Addendum_4.pdf

PDF 91 KB Posted

Attached to
Construction of Squadron Operations Building Federal contract opportunity
Solicitation number
W912JA-18-R-6004
Issued by
Department of the Army Alabama Army National Guard

About this file

Addendum 4

View the file

Other files for this federal contract opportunity

Other files attached to Construction of Squadron Operations Building, newest first.
File Type Posted
W912JA-18-R-6004_0008.pdf PDF
W912JA-18-R-6004-0007_SF30.pdf PDF
W912JA-18-R-6004-0005.pdf PDF
W912JA-18-R-6004-0004.pdf PDF
W912JA-18-R-6004-0003.pdf PDF
Addendum__3_Squadron_Operations_Facility.pdf PDF
W912JA-18-R-6004-0002.pdf PDF
W912JA-18-R-6004-0002_MOD_DOC.pdf PDF
RFI_Listing2_14_18_(SS&L_Responses).docx DOCX document
Addendum__2_Squadron_Operations_Facility.pdf PDF
W912JA-18-R-6004-0001.pdf PDF
W912JA-18-R-6004-0001_Modification_Doc.pdf PDF
Bldg_1311,_1317_and_1319_Asbestos_Info.pdf PDF
RFI_Listing_2_3_18.docx DOCX document
Addendum__1.pdf PDF
Amend_U00001_Mod_Document.pdf PDF
OPS_Site_Visit_Meeting_Minutes.pdf PDF
RFI_Listing_1_31_18.docx DOCX document
OPS_Building_Site_Visit_Attendance_Roster.pdf PDF
Pre-proposal_slides.ppt PPT presentation
W912JA-18-R-6004_Signed.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: February 26, 2018

To: Kast, Craig; MSgt Shanks, Stephen; Capt Sanders, Adam

Subject: Addendum No. 4

Project: 187TH Squadron Operations Facility

Job #: SSL# 10065.01

ANG# FAKZ 059173

From: Jeffrey Bazzell

The plans and Specifications of the subject project, dated June 2010 are amended as follows: (Where there are conflicts between the plans and specifications and the addendum, this addendum shall govern)

Item No. 1: Clarification: No TEMPEST filtering devices will be required on this project, although all metallic penetrations through the SAPF and SAPCA perimeters walls including but limited to penetrations associated with security systems, mechanical systems, fire protection, fire alarm, power, lighting, and communications cabling shall be electrically isolated in accordance with UFC 4-010-05. Refer to electrical detail 2/E4.3, fire protection detail B/FP0.1, and mechanical detail D/M0.7.

Sheet E3.1 (First Floor Plan – Power)

1. Locate Sheet Legend denoting secure wall (dashed line) and change the description to read as follows “PROVIDE PVC CONDUIT

SLEEVES FOR ALL CONDUIT PASSING THROUGH WALL (NO

EXCEPTIONS). PVC SHALL EXTEND 1 INCH ON EITHER SIDE OF

WALL. SEE DETAIL 2/E4.3. ADDITIONALLY, THE CONTRACTOR

SHALL COORDINATE WITH THE MECHANICAL CONTRACTOR

AND PROVIDE GROUND CLAMPS FOR EACH MECHANICAL

SYSTEM COPPER PIPE PENETRATING THIS BARRIER AND

PROVIDE A #6 COPPER GROUND WIRE FROM EACH OF THESE

GROUND CLAMPS (ONE ON EITHER SIDE OF WALL) TO THE

NEAREST GROUND ON THE SIDE OF THE WALL WHERE THE

GROUND CLAMP IS INSTALLED. IT SHALL BE THE

RESPONSILITITY OF THE ELECTRICAL CONTRACTOR TO

GROUND ALL METALLIC OBJECTS PENETRATING THIS

BARRIER REGARDLESS OF WHOSE SYSTEM IT IS. INCLUDE IN

BID. “

SQUADRON OPERATIONS FACILITY ADDENDUM NO. 4

Sheet E3.2 (First Floor Plan – Mechanical Power) change the description to read as follows “PROVIDE PVC CONDUIT

SLEEVES FOR ALL CONDUIT PASSING THROUGH WALL (NO

EXCEPTIONS). PVC SHALL EXTEND 1 INCH ON EITHER SIDE OF

WALL. SEE DETAIL 2/E4.3. ADDITIONALLY, THE CONTRACTOR

SHALL COORDINATE WITH THE MECHANICAL CONTRACTOR

AND PROVIDE GROUND CLAMPS FOR EACH MECHANICAL

SYSTEM COPPER PIPE PENETRATING THIS BARRIER AND

PROVIDE A #6 COPPER GROUND WIRE FROM EACH OF THESE

GROUND CLAMPS (ONE ON EITHER SIDE OF WALL) TO THE

NEAREST GROUND ON THE SIDE OF THE WALL WHERE THE

GROUND CLAMP IS INSTALLED. IT SHALL BE THE

RESPONSILITITY OF THE ELECTRICAL CONTRACTOR TO

GROUND ALL METALLIC OBJUECTS PENETRATING THIS

BARRIER REGARDLESS OF WHOSE SYSTEM IT IS. INCLUDE IN

BID. “

Sheet E4.1 (First Floor Plan – Auxiliary Systems) change the description to read as follows “PROVIDE PVC CONDUIT

SLEEVES FOR ALL CONDUIT PASSING THROUGH WALL (NO

EXCEPTIONS). PVC SHALL EXTEND 1 INCH ON EITHER SIDE OF

WALL. SEE DETAIL 2/E4.3. ADDITIONALLY, THE CONTRACTOR

SHALL COORDINATE WITH THE MECHANICAL CONTRACTOR

AND PROVIDE GROUND CLAMPS FOR EACH MECHANICAL

SYSTEM COPPER PIPE PENETRATING THIS BARRIER AND

PROVIDE A #6 COPPER GROUND WIRE FROM EACH OF THESE

GROUND CLAMPS (ONE ON EITHER SIDE OF WALL) TO THE

NEAREST GROUND ON THE SIDE OF THE WALL WHERE THE

GROUND CLAMP IS INSTALLED. IT SHALL BE THE

RESPONSILITITY OF THE ELECTRICAL CONTRACTOR TO

GROUND ALL METALLIC OBJUECTS PENETRATING THIS

BARRIER REGARDLESS OF WHOSE SYSTEM IT IS. INCLUDE IN

BID. “

2. Add three (1) 1 inch conduit sleeves above finished ceiling passing between Electrical 114 and the IAO 518 to facilitate passage of CATV fiber optic cable (by owner’s contractor) and other security systems installed by Advantor. Sleeves shall be electronically isolated per detail

2.E4.3.

Sheet E6.5 (Electrical Details)

1. Delete detail 4/E6.5. It is not applicable to this project.

SQUADRON OPERATIONS FACILITY ADDENDUM NO. 4

Item No. 2: Refer to drawings and specifications: The contractor shall provide all testing, inspections and similar services; these services also include those specified to be performed by an independent agency. Any mention of testing or similar services to be furnished by the owner shall be changed to state “by the contractor”.

End of Addendum #4