Q A 23 July 2010.pdf
PDF 67 KB Posted
- Solicitation number
- W912JB10R4005
About this file
Q A's for 23 July 2010 - Requested extension of closing date
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 10R4005 Amend 0002.pdf | ||
| Q A 22 July 2010.pdf | ||
| 1990 1800 spec book scan.pdf | ||
| 10R4005 Amend 0001.pdf | ||
| Q A 15 July 2010.pdf | ||
| Pre Proposal Conference Attendance.pdf | ||
| SANGB Horizontal MATOC Pre-Proposal Conference Slides 30 Jun 10.pdf | ||
| Important Info regarding the DD 2345.pdf | ||
| Important Info regarding the DD 2345.pdf | ||
| MATOC EXHIBITS A-D F and G Horizontal.docx | DOCX document | |
| MATOC EXHIBIT E Jan 09.docx | DOCX document | |
| 10R4005 Solicitation.pdf | ||
| set-aside Exhibit E-1 corrected.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q&A’s 23 July 2010
W912JB10R4005
Horizontal MATOC IDIQ
Q1. For subcontractors that provide services to more than one prime contractor, does the Contracting Officer correlate responses from references (ie. Exhibit C) to each of the proposals the subcontractor participates in?
A1. Exhibit C's are proposal specific and do not carry over to other offeror's packages. If XYZ is a sub and they perform for offeror #3, #7, and #11 and only offeror #7 submits an exhibit C, then that exhibit is used in offeror #7's package only.
Q2. Are subcontractors responsible for providing any bonding?
A2. In the event that a Task Order requires performance or payment bonds, the government will require bonding from the Prime contractor as the government will have a contract with the Prime and not the subs.
Q3. We have recently submitted a proposal for W912JB‐10‐R‐4004, MATOC for vertical construction. As part of that proposal we had some of our clients submit references to your office. Is it necessary for us to have our clients resubmit references for this proposal?
A3. It is necessary for separate references to be provided for the horizontal MATOC W912JB10R4005.
These exhibits are project and proposal specific.
Q4. We are looking to bid on this project (Solicitation Number: W912JB10R4005), and we have been certified to view the drawings and specs. We have received out certification number but still cannot get into the website to obtain the drawings and specs. Do I need to input this number somewhere on the site?
A4. You will need to contact the FBO help desk in order to find out this information if you have not already taken care of it. Anything having to do with the DD2345 is not a base level function.
Q5. I can't seem to find the reference forms to send to my references. Can you please guide me to them?
A5. Please refer to the attachment on the website "MATOC EXHIBITS A‐D F and G Horizontal"
Q6.I have investigated the MDOT website in hope for finding details on the MDOT 1800L/1800T Asphalt Mix. After searching the website I was unable to find any detail. I was able to get some information from a batch plant, however, they were unable to give me the actual specification.
Could you please provide the spec for MDOT 1800L/1800T Asphalt Mix?
A6. Mix designs come from the batch plant. Those are all in the MDOT spec's. MDOT should be able to provide the correct specs.
Q7. For binder 1 volume 1 – Areas of Consideration, do you just need page 9 returned? Or do we need to fill out pages 3‐6 as well.
A7. Page 9 only, do not fill in pages 3‐6
Q8. In regards to addendum #1, I don’t feel that we have adequate time to get the additional information from the respective entities due to short notice and summer vacation schedules that are out of our control. Can the due date be extended to Friday the 30th to all allow enough time?
A8. The closing date is being extended to Friday, 30 July 2010. Official amendment is forthcoming.