Addendum 0003
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KNMD069209/109500
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Clause 52.209-8 Deleted 52.209-9 ALT I, UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS - ALTERNATE I (JAN 2011) Added.
Closing Date Extended to Feb 17, 2011 (2pm HST).
Questions and Answ ers extended to Feb 11, 2011 ( 12 Noon EST).
Clarif ications to Bid Schedule (see attached summary).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Feb-2011
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912J6-11-R-0001
X 9B. DATED (SEE ITEM 11)
13-Jan-2011
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Feb-2011
CODE
USPFO FOR HAWAII
ATTN: CPT MANUEL LLANES
91-1179 ENTERPRISE AVE
KAPOLEI HI 96707-2150
W912J6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912J6-11-R-0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Addendum 0003
Replace section 012300 with revised section.
Specifications
Add the attachment “HIANG ACM Survey” to Section 132800 Drawings Drawing C-211, Utility Note 2 shall be changed “All work associated with the aircraft wash water tank,… shall be completed and operational 3 months after NEPDES permit approval and included as Bid Option 3.”
Drawing C-210 and C-102, The existing 4" sanitary sewer force main shall be removed to the coordinates N
55341.94 and E 1656353.34 indicated on C-210 where the new 6 inch force main will connect to it.
Drawing A-111, Drawing A-307 and Drawing A-311, - paver tile roof system shall meet the following requirements - Nominal 16” x 16” x 1.5 to 2” concrete paver tiles; compressive strength 6,500 PSI; Flexural strength 600 PSI; Water Absorption: ASTM C140, Not greater than 5 percent; Freeze/Thaw: ASTm C67, no breakage and not more than 1 percent loss in dry weight after 50 cycles. Finish-Light sandblast; Color-as selected by Architect from color samples, general color range sandstone.
Delete all notes to right of enlarged floor plan 1/A-102 – “Option Notes, Options, and Other Cost Savings adjustments.
Drawing A-407, Change all notes on this drawing to reference option 22 in lieu of 20.
Drawing A-423, Change all notes on this drawing to reference option 21 in lieu of 19.
Drawing A-603, Change details for door 100C to 4/5 & 6 – sheet A-604.
HICK012300.HGR.DOC 012300-1
SECTION 012300 - OPTIONS
PART 1 -GENERAL
1.01 SUMMARY:
A. This Section specifies administrative and procedural requirements for Options.
B. Definition: An Option is an amount proposed by Bidders and stated on the Bid Form for certain construction activities defined in the Bidding Requirements that may be added to or deducted from Base Bid amount if Contracting Officer decides to accept a corresponding change in either the amount of construction to be completed, or in the Equipment and Materials, or installation methods described in Contract Documents.
C. Coordination: Coordinate related Work and modify or adjust adjacent Work as necessary to ensure that Work affected by each accepted Option is complete and fully integrated into the Project. Costs listed for each Option shall include costs of related coordination, modification, or adjustment.
D. Notification: Immediately following the award of the Contract, prepare and distribute to each party involved, notification of the status of each Option. Indicate whether Options have been accepted, rejected, or deferred for consideration at a later date. Include a complete description of negotiated modifications to Options.
E. Schedule: A "Schedule of Options" is noted below. Specification Sections referenced in the Schedule, if any, contain requirements for Equipment and Materials and methods necessary to achieve the Work described under each Option.
1 Each Option is noted below, recognizing that Drawings and Specifications document the requirements.
2 Include as part of each Option, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation whether or not mentioned as part of the Option.
PART 2 -PRODUCTS - Not Applicable.
PART 3 -EXECUTION
3.01 SCHEDULE OF OPTIONS:
A. Option 1 - Demolition and Renovation of Building 3400.
B. Option 2 - Epoxy Floor Coating in Hangar Bay.
C. Option 3 - North Shops.
D. Option 4 - Concrete Apron Pavement.
E. Option 5 - Concrete Towway Connection.
F. Option 6 - Landscaping.
G. Option 7 - Free Standing Sunscreen.
H. Option 8 - Covered Lanai with Second Floor Administrative Area (Options 7 and 8 are mutually exclusive - the Government may if it chooses to execute one but will not award both options).
I. Option 9 - Screen Walls Surrounding Mechanical Equipment.
J. Option 10 - All Lockers.
K. Option 11 - All Casework.
L. Option 12 - Fixed Seating on 2nd Floor.
M. Option 13 - Markerboards, Screens and All Wall Boards.
N. Option 14 - All Exterior Bollards.
SECTION 012300 - OPTIONS: continued O. Option 15 - Government Owned Vehicle Asphalt Parking.
P. Option 16 - AGE Concrete Parking Area.
Q. Option 17 - AGE Access Drive.
R. Option 18 - Install, Terminate and Test Communications in System Furniture.
S. Option 19 - Static Display for F-22 Model Including Civil Landscaping and Structural Work.
T. Option 20 - Roof Mounted Photovoltaic System.
S.1. All work associated with the installation of the Photovoltaic System including but not limited to equipment, materials and labor shall be removed from the base bid and shall be considered as a bid option to the contract. The work associated with the Photovoltaic System is shown on Drawings E-107, Drawing E-402 Detail 3, E-512, E-601 and E-605 and specified in sections 481413 SOLAR ENERGY COLLECTORS and 481916 GRID-
TIE UTILITY INTERACTIVE INVERTERS.
T.U. Option 19 21 - 2nd Floor Special Ceiling and Lighting, as shown on A423.
V. Option 20 22 - Wall Mural Art on both 1st and 2nd Floor, as shown on on A407.
U.W. Option 23 - Mass Notification System.
END OF SECTION 012300
SECTION 00010 - SOLICITATION CONTRACT FORM
SUBCLIN 0001AV
The CLIN description has changed from Option19, Mass Notif System Equipment to Option 19, Static Display for F-22 Model.
The CLIN extended description has changed from 1Nonpersonal services: Provide all plant, labor, transportation, tools, equipment, appliances, supplies, services, permits, insurance and supervision necessary to construct a new Mass Notification System Equipment and Wiring in accordance with project plans and specifications. to Static Display for F-22 Model Including Civil Landscaping and Structural Work1Nonpersonal services: Provide all plant, labor, transportation, tools, equipment, appliances, supplies, services, permits, insurance and supervision necessary to construct Static Display for F-22 Model.
CLIN 0001AW is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001AW
option 20,Roof mounted Photovoltaic sys
FFP
All work associated with the installation of the Photovoltaic System including but not limited to equipment, materials and labor shall be removed from the base bid and shall be considered as a bid option to the contract. The work associated with the Photovoltaic System is shown on Drawings E-107, Drawing E-402 Detail 3, E- 512, E-601 and E-605 and specified in sections 481413 SOLAR ENERGY COLLECTORS and 481916 GRID-TIE UTILITY INTERACTIVE INVERTERS.
FOB: Destination
NET AMT
CLIN 0001AX is added as follows:
0001AX
Option 21, 2nd Floor Special Ceiling
FFP
2nd Floor Special Ceiling and Lighting, as shown on A423.
CLIN 0001AY is added as follows:
0001AY
Option22, Wall Mural Art
FFP
Wall Mural Art on both 1st and 2nd Floor, as shown on on A407.
CLIN 0001AZ is added as follows:
0001AZ
Option 23 - Mass Notification System.
FFP
INSPECTION AND ACCEPTANCE
The following Acceptance/Inspection Schedule was added for CLIN 0003:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
N/A N/A N/A Government
The following Acceptance/Inspection Schedule was added for CLIN 0004:
The following Acceptance/Inspection Schedule was added for CLIN 0005:
The following Acceptance/Inspection Schedule was added for CLIN 0006:
SECTION 00700 - CONTRACT CLAUSES
The following have been deleted:
52.209-8 Updates of Information Regarding Responsibility Matters APR 2010
The Following Has been added;
"52.209-9 ALT I, UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS -
ALTERNATE I (JAN 2011)
(a)(1) The Contractor shall update the information in the Federal Awardee Performance and Integrity Information System (FAPIIS) on a semi-annual basis, throughout the life of the contract, by posting the required information in the Central Contractor Registration database at http://www.ccr.gov.
(2) At the first semi-annual update on or after April 15, 2011, the Contractor shall post again any required information that the Contractor posted prior to April 15, 2011.
(b)(1) The Contractor will receive notification when the Government posts new information to the Contractor’s record.
(2) The Contractor will have an opportunity to post comments regarding information that has been posted by the Government.
The comments will be retained as long as the associated information is retained, i.e., for a total period of 6 years. Contractor comments will remain a part of the record unless the Contractor revises them.
(3)(i) Public requests for system information posted prior to April 15, 2011, will be handled under Freedom of Information Act procedures, including, where appropriate, procedures promulgated under E.O. 12600.
(ii) As required by section 3010 of Public Law 111-212, all information posted in FAPIIS on or after April 15, 2011, except past performance reviews, will be publicly available.
(End of clause)" http://www.ccr.gov/�
HIANG ACM Survey” to Section 132800
Attached EXHIBIT D
EXHIBIT D
OPTION EXECUTION PERIOD
SOLICITATION W912J6-11-R-0001
PLEASE REVIEW THE FOLLOWING AND INCLUDE COMPLETED FORM WITH VOLUME 1
To the maximum extent possible, the Government intends on awarding options at time of the Contract Award. In the event all options are not awarded at the time of contract award, the Government may award an option, provided it does not impact the performance period of the contract. Providing and/or receipt of this information will not be used for evaluation purposes and in no way guarantees that the Government will exercise the Option(s).
COMPLETE THE FOLLOWING WITH THE NUMBER OF DAYS AFTER NOTICE TO PROCEED
(NTP) THE LISTED OPTION MAY BE EXERCISED AND NOT AFFECT THE CONTRACT
PERFORMANCE PERIOD.
BASIC AWARD CONTRACT COMPLETION PERIOD OF 720 DAYS AFTER NTP
CLIN 0001AB OPTION 1 DAYS AFTER NTP
CLIN 0001AC OPTION 2 DAYS AFTER NTP
CLIN 0001AD OPTION 3 DAYS AFTER NTP
CLIN 0001AE OPTION 4 DAYS AFTER NTP
CLIN 0001AF OPTION 5 DAYS AFTER NTP
CLIN 0001AG OPTION 6 DAYS AFTER NTP
CLIN 0001AH OPTION 7 DAYS AFTER NTP
CLIN 0001AJ OPTION 8 DAYS AFTER NTP
CLIN 0001AK OPTION 9 DAYS AFTER NTP
CLIN 0001AL OPTION 10 DAYS AFTER NTP
CLIN 0001AM OPTION 11 DAYS AFTER NTP
CLIN 0001AN OPTION 12 DAYS AFTER NTP
CLIN 0001AP OPTION 13 DAYS AFTER NTP
CLIN 0001AQ OPTION 14 DAYS AFTER NTP
CLIN 0001AR OPTION 15 DAYS AFTER NTP
CLIN 0001AS OPTION 16 DAYS AFTER NTP
CLIN 0001AT OPTION 17 DAYS AFTER NTP
CLIN 0001AU OPTION 18 DAYS AFTER NTP
CLIN 0001AV OPTION 19 DAYS AFTER NTP
CLIN 0001AW OPTION 20 DAYS AFTER NTP
CLIN 0001AX OPTION 21 DAYS AFTER NTP
CLIN 0001AY OPTION 22 DAYS AFTER NTP
CLIN 0001AZ OPTION 23 DAYS AFTER NTP
CLIN 0002AB OPTION 1 DAYS AFTER NTP
CLIN 0002AC OPTION 2 DAYS AFTER NTP
CLIN 0002AD OPTION 3 DAYS AFTER NTP
CLIN 0002AE OPTION 4 DAYS AFTER NTP
CLIN 0002AF OPTION 5 DAYS AFTER NTP