This is Amendment 0003 to Solicitation W912JD26QA025 issued by the W912C USPFO Activity in Augusta, Maine. The amendment is effective 14 September 2026 and was signed by Contracting Officer Darlene Howes. The solicitation concerns the installation of Whelen lighting equipment and a Kussmaul battery tender/charger system on a Government-furnished Ford F550 vehicle that contains Vehicle Mounted Radiation Detection System (VMRDS) equipment. The amendment does not extend the offer receipt date or change the question submission deadline or solicitation closing date established in previous amendments.

The amendment addresses 24 questions raised by interested parties regarding equipment specifications, installation requirements, and logistical procedures. Key details include: the Ford F550 is located at 1 Armory Road, Waterville, Maine 04901 but may be transported to the contractor's facility; all lighting components, the Whelen CORE controller system, and the Kussmaul Auto Eject 20 shore-power assembly are Government-furnished; the contractor must program the Whelen CORE system to include steady burn capability and standard patterns/sounds for sirens and lights; demonstrated automotive electrical/upfitting experience (not specific manufacturer certification) is acceptable; all mounting surfaces require custom drilling with no pre-set locations; the contractor may perform work at either the Government location (with indoor shop space provided) or at a contractor facility within Maine, Vermont, New Hampshire, or Massachusetts; and the Government will handle all transportation of the vehicle to and from the selected installer. The amendment specifies this is a performance-based acquisition where the Government is primarily concerned with correct, safe completion meeting all technical, quality, safety, and schedule requirements, with contractors expected to determine their own means and methods.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Solicitation/Contract Form

The following changes have been made:

Miscellaneous text in this section has been modified from:

Amendment 0002

The due date for questions has not changed.

The closing date for the solicitation has not changed.

12. May the prospective prime contractor rely on its proposed subcontractor's technicians, relevant experience, past performance, and installation facility to satisfy the Technical (Subfactor 1.1-1.3) and Past Performance evaluation factors described in Section M, where the subcontractor - not the prime - would perform the actual installation work?

For the technical submission the proposed subcontractor's information may be the focus as it directly applies to how the quoted solution would fulfill the requirement.

The Government's past performance evaluation is focused on the prime/quoter. Past Performance shows the Government how well the prime contractor performed the work, in other words, how well they executed what was promised in the quote. "The past performance assessment will assess the prime's (hereafter referred to as quoter's) ability to successfully accomplish the proposed effort based on the quoter's demonstrated present and past work record." (Addendum to FAR 52.212-2 Evaluation, b. Past Performance Rating). If the prime contractor has had previous experience with their proposed subcontractor then that effort could be viewed as relevant. In the instance that the proposed subcontractor is an entity that the prime contractor has had no dealings with previously, the prime contractor could focus their past performance submission on efforts where they managed a subcontractor successfully as that is essentially what the prime is proposing to do for this effort.

13. Does the Supplier Performance Risk System (SPRS) evaluation described in Section M(c) apply only to the prospective prime contractor (the quoter), or does it also apply to any subcontractor performing the work?

W912JD26QA0250003

1.

2.

3.

SPRS evaluation applies only to the prime contractor (quoter). See response to question 12 for expanded past performance response.

Amendment 0001

The due date for questions has not changed.

The closing date for the solicitation has not changed.

Could you please confirm the exact physical address/place of performance where the Ford F- 550 will be available for the installation work?

1 Armory Road, Waterville, ME 04901; however we can drive the vehicle to necessary place of installation.

Can you provide the exact part numbers/models for the Whelen CORE/Controller, Inner Edge, and associated Whelen lighting components being supplied?

See answer 3.

Can you provide the exact model/part numbers for the Kussmaul battery charger/tender and Auto Eject components being supplied?

All parts listed below:

SMARTLED 600 Series (Red) x4 P/N: 01-06841264R0 SMARTLED 600 Series (Blue) x4 P/N: 01-06841264B0 Inner Edge Light w/PROCLEAR (left & right) P/N: 01-0688274L33V WHELEN Remote Siren HHS4200 P/N: 01-026H609-01C Super Auto Eject 20 (No P/N, 2 items this is the parts for the shore power) Model #: 091-55-20-120 S/N: S20227468 S/N: S2025371480 Charge Guard 12VDC (No P/N) S/N: 106-041 Siren Remote P/N: 01-0688277-00A KCT-23 Set (Multi Item) Cable set (w/Fuse holder): No P/N // Crimp terminal P/N:

E23-0692-X5 // Socket terminal P/N: E23-0686-X5 (x2) // Fuse 15A P/N: F05- 1537-X5 Door Lights x2 (Whelen three diode inner window mount, no P/N) 4" lights x4 (Whelen slim light surface mount, no P/NNo info) The whelen core system will need to be programmed, it may have a file on it but we would like to add a steady burn option as well and any other updates that core may need.

The truck and body are one unit already put together, there are no pre set mounting surfaces, all lights will need custom drilling for wire routing and mounting purposes

4.

5.

6.

7.

8.

9.

10.

11.

Will a Whelen CORE configuration/programming file be provided, or is the contractor expected to develop and program the system configuration as part of the installation?

Contractor will be expected to install. Unit can/will provide necessary file.

Does this requirement require any specific Whelen or Kussmaul manufacturer certification or authorized-installer status, or is demonstrated automotive electrical/upfitting experience acceptable?

Demonstrated automotive electrical/upfitting experience is exceptable.

Will the F-550 and VMRDS equipment body arrive fully assembled, and are necessary mounting penetrations through the equipment enclosure/body permitted for installation of the specified lighting and shore-power components?

Components are not assembled; contractor/installer is permitted to make modifications as necessary.

Is there a predetermined lighting/function specification for the Whelen CORE system, including required flash patterns, controller functions, ignition behavior, scene/warning functions, or other operating logic?

"Nothing is pre determined on the Whelen Core at this time, we would again like to add a steady burn function on the light system and all other sirens/lights can just be standard patterns/sounds.

What is the physical address/location of the Government-owned F-550?

See response to question 1.

Is the contractor expected to perform the installation at a Government facility, or may the vehicle be transported to the contractor's commercial installation facility?

Either If work is required at the Government location, will indoor shop/garage space be provided for the installation?

Yes If performance at a contractor facility is permitted, is there a maximum allowable distance or geographic restriction for transporting the Government vehicle?

Geographic restriction to Maine, Vermont, New Hampshire, or Massachusetts. We can drive the vehicle for installation anywhere within those four states.

To:

Amendment 0003

The due date for questions has not changed

The closing date for the solicitation has not changed

14. Which Government-furnished component is the battery tender/charger?

A photo of the Government-furnished Whelen lighting equipment has been added to the solicitation as Amendment 0003. The Government does not have additional model/part numbers or mounting kits beyond what is visible in the photo and previously provided information.

15. Which component is the shore-power/Auto Eject connection?

See response to question 14.

16. What is the manufacturer and model number of the battery tender/charger?

See response to question 14.

17. If available, please provide the vehicle model year, configuration, photographs, drawings, or relevant electrical/battery information that may assist contractors in planning the installation.

Ford F550

18. Please provide the exact model/part numbers and available mounting kits/accessories for the Government-furnished Whelen Inner Edge, Whelen Core/Controller, slim lights, body lights, trio lights, and Kussmaul battery tender.

See response to question 14.

19. PWS Section 3.3.7 identifies one Kussmaul battery tender as Government-furnished, while Section 5.3 requires installation of the battery tender with an auto-eject shore-power connection.

Please confirm whether the auto-eject assembly, shore-power inlet, associated cable/hardware, and mounting components are Government-furnished or contractor-furnished.

All of the equipment was removed from a previous VMRDS vehicle and the intent of this requirement is to reinstall it to the new F550. All equipment listed in previous solicitation and in the attached photograph is Government provided.

20. Please confirm the required light colors, flash patterns, Whelen Core programming, control functions, and operating sequences, if these are not already programmed into the Government-furnished equipment.

See Amendment 0001 question 3 "The whelen core system will need to be programmed, it may have a file on it but we would like to add a steady burn option as well and any other updates that core may need."

21. Please confirm the required shore-power voltage/amperage and whether the Government has a preferred mounting location for the Kussmaul auto-eject connection.

See response to question 23.

22. Please advise how and when the Government-furnished equipment will be delivered or made available to the selected installer.

See Amendment 0001 question 11. The Government can transport the vehicle to selected installer within geographic restriction.

23. Are there any special restrictions concerning drilling, body penetrations, electrical integration, or work near the existing Vehicle Mounted Radiation Detection System equipment that installers should account for?

The Government does not prescribe the specific means, methods, or procedures the contractor must use to accomplish the work, provided that the contractor's approach meets all technical, quality, safety, and schedule requirements stated in the solicitation. The contractor is expected to use its own expertise, experience, and professional judgment to determine the most efficient and effective way to deliver the required outcome.

The Government has structured this requirement as a Performance-Based acquisition. In accordance with FAR 2.101 and FAR 37.602, the Government is primarily concerned with the end result -- that the required services are performed correctly, safely, and in full compliance with all applicable standards, regulations, and performance requirements.

24. Will the Government deliver and retrieve after installation completion the Ford F550 to/from the selected contractor's installation facility?

Yes, the Government will handle moving the vehicle to and from selected installation facility.

The contractor is under no obligation to move the Ford F550.

*****Amendment 0002*****

The due date for questions has not changed.

The closing date for the solicitation has not changed.

12. May the prospective prime contractor rely on its proposed subcontractor's technicians, relevant experience, past performance, and installation facility to satisfy the Technical (Subfactor 1.1-1.3) and Past Performance evaluation factors described in Section M, where the subcontractor - not the prime - would perform the actual installation work?

For the technical submission the proposed subcontractor's information may be the focus as it directly applies to how the quoted solution would fulfill the requirement.

The Government's past performance evaluation is focused on the prime/quoter. Past Performance shows the Government how well the prime contractor performed the work, in

1.

2.

3.

other words, how well they executed what was promised in the quote. "The past performance assessment will assess the prime's (hereafter referred to as quoter's) ability to successfully accomplish the proposed effort based on the quoter's demonstrated present and past work record." (Addendum to FAR 52.212-2 Evaluation, b. Past Performance Rating). If the prime contractor has had previous experience with their proposed subcontractor then that effort could be viewed as relevant. In the instance that the proposed subcontractor is an entity that the prime contractor has had no dealings with previously, the prime contractor could focus their past performance submission on efforts where they managed a subcontractor successfully as that is essentially what the prime is proposing to do for this effort.

13. Does the Supplier Performance Risk System (SPRS) evaluation described in Section M(c) apply only to the prospective prime contractor (the quoter), or does it also apply to any subcontractor performing the work?

SPRS evaluation applies only to the prime contractor (quoter). See response to question 12 for expanded past performance response.

*****Amendment 0001*****

The due date for questions has not changed.

The closing date for the solicitation has not changed.

Could you please confirm the exact physical address/place of performance where the Ford F- 550 will be available for the installation work?

1 Armory Road, Waterville, ME 04901; however we can drive the vehicle to necessary place of installation.

Can you provide the exact part numbers/models for the Whelen CORE/Controller, Inner Edge, and associated Whelen lighting components being supplied?

See answer 3.

Can you provide the exact model/part numbers for the Kussmaul battery charger/tender and Auto Eject components being supplied?

All parts listed below:

SMARTLED 600 Series (Red) x4 P/N: 01-06841264R0 SMARTLED 600 Series (Blue) x4 P/N: 01-06841264B0 Inner Edge Light w/PROCLEAR (left & right) P/N: 01-0688274L33V WHELEN Remote Siren HHS4200 P/N: 01-026H609-01C Super Auto Eject 20 (No P/N, 2 items this is the parts for the shore power) Model #: 091-55-20-120 S/N: S20227468 S/N: S2025371480 Charge Guard 12VDC (No P/N) S/N: 106-041 Siren Remote P/N: 01-0688277-00A

4.

5.

6.

7.

8.

9.

10.

11.

KCT-23 Set (Multi Item) Cable set (w/Fuse holder): No P/N // Crimp terminal P/N:

E23-0692-X5 // Socket terminal P/N: E23-0686-X5 (x2) // Fuse 15A P/N: F05- 1537-X5 Door Lights x2 (Whelen three diode inner window mount, no P/N) 4" lights x4 (Whelen slim light surface mount, no P/NNo info) The whelen core system will need to be programmed, it may have a file on it but we would like to add a steady burn option as well and any other updates that core may need.

The truck and body are one unit already put together, there are no pre set mounting surfaces, all lights will need custom drilling for wire routing and mounting purposes

Will a Whelen CORE configuration/programming file be provided, or is the contractor expected to develop and program the system configuration as part of the installation?

Contractor will be expected to install. Unit can/will provide necessary file.

Does this requirement require any specific Whelen or Kussmaul manufacturer certification or authorized-installer status, or is demonstrated automotive electrical/upfitting experience acceptable?

Demonstrated automotive electrical/upfitting experience is exceptable.

Will the F-550 and VMRDS equipment body arrive fully assembled, and are necessary mounting penetrations through the equipment enclosure/body permitted for installation of the specified lighting and shore-power components?

Components are not assembled; contractor/installer is permitted to make modifications as necessary.

Is there a predetermined lighting/function specification for the Whelen CORE system, including required flash patterns, controller functions, ignition behavior, scene/warning functions, or other operating logic?

"Nothing is pre determined on the Whelen Core at this time, we would again like to add a steady burn function on the light system and all other sirens/lights can just be standard patterns/sounds.

What is the physical address/location of the Government-owned F-550?

See response to question 1.

Is the contractor expected to perform the installation at a Government facility, or may the vehicle be transported to the contractor's commercial installation facility?

Either If work is required at the Government location, will indoor shop/garage space be provided for the installation?

Yes If performance at a contractor facility is permitted, is there a maximum allowable distance or geographic restriction for transporting the Government vehicle?

Geographic restriction to Maine, Vermont, New Hampshire, or Massachusetts. We can drive the vehicle for installation anywhere within those four states.

IDCode: J
Page: 1
Pages: 9
AmendNo: 0003
EffDate: 14 SEP 2026
ReqNo:
ProjNo:
IssCode: W912JD
AdmCode:
IssuedBy: W7NC USPFO ACTIVITY ME ARNG

KO FOR MEARNG DO NOT DELETE, WITHROP STREET BLDG 39

AUGUSTA, ME 04333-0032

UNITED STATES

THOMAS RYAN, EMAIL: THOMAS.J.RYAN36.CIV@ARMY.MIL TELEPHONE: (207) 430-5297

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W912JD26QA025
SolDate: 21 AUG 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: The purpose of this amendment is for the Government to provide a response to questions raised by interested parties.
ContNameTitle:
CoNameTitle: DARLENE HOWES
ContDate:
CODate: 14 SEP 2026

File details come from the government source that posted it. Updated .