RFI_2_Repair_Add_base_parking.pdf
PDF 260 KB Posted
- Attached to
- Repair Basewide Parking Federal contract opportunity
- Solicitation number
- W912JV-16-B-7002
About this file
RFI_2_Repair_Add_base_parking
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Revised_E-1_dwg.pdf | ||
| RFI-1_Response.pdf | ||
| W912JV-16-B-7002-0001.pdf | ||
| SOUTHApronTypeBFINALCompleteDrwgSet18.pdf | ||
| Fire_Station_Parking_Drawings.pdf | ||
| W912JV-16-B-7002.pdf | ||
| 404_drawing_set.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION DATE
Aug 22, 2016
ACTIVITY ID
Repair/Add Basewide Parking
CONTRACT TITLECONTRACT NO
Solicit- Number: W912JV-16-B-7002
RFI NO
Light Pole Bases
RFI SUBJECT
E-1
DWG NO
DWG DETAIL
DWG SHEET NO
SPEC SECTION
SPEC PARAGRAPH
SPEC PAGE NO
RFI PRIORITY?
POTENTIAL TIME/COST?
SCHEDULE REFERENCED?
CRITICAL PATH?
HIGH NORMAL
YES NO
YES NO
YES NO
4296/2C (9/98) SHEET of
CONTRACTOR QUESTION AND PROPOSED SOLUTION
RFI QUESTION/ISSUE:
Can you please verify if the light poles are government furnished or contractor furnished?
CONTRACTOR PROPOSED SOLUTION:
DATECONTRACTOR/PROJECT MANAGER
NOTE: If the determination of this RFI is "Answered - No Cost" then this reply is given with the expressed understanding that it does not constitute a basis for any change in the amount or time of subject contract. Information provided in this response does not authorize work not currently included in the contract. If determination of this RFI is "Answered - Pending PCO" then this response may require a change to the contract.
ANSWERS AND COMMENTS
RFI REASON CODE
RFI ACTION
COMMENTS FOR DETAILED REVIEWER:
DETAILED REVIEWER 1 RECOMMENDED RFI SOLUTION:
Light poles and lights are contractor furnished. See revised drawing E-1
DETAILED REVIEWER 1 NAME/SIGNATURE TITLE
8/23/2016Project Manager
RESPONSE DATE
DETAILED REVIEWER 2 RECOMMENDED RFI SOLUTION:
DETAILED REVIEWER 2 NAME/SIGNATURE TITLE RESPONSE DATE
RFI RESPONSE:
DATEGOVERNMENT CONSTRUCTION MANAGER
REQUEST FOR INFORMATION
DATE
ACTIVITY ID
CONTRACT TITLE
CONTRACT NO
RFI NO
RFI SUBJECT
DWG NO
DWG DETAIL
DWG SHEET NO
SPEC SECTION
SPEC PARAGRAPH
SPEC PAGE NO
RFI PRIORITY?
POTENTIAL TIME/COST?
SCHEDULE REFERENCED?
CRITICAL PATH?
4296/2C (9/98)
SHEET
of
CONTRACTOR QUESTION AND PROPOSED SOLUTION
RFI QUESTION/ISSUE:
CONTRACTOR PROPOSED SOLUTION:
DATE
CONTRACTOR/PROJECT MANAGER
NOTE: If the determination of this RFI is "Answered - No Cost" then this reply is given with the expressed understanding that it does not constitute a basis for any change in the amount or time of subject contract. Information provided in this response does not authorize work not currently included in the contract. If determination of this RFI is "Answered - Pending PCO" then this response may require a change to the contract.
ANSWERS AND COMMENTS
RFI REASON CODE
RFI ACTION
COMMENTS FOR DETAILED REVIEWER:
DETAILED REVIEWER 1 RECOMMENDED RFI SOLUTION:
DETAILED REVIEWER 1 NAME/SIGNATURE
TITLE
RESPONSE DATE
DETAILED REVIEWER 2 RECOMMENDED RFI SOLUTION:
DETAILED REVIEWER 2 NAME/SIGNATURE
TITLE
RESPONSE DATE
RFI RESPONSE:
DATE
GOVERNMENT CONSTRUCTION MANAGER
8.0.1291.1.339988.308172
| DateTimeField2: 2016-08-22 |
| activityID: |
| contractTitle: Repair/Add Basewide Parking |
| Enter Cnt # Here: Solicit- Number: W912JV-16-B-7002 |
| rfiNo: 2 |
| rfiSubject: Light Pole Bases |
| dwgNo: E-1 |
| dwgDetail: |
| dwSheetNo: |
| specSection: |
| specParagraph: |
| specPageNo: |
| : |
| PageNumber: |
| TextField: Can you please verify if the light poles are government furnished or contractor furnished? |
| TextField: |
| TextField: Light poles and lights are contractor furnished. See revised drawing E-1 |
| SignatureField1: |
| DateTimeField1: 8/23/2016 |
| rfiReason: |
| SignatureField3: |
| TextField1: Project Manager |
| SignatureField2: |