Addendum_4.pdf
PDF 91 KB Posted
- Attached to
- Construction of Squadron Operations Building Federal contract opportunity
- Solicitation number
- W912JA-18-R-6004
About this file
Addendum 4
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912JA-18-R-6004_0008.pdf | ||
| W912JA-18-R-6004-0007_SF30.pdf | ||
| W912JA-18-R-6004-0005.pdf | ||
| W912JA-18-R-6004-0004.pdf | ||
| W912JA-18-R-6004-0003.pdf | ||
| Addendum__3_Squadron_Operations_Facility.pdf | ||
| W912JA-18-R-6004-0002.pdf | ||
| W912JA-18-R-6004-0002_MOD_DOC.pdf | ||
| RFI_Listing2_14_18_(SS&L_Responses).docx | DOCX document | |
| Addendum__2_Squadron_Operations_Facility.pdf | ||
| W912JA-18-R-6004-0001.pdf | ||
| W912JA-18-R-6004-0001_Modification_Doc.pdf | ||
| Bldg_1311,_1317_and_1319_Asbestos_Info.pdf | ||
| RFI_Listing_2_3_18.docx | DOCX document | |
| Addendum__1.pdf | ||
| Amend_U00001_Mod_Document.pdf | ||
| OPS_Site_Visit_Meeting_Minutes.pdf | ||
| RFI_Listing_1_31_18.docx | DOCX document | |
| OPS_Building_Site_Visit_Attendance_Roster.pdf | ||
| Pre-proposal_slides.ppt | PPT presentation | |
| W912JA-18-R-6004_Signed.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date: February 26, 2018
To: Kast, Craig; MSgt Shanks, Stephen; Capt Sanders, Adam
Subject: Addendum No. 4
Project: 187TH Squadron Operations Facility
Job #: SSL# 10065.01
ANG# FAKZ 059173
From: Jeffrey Bazzell
The plans and Specifications of the subject project, dated June 2010 are amended as follows: (Where there are conflicts between the plans and specifications and the addendum, this addendum shall govern)
Item No. 1: Clarification: No TEMPEST filtering devices will be required on this project, although all metallic penetrations through the SAPF and SAPCA perimeters walls including but limited to penetrations associated with security systems, mechanical systems, fire protection, fire alarm, power, lighting, and communications cabling shall be electrically isolated in accordance with UFC 4-010-05. Refer to electrical detail 2/E4.3, fire protection detail B/FP0.1, and mechanical detail D/M0.7.
Sheet E3.1 (First Floor Plan – Power)
1. Locate Sheet Legend denoting secure wall (dashed line) and change the description to read as follows “PROVIDE PVC CONDUIT
SLEEVES FOR ALL CONDUIT PASSING THROUGH WALL (NO
EXCEPTIONS). PVC SHALL EXTEND 1 INCH ON EITHER SIDE OF
WALL. SEE DETAIL 2/E4.3. ADDITIONALLY, THE CONTRACTOR
SHALL COORDINATE WITH THE MECHANICAL CONTRACTOR
AND PROVIDE GROUND CLAMPS FOR EACH MECHANICAL
SYSTEM COPPER PIPE PENETRATING THIS BARRIER AND
PROVIDE A #6 COPPER GROUND WIRE FROM EACH OF THESE
GROUND CLAMPS (ONE ON EITHER SIDE OF WALL) TO THE
NEAREST GROUND ON THE SIDE OF THE WALL WHERE THE
GROUND CLAMP IS INSTALLED. IT SHALL BE THE
RESPONSILITITY OF THE ELECTRICAL CONTRACTOR TO
GROUND ALL METALLIC OBJECTS PENETRATING THIS
BARRIER REGARDLESS OF WHOSE SYSTEM IT IS. INCLUDE IN
BID. “
SQUADRON OPERATIONS FACILITY ADDENDUM NO. 4
Sheet E3.2 (First Floor Plan – Mechanical Power) change the description to read as follows “PROVIDE PVC CONDUIT
SLEEVES FOR ALL CONDUIT PASSING THROUGH WALL (NO
EXCEPTIONS). PVC SHALL EXTEND 1 INCH ON EITHER SIDE OF
WALL. SEE DETAIL 2/E4.3. ADDITIONALLY, THE CONTRACTOR
SHALL COORDINATE WITH THE MECHANICAL CONTRACTOR
AND PROVIDE GROUND CLAMPS FOR EACH MECHANICAL
SYSTEM COPPER PIPE PENETRATING THIS BARRIER AND
PROVIDE A #6 COPPER GROUND WIRE FROM EACH OF THESE
GROUND CLAMPS (ONE ON EITHER SIDE OF WALL) TO THE
NEAREST GROUND ON THE SIDE OF THE WALL WHERE THE
GROUND CLAMP IS INSTALLED. IT SHALL BE THE
RESPONSILITITY OF THE ELECTRICAL CONTRACTOR TO
GROUND ALL METALLIC OBJUECTS PENETRATING THIS
BARRIER REGARDLESS OF WHOSE SYSTEM IT IS. INCLUDE IN
BID. “
Sheet E4.1 (First Floor Plan – Auxiliary Systems) change the description to read as follows “PROVIDE PVC CONDUIT
SLEEVES FOR ALL CONDUIT PASSING THROUGH WALL (NO
EXCEPTIONS). PVC SHALL EXTEND 1 INCH ON EITHER SIDE OF
WALL. SEE DETAIL 2/E4.3. ADDITIONALLY, THE CONTRACTOR
SHALL COORDINATE WITH THE MECHANICAL CONTRACTOR
AND PROVIDE GROUND CLAMPS FOR EACH MECHANICAL
SYSTEM COPPER PIPE PENETRATING THIS BARRIER AND
PROVIDE A #6 COPPER GROUND WIRE FROM EACH OF THESE
GROUND CLAMPS (ONE ON EITHER SIDE OF WALL) TO THE
NEAREST GROUND ON THE SIDE OF THE WALL WHERE THE
GROUND CLAMP IS INSTALLED. IT SHALL BE THE
RESPONSILITITY OF THE ELECTRICAL CONTRACTOR TO
GROUND ALL METALLIC OBJUECTS PENETRATING THIS
BARRIER REGARDLESS OF WHOSE SYSTEM IT IS. INCLUDE IN
BID. “
2. Add three (1) 1 inch conduit sleeves above finished ceiling passing between Electrical 114 and the IAO 518 to facilitate passage of CATV fiber optic cable (by owner’s contractor) and other security systems installed by Advantor. Sleeves shall be electronically isolated per detail
2.E4.3.
Sheet E6.5 (Electrical Details)
1. Delete detail 4/E6.5. It is not applicable to this project.
SQUADRON OPERATIONS FACILITY ADDENDUM NO. 4
Item No. 2: Refer to drawings and specifications: The contractor shall provide all testing, inspections and similar services; these services also include those specified to be performed by an independent agency. Any mention of testing or similar services to be furnished by the owner shall be changed to state “by the contractor”.
End of Addendum #4