Bid Items Matrix 2011-04-12.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
REPAIR HANGARS EXTERIORS-BLDGS 301/302
Solicitation number
W912KC-11-R-0002
Issued by

About this file

Line Item (CLIN) Bid Structure.

View the file

Other files

File Type Posted
W912KC-11-R-0002-0002.doc DOC document
SV-Notes_12May2011.pdf PDF
Site-Visit_Sign-In_sheet.pdf PDF
Pre-Bid_Sign-In-Sheet.pdf PDF
W912KC-11-R-0002-0001.pdf PDF
Pre-Bid_Presentation.pptx PPTX presentation
Phasing Schedule.pdf PDF
AFForm66 - PAANG - Revised.xls XLS spreadsheet
PA100001_4-15-11.txt TXT text file
11-R-0002_Exhibit D and F.doc DOC document
11-R-0002_Exhibit C.doc DOC document
11-R-0002_Exhibit B.doc DOC document
11-R-0002_Exhibit A.doc DOC document
W912KC-11-R-0002.doc DOC document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B301

BUILDING 301PROJECT JLSQ092024
CLINBid Item DescriptionSummaryLocation of Details (Plan Sheets)
0001AABASE BID - Sustainment Maintenance (Existing Wall Repair)Includes all anchoring, ledge beam, and associated substructure support elements for installation of the new exterior metal panel system as well as maintenance to existing that will remain visible.S-301
0001ABBASE BID - Sustainment Repair (Roof Repair)Includes all demolition and reconstruction associated work for all roof work including barrel roof areas and EPDM roof areas. Includes rigid insulation, roof drainage features, roof access, ladders, mechanical curbs, and all other associated work items.G-003-4, AE-111-12, AE-201-3, AD-111-112, AD-201-3, A-111-12, A-201-3, A-301-25, S-001, S-101, S-301, S-304
0001ACBASE BID - Restoration Modernization RepairIncludes all other project scope items as defined in the project documents not already defined in Sustainment Maintenance and Sustainment Repair items above. Includes new exterior wall panels, personnel door and window replacement, opaque cladding on rear of hangars, repair/replacement of hangar doors, miscellaneous electrical and communications repairs, site-related improvements including but not limited to loading dock reconstruction, replacement of retaining walls, sidewalks, and stairways.All Sheets
0001ADBID OPTION 1 - Split Face Masonry to Base of WindowsIncludes the construction of a split face masonry façade around the base of the hangar building as detailed in the plans up to the base of the ground floor windows. This ABI would involve additive difference in cost for the deduction of the offset area of metal panel installation, credited against the cost of the masonry wall installation as shown.A-204-6, A-314-6, A-320-1, A-501-2, S-301
0001AEBID OPTION 2 - Split Face Masonry to Height of First FloorIncludes the construction of a split face masonry façade around the base of the hangar building as detailed in the plans up to the base of the height of the ground floor/first floor. This ABI would involve additive difference in cost for the deduction of the offset area of metal panel installation, credited against the cost of the masonry wall installation as shown.A-204-9, A-314-6, A-320-1, A501-2, S-301
0001AFBID OPTION 3 - ANG Graphics on Hangar DoorIncludes the addition of the Pennsylvania Air National Guard logo/graphic on the center of the fabric hangar door as an additive cost item.A-201 (Detail and Note 23)

B302

BUILDING 302PROJECT JLSQ092025
CLINBid Item DescriptionSummaryLocation of Details (Plan Sheets)
0002AABASE BID - Sustainment Maintenance (Existing Wall Repair)Includes all anchoring, ledge beam, and associated substructure support elements for installation of the new exterior metal panel system as well as maintenance to existing that will remain visible.S-301
0002ABBASE BID - Sustainment Repair (Roof Repair)Includes all demolition and reconstruction associated work for all roof work including barrel roof areas and EPDM roof areas. Includes rigid insulation, roof drainage features, roof access, ladders, mechanical curbs, and all other associated work items.G-003-4, AE-111-12, AE-201-3, AD-111-112, AD-201-3, A-111-12, A-201-3, A-301-25, S-001, S-101, S-301, S-304
0002ACBASE BID - Restoration Modernization RepairIncludes all other project scope items as defined in the project documents not already defined in Sustainment Maintenance and Sustainment Repair items above. Includes new exterior wall panels, personnel door and window replacement, opaque cladding on rear of hangars, repair/replacement of hangar doors, miscellaneous electrical and communications repairs, site-related improvements including but not limited to loading dock reconstruction, replacement of retaining walls, sidewalks, and stairways.All Sheets
0002ADBID OPTION 1 - Split Face Masonry to Base of WindowsIncludes the construction of a split face masonry façade around the base of the hangar building as detailed in the plans up to the base of the ground floor windows. This ABI would involve additive difference in cost for the deduction of the offset area of metal panel installation, credited against the cost of the masonry wall installation as shown.A-204-6, A-314-6, A-320-1, A-501-2, S-301
0002AEBID OPTION 2 - Split Face Masonry to Height of First FloorIncludes the construction of a split face masonry façade around the base of the hangar building as detailed in the plans up to the base of the height of the ground floor/first floor. This ABI would involve additive difference in cost for the deduction of the offset area of metal panel installation, credited against the cost of the masonry wall installation as shown.A-204-9, A-314-6, A-320-1, A501-2, S-301
0002AFBID OPTION 3 - Pavement Repair/ReplacementIncludes the milling and repaving of the asphalt areas around building B-302 (B-302A) as noted in the construction documents.C-001, CD-101, C-101-2, C-501
0002AGBID OPTION 4 - ANG Graphics on Hangar DoorIncludes the addition of the Pennsylvania Air National Guard logo/graphic on the center of the fabric hangar door as an additive cost item.A-201 (Detail and Note 23)
0002AHBID OPTION 5 - Replace Communications Room WindowsIncludes the removal, replacement, and all associated work for the two windows in the communications room as detailed in the construction documents.AD-201 (Note 16), A-201 (Note 24)