Addendum__3_Squadron_Operations_Facility.pdf

PDF 100 KB Posted

Attached to
Construction of Squadron Operations Building Federal contract opportunity
Solicitation number
W912JA-18-R-6004
Issued by
Department of the Army Alabama Army National Guard

About this file

Addendum 3

View the file

Other files for this federal contract opportunity

Other files attached to Construction of Squadron Operations Building, newest first.
File Type Posted
W912JA-18-R-6004_0008.pdf PDF
W912JA-18-R-6004-0007_SF30.pdf PDF
Addendum_4.pdf PDF
W912JA-18-R-6004-0005.pdf PDF
W912JA-18-R-6004-0004.pdf PDF
W912JA-18-R-6004-0003.pdf PDF
RFI_Listing2_14_18_(SS&L_Responses).docx DOCX document
Addendum__2_Squadron_Operations_Facility.pdf PDF
W912JA-18-R-6004-0002.pdf PDF
W912JA-18-R-6004-0002_MOD_DOC.pdf PDF
W912JA-18-R-6004-0001.pdf PDF
W912JA-18-R-6004-0001_Modification_Doc.pdf PDF
Bldg_1311,_1317_and_1319_Asbestos_Info.pdf PDF
RFI_Listing_2_3_18.docx DOCX document
Addendum__1.pdf PDF
Amend_U00001_Mod_Document.pdf PDF
RFI_Listing_1_31_18.docx DOCX document
OPS_Building_Site_Visit_Attendance_Roster.pdf PDF
Pre-proposal_slides.ppt PPT presentation
OPS_Site_Visit_Meeting_Minutes.pdf PDF
W912JA-18-R-6004_Signed.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: February 20, 2018

To: Kast, Craig; MSgt Shanks, Stephen; Capt Sanders, Adam

Subject: Addendum No. 3

Project: 187TH Squadron Operations Facility

Job #: SSL# 10065.01

ANG# FAKZ 059173

From: Jeffrey Bazzell

The plans and Specifications of the subject project, dated June 2010 are amended as follows: (Where there are conflicts between the plans and specifications and the addendum, this addendum shall govern)

Item No. 1: Clarification: Refer to Addendum No. 2. The header on pages 2 through

5 should say “Addendum No. 2” not Addendum No. 1.

Item No. 2: Refer to Addendum No. 2, Item No. 26. Delete this item in its entirety.

Subcontractors are not required to provide performance and payment bonds.

Item No. 3: Refer to sheet E3.1 issued in Addendum No. 2. There are two Sheet Notes for Note 6. Both notes apply. There are two Sheet Notes for Note 5. The Note 5 which states “the contractor shall provide one (1) continuous #6 cu grounding conductor attached to each raised floor pedestal in this area.

The ground shall be routed to the main building system ground bus in the main electrical room” on applies only to rooms with access flooring.

Item No. 4: Electrical: surface mounted raceways shall be surface metal raceway

“wire mold or similar”.

Item No. 5: Refer to sheet E3.1: Clarification: Conduit can NOT be concealed inside the secure wall for receptacles on the exterior of the building.

Item No. 6: Refer to notes regarding tempest filtering on sheet E0.2 and E2.1.

Clarification tempest filtering is required at all penetrations occurring in SAPF and SAPCA secure perimeter walls.

SQUADRON OPERATIONS FACILITY ADDENDUM NO. 3

Item No. 7: Refer to sheet E3.1: Sheet Note 3 applies to the room Flight Simulator

S16.

Item No. 8: Refer to sheet E3.1 Legend: Grounding for wall panels is NOT required.

Item No. 9: Tempest Filtering: The following is a list of manufacturers of tempest filtering equipment. Astrodyne TDI, MPE Inc, Curtis Industries, Captor Corporations, RFI Corp.

All tempest equipment shall be located with the SAPF and SAPCA.

Item No. 10: Refer to sheet E3.1. There are two panels labeled FPEM. The panel closets to the exit is FPEM, change the other panel labeled FPRM to

EMMC.

Item No. 11: Clarification regarding master label: The master label is required for this project. Contractor shall provide whatever is necessary and required by code to achieve master label.

End of Addendum #3