Site_Visit_Deconstruction_of_Buildings.pdf

PDF 329 KB Posted

Attached to
Demolition of Buildings 494 and 418
Solicitation number
W912JD-16-B-2002
Issued by

About this file

Site Visit Slides

View the file

Other files

File Type Posted
Record_of_Attendance.pdf PDF
SF_1409.pdf PDF
Q A.pdf PDF
Rec_of_Att.pdf PDF
C201_Revised.pdf PDF
015000_Temporary_Controls_B494.pdf PDF
329200_Turf_Grasses_B494.pdf PDF
Site_Demolition_Plans_B494.pdf PDF
312000_Earth_Moving_B494.pdf PDF
024100__Deconstruction_B494.pdf PDF
SOW_Deconstruct__B418.pdf PDF
16-B-2002.pdf PDF
SOW_Deconstruct_B494.pdf PDF
Record_Dwg_B494.pdf PDF
021200__Disposal_Haz_Waste_B494.pdf PDF
Site_Demolition_Plans_B418.pdf PDF
Asbuilts_Drawings__1986_B418.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912JD‐16‐B‐2002

Capt John Cronin, Base Civil Engineer SSgt Justine Drake, COR Inspector, Mr. Glen Tompkins MSgt Jason Edwards, Contracting Officer SSgt Bradford Erdmann, Contract Specialist

Environmental Safety Security Etc.

Total Small Business Set‐Aside Bid Due Date/Time: 12 July 2013 1:00 PM EST.

Contracting Office, Bldg. 505

Period of Performance: 120 Days

Wage Determination: 2005‐2241 Revision # 18, 12/29/2015 Maine Statewide; Service Contract Act.

Basis for Award:

Price Government intends to award to a single offeror.

CLIN 0001 ‐Deconstruct Bldg. 494

IAW SOW

CLIN 0002 ‐Demolish Bldg. 418

IAW SOW

CLIN 0003 – Satisfactory Lawns Accomplished in the Spring

CLIN 0004 –Contractor Manning Reporting Administration

Executive Compensation and First Tier Subcontract Awards is applicable.

CONTRACTOR MANPOWER REPORTING

“The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Air Force collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/.

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk at http://www.ecmra.mil/.”

Bids must be:

Hand carried Parcel Delivery (Notify Contracting Officer via E‐mail)

Bid Opening 12 September 2016, 1:00 PM, Bldg. 505 Bids must be in the possession of the contracting officer.

FAR 52.212‐1(f) “Late submission, modifications, revisions, and withdrawals of offers.” Electronic, Facsimile and Telegraphic Bids will not be accepted.

FAR 52.228‐1 Bid Guarantee Shall be at least 20% of the bid price

Performance & Payment Bonds 100% within 10 days; before performance starts

All specifications, drawings and as‐builts are available online at the FBO.gov website

(W912JD‐16‐B‐2002).

No printed copies will be provided.

All attendees need to stay together when touring all buildings.

Please do not wander off on your own.

Please do not handle any stored items on the hangar floor or in any offices.

Pictures are allowed of the buildings being demolished only; no pictures of aircraft or any other facilities.

All questions and answers must be in writing.

E‐mail all questions to:

SSgt Bradford Erdmann

Do not contact engineers or A&E.

Questions must be received NLT Wednesday, 7 September 2016.

All questions and answers will be posted to www.FBO.gov.

File details come from the government source that posted it. Updated .