07_21_29_-_Sprayed_Insulation.pdf

PDF 12 KB Posted

Attached to
REPAIR HANGARS B301 & B302 Federal contract opportunity
Solicitation number
W912KC-17-R-0001
Issued by
Department of the Army Pennsylvania Army National Guard

About this file

Sprayed Insulation

View the file

Other files for this federal contract opportunity

Other files attached to REPAIR HANGARS B301 & B302, newest first.
File Type Posted
AMENDMENT_4_-_W912KC-17-R-0001_-_REPAIR_B301-B302.pdf PDF
AMENDMENT_3_-_W912KC-17-R-0001_-_REPAIR_B301-B302.pdf PDF
20120309-135148.PDF PDF
20120309-140019.PDF PDF
20120314-104233.PDF PDF
20120309-135755.PDF PDF
20120314-111039.PDF PDF
20120309-135905.PDF PDF
20120309-135615.PDF PDF
20120309-133712.PDF PDF
20120314-110802.PDF PDF
20120309-135023.PDF PDF
20120309-135436.PDF PDF
20120309-134001.PDF PDF
20120309-141035.PDF PDF
20120309-135317.PDF PDF
20120309-133846.PDF PDF
AMENDMENT_1_-_W912KC-17-R-0001-J-0001_-_REPAIR_B301-B302.pdf PDF
PA_ANG_301_-_Kitchen.pdf PDF
LEED_Companion_Sheet.pdf PDF
QA_Master_Document_20170413.pdf PDF
AMENDMENT_4_W912KC-17-R-0001.pdf PDF
AMENDMENT_3_RFI_FINAL.PDF PDF
ASK-001.pdf PDF
ATFP_Plan.pdf PDF
Utility_Sketch.pdf PDF
Ansulite_3__AFFF_(AFC-5-A)_SDS.PDF PDF
PA_ANG_-_Bldg_301__302_-_Spec_Sec_01_00_00.pdf PDF
Site_Visit_20170206.pptx PPTX presentation
Sign_In_Roster_W912KC-R-17-0001.pdf PDF
B302_Part_5_Drawings.pdf PDF
B302_Part_9_Drawings.pdf PDF
B302_Part_10_Drawings.pdf PDF
B301_Part_2_Drawings.pdf PDF
B301_Part_4_Drawings.pdf PDF
B301_Part_9_Drawings.pdf PDF
B301_Part_1_Drawings.pdf PDF
B302_Part_1_Drawings.pdf PDF
B301_Part_5_Drawings.pdf PDF
B301_Part_6_Drawings.pdf PDF
B301_Part_3_Drawings.pdf PDF
B302_Part_4_Drawings.pdf PDF
PAANG_301_302_Combined_Specs_Vol.1.pdf PDF
PAANG_301_302_Combined_Specs_Vol.2.pdf PDF
BLDG_301_Specs_&_Drawings_Part_2.pdf PDF
BLDG_302_Specs_&_Drawings_Part_2.pdf PDF
BLDG_301_Specs_&_Drawings_Part_1.pdf PDF
EXHIBIT_A_B301_B302_Hangar_Repairs.pdf PDF
EXHIBIT_B_B301_B302_Hangar_Repairs.pdf PDF
EXHIBIT_C_B301_B302_Hangar_Repairs.pdf PDF
Show all 50

REPAIR HANGARS B301 & B302 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PA ANG Repair Hangars 301 and 302

SECTION 07 21 29

SPRAYED INSULATION

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM C 411 (2011) Standard Test Method for Hot-Surface Performance of High-Temperature Thermal Insulation

ASTM C 518 (2004) Steady-State Thermal Transmission Properties by Means of the Heat Flow Meter Apparatus

ASTM D 2842 (2006) Water Absorption of Rigid Cellular Plastics

ASTM E 2178 (2011) Standard Test Methods of Air Permeance of Building Materials

ASTM E 96/E 96M (2005) Standard Test Methods for Water Vapor Transmission of Materials

ASTM E 84 (2011a) Standard Test Method for Surface Burning Characteristics of Building Materials

ASTM E 96/E 96M (2005) Standard Test Methods for Water Vapor Transmission of Materials

1.2 SUMMARY

A. Section Includes: Medium-density, 100 percent water blown polyurethane foam insulation with recycled content.

B. Coordinate mechanical ventilation and fresh air supply with Mechanical sections and ASHRAE Guidelines for optimum indoor air quality.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section

01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Spray foam insulation materials ; G

Indicate VOC Content

SECTION 07 21 29 Page 1

SD-06 Test Reports

Submit test reports performed by a qualified independent testing agency evidencing compliance of insulation products with specified requirements including those for thermal resistance, fire-test-response characteristics, water-vapor transmission, water absorption, and other properties, based on comprehensive testing of current products.

SD-07 Certificates

Submit manufacturer's certificate certifying insulation provided meets or exceeds specified requirements.

SD-11 Closeout Submittals

Warranty

1.4 QUALITY ASSURANCE

1.4.1 Delivery

a. Manufacturer's Qualifications: Product produced in an ISO 9001 registered factory.

b. Single Source Responsibility: Single source product from one manufacturer.

c. Installer Qualifications: Engage an Licensed Dealer (applicator) who has been trained and certified by the manufacturer.

d. Fire-Test-Response Characteristics: Provide materials specified as determined by testing identical products per test method indicated below by a testing and inspecting agency acceptable to authorities having jurisdiction. Identify materials with appropriate markings of applicable testing and inspecting agency.

e. Surface-Burning Characteristics: ASTM E 84 .

f. Toxicity/Hazardous Materials.

1. Provide products that contain no urea-formaldehyde.

2. Products and equipment requiring or using CFCs, HCFCs, or HFCs during the manufacturing or application process will not be permitted

3. Provide products that contain no PBDEs

4. Provide products that are "Low-emitting"

1.5 DELIVERY, STORAGE, AND HANDLING

Comply with manufacturers written instructions for handling and protection prior to and during installation. Store both components in a temperature controlled area between 60 and 90 degrees F. Do not allow product to freeze. Use only those components that are supplied by the Manufacturer.

1.6 PROJECT CONDITIONS

Do not expose to sunlight, except to extent necessary for period of installation and concealment.

1.7 WARRANTY

Manufacturer's standard limited lifetime warranty.

SECTION 07 21 29 Page 2

PART 2 PRODUCTS

2.1 BASIS-OF-DESIGN MANUFACTURER:

Polyurethane Spray Foam Insulation: ICYNENE MD-R-200TM by Icynene Inc.

2.2 MATERIALS

a. General: Provide insulating materials that comply with requirements and with referenced standards.

b. Provide Medium-density, water-blown, with recycled content, conforming to the following:

1. Thermal Resistance (R-Value/inch @75 deg F): ASTM C 518 ; 5.1 hr/sq ft/degree F/BTU.

2. Air Permeance (for 2 inches of material): ASTM E 2178 : < 0.02 L/s.m2 @ 75 Pa.

3. Water Vapor Transmission (for 3 inches of material):

ASTM E 96/E 96M ; 1.3 perms.

4. Water Absorption: 1.7% per ASTM D 2842 .

5. Flame Spread and Smoke Developed Rating: ASTM E 84 .

a. Flame Spread: Less than 20.

b. Smoke Development: Less than 400.

c. Product Description:

a. Effective "breathing," (Vapor Permeable), air barrier material that can maintain the air barrier characteristic for the life of the building.

2.3 SOURCE QUALITY CONTROL

A. Product produced in an ISO 9001 registered factory.

PART 3 EXECUTION

3.1 EXAMINATION

Examine substrates and conditions, under which work is to be performed.

Do not proceed until unsatisfactory conditions have been corrected.

1. Review placement area to determine final location will not be within 3 inches of any heat source where the temperature will exceed 180 deg F per ASTM C 411 or in accordance with authorities having jurisdiction.

3.2 PREPARATION

Clean substrates and cavities of loose materials capable of interfering with insulation placement.

3.3 APPLICATION

a. Apply insulation to substrates in compliance with manufacturer's written instructions.

b. Apply insulation to produce thickness required for indicated R Value.

c. Extend insulation in thickness indicated to envelop entire area to be insulated.

SECTION 07 21 29 Page 3

3.4 PROTECTION

Protect installed insulation from damage due to harmful weather exposures, physical abuse, and other causes. Provide temporary coverings where insulation is subject to abuse.

-- End of Section --

SECTION 07 21 29 Page 4

File details come from the government source that posted it. Updated .