sheet

Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1) Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation

Date:Base: Pennsylvania International Airport

Points and Point Cost Impact

USGBC Project Registration Access #:

11-Mar-16 Type B.2 (95%)

USGBC Project Title: Repair Hangars B301 & B302

Credit Description

Program FY:

Other

Design

Points Points

Non

Achiev able

Points

Credit 4 Recycled Content 1 to 2

Points

ANG Required. Federal Sustainable

Buildings MOU. A-E must achieve if applicable by project scope.

This credit will be achieved by requiring the contractor to use materials with recycled content such that the sum of post-consumer recycled content plus one-half of the pre-consumer content constitutes at least 10% (based on cost) of the total value of the materials in the project.

20% (post-consumer + ½ pre-consumer) 1 1 $0 1 $0

This credit will be achieved by requiring the contractor to use materials with recycled content such that the sum of post-consumer recycled content plus one-half of the pre-consumer content constitutes an additional 10% beyond

MR Credit 4.1 (total of 20%, based on cost) of the total value of the materials in the project.

Credit 5 Regional Materials 1 to 2

Points

ANG Required. Federal Sustainable

Buildings MOU. A-E must achieve if applicable by project scope.

This credit will be achieved by requiring the contractor to use building materials or products that have been extracted, harvested or recovered, as well as manufactured, within 500 miles of the project site for a minimum of 10%

(based on cost) of the total materials value.

1 $0 10% Extracted, Processed &

Manufactured Regionally

ANG

Required.

(1 point) 1 $0

ANG

Required.

(1 point)

10% (post-consumer + ½ pre-consumer) $01 $0

Project

Design

Points

(Goals)

ANG

Req.

Points Credit

Project Num:

Project Title:

JLSQ132013 & JLSQ132014

Repair Hangars B301 & B302

All Point

Cost

Estimates

Design Status:

642810545165720

LEED

- AP Project Comments:

Project

Design

Point Cost

Estimates

Air National Guard Sustainable Design and Energy Conservation Score Sheet

Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1) Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation

Date:Base: Pennsylvania International Airport

Points and Point Cost Impact

USGBC Project Registration Access #:

11-Mar-16 Type B.2 (95%)

USGBC Project Title: Repair Hangars B301 & B302

Credit Description

Program FY:

Other

Design

Points Points

Non

Achiev able

Points

20% Extracted, Processed &

Manufactured Regionally 1 $0 1 $0

This credit will be achieved by requiring the contractor to use building materials or products that have been extracted, harvested or recovered, as well as manufactured, within 500 miles of the project site for an additional 10% beyond MR Credit 5.1 (total of 20%, based on cost) of the total materials value.

Credit 6 Rapidly Renewable Materials ANG Required. Federal Sustainable

Buildings MOU. A-E must achieve if applicable by project scope.

Project can easily achieve. Requirements will be in specifications to accomplish.

Credit 7 Certified Wood

ANG Recommended. Federal Sustainable

Buildings MOU. A-E must evaluate feasibility and achieve if applicable by project scope.

This credit will be obtained by using a minimum of 50% of wood-based materials and products, which are certified in accordance with the Forest

Stewardship Council’s (FSC) Principles and

Criteria, for wood building components.

11 $0

$01

ANG

Recom.

(1 point)

ANG

Recom.

(1 point)

$0

Project

Design

Points

(Goals)

ANG

Req.

Points Credit

Project Num:

Project Title:

JLSQ132013 & JLSQ132014

Repair Hangars B301 & B302

All Point

Cost

Estimates

Design Status:

642810545165720

LEED

- AP Project Comments:

Project

Design

Point Cost

Estimates

Air National Guard Sustainable Design and Energy Conservation Score Sheet

Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1) Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation

Date:Base: Pennsylvania International Airport

Points and Point Cost Impact

USGBC Project Registration Access #:

11-Mar-16 Type B.2 (95%)

USGBC Project Title: Repair Hangars B301 & B302

Credit Description

Program FY:

Other

Design

Points Points

Non

Achiev able

Points

Also Federal Sustainable Buildings MOU.

The project will be designed in accordance with

ASHRAE 62.1.

Also Federal, DoD and Air Force Regulation.

Smoking will not be permitted in the building.

Any designated smoking areas outside of the building will be located at least 25 feet away from any building entrances or air intake systems.

Credit 1 Outdoor Air Delivery Monitoring 1 1 $20,000 1 $20,000

This credit will be achieved by installing a permanent monitoring system that provides feedback on ventilation system performance to ensure that ventilation systems maintain design minimum ventilation requirements.

Credit 2 Increased Ventilation 1 1 The project will not pursue this credit.

ANG Requirement. Federal Sustainable

Buildings MOU. A-E must ensure project achieves this point.

This credit will be achieved by requiring the contractor to develop and implemt an Indoor Air

Quality (IAQ) Management Plan for the construction and pre-occupancy phases of the building

ANG Requirement. Federal Sustainable

Buildings MOU. A-E must ensure project achieves this point.

This credit will be achieved by requiring the contractor to include pre-occupancy phase building flush-out or air quality testing in the

Indoor Air Quality (IAQ) Management Plan.

Prereq 2

Indoor Environmental Quality Possible Points: 15

Credit 3.2 Construction IAQ Management Plan, Before Occupancy

ANG

Required.

(1 point)

Credit 3.1 Construction IAQ Management Plan, During Construction

X

ANG

Required.

(1 point)

Environmental Tobacco Smoke

(ETS) Control

USGBC

Prereq

$3,000

$5,000 1

X $0Prereq 1 Minimum IAQ Performance

USGBC

Prereq

$5,000

$0

$0

$3,000

Project

Design

Points

(Goals)

ANG

Req.

Points Credit

Project Num:

Project Title:

JLSQ132013 & JLSQ132014

Repair Hangars B301 & B302

All Point

Cost

Estimates

Design Status:

642810545165720

LEED

- AP Project Comments:

Project

Design

Point Cost

Estimates

Air National Guard Sustainable Design and Energy Conservation Score Sheet

Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1) Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation

Date:Base: Pennsylvania International Airport

Points and Point Cost Impact

USGBC Project Registration Access #:

11-Mar-16 Type B.2 (95%)

USGBC Project Title: Repair Hangars B301 & B302

Credit Description

Program FY:

Other

Design

Points Points

Non

Achiev able

Points

ANG Required - If Applicable. E.O. 13423 -

Reduction of Toxic and Hazardous Materials

Acquired. Federal Sustainable Buildings

MOU. A-E must achieve if applicable by project scope.

This credit will be achieved by requiring the contractor to have all adhesives and sealants used on the interior of the building (defined as inside of the weatherproofing system and applied on-site) comply with the requirements set forth by

SCAQMD Rule #1168.

ANG Required - If Applicable. E.O. 13423 -

Reduction of Toxic and Hazardous Materials

Acquired. Federal Sustainable Buildings

MOU. A-E must achieve if applicable by project scope.

This credit will be achieved by requiring the contractor to have all paints and coatings used on the interior of the building (defined as inside of the weatherproofing system and applied on-site) comply with the criteria as set forth by the LEED

Reference Guide.

Credit 4.1 Low-Emitting Materials, Adhesives & Sealants

ANG

Required.

(1 point)

Credit 4.2 Low-Emitting Materials, Paints & Coatings

ANG

Required.

(1 point)

$1,000 1

$500

$1,000

$500

Project

Design

Points

(Goals)

ANG

Req.

Points Credit

Project Num:

Project Title:

JLSQ132013 & JLSQ132014

Repair Hangars B301 & B302

All Point

Cost

Estimates

Design Status:

642810545165720

LEED

- AP Project Comments:

Project

Design

Point Cost

Estimates

Air National Guard Sustainable Design and Energy Conservation Score Sheet

Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1) Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation

Date:Base: Pennsylvania International Airport

Points and Point Cost Impact

USGBC Project Registration Access #:

11-Mar-16 Type B.2 (95%)

USGBC Project Title: Repair Hangars B301 & B302

Credit Description

Program FY:

Other

Design

Points Points

Non

Achiev able

Points

ANG Required - If Applicable. E.O. 13423 -

Reduction of Toxic and Hazardous Materials

Acquired. Federal Sustainable Buildings

MOU. A-E must achieve if applicable by project scope.

This credit will be achieved by requiring the contractor to have all carpet installed in the building interior meet the testing and product requirements of the Carpet and Rug Institute’s

Green Label Plus program. All carpet cushion installed in the building interior will meet the requirements of the Carpet and Rug Institute

Green Label program.

ANG Required - If Applicable. E.O. 13423 -

Reduction of Toxic and Hazardous Materials

Acquired. Federal Sustainable Buildings

MOU. A-E must achieve if applicable by project scope.

This credit will be achieved by requiring the contractor to have all composite wood and

Agrifiber products used on the interior of the building (defined as inside the weatherproofing system) contain no added urea-formaldehyde resins.

Credit 5 Indoor Chemical & Pollutant Source

Control 1 1

Accomplishing this credit would require construction of a special room within the facility and special HVAC and exhaust systems. We will not pursue this credit.

Low-Emitting Materials, Carpet Systems

ANG

Required.

(1 point)

ANG

Required.

(1 point)

Low-Emitting Materials, Composite Wood & Agrifiber Products Credit 4.4

Credit 4.3

$2,000

$1,000 $1,000

$2,000

Project

Design

Points

(Goals)

ANG

Req.

Points Credit

Project Num:

Project Title:

JLSQ132013 & JLSQ132014

Repair Hangars B301 & B302

All Point

Cost

Estimates

Design Status:

642810545165720

LEED

- AP Project Comments:

Project

Design

Point Cost

Estimates

Air National Guard Sustainable Design and Energy Conservation Score Sheet

Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1) Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation

Date:Base: Pennsylvania International Airport

Points and Point Cost Impact

USGBC Project Registration Access #:

11-Mar-16 Type B.2 (95%)

USGBC Project Title: Repair Hangars B301 & B302

Credit Description

Program FY:

Other

Design

Points Points

Non

Achiev able

Points

ANG Required. EPAct 2005 - Energy

Conservation. E.O. 13423 - Energy

Conservation. Federal Sustainable Buildings

MOU. A-E must ensure project achieves this point.

This credit will be achieved by providing individual lighting controls for 90% (minimum) of the building occupants to enable adjustments to suit individual task needs and preferences AND providing lighting system controllability for all shared multi-occupant spaces to enable lighting adjustment that meets group needs and preferences.

Credit 6.2 Controllability of Systems, Thermal Comfort 1 1 $80,000 1 $80,000

This credit will be achieved by providing individual comfort controls for 50% (minimum) of the building occupants to enable adjustments to suit individual task needs and preferences.

ANG Recommended. Federal Sustainable

Buildings MOU. A-E must achieve if applicable by project scope.

This credit will be achieved by designing the

HVAC systems and the building envelope to meet the requirements of ASHRAE Standard 55-

2004, Thermal Comfort Conditions for Human

Occupancy.

ANG

Required 1 $70,000

Credit 7.1 Thermal Comfort, Design

ANG

Recom.

(1 point)

Credit 6.1 Controllability of Systems, Lighting

1 $0 1

1 $70,000

Project

Design

Points

(Goals)

ANG

Req.

Points Credit

Project Num:

Project Title:

JLSQ132013 & JLSQ132014

Repair Hangars B301 & B302

All Point

Cost

Estimates

Design Status:

642810545165720

LEED

- AP Project Comments:

Project

Design

Point Cost

Estimates

Air National Guard Sustainable Design and Energy Conservation Score Sheet

Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1) Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation

Date:Base: Pennsylvania International Airport

Points and Point Cost Impact

USGBC Project Registration Access #:

11-Mar-16 Type B.2 (95%)

USGBC Project Title: Repair Hangars B301 & B302

Credit Description

Program FY:

Other

Design

Points Points

Non

Achiev able

Points

Credit 7.2 Thermal Comfort, Verification 1 1 $10,000 1 $10,000

This credit can be achieved by implementing a thermal comfort survey of building occupants within 6-18 months after occupancy. If more than 20% of the occupants are dissatisfied with the thermal comfort of the building, a plan will be developed to solve the problem.

ANG Required. Federal Sustainable

Buildings MOU. A-E must ensure that project achieves this point. A7O project manager can waive requirement if A-E demonstrates that obtaining point is not possible due to project scope.

Due to the geometry of the existing facility, this credit cannot be achieved.

Credit 8.2 Daylight & Views, Views for 90% of Spaces 1 1

Due to the geometry of the existing facility, this credit cannot be achieved.

Credit 1.1 Innovation in Design:

Exemplary Performance MR Credit 7 1 1 $0 1 $0

By requiring 100% certified wood on this project, an innovation in design point will be awarded.

Credit 1.2 Innovation in Design:

Provide Specific Title 1 1

A-E Comment:

Credit 1.3 Innovation in Design:

Provide Specific Title 1 1

A-E Comment:

Credit 1.4 Innovation in Design:

Provide Specific Title 1 1

A-E Comment:

Credit 1.5 Innovation in Design:

Provide Specific Title 1 1

A-E Comment:

Innovation & Design Process Possible Points: 6

Credit 8.1 Daylight & Views, Daylight 75% of Spaces

ANG

Required (1 point)

Project

Design

Points

(Goals)

ANG

Req.

Points Credit

Project Num:

Project Title:

JLSQ132013 & JLSQ132014

Repair Hangars B301 & B302

All Point

Cost

Estimates

Design Status:

642810545165720

LEED

- AP Project Comments:

Project

Design

Point Cost

Estimates

Air National Guard Sustainable Design and Energy Conservation Score Sheet

Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1) Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation

Date:Base: Pennsylvania International Airport

Points and Point Cost Impact

USGBC Project Registration Access #:

11-Mar-16 Type B.2 (95%)

USGBC Project Title: Repair Hangars B301 & B302

Credit Description

Program FY:

Other

Design

Points Points

Non

Achiev able

Points

ANG Requirement. EPAct 2005.

A-E must ensure project achieves this point.

A LEED AP is involved with the project.

1Credit 2

ANG

Required

1LEED

Accredited Professional $0 $0

Project

Design

Points

(Goals)

ANG

Req.

Points Credit

Project Num:

Project Title:

JLSQ132013 & JLSQ132014

Repair Hangars B301 & B302

All Point

Cost

Estimates

Design Status:

642810545165720

LEED

- AP Project Comments:

Project

Design

Point Cost

Estimates

Air National Guard Sustainable Design and Energy Conservation Score Sheet

Companion to USGBC LEED® for NC 2009 - Version ANGv2010(1) Includes Energy Policy Act 2005, Federal Sustainable Buildings MOU, Executive Order 13423 and Energy Independence and Security Act 2007 Implementation

Date:Base: Pennsylvania International Airport

Points and Point Cost Impact

USGBC Project Registration Access #:

11-Mar-16 Type B.2 (95%)

USGBC Project Title: Repair Hangars B301 & B302

Credit Description

Program FY:

Other

Design

Points Points

Non

Achiev able

Points

Credit 1.1 Regional Priority:

MR Credit 1.1 1 1 $0 1 $0

By maintaining at least 55% of existing walls, floor and roof per requirements for MR Credit 1.1, the project will be awarded a Regional Priority

Credit.

Credit 1.2 Regional Priority:

SS Credit 7.2 1 1 $0 1 $0

By meeting the requirements for SS Credit 7.2, the project will be awarded a Regional Priority

Credit.

Credit 1.3 Regional Priority:

Provide Specific Title 1 1

A-E Comment:

Credit 1.4 Regional Priority:

Provide Specific Title 1 1

A-E Comment:

Req.

Pts.

Oth.

Pts.

All Point

Cost Est.

X Pts.

Proj.

Goal

Proj. Goal

Cost Est.

Points and Point Cost Impact

Summary 110 24 30 $917,500 56 54 $917,500

Summary: Project LEED Score and

Cost Estimate

USGBC Rating System:

ANG Category Requirements:

Regional Priority Possible Points: 4

Cost: $917,500Score: 54

Vertical - USGBC Silver 50 to 59 points. Industrial - USGBC Silver 50 to 59 points.

Horizontal - 11-13 USGBC points. Utility - 9-10 USGBC points.

Certified 40 to 49 points Silver 50 to 59 points Gold 60 to 79 points Platinum 80+ points