Revised_SOW_Hangar_7_Interior_Paint.pdf
PDF 89 KB Posted
- Attached to
- Paint Interior Wall & Hangar Door Bldg 7
- Solicitation number
- W912JB19R5013
About this file
Revised Statement of Work dated 08 Aug 2019
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work 08 Aug 2019
Project Number, Title: VGLZ182004 B7 Paint Interior Wall & Interior & Exterior of Hangar Door
The generic contract specifications and Selfridge Design Standards apply to this contract. The work shall be in strict compliance with those specifications and the requirements identified in this Statement of Work and its attachments.
Sections of this contract may supersede the requirements of the generic specifications, in which case the more stringent/higher quality requirements shall apply.
1. This contract provides for, but is not limited to:
A. Contractor shall review attached lead based paint testing data and conduct investigation to see to what extent lead paint is present in area where work to be performed. Contractor shall use all necessary precautions when preparing areas where lead based paint exists.
B. The Contractor shall paint interior block walls and accessories, and accessible portions of the interior and exterior sides of the hangar doors and trim. Refer to attached drawings and Selfridge Design Standards for additional information.
a. Interior block walls shall be prepared for paint as required. Painted walls shall receive 1 coat primer and 2 coats semi-gloss latex. Paint scheme for walls is to reflect current scheme. Top portion shall bright white and bottom shall be color matched to epoxy floor.
Paint drawdowns require approval prior to completion of the work.
b. Interior and exterior side of eastern hangar door and exterior side of western hangar door shall be prepared for paint as required. Painted doors shall receive 1 coat primer and 2 coats of an appropriate paint to withstand the elements. Contractor shall not paint over the translucent fiberglass panels. Door paint scheme shall reflect the current paint scheme of the door. Paint drawdown require approval prior to completion of the work.
C. The contractor shall cleanup site and adjacent areas affected by their work.
2. Additional specifications for materials or requirements not included in the specifications:
A. See Selfridge Design Standards.
3. The following attachments are included with the revised Statement of Work dated 8 August 2019:
1. Drawing. Dated 20190807
2. Lead Based Testing Data – H7
4. Antiterrorism / Operations Security / Information Protection:
A. Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within Government controlled installation, facility, or area. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR).
The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
B. For Contractors that do not require CAC, but require access to a DoD Facility and/or Installation.
Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 31-101 and AFI 10-245), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided
Statement of Work 08 Aug 2019 by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
C. AT Level I Training. This standard language is for contractor employees with an area of performance within an Government controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Government Installations, Facilities and Controlled Access areas shall complete AT Level I awareness training within 10 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable.
Certificates of completion for each affected contractor employee and subcontractor employee will be maintained by the COR or Antiterrorism Representative. AT level I Awareness Training is available at the following website: http://jko.jten.mil
5. Period of Performance: 120 Days after Notice to Proceed