F8Y36P9128AW03-1
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this modification is to incorporate the follow ing changes:
1.) to replace in its entirety the Statement of Work in the Solicitation dated 26 Jul 2019 w ith the Statement of Work dated 08 Aug 2019 that w as provided at the site visit;
2.) to confirm the posting of Lead Based Paint Testing Data and Draw ing (dated 7 Aug 19) on FBO on 12 Aug 2019; and 3.) to extend the due date of the proposal from 16 Aug 2019 to 19 Aug 2019 at 3:00 PM.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Aug-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912JB19R5013
X 9B. DATED (SEE ITEM 11)
26-Jul-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Aug-2019
CODE
127 MSC - FA6221
43200 MAPLE ST
BLDG 105, RM 16
SELFRIDGE ANGB MI 48045-5213
W912JB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912JB19R5013
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 16-Aug-2016 12:00 PM to 19-Aug-2016 03:00 PM.
The required performance has changed from Project Title / No.: Paint Interior Wall & Hangar Door Bldg 7, VGLZ182012Solicitation #: W912JB-19-R-5013Location: Selfridge ANGB, MIPeriod of Performance (POP):
120 Days1) Set-aside: This requirement will be 100% Set-Aside for Small Business.2) Small Business Size Standard: $15M3) NAICS Code: 238320 - Painting and Wall Covering Contractors4) Project Magnitude: Between $25,000-$100,0005) Submit Proposals no later than 16 Aug 2019 @ 12:00pm ET6) Prospective offerors are highly encouraged to attend a Site Visit on 8 Aug 2019 at 9:00am ET. (See Documents for Access Requirements)Award will be made, in accordance with FAR 13.106-3, to the responsible offeror whose Proposal conforms to the Request for Proposal and is most advantageous to the Government considering price and non-price related factors. to Project Title / No.: Paint Interior Wall & Hangar Door Bldg 7, VGLZ182012Solicitation #: W912JB-19-R-5013Location:
Selfridge ANGB, MIPeriod of Performance (POP): 120 Days1) Set-aside: This requirement will be 100% Set-Aside for Small Business.2) Small Business Size Standard: $15M3) NAICS Code: 238320 - Painting and Wall Covering Contractors4) Project Magnitude: Between $25,000-$100,0005) Submit Proposals no later than 19 Aug 2019 @ 3:00pm ET6) Prospective offerors are highly encouraged to attend a Site Visit on 8 Aug 2019 at 9:00am ET. (See Documents for Access Requirements)Award will be made, in accordance with FAR 13.106-3, to the responsible offeror whose Proposal conforms to the Request for Proposal and is most advantageous to the Government considering price and non-price related factors..
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been added by full text:
STATEMENT OF WORK-08 AUG 2019
Project Number, Title: VGLZ182004 B7 Paint Interior Wall & Interior & Exterior of Hangar Door The generic contract specifications and Selfridge Design Standards apply to this contract. The work shall be in strict compliance with those specifications and the requirements identified in this Statement of Work and its attachments.
Sections of this contract may supersede the requirements of the generic specifications, in which case the more stringent/higher quality requirements shall apply.
1. This contract provides for, but is not limited to:
A. Contractor shall review attached lead based paint testing data and conduct investigation to see to what extent lead paint is present in area where work to be performed. Contractor shall use all necessary precautions when preparing areas where lead based paint exists.
B. The Contractor shall paint interior block walls and accessories, and accessible portions of the interior and exterior sides of the hangar doors and trim. Refer to attached drawings and Selfridge Design Standards for additional information.
a. Interior block walls shall be prepared for paint as required. Painted walls shall receive 1 coat primer and 2 coats semi-gloss latex. Paint scheme for walls is to reflect current scheme. Top portion shall bright white and bottom shall be color matched to epoxy floor.
Paint drawdowns require approval prior to completion of the work.
b. Interior and exterior side of eastern hangar door and exterior side of western hangar door shall be prepared for paint as required. Painted doors shall receive 1 coat primer and 2 coats of an appropriate paint to withstand the elements. Contractor shall not paint over the translucent fiberglass panels. Door paint scheme shall reflect the current paint scheme of the door. Paint drawdown require approval prior to completion of the work.
C. The contractor shall cleanup site and adjacent areas affected by their work.
2. Additional specifications for materials or requirements not included in the specifications:
W912JB19R5013
A. See Selfridge Design Standards.
3. The following attachments are included with the revised Statement of Work dated 8 August 2019:
1. Drawing. Dated 20190807
2. Lead Based Testing Data – H7
4. Antiterrorism / Operations Security / Information Protection:
A. Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within Government controlled installation, facility, or area. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR).
The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
B. For Contractors that do not require CAC, but require access to a DoD Facility and/or Installation.
Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 31-101 and AFI 10-245), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
C. AT Level I Training. This standard language is for contractor employees with an area of performance within an Government controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Government Installations, Facilities and Controlled Access areas shall complete AT Level I awareness training within 10 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable.
Certificates of completion for each affected contractor employee and subcontractor employee will be maintained by the COR or Antiterrorism Representative. AT level I Awareness Training is available at the following website: http://jko.jten.mil
5. Period of Performance: 120 Days after Notice to Proceed
(End of Summary of Changes)