Specifications_-_Project_Manual_-_1.pdf
PDF 2 MB Posted
- Attached to
- Repair Electrical Transformers Federal contract opportunity
- Solicitation number
- W912JB19B5009
About this file
Specifications - Project Manual - Part 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Out of scope JA II (003).pdf | ||
| W912JB19B5009_Amendment_0001a.pdf | ||
| Specifications_-_Project_Manual_-_4.pdf | ||
| Specifications_-_Project_Manual_-_2.pdf | ||
| Electrical_Systems_Combined_Drawings.pdf | ||
| Selfridge_ANGB_Vetting_Access_Request_Form.pdf | ||
| Specifications_-_Project_Manual_-_3.pdf | ||
| W912JB19B5009_Repair_Electrical_Transformers.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Copyright © 2017
PROJECT NO.: 2016-01842-000
PRINTED ON RECYLED PAPER TITLE PAGE
000101-1
Project Manual
Selfridge Air National Guard Base
SANG Design and Repair of Electrical Systems:
Buildings 36, South of 45, 860, 1400 at
Harrison Township, MI
For
Selfridge Air National Guard Base
General Contract
Project No.: 2016-01842-000
Issued for Final (100%) Submittal:
April 28, 2017
THIS PAGE INTENTIONALLY LEFT BLANK
Final (100%) Submittal
SELFRIDGE AIR NATIONAL GUARD BASE PROJECT NO.: 2016-01842-000
SANG DESIGN AND REPAIR OF ELECTRICAL SYSTEMS:
BUILDINGS 36, SOUTH of 45, 860, 1400
TABLE OF CONTENTS
2/16/2017 2:12:43 PM 00 01 10 - 1
SECTION 00 01 10 - TABLE OF CONTENTS
LATEST SECTION SECTION PAGE
REVISION NUMBER TITLE NUMBER
INTRODUCTORY INFORMATION
00 01 01 Title Page 1 only 00 01 10 Table of Contents 00 01 15 List of Drawings
BIDDING REQUIREMENTS AND CONTRACTING REQUIREMENTS
Note: Bidding and contracting documents will be provided by Owner.
00 26 50 Buy American Requirements
CONSTRUCTION PRODUCTS AND ACTIVITIES
DIVISION 1 - GENERAL REQUIREMENTS
01 00 00 Requirements of Selfridge Air National Guard Base Supplements:
Attachment 1 - Contractor Base Pass Request Attachment 2 - AF Form 66 Modified, Schedule of Material Submittals Attachment 3 - AF Form 3000, Material Approval Submittal Attachment 4 - Request for Information (RFI) Format Attachment 5 - AF Form 3064, Contract Progress Schedule Attachment 6 - AF 3065, Contract Progress Report Attachment 7 - Demonstrations Commissioning Testing Spreadsheet Attachment 8 - Spare Material Parts Spreadsheet Attachment 9 - Extended Manufacturer Warranty Spreadsheet Attachment 10 - DD Form 1354, Transfer and Acceptance of Military Real Property Attachment 12 - O&M Data Spreadsheet Attachment 13 - SANGB Form 23, Contractor Hazardous Material Identification Attachment 14 - Solid Waste Disposal and Diversion Tracking Form Attachment 15 - Project Sign (Sample) 01 10 00 Summary of Work 01 22 00 Unit Prices 01 25 00 Substitution Procedures 01 26 00 Contract Considerations 01 29 00 Applications for Payment 01 31 00 Coordination and Project Meetings
PROJECT NO.: 2016-01842-000 SELFRIDGE AIR NATIONAL GUARD BASE
00 01 10 - 2 2/16/2017 2:12:43 PM
01 32 00 Construction Progress Schedules 01 32 33 Construction Photographs 01 33 00 Submittals 01 35 23 Safety Policies and Procedures Supplements:
Sample Construction Hazard Plan 01 40 00 Quality Control – General 01 40 10 Testing And Inspection Services - Building 01 41 00 Project Coordination 01 42 00 Reference Standards 01 45 23 Testing Services 01 50 00 Construction Facilities and Temporary Controls 01 51 00 Temporary Utilities 01 57 00 Erosion and Sediment Control 01 57 19 Environmental Protection Supplements:
Form 6: Tank Inspection Form 01 60 00 Material and Equipment 01 62 35 Recycled/Recovered/Biobased Materials Green Procurement Reporting Form 01 64 00 SANG Furnished/Contractor Installed Equipment 01 73 00 Cleaning 01 73 29 Cutting and Patching 01 74 00 Warranties 01 74 19 Construction Waste Management and Disposal Supplements:
Form CWM-1: Construction Waste Identification Form CWM-3: Construction Waste Reduction Work Plan Form CWM-5: Cost/Revenue Analysis of Construction Waste Reduction Work Plan Form CWM-7: Construction Waste Reduction Progress Report 01 74 19-A Soil Relocation Guidance for Selfridge Air National Guard Base 01 75 00 Starting of Systems 01 77 00 Project Closeout 01 78 23 Operation and Maintenance Data 01 78 39 Project Record Documents 01 79 00 Demonstration and Training 01 81 13 Sustainable Design Requirements LEED New Construction v2.2 Registered Project Checklist 01 88 18 Weather 01 91 13 General Commissioning Requirements
DIVISION 2 – EXISTING CONDITIONS – (NOT USED)
DIVISION 3 – CONCRETE
03 30 00 Cast-In-Place Concrete
2/16/2017 2:12:43 PM 00 01 10 - 3
DIVISION 4 - MASONRY - (NOT USED)
DIVISION 5 - METALS
05 80 10 Post-Installed Anchors
DIVISION 6 WOOD, PLASTICS AND COMPOSITES – (NOT USED)
DIVISON 7 - THERMAL AND MOISTURE PROTECTION – (NOT USED)
DIVISION 8 - DOORS AND WINDOWS – (NOT USED)
DIVISION 9 - FINISHES – (NOT USED)
DIVISIONS 10 - 21 - (NOT USED)
DIVISION 22 – PLUMBING – (NOT USED)
DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING – (NOT USED)
DIVISION 26 - ELECTRICAL
26 05 00 General Requirements, Electrical Work 26 05 00A Appendixes 26 05 13 Medium-Voltage (601 Volt To 35KV) Cable And Accessories 26 05 19 Wires And Cables (600 Volts And Less) 26 05 26 Grounding 26 05 33 Raceways And Fittings 26 05 43 Underground Electrical Service 26 05 53 Identification For Electrical Systems 26 05 73 Arc Flash Hazard Calculations & Labels 26 12 00 Pad Mounted Oil Filled Transformers 26 13 00.02 Medium Voltage Metal Enclosed Switchgear 26 28 13 Fuses 26 70 00 Electrical Systems Testing 26 70 00A Electrical Systems Testing, Appendix A 26 70 00B Electrical Systems Testing, Appendix B 26 70 00E Electrical Systems Testing, Appendix E
00 01 10 - 4 2/16/2017 2:12:43 PM
DIVISIONS 27 - 30 - (NOT USED)
DIVISION 31 – EARTHWORK
312020 Earthwork For Buildings
DIVISIONS 32 - 49 - (NOT USED)
END OF TABLE OF CONTENTS
KAK
LIST OF DRAWINGS
04/27/17 2:32PM 00 01 15- 1
SECTION 00 01 15 - LIST OF DRAWINGS
1.1 CONTRACT DRAWINGS
A. The following Drawings, marked and dated as noted below, form a part of the Contract Documents:
1. Marked: Issued for: Final (100%) Submittal
2. Dated: April 28, 2017
3. List: Refer to Drawing TS-01, "Title Sheet", for complete list of drawings.
END OF SECTION
LIST OF DRAWINGS
000115- 2 04/27/17 2:32PM
BUY AMERICAN REQUIREMENTS
2/16/2017 2:12:30 PM 00 26 50 - 1
SECTION 00 26 50 - BUY AMMERICAN REQUIREMENTS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes “Buy American – Construction Materials” requirements.
1.3 REQUIREMENTS: BUY AMERICAN – CONSTRUCTION MATERIALS
Buy American–Construction Materials (May 2014)
(a) Definitions. As used in this clause--
“Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR
2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, 00 26 50 - 2 2/16/2017 2:12:30 PM emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means--
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph
(1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
(i) The cost of its components mined, produced, or manufactured in the United
States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other than a domestic construction material.
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements the 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a
COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
2/16/2017 2:12:30 PM 00 26 50 - 3
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
______ [Contracting Officer to list applicable excepted materials or indicate “none”]
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy
American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the
United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1)
(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
00 26 50 - 4 2/16/2017 2:12:30 PM
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the
Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy
American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction material description Unit of measure Quantity Price (dollars) *
Item 1
Foreign construction material
Domestic construction material
Item 2
Foreign construction material
2/16/2017 2:12:30 PM 00 26 50 - 5
Domestic construction material
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]
[Include other applicable supporting information.]
[*Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]
1.4 ACTION SUBMITTALS
A. Provide submittals as required by Article 1.3 Requirements “Buy American – Construction
Materials” if requesting a deviation from the requirements.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 002650
00 26 50 - 6 2/16/2017 2:12:30 PM
REQUIREMENTS OF SELFRIDGE
AIR NATIONAL GUARD BASE
2/16/2017 2:12:18 PM 01 00 00- 1
SECTION 01 00 00 - REQUIREMENTS OF SELFRIDGE AIR NATIONAL GUARD BASE
PART 1 - GENERAL
1.1 SCOPE
A. Project provides for furnishing all plant, labor, materials, equipment and furnishings for the project at Selfridge ANG Base MI as described herein and shown on the construction drawings.
Hierarchy of contract documents is as follows: Delivery Order requirements (Statement of
Work or Statement of Objectives) precedes default specifications.
B. The Contractor will be held responsible for all requirements described in the Contract
Documents and all work including that of all tier subcontractor(s), if any, shall be done in accordance with the Contract Documents. Failure to be familiar with all contract requirements will not relieve the Contractor of the responsibility to comply.
C. The Contract Documents Are Complementary: What is required by one is as binding as if required by all. The Contractor shall coordinate all portions of the work such that it is delivered complete.
D. The organization of the specification’s divisions, sections, and attachments, and the arrangement of the Drawings shall not control the Contractor in dividing the work among subcontractor(s) or in establishing the extent of the work to be performed by any trade.
1.2 ENTRY TO BASE/ACCESS TO SITE
A. Selfridge ANG Base MI is a closed base, pursuant to Section 21, Internal Security Act of 1950, 50 U.S.C. 797 and, as such, only those persons granted permission may enter. It is, therefore, required that control be exercised over Contractor personnel while working on the Base. To maintain this control, a list (herein attached) of all Contractor personnel (prime and all tiers of subcontractors) who will be working under the contract, must be submitted to the Contracting
Officer a minimum of 5 working days prior to the start of work. The preferred method of providing this list is via email, to the Contracting Officer. The list shall include, but is not limited to, contract number, project number, project title, company names, employee names, and the estimated start and end date of each person’s employment on the Project. Subsequent lists updating all personnel additions and/or deletions will be submitted as indicated above as employees are hired or released.
B. During construction, the Contractor shall permit base personnel access to the facilities within the work area. The Contractor shall provide protection to persons and property throughout the progress of the work.
01 00 00- 2 2/16/2017 2:12:18 PM
C. In the event of a declared National Emergency, the Contracting Officer may be required to stop work on this Contract for security reasons. Contractor shall ensure the Contracting Officer has a current “Off Duty/Emergency” contact name and telephone number at all times to facilitate notification.
1.3 INSPECTION OF SITE
A. The Contractor shall be responsible for the complete determination and coordination of the work of all trades. Reference Contract Clauses FAR 52.236-19, “Organization and Direction of
Work.”
B. It is expected that prospective bidders/offerors visit the premises and thoroughly familiarize themselves with the details of the work and working conditions. A certification from the contractor that they have visited or the understanding of potential consequences for not attending the site will be required at the time of proposal. It is the responsibility of all bidders/offerors to have compared the premises and the site with the Specifications and
Drawings, and to have satisfied themselves as to all conditions of the premises, the existing obstructions, the actual elevations, and any other conditions affecting the execution and completion of the work prior to submission of a proposal. Reference Contract Clause
FAR 52.236-3, “Site Investigation and Conditions Affecting the Work.”
C. No allowances or extra construction on behalf of any Contractor will be permitted by reason of error or oversight. Reference Contract Clause FAR 52.236-3, “Site Investigation and
Conditions Affecting the Work.”
D. Carefully check the site where this project is to be erected and observe any overhead wires and equipment. Any such work shall be moved, replaced, or protected, as required, whether or not shown or specified.
E. All dimensions shown on the Drawings are based on “as-built” record drawings and, to the extent possible, accurately represent existing conditions; however, there may be some variance between existing conditions and Contract Drawings. The Contractor is responsible for verifying all dimensions and for reporting to the Contracting Officer any discrepancies that may affect performance of the work represented by Contract Drawings and Specifications. Reference
Contract Clause DFARS 252.236-7001 “Contract Drawings and Specifications.”
1.4 CORRELATION OF DRAWINGS, SPECIFICATIONS, AND CONTRACTS
A. The Contract specifications and the accompanying Drawings are intended to describe and provide for the attached project. They are intended to be cooperative and what is called for by one shall be as binding as if called for by all. The Contractor shall understand that the work herein described shall be complete in every detail, not withstanding that every item necessarily involved is not particularly mentioned, and the Contractor shall be held to provide all labor and material for the entire completion of the work intended to be described and shall not avail any
2/16/2017 2:12:18 PM 01 00 00- 3
manifestly unintentional error or omission, should any exist. Should any error or inconsistency appear in the Drawings and/or specifications, the Contractor, before proceeding with the work, shall make mention in writing of same to the Contracting Officer for proper adjustment, and in no case shall proceed with the work in uncertainty. Reference Contract Clauses FAR 52.236-21
“Specifications and Drawings for Construction.”
1.5 REPORT OF ERROR AND DISCREPANCIES
A. The Contractor shall be responsible for the coordination and proper relation of all aspects of the work. The Contractor shall field verify all dimensions and promptly notify the Contracting
Officer in writing of any discrepancies, prior to proceeding with any phase of the work. Where exact locations are not given for the positioning of equipment and devices, they shall be positioned to permit easy access for maintenance and for removal and replacement of component parts per manufacturer’s recommendations and applicable codes.
B. The Contractor shall be responsible for any and all discrepancies in work due to failure to obtain dimensions and investigate conditions at the Project site before fabrication and installation of materials.
C. The Contractor shall bear all costs in replacing all materials and labor lost due to not observing the above paragraph and such replaced materials shall meet the approval of the Contracting
Officer.
D. Any proposed changes to the specifications by the Contractor must be submitted in writing to the Contracting Officer for approval prior to implementation.
E. Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
F. Reference Contract Clauses FAR 52.236-21, “Specifications and Drawings for Construction.”
FAR 52.246-12 “Inspection of Construction,” and DFARS 252.236-7001, “Contract Drawings, and Specifications.”
1.6 DIVISION OF WORK
A. The various divisions of the specifications shall not be considered as negotiations of the material and labor involved. The arrangement and order of these divisions have been made for convenience only, and it is not the intent, nor shall it be so construed, that a particular trade or
Subcontractor must perform that work included in any one division. Reference Contract Clause
FAR 52.236-21, “Specifications and Drawings for Construction.”
01 00 00- 4 2/16/2017 2:12:18 PM
B. Any item mentioned under any division heading must be supplied even though it is not specified under the heading for the respective work, but is shown on the Drawings. No claims for extras arising out of real or alleged error in such arrangement or order of the various divisions will be given consideration.
1.7 METHOD OF CARRYING ON THE WORK
A. All work under the Contract shall be arranged and carried on in such a manner as to complete work in the least possible time. The Contractor shall consult with the Contracting Officer as to methods or sequence of carrying on the work. A definite program of work shall be arranged before starting. Master schedule shall be provided and presented 5 calendar days following issuance of Notice to Proceed unless waived by the Contracting Officer. Reference Contract
Clause FAR 52.236-15, “Schedules for Construction Contracts.”
B. Activities in the vicinity of this Project may be kept in full or partial operation during construction. The Contractor shall coordinate with the Contracting Officer to schedule construction activities. Reference Contract Clause FAR 52.236-8, “Other Contracts.”
C. The Contractor shall be responsible for the coordination of his work with any other contractor in the area, making them aware of proposed work that may affect the work of their particular trade in process of performance (Reference Contract Clause FAR 52.236-8 “Other Contracts”).
1.8 STANDARDS OF MANUFACTURE
A. All recognized regulatory/code standards shall be in accordance with the most current published adopted edition prior to the release for bid/proposal of the Contract Documents.
B. For the purpose of establishing the standard of construction and the requirements to be met in the work, these Specifications and the Drawings are based on the use of products hereinafter specified, and adapted to the installation as required to meet current Base Standards to include but not limited to Vision 2020, ANG ETLs, and appropriate UFCs.
C. Where brand names are shown, these names are intended to describe a quality of product, and in no way are intended to limit products of equal quality. Therefore, products of other manufacturers may be employed for this work provided they are equivalent materials and construction and equally adaptable to the conditions as approved by the Contracting Officer.
Reference Contract Clause FAR 52.236-5, “Materials and Workmanship.”
1.9 BRAND NAME CLARIFICATION
A. Where the specifications refer to acceptable manufacturers or manufacturer’s products, an equal product of another manufacturer may be substituted. Brand names are used to set a standard of quality. Reference Contract Clause FAR 52.236-5 “Materials and Workmanship.”
2/16/2017 2:12:18 PM 01 00 00- 5
1.10 MEANING OF APPROVED, DIRECTED, ETC.
A. “Approved”, “Directed”, “Required”, “Applicable”, and/or words of like or similar effect, when used in the specifications shall be interpreted to mean “Approved By”, “Directed By”, etc., the
Contracting Officer unless otherwise specifically stipulated.
1.11 MISPLACED MATERIALS
A. Any material that is deposited other than in areas designated as approved by the Contracting
Officer shall be rehandled and deposited where directed. No payment will be made for rehandling such material. The Contracting Officer will notify Contractor of any noncompliance with the foregoing provision.
1.12 COMPLIANCE WITH CODES AND REGULATIONS
A. All work shall be done in accordance with the applicable codes and/or ordinances in force at the time of construction. It is the Contractor’s responsibility to ensure that where EPA, MDEQ, or other such regulations control the removal, handling, installation or disposal of materials, they shall be strictly adhered to whether or not specifically referenced in the construction documents.
B. Contractor shall have Material Safety Data Sheets (MSDSs) available at the site on any materials used to comply with MIOSHA and EPA. Reference Contract Clause FAR 52.223-3, “Hazardous Material Identification and Material Safety Data.”
1.13 MATERIAL TESTING BY NATIONAL LABORATORIES
A. Electrical materials and equipment shall be new and bear the Underwriters Laboratories (UL) label or be listed in the UL Electrical Construction Materials Directory or Electrical Appliance and Utilization Equipment Directory, wherever standards have been established by the agency.
B. The Contractor shall submit proof that the material or equipment proposed to be furnished under this Specification conforms to the standards of Underwriters Laboratories. The label of
Underwriters Laboratories (UL) shall be accepted as conforming to this requirement.
C. In lieu of the label, the Contractor may submit a written certification from any recognized testing agency, adequately equipped and competent to perform such services, that the material or equipment has been tested and conforms to the standards, including the methods of testing used.
D. Refer to Section 01 32 00, Construction Progress Schedules, for additional information.
01 00 00- 6 2/16/2017 2:12:18 PM
1.14 SUBMITTALS
A. Construction Submittals:
1. Submittal Schedule: In accordance with the AF Form 66, Schedule of Material Approval
Submittals, as herein attached, the Contractor is required to submit all Shop Drawings and material submittals to the Contracting Officer within 10 days after receipt of the
Notice to Proceed (NTP), or within the timeframe directed by the Contracting Officer.
The submittal schedule is considered not all inclusive. The Contractor shall also submit additional material submittals as may be required by these Contract Specifications.
2. Submittal Preparation: When preparing each submittal, the Contractor shall comply with the submittal schedule in such detail as to demonstrate conformance with all its requirements. Refer to Section 01 33 00, Submittals, for additional information.
Submittals shall be given a distinct identification system by Line Item if multiple Line
Items are applicable. Individual submittal documents shall not be comprised of items for more than one Line Item. Every submittal for a material item, or items to be installed, for which the submittal schedule requires catalog data, shall include the specific catalog and model specification number designation(s), unless specifically directed otherwise by these Specifications or by the Contracting Officer. Each submittal shall provide the appropriate number of copies as specified on the submittal schedule, and shall include an
AF Form 3000, Material Approval Submittal, as herein attached, or approved equal.
Reference Contract Clause FAR 52.236-5, “Material and Workmanship,” FAR 52.225-5, “Buy American Act-Construction Materials,” FAR 52.223-3, “Hazardous Material
Identification and Material Safety Data,” and DFAR 252.227-7033, “Rights in Shop
Drawings.”
3. Submittal Accuracy:
a. The Contractor assumes full responsibility for the appropriate and accurate submission of all material submittals as furnished by the Contractor and all tier subcontractors.
b. Prior to submitting a material submittal the Contractor shall:
1) Ensure that an individual within the company, with the appropriate authority to certify, signs the certification on the AF Form 3000.
2) Ensure that the Contractor’s certification shall constitute a representation to the Government that the Contractor has verified and determined the applicability and accuracy of the submittal contents, including as necessary but not limited to, that dimensions, field measurements, materials, catalog numbers, and similar data being submitted are in compliance with the work and the Contract Documents.
3) Ensure that any material deviation from the original requirements of the
Contract Documents shall be brought to the attention of the Contracting
Officer at the time of its submission. The material deviation shall be identified on the AF Form 3000, or approved equal, as a deviation.
2/16/2017 2:12:18 PM 01 00 00- 7
4. Submittal Approval: In accordance with the submittal schedule and prior to the purchase of materials the Contractor shall submit for approval the materials he/she proposes to supply. The Contracting Officer will inform the Contractor as to whom submittals should be forwarded for review (example: the Architect-Engineer (A-E) firm or the Contracting
Officer) at the post award/preconstruction conference. If direction is given to send submittals to the A-E, then the Contractor shall also submit a “suspense” copy of each entire submittal to the Contracting Officer. No unapproved or disapproved materials shall be used. It is the Contractor’s responsibility to review the specifications to ensure that all required materials are submitted for approval prior to installation. It is recognized that all submittals may not immediately be available for review; however, it is the
Contractor’s responsibility to ensure that submittals are prepared in sufficient time to allow the Government up to 14 calendar days for review. Reference Contract Clause
FAR 52.236-5, “Material and Workmanship.”
5. Resubmittal Reviews: For submittals requiring A-E review to include test reports, if an original submittal and its first resubmittal are disapproved, a fee may be charged at
Contracting Officer’s discretion for reviewing a second resubmittal, and each subsequent resubmittal payable to the A-E for review costs.
1.15 REQUESTS FOR INFORMATION (RFI)
A. A Contractor’s Request for Information (RFI), as herein attached, shall address technical questions only and shall be submitted to the Contracting Officer in an approved RFI format.
B. The Contractor shall allow a minimum of 3 business days from the date the Government receives the RFI to receive a response.
C. Section 01 31 00, Coordination and Project Meetings, for additional information.
1.16 PROGRESS SCHEDULES, PROGRESS REPORTS, AND PROGRESS MEETINGS
A. Progress Schedules:
1. All projects exceeding 60 calendar days or required by the delivery order require submission of a work progress schedule. Reference Contract Clause FAR 52.236-15, “Schedules for Construction Contracts.”
2. The Contractor shall prepare a progress schedule required for completion of each of the various divisions of work.
3. The Contractor shall prepare the progress schedule using AF Form 3064, Contract
Progress Schedule, as herein attached, or computer generated format, as approved by the
Contracting Officer.
4. The Contractor shall ensure the schedule encompasses all divisions of work for the
Project, to include contract closeout documents.
5. Contract close-out documents shall constitute a minimum of 5 percent of the total contract cost.
01 00 00- 8 2/16/2017 2:12:18 PM
6. The Contractor shall, within 10 calendar days (or another period of time as determined by the Contracting Officer) after receipt of the Notice to Proceed (NTP), submit (hardcopy, and CD or e-mail file), in the number of copies as specified on the AF Form 66, a practicable progress schedule, along with an AF Form 3000, to the Contracting Officer for approval. Master schedule shall be provided and presented 5 calendar days following issuance of Notice to Proceed. The schedule shall show the sequence, in which the
Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the several salient features of work. The work shall be scheduled so that, upon the start of construction, work progresses in a continuous and diligent manner. A schedule which does not reflect steady and reasonable progress throughout the construction period will be rejected. Reference Contract Clause
FAR 52.236-15, “Schedules for Construction Contracts.”
7. If there are possible deviations from the original plan, those must be noted by the
Contractor and approved by the Contracting Officer before work changes are implemented. A revised schedule shall be provided within 5 calendar days following
Contracting Officer’s acknowledgement of deviations.
8. For projects exceeding $1 million, the Contractor shall provide to the Contracting
Officer, unless otherwise directed, a project plan (along with the AF 3064) in the most current version of Microsoft Project to define work tasks and track progress. At least
5 days prior to work initiation, the Contractor shall provide the Contracting Officer hardcopy Gantt charts and a formatted CD, or e-mail file, of the plan. Additionally, the
Project plan shall have a cost per task field for each task – this is commonly called line item cost. No work may start until the Contracting Officer approves the plan in writing.
a. This schedule shall include a line item for rough inspections by Government personnel as outlined in the various sections of the specifications or on the plans.
A rough inspection is required on all installed systems prior to sealing off or closing in a wall, pipe chase, suspended ceiling system etc. These systems include but are not limited to domestic and heating water lines, communication and electric runs, all insulation material to be covered by other material (GWB, wood panel etc), duct runs, ceiling suspension systems, roofing systems, raised flooring, fire detection/ protection/ suppression systems, etc. A second or finish inspection will be conducted after these systems are “hidden" to insure the quality of the finished product. The second or finish inspection does not constitute the final project inspection that is accomplished at project completion. The Contractor shall request these inspections through the Contracting Officer at least 5 working days prior to the desired inspection date.
B. Progress Reports: The Contractor is required to provide monthly progress reports covering the period from Notice to Proceed through final inspection. These reports shall track progress by
Line Item, if the contract contains multiple Line Items. Progress reports shall be submitted to the Contracting Officer in electronic format for review and approval using AF Form 3065, Contract Progress Report, as herein attached. The Contracting Officer will designate the frequency of submission for Progress Reports.
2/16/2017 2:12:18 PM 01 00 00- 9
C. Progress Meetings: A weekly meeting may be held with the Contractor, COR, and Contracting
Officer (KO), if necessary, to discuss work progress, problems, and potential change orders.
The Contractor shall attend these meetings at no additional cost to the Government. Prior to beginning work on specific work elements of a project, the Contractor shall confer with the
COR and agree on a sequence of procedures and means of access to premises and buildings;
space for storage of materials and equipment; delivery of materials; and use of approaches, use of corridors, stairways, and similar means of passage.
D. Refer to Section 01 31 00, Coordination and Project Meetings, for additional information.
1.17 SAFETY ASSURANCE
A. All work including the handling of hazardous materials or the disturbance or dismantling of structures containing hazardous materials shall comply with the applicable requirements of
29 CFR 1910/1926. Work involving the disturbance or dismantling of asbestos or asbestos-containing materials; the demolition of structures containing asbestos; and/or disposal and removal of asbestos, shall also comply with the requirements of 40 CFR, Part 61, Subparts A and B, ETL 1110-1-118 and DA Circular 40-83-4. All work shall comply with applicable state and municipal safety and health requirements. Where there is a conflict between applicable regulations, the most stringent shall apply. The Safety Manual is available at the following web site: http://www.usace.army.mil/inet/usace-docs/eng-manuals/em385-1-1/toc.htm. The
Contractor shall assume full responsibility and liability for compliance with all applicable regulations pertaining to the health and safety of personnel during the execution of work. The
Government shall not be held liable for any actions on the part of the Contractor, any tier subcontractor(s), or any of their respective employees that result in illness, injury, or death.
Work shall conform to EM 385-1-1, US Army Corps of Engineers Safety and Health
Requirements Manual.
B. The required inspections, tests and reports made by the Contractor, any tier subcontractor(s), specially trained technicians, equipment manufacturers, and others as required, shall be at the
Contractor’s expense (herein attached). Reference FAR Clause: 52.236-13 Accident Prevention
C. Special facilities, devices, equipment, clothing, and similar items used by the Contractor in the execution of work shall comply with applicable regulations.
D. The Contractor shall comply with the recommendations contained in Part 6 of the U.S.
Department of Transportation, Federal Highway Administration’s “Manual on Uniform Traffic
Control Devices,” 2003 edition with Revision 1, available at http://mutcd.fhwa.dot.gov/ to ensure proper warnings to motorists and adequate traffic control. The Contractor shall provide all warning lights, barricades, and other traffic control devices and signs.
E. Crawl spaces and attics are to be treated as confined space entry. Contractor must follow
29 CFR 1910.146 and use Air Force Form 1024 when making an entry. NOTE: A confined space does not include areas above suspended acoustical tile ceiling.
01 00 00- 10 2/16/2017 2:12:18 PM
F. Where an employee can fall more than 6 feet, a fall protection system must be used;
29 CFR 1926.500 stipulates where this can occur and the different types of fall arrest systems.
G. The Contractor must provide Material Safety Data Sheets (MSDS) to the Contracting Officer and receive approval before they begin the work.
H. All references to protection of the site and adjacent buildings when trenching, shall include protection of all employees also.
I. In addition, the Contractor shall:
1. Caution vehicle operators to avoid intrusion on the runway, taxiway, or operational flight line.
2. Obtain flight line authorization from the Airfield Manager, through the Contracting
Officer’s Representative, before operating a vehicle on the flight line.
3. Yield to all emergency vehicles including security police, fire department, ambulance, and ambulance buses when their red lights and/or sirens are operating.
4. Coordinate movement of heavy oversized equipment such as cranes, extended flat bed trailers and large earth moving vehicles with the base security police through the
Contracting Officer’s Representative.
5. Provide personnel to direct traffic when Contractor-operated vehicles block one or both lanes of a two-lane road.
J. Refer to Section 01 35 23, Safety Policies and Procedures, for additional information.
1.18 FIRE PROTECTION
A. The Contractor shall at all times maintain good housekeeping practices to reduce the risk of fire damage. All scrap materials, rubbish, and trash shall be removed daily from in and about the building and shall not be permitted to be scattered on adjacent property.
B. Suitable storage space shall be provided 50 feet minimum outside the building area for storing flammable materials and paints; no storage will be permitted in the building. Excess flammable liquids being used inside the building shall be kept in closed metal containers and removed from the building during unused periods.
C. The Contractor shall provide a fire extinguisher at each location where cutting and/or welding is being performed. Where electric or gas welding or cutting is done, interposed shields of incombustible material shall be used to protect against fire damage due to sparks and hot metal.
D. When temporary heating devices are used, a watchman shall be present to cover all periods when other workmen are not on the premises.
2/16/2017 2:12:18 PM 01 00 00- 11
E. The Contractor shall provide fire extinguishers in accordance with the recommendations of
NFPA Nos. 10 and 241. However, in all cases a minimum of four (4) fire extinguishers shall be available for each building.
F. Fire Codes: The Contractor shall obey all requirements of the National Fire Codes, Air Force
Fire Regulations and Installation Fire Regulations, as they relate to his work on the Installation.
1.19 BURN PERMIT
A. Prior to commencing any open flame burning, or welding operations, the Contractor shall obtain a Burn permit from the Base Fire Department. Request shall include a description of activities and duration of work. Allow a minimum of 5 days for burn permit approval.
1.20 PROTECTION FOR OPEN FLAME DEVICES
A. When open flame and/or spark producing devices, i.e., acetylene oxygen welding equipment, electric arc welding, etc., are employed for job accomplishment, the following procedures are mandatory:
1. Inspect all surroundings and equipment to insure that combustible substances are not present in any area where contact of metal at a temperature above the flashpoint of any compound is possible.
2. Ensure that no open containers or spills of combustible substances are present.
3. Ensure that ignition is not possible by conduction, convection, radiation, or dispersion of molten metal.
4. Proper protection equipment and practices will be used, i.e., fireproof blankets, wetting of surrounding area, removal of combustible materials where practicable, earth filled backing, and portable fire extinguishers of proper type on hand.
5. When the above devices are being used notify the Installation Fire Department 24 hours ahead of usage.
1.21 INSPECTIONS AND TESTS
A. Inspections and tests are for the sole benefit of the Government and shall not relieve the
Contractor of the responsibility of providing quality control measures to ensure that the work strictly complies with the contract requirements. No inspection or test by the Government shall be construed as constituting or implying acceptance. Reference Contract Clause
FAR 52.246-12, “Inspection of Construction.”
1.22 CONTRACTOR QUALITY CONTROL/TESTS
A. Contractor Quality Control (CQC) Program:
01 00 00- 12 2/16/2017 2:12:18 PM
1. The Contractor shall comply with the quality control provisions as specified herein, and provide and maintain an effective Contractor Quality Control (CQC) program in accordance with the Contract. The Contractor shall perform all quality control inspection and/or testing required by this Contract unless specifically designated to be performed by the Government. The quality control program consists of plans, workmanship, fabrication, construction, and operations that comply with Contract requirements. The program shall cover construction operations, including fabrication both onsite and offsite, and shall be keyed to the proposed construction sequence.
2. Where work is specified to be in conformity with Standard Specifications of the
American Society for Testing Materials (ASTM), or with Federal specifications or with specifications of well known recognized technical and trade organizations, but no tests are specifically stipulated in connection herewith, the Contractor shall furnish and pay for any tests or certifications required by the Contracting Officer to show that the proposed materials meet with the applicable requirements.
3. The Contractor shall submit a written certification from any recognized testing agency, adequately equipped and competent to perform such services, that the material or equipment has been tested and conforms to the standards, including the method(s) of testing used.
4. Wherever testing or analysis of material is required, such testing unless otherwise noted will be made at the Contractor’s expense.
5. Subsequent testing of those materials which fail to meet specifications will be accomplished by the Contractor at no cost to the Government.
6. Samples used for testing shall be selected as specified for the various tests elsewhere in these Specifications, but in every case the method of selecting samples and the location for selection shall be as approved by the Contracting Officer.
7. Tests shall be made in accordance with the specified testing procedures and/or methods and otherwise as required to provide compliance with all Contract requirements. Tests shall be made by independent, commercial testing laboratories approved in writing by the
Contracting Officer.
8. Results of all tests shall be recorded on certified test reports of the commercial testing laboratories. Reports shall include a statement that the materials tested do or do not meet the requirements of the Contract specifications. Six copies of all reports shall be forwarded directly to the Contracting Officer for approval within 5 days of the actual performance of the test. The testing agency shall immediately notify (verbally) the
Contracting Officer of any tests, which indicate failure to meet the Contract requirements.
9. Any item for which test reports show failure to meet all Contract requirements shall be retested at the Contractor’s expense as often as required until full compliance with
Contract requirements is shown.
10. The Contractor will provide a plan for contingencies, and will accomplish repairs in the event of utility and/or communications emergency situations.
B. Contractor Quality Control (CQC) Plan:
1. Within 10 days of the award of the Contract, the Contractor shall provide 3 copies of the
Project CQC Plan to the Contracting Officer. This document, as a minimum, shall include: 1) the name and address of the independent testing agency and the responsible
2/16/2017 2:12:18 PM 01 00 00- 13
principal with the firm, 2) a summary of QC tests required by the specification and to be provided by the testing agency, and 3) typical daily report(s) forms to be used for this
Project. The plan shall also indicate organizational procedures to immediately notify the
Contracting Officer or designated representative of test results in noncompliance with the specification and recommendations on correction. The testing agency must be an independent company and not owned or partially owned by the Contractor or any relation or employee of the Contractor.
2. The Contracting Officer will review the quality control plan. The Contractor shall make such changes and additions as necessary for clarity and completeness as requested by the
Contracting Officer. Acceptance of the Contractor’s plan is predicated on satisfactory performance during construction. Acceptance is conditional and the Government reserves the right to require the Contractor to make changes in quality control plans, personnel and operations to correct deficiencies, and to assure Contract compliance.
3. When the Contractor proposes changes in the quality control plan or implementation during construction, the Contracting Officer shall be notified in writing. The Contractor shall implement no changes prior to acceptance in writing by the Contracting Officer.
4. If the Contractor fails to submit an acceptable quality control plan within the time herein prescribed, the Contracting Officer may refuse to allow construction to start if an acceptable interim plan is not furnished or may withhold funds from progress payments until such time as the Contractor submits an acceptable final plan. Reference Contract
Clause FAR 52.232-5, “Payments Under Fixed Price Construction Contracts.”
1.23 DEMONSTRATIONS, COMMISSIONING, AND TESTING
A. Demonstrations, commissioning, and testing requirements will be identified in the applicable divisions and parts of the Specifications. The Contractor is responsible for reviewing the
Contract specifications to ensure all required demonstrations, commissioning, and tests are performed.
B. Demonstrations, commissioning, and testing requirements must be completed within
14 calendar days from the date of Beneficial Occupancy, Substantial Completion, or Final
Acceptance.
C. Prior to all demonstrations, commissioning, and testing requirements being performed, the
Contractor shall coordinate scheduling with the Government Inspector. The scheduling shall be requested at least 3 business days prior to date of demonstration, commissioning, or testing.
D. After completion of all demonstrations, commissioning, and testing, the Contractor shall complete the column entitled “Date Contractor Conducted” on the attached spreadsheet, Attachment 7, and submit the completed spreadsheet to the Contracting Officer within
7 calendar days.
E. The demonstrations, commissioning, and testing spreadsheet are considered part of the Contract closeout documents.