Hawaii Air National Guard PN KNMD109500 Contract / Project Number: __W9133N-04-D-0003 Delivery Order 9N07 Project Name: Hickam Air Force Base TFI-F-22 Squadron Operations / AMU Hangar

SUBMITTAL REGISTER

Submit Approval Material to

Spec. Section Name Description Submit Needed Needed Code Date Government Code Date Remarks

01 25 00 Substitutions 1.03.A Substitution Request Submittal

01 25 00 Substitutions 1.03.A.1 3 copies of each request for substitution consideration 01 25 00 Substitutions 1.03.A.2 Identify the Equipment or Material 01 25 00 Substitutions 1.03.A.3 Documentation showing compliance 01 25 00 Substitutions 1.03.A.4 Contracting Officer's Action 01 32 33 Construction Photographs 1.02.A Submit prints as specified in Sec 01 33 00 01 32 33 Construction Photographs 1.02.B Photographer submit 2 sample prints

01 41 00 Environmental Protection 1.02.A Refer to Sec 01 33 00 for submittal provisions and procedures

01 41 00 Environmental Protection 1.02.B Submit propsed Environmental Plan including

Dust Control Plan in writing

01 41 00 Environmental Protection 1.02.C Submit proposed Stormwater Pollution

Prevention Plan

01 41 00 Environmental Protection 1.02.C.1 Storm Water Pollution Prevention Plan

(SWP3)

01 41 00 Environmental Protection 1.02.D Sustainable Design 01 41 00 Environmental Protection 1.02.D.1 Local/Regional Materials 01 41 00 Environmental Protection 1.02.D.2 Recycled Content

Spec Sect or Drwg #

Contractor ActionContractor Schedule Dates

DATE

Government Action

Para # or Note # y

01 41 00 Environmental Protection 1.02.D.3 Adhesives & Sealants, Paints & Coatings, Carpet Composite Wood 01 41 00 Environmental Protection 1.02.D.4 Certified Wood 01 51 00 Temporary Utilities and Facilities 1.03.A Temporary Utilities 01 51 00 Temporary Utilities and Facilities 1.03.B Implementation and Termination Schedule

01 57 20 Construction Waste Management and

Disposal 1.06.A Waste Management Plan

01 57 20 Construction Waste Management and

Disposal 1.06.B Waste Reduction Progress Reports

01 57 20 Construction Waste Management and

Disposal 1.06.C Waste Reduction Calculations

01 57 20 Construction Waste Management and

Disposal 1.06.D Records of Donations

01 57 20 Construction Waste Management and

Disposal 1.06.E Records of Sales

01 57 20 Construction Waste Management and

Disposal 1.06.F Recycling and Processing Facility Records

01 57 20 Construction Waste Management and

Disposal 1.06.G Landfill and Incinerator Disposal Records

01 57 20 Construction Waste Management and

Disposal 1.06.H LEED Submittal

01 57 20 Construction Waste Management and

Disposal 1.06.I Qualification Data 01 58 00 Project Identification and Signs 1.03.A Submit as specified in Sec 01 33 00 01 58 00 Project Identification and Signs 1.03.B.1 Shop Drawings

9/20/2010 4:37 PM 52085 Submittal Register.xls 1 of 32

Project Name: Hickam Air Force Base TFI-F-22 Squadron Operations / AMU Hangar

SUBMITTAL REGISTER

Submit Approval Material to

Spec. Section Name Description Submit Needed Needed Code Date Government Code Date Remarks Spec Sect or

Drwg #

Contractor ActionContractor Schedule Dates

DATE

Government Action

Para # or Note #

01 58 00 Project Identification and Signs 1.03.B.2 Show content, layout, lettering, colors, structure and foundation

01 60 00 Equipment and Materials 1.03.A Preliminary procurement schedule as specified in Sec 01 31 00

01 60 00 Equipment and Materials 1.03.B Submittal for products as specified in Sec 01

33 00 01 73 29 Cutting and Patching 1.02.A Cutting and Patching Proposal

01 78 00 Contract Closeout 1.04.A Protect record documents from deterioration and loss 01 78 00 Contract Closeout 1.04.B Record Drawings

01 78 00 Contract Closeout 1.04.B.1 Record information concurrently with construction progress 01 78 00 Contract Closeout 1.04.B.2 Mark record sets with red erasable pencil

01 78 00 Contract Closeout 1.04.B.3

Mark new information that is important to Government but was not shown on Contract or Shop Drawings

01 78 00 Contract Closeout 1.04.B.4 Note related Change Order numbers where applicable 01 78 00 Contract Closeout 1.04.B.5 Organize record drawing sheets

Upon completion of the Work, submit record 01 78 00 Contract Closeout 1.04.B.6 p p , drawings to Contracting Officer

01 78 00 Contract Closeout 1.04.B.7.a Depths of various elements of foundation in relation to finish first floor datum

01 78 00 Contract Closeout 1.04.B.7.b Horizontal and vertical locations of underground utilities and appurtenances

01 78 00 Contract Closeout 1.04.B.7.c Location of internal utilities and appurtenances concealed in the construction

01 78 00 Contract Closeout 1.04.B.7.d Record a cross-refernce at corresponding location on Drawings 01 78 00 Contract Closeout 1.04.B.7.e Field changes of dimension and detail

01 78 00 Contract Closeout 1.04.B.7.f Changes made by Change Order or other

Modifications 01 78 00 Contract Closeout 1.04.B.7.g Details not on original Contract Drawings 01 78 00 Contract Closeout 1.04.C Record Specifications

01 78 00 Contract Closeout 1.04.C.1 Mark documents to show substantial variations in actual Work performed

01 78 00 Contract Closeout 1.04.C.2 Substitution and selection of options and information on concealed construction

01 78 00 Contract Closeout 1.04.C.3 Note related record drawing information and product data

01 78 00 Contract Closeout 1.04.C.4 Submit record Specifications to Contracting

Officer for Owner's records

01 78 00 Contract Closeout 1.04.C.5.a

Manufacturer, trade name, catalog number, and Supplier of each product and item of

Equipment actually installed

9/20/2010 4:37 PM 52085 Submittal Register.xls 2 of 32

Project Name: Hickam Air Force Base TFI-F-22 Squadron Operations / AMU Hangar

SUBMITTAL REGISTER

Submit Approval Material to

Spec. Section Name Description Submit Needed Needed Code Date Government Code Date Remarks Spec Sect or

Drwg #

Contractor ActionContractor Schedule Dates

DATE

Government Action

Para # or Note #

01 78 00 Contract Closeout 1.04.C.5.b Changes made by Addendum, Change Order or other Modifications 01 78 00 Contract Closeout 1.04.C.5.c Related Submittals 01 78 00 Contract Closeout 1.04.D Record Product Data

01 78 00 Contract Closeout 1.04.D.1

Mark documents to show significant variations in actual Work performed in comparison with information submitted

01 78 00 Contract Closeout 1.04.D.2 Give particular attention to concealed products and portions of the Work

01 78 00 Contract Closeout 1.04.D.3

Upon Completion of the Work, submit record drawings to Contracting Officer for

Government's records 01 78 00 Contract Closeout 1.04.E Record Samples Submitted 01 78 00 Contract Closeout 1.04.F Miscellaneous Record Submittals

01 78 00 Contract Closeout 1.04.G Organize operation and maintenance data into suitable sets 01 78 00 Contract Closeout 1.04.H Electonic Documentation

01 78 00 Contract Closeout 1.04.H.1

Provide electionic versions of record documents showing "as constructed" conditions

01 78 00 Contract Closeout 1.04.H.2 Provide post-construction CCTV videos of new gravity mains.

01 78 00 Contract Closeout 1.04.I LEED Documentation

01 78 36 Warranties 1.04.A Submit written warranties to Engineer prior to the date of Substantial Completion 01 78 36 Warranties 1.04.B Special Warranty 01 78 36 Warranties 1.04.C Forms for special warranties 01 78 36 Warranties 1.04.D Form of Submittal 01 78 36 Warranties 1.04.E Binding Warranties

01 81 13 Sustainable Design Requirements 1.05.A Submit additional LEED submittals required by other Specification Sections

01 81 13 Sustainable Design Requirements 1.05.B LEED Submittals are in addition to other submittals 01 81 13 Sustainable Design Requirements 1.05.C Project Materials Cost Data 01 81 13 Sustainable Design Requirements 1.05.D LEED Action Plans 01 81 13 Sustainable Design Requirements 1.05.E LEED Documentation Notebook 01 81 13 Sustainable Design Requirements 1.05.F LEED Documentation Submittals 01 81 50 Recycled/Recovered Materials 1.03.A Refer to Section 01 81 13

01 81 50 Recycled/Recovered Materials 1.03.A.1 Indicate percentage of post-consumer recycled content per unit

01 81 50 Recycled/Recovered Materials 1.03.A.2 Indicate percentage of pre-consumer recycled content per unit

02 12 00 Transportation and Disposal of Hazardous

Materials 1.02.A Owner Reprresentative Approval is required for submittals iwh an "ORA" designation.

02 12 00 Transportation and Disposal of Hazardous

Materials 1.02.B SD-03 Product Data On-site Hazardous

Waste Management

9/20/2010 4:37 PM 52085 Submittal Register.xls 3 of 32

Project Name: Hickam Air Force Base TFI-F-22 Squadron Operations / AMU Hangar

SUBMITTAL REGISTER

Submit Approval Material to

Spec. Section Name Description Submit Needed Needed Code Date Government Code Date Remarks Spec Sect or

Drwg #

Contractor ActionContractor Schedule Dates

DATE

Government Action

Para # or Note #

02 12 00 Transportation and Disposal of Hazardous

Materials 1.02.C SD-06 Test Reports

02 12 00 Transportation and Disposal of Hazardous

Materials 1.02.D SD-07 Certifications 02 41 00 Demolition 1.02.A.1 As Specified in Division 1

02 41 00 Demolition 1.02.A.2

Schedule the coordination for shutoff, capping, and continuation of utility services

02 41 00 Demolition 1.02.A.3 Detailed Sequence of demolition and removal work 03 15 50 Vapor Retarder 1.03.A As Specified in Division 1 03 15 50 Vapor Retarder 1.03.B.1 Product Data 03 15 50 Vapor Retarder 1.03.B.2 Installation Instructions 03 20 00 Concrete Reinforcement 1.03.A As Specified in Division 1 03 20 00 Concrete Reinforcement 1.03.B LEED Submittal

03 20 00 Concrete Reinforcement 1.03.C Completed Bar Schedule, Bar Details, and Erection Drawings 03 30 00 Concrete 1.03.A As Specified in Division 1 03 30 00 Concrete 1.03.B LEED Submittal 03 30 00 Concrete 1.03.C Product data and Shop Drawingsp g 03 30 00 Concrete 1.03.D Mill Certificates 03 30 00 Concrete 1.03.E Concrete Mix Design Proprotions 03 30 00 Concrete 1.03.F Production Test Reports 03 45 00 Precast Architectural Concrete 1.06.A As Specified in Division 1 03 45 00 Precast Architectural Concrete 1.06.B Product Data 03 45 00 Precast Architectural Concrete 1.06.C LEED Submittal 03 45 00 Precast Architectural Concrete 1.06.D Design Mixtures 03 45 00 Precast Architectural Concrete 1.06.E Shop Drawings 03 45 00 Precast Architectural Concrete 1.06.F Samples 03 45 00 Precast Architectural Concrete 1.06.G Welding Certificates 03 45 00 Precast Architectural Concrete 1.06.H Qualification Data 03 45 00 Precast Architectural Concrete 1.06.I Material Test Reports 03 45 00 Precast Architectural Concrete 1.06.J Material Certificates 03 45 00 Precast Architectural Concrete 1.06.K Source quality-control test reports 03 45 00 Precast Architectural Concrete 1.06.L Field quality - control reports 04 22 00 Concrete Unit Masonry 1.07.A As Specified in Division 1 04 22 00 Concrete Unit Masonry 1.07.B Product data and Shop Drawings 04 22 00 Concrete Unit Masonry 1.07.C LEED Submittal 04 22 00 Concrete Unit Masonry 1.07.D Shop Drawings 04 22 00 Concrete Unit Masonry 1.07.E Samples for Initial Selection 04 22 00 Concrete Unit Masonry 1.07.F Samples for Verification

04 22 00 Concrete Unit Masonry 1.07.G List of Materials Used in Constructing

Mockups 04 22 00 Concrete Unit Masonry 1.07.H Qualification Data for testing agency 04 22 00 Concrete Unit Masonry 1.07.I Material Certificates 04 22 00 Concrete Unit Masonry 1.07.J Mix Designs

9/20/2010 4:37 PM 52085 Submittal Register.xls 4 of 32

Project Name: Hickam Air Force Base TFI-F-22 Squadron Operations / AMU Hangar

SUBMITTAL REGISTER

Submit Approval Material to

Spec. Section Name Description Submit Needed Needed Code Date Government Code Date Remarks Spec Sect or

Drwg #

Contractor ActionContractor Schedule Dates

DATE

Government Action

Para # or Note #

04 22 00 Concrete Unit Masonry 1.07.K Statement of Compressive Strength of

Masonry 04 22 00 Concrete Unit Masonry 1.07.L Cold-Weather and Hot-Weather Procedures 05 12 00 Steel 1.03.A As Specified in Division 1 05 12 00 Steel 1.03.B LEED Submittal 05 12 00 Steel 1.03.C Fabrication and Erection Drawings 05 12 00 Steel 1.03.D Mill Tests 05 12 00 Steel 1.03.E Manufacturer's Inspections Certificate 05 21 00 Steel Joists 1.03.A As Specified in Division 1 05 21 00 Steel Joists 1.03.B LEED Submittal

05 21 00 Steel Joists 1.03.C Fabrication and erection of joists, including details, end supports and bridging.

05 31 13 Steel Floor Deck 1.03.A As Specified in Division 1 05 31 13 Steel Floor Deck 1.03.B LEED Submittal 05 31 13 Steel Floor Deck 1.03.C Product data and Shop Drawings 05 31 13 Steel Floor Deck 1.03.D Mill Tests 05 31 23 Steel Roof Deck 1.03.A As Specified in Division 1 05 31 23 Steel Roof Deck 1.03.B LEED Submittal 05 31 23 Steel Roof Deck 1.03.C Product data and Shop Drawings 05 31 23 Steel Roof Deck 1.03.D Mill Tests 05 40 00 Cold-Formed Steel Framing 1.04.A As Specified in Division 1 05 40 00 Cold-Formed Steel Framing 1.04.B Product Data 05 40 00 Cold-Formed Steel Framing 1.04.C Shop Drawings 05 40 00 Cold-Formed Steel Framing 1.04.D Mill Certificates 05 40 00 Cold-Formed Steel Framing 1.04.E Welding Certificates 05 40 00 Cold-Formed Steel Framing 1.04.F Product Test Reports 05 51 00 Metal Stairs 1.05.A As Specified in Division 1 05 51 00 Metal Stairs 1.05.B Product Data 05 51 00 Metal Stairs 1.05.C LEED Submittal 05 51 00 Metal Stairs 1.05.D Shop Drawings 05 51 00 Metal Stairs 1.05.E Samples for Initial Selection 05 51 00 Metal Stairs 1.05.F Samples for Verification 05 51 00 Metal Stairs 1.05.G Delegated-Design Submittal 05 51 00 Metal Stairs 1.05.H Qualification Data for testing agency 05 51 00 Metal Stairs 1.05.I Welding Certificates 05 51 00 Metal Stairs 1.05.J Paint Compatibility Certificates 05 51 00 Metal Stairs 1.05.K Product Test Reports 05 50 00 Metal Fabrications 1.03.A As Specified in Division 1 05 50 00 Metal Fabrications 1.03.B.1 Fabrication and erection drawings 05 50 00 Metal Fabrications 1.03.B.2 Shop Drawings 05 50 00 Metal Fabrications 1.03.C LEED Submittal 05 73 00 Decorative Metal Railings 1.04.A As Specified in Division 1 05 73 00 Decorative Metal Railings 1.04.B Product Data 05 73 00 Decorative Metal Railings 1.04.C Shop Drawings 05 73 00 Decorative Metal Railings 1.04.D Samples for Initial Selection - color charts 05 73 00 Decorative Metal Railings 1.04.E Samples for Initial Selection

9/20/2010 4:37 PM 52085 Submittal Register.xls 5 of 32

Project Name: Hickam Air Force Base TFI-F-22 Squadron Operations / AMU Hangar

SUBMITTAL REGISTER

Submit Approval Material to

Spec. Section Name Description Submit Needed Needed Code Date Government Code Date Remarks Spec Sect or

Drwg #

Contractor ActionContractor Schedule Dates

DATE

Government Action

Para # or Note #

05 73 00 Decorative Metal Railings 1.04.F Samples for Verification 05 73 00 Decorative Metal Railings 1.04.G Qualification Data 05 73 00 Decorative Metal Railings 1.04.H Product Test Reports 05 73 00 Decorative Metal Railings 1.04.I Product Test Reports - handrails and railings 06 10 00 Rough Carpentry 1.05.A As Specified in Division 1 06 10 00 Rough Carpentry 1.05.B Product Data

06 10 00 Rough Carpentry 1.05.B.1 Data for wood-preservative treatment from chemical treatment

06 10 00 Rough Carpentry 1.05.B.2 Data for fire-retardant treatment from chemical treatment

06 10 00 Rough Carpentry 1.05.B.3 Fire-treatment specified to be High-temperature (HT) type 06 10 00 Rough Carpentry 1.05.B.4 Products receiving a waterborne treatment 06 10 00 Rough Carpentry 1.05.B.5 Copies of warranties from chemical treatment 06 10 00 Rough Carpentry 1.05.C Fastener Patterns 06 10 00 Rough Carpentry 1.05.D LEED Submittal 06 10 00 Rough Carpentry 1.05.E Material Certificates 06 10 00 Rough Carpentry 1.05.F Research/Evaluation 06 16 00 Sheathing 1.05.A As Specified in Division 1 06 16 00 Sheathing 1.05.B Product Data06 16 00 Sheathing 1.05.B Product Data 06 16 00 Sheathing 1.05.C LEED Submittal 06 16 00 Sheathing 1.05.D Research/Evaluation Reports 06 40 23 Interior Architectural Woodwork 1.05.A As Specified in Division 1 06 40 23 Interior Architectural Woodwork 1.05.B Product Data 06 40 23 Interior Architectural Woodwork 1.05.C Shop Drawings 06 40 23 Interior Architectural Woodwork 1.05.D Samples for Initial Selection 06 40 23 Interior Architectural Woodwork 1.05.E Samples for Verification 06 40 23 Interior Architectural Woodwork 1.05.F LEED Submittal 06 40 23 Interior Architectural Woodwork 1.05.G Product Certificates

06 40 23 Interior Architectural Woodwork 1.05.H Woodwork Quality Standard Compliance

Certificates 06 40 23 Interior Architectural Woodwork 1.05.I Qualification Data for Installer 06 64 00 Plastic Paneling 1.04.A As Specified in Division 1 06 64 00 Plastic Paneling 1.04.B Product Data 06 64 00 Plastic Paneling 1.04.C LEED Submittal 06 64 00 Plastic Paneling 1.04.D Samples for Initial Selection 06 64 00 Plastic Paneling 1.04.E Samples for Verification 07 11 13 Bituminous Damproofing 1.04.A As Specified in Division 1 07 11 13 Bituminous Damproofing 1.04.B Product Data 07 11 13 Bituminous Damproofing 1.04.C Material Certificates 07 11 13 Bituminous Damproofing 1.04.D LEED Submittal 07 13 26 Self-Adhering Sheet Waterproofing 1.04.A As Specified in Division 1 07 13 26 Self-Adhering Sheet Waterproofing 1.04.B Product Data 07 13 26 Self-Adhering Sheet Waterproofing 1.04.C Shop Drawings 07 13 26 Self-Adhering Sheet Waterproofing 1.04.D LEED Submittal 07 13 26 Self-Adhering Sheet Waterproofing 1.04.E Samples

9/20/2010 4:37 PM 52085 Submittal Register.xls 6 of 32

Project Name: Hickam Air Force Base TFI-F-22 Squadron Operations / AMU Hangar

SUBMITTAL REGISTER

Submit Approval Material to

Spec. Section Name Description Submit Needed Needed Code Date Government Code Date Remarks Spec Sect or

Drwg #

Contractor ActionContractor Schedule Dates

DATE

Government Action

Para # or Note #

07 13 26 Self-Adhering Sheet Waterproofing 1.04.F Installer Certificates 07 13 26 Self-Adhering Sheet Waterproofing 1.04.G Qualification Data 07 13 26 Self-Adhering Sheet Waterproofing 1.04.H Product Test Reports 07 13 26 Self-Adhering Sheet Waterproofing 1.04.I Warranties 07 19 00 Water Repellents 1.05.A As Specified in Division 1 07 19 00 Water Repellents 1.05.B Product Data 07 19 00 Water Repellents 1.05.C LEED Submittal 07 19 00 Water Repellents 1.05.D Samples 07 19 00 Water Repellents 1.05.E Manufacturer's Certificates 07 19 00 Water Repellents 1.05.F Qualification Data 07 19 00 Water Repellents 1.05.G Warranties 07 21 00 Thermal Insulation 1.04.A As Specified in Division 1 07 21 00 Thermal Insulation 1.04.B Product Data 07 21 00 Thermal Insulation 1.04.C Samples for Verification 07 21 00 Thermal Insulation 1.04.D LEED Submittal 07 21 00 Thermal Insulation 1.04.E Product Test Reports 07 21 00 Thermal Insulation 1.04.F Research/Evaluation Reports 07 41 13 Metal Roof Panels 1.06.A As Specified in Division 1 07 41 13 Metal Roof Panels 1.06.B Product Data 07 41 13 Metal Roof Panels 1.06.C LEED Submittal 07 41 13 Metal Roof Panels 1.06.D Samples for Initial Selection 07 41 13 Metal Roof Panels 1.06.E Samples for Verification 07 41 13 Metal Roof Panels 1.06.F Delegated-Design Submittal 07 41 13 Metal Roof Panels 1.06.G Coordination Drawings 07 41 13 Metal Roof Panels 1.06.H Manufacturer Certificates 07 41 13 Metal Roof Panels 1.06.I Qualification Data 07 41 13 Metal Roof Panels 1.06.J Product Test Reports 07 41 13 Metal Roof Panels 1.06.K Maintenance Data 07 41 13 Metal Roof Panels 1.06.L Warranties 07 42 16 Insulated-Core Metal Wall Panels 1.06.A Product Data 07 42 16 Insulated-Core Metal Wall Panels 1.06.B LEED Submittal 07 42 16 Insulated-Core Metal Wall Panels 1.06.C Shop Drawings 07 42 16 Insulated-Core Metal Wall Panels 1.06.D Samples for Initial Selection 07 42 16 Insulated-Core Metal Wall Panels 1.06.E Samples for Verification 07 42 16 Insulated-Core Metal Wall Panels 1.06.F Coordination Drawings 07 42 16 Insulated-Core Metal Wall Panels 1.06.G Wall panels and attachments 07 42 16 Insulated-Core Metal Wall Panels 1.06.H Product Test Reports 07 42 16 Insulated-Core Metal Wall Panels 1.06.I Metal Wall and Soffit Panels 07 42 16 Insulated-Core Metal Wall Panels 1.06.J Maintenance Data 07 42 16 Insulated-Core Metal Wall Panels 1.06.K Warranties 07 62 00 Sheet Metal Flashing and Trim 1.04.A As Specified in Division 1 07 62 00 Sheet Metal Flashing and Trim 1.04.B Product Data 07 62 00 Sheet Metal Flashing and Trim 1.04.C Shop Drawings 07 62 00 Sheet Metal Flashing and Trim 1.04.D Samples 07 71 00 Roof Specialties 1.4.A Product Data 07 71 00 Roof Specialties 1.4.B Shop Drawings

9/20/2010 4:37 PM 52085 Submittal Register.xls 7 of 32

Project Name: Hickam Air Force Base TFI-F-22 Squadron Operations / AMU Hangar

SUBMITTAL REGISTER

Submit Approval Material to

Spec. Section Name Description Submit Needed Needed Code Date Government Code Date Remarks Spec Sect or

Drwg #

Contractor ActionContractor Schedule Dates

DATE

Government Action

Para # or Note #

07 71 00 Roof Specialties 1.4.C Samples for Initial Selection 07 71 00 Roof Specialties 1.4.D Samples for Verification 07 72 00 Roof Accessories 1.4.A Product Data 07 72 00 Roof Accessories 1.4.B Shop Drawings 07 72 00 Roof Accessories 1.4.C Samples 07 84 13 Through-Penetration Firestop Systems 1.04.A As Specified in Division 1 07 84 13 Through-Penetration Firestop Systems 1.04.B Product Data 07 84 13 Through-Penetration Firestop Systems 1.05.C Shop Drawings

07 84 13 Through-Penetration Firestop Systems 1.04.D Through-Penetration Firestop System

Schedule 07 84 13 Through-Penetration Firestop Systems 1.04.E Qualification Data 07 84 13 Through-Penetration Firestop Systems 1.04.F Product Certificates 07 84 13 Through-Penetration Firestop Systems 1.04.G Product Test Reports 07 92 00 Joint Sealants 1.03.A As Specified in Division 1 07 92 00 Joint Sealants 1.03.B.1 Product data and Specifications 07 92 00 Joint Sealants 1.03.B.2 Color charts 07 92 00 Joint Sealants 1.03.B.3 Samples for Initial Selection 07 92 00 Joint Sealants 1.03.B.4 Samples for Verification 07 92 00 Joint Sealants 1.03.C Certificates 07 92 00 Joint Sealants 1.03.D LEED Submittal 08 11 13 Hollow Metal Doors and Frames 1.05.A As Specified in Division 1 08 11 13 Hollow Metal Doors and Frames 1.05.B Product Data 08 11 13 Hollow Metal Doors and Frames 1.05.C Shop Drawings 08 11 13 Hollow Metal Doors and Frames 1.05.D Samples for Initial Selection 08 11 13 Hollow Metal Doors and Frames 1.05.E Samples for Verification 08 11 13 Hollow Metal Doors and Frames 1.05.F Schedule 08 11 13 Hollow Metal Doors and Frames 1.05.G Oversize Construction Certification 08 11 13 Hollow Metal Doors and Frames 1.05.H Product Test Reports 08 14 16 Flush Wood Doors 1.04.A As Specified in Division 1 08 14 16 Flush Wood Doors 1.04.B Product Data 08 14 16 Flush Wood Doors 1.04.C LEED Submittal 08 14 16 Flush Wood Doors 1.04.D Shop Drawings 08 14 16 Flush Wood Doors 1.04.E Samples for Initial Selection 08 14 16 Flush Wood Doors 1.04.F Samples for Verification 08 14 16 Flush Wood Doors 1.04.G Warranties 08 31 00 Metal Access Doors 1.02.A As Specified in Division 1 08 31 00 Metal Access Doors 1.02.B.1 Product Data 08 31 00 Metal Access Doors 1.02.B.2 Complete Schedule 08 31 00 Metal Access Doors 1.02.B.3 Shop Drawings 08 33 00 Coiling Security Grilles 1.03.A As Specified in Division 1 08 33 00 Coiling Security Grilles 1.03.B Shop Drawings 08 33 00 Coiling Security Grilles 1.03.C Product Literature 08 33 00 Coiling Security Grilles 1.03.D Maintenance and Operating Manuals 08 33 23 Overhead Coiling Doors 1.05.A Product Data 08 33 23 Overhead Coiling Doors 1.05.B Shop Drawings 08 33 23 Overhead Coiling Doors 1.05.C Samples for Initial Selection

9/20/2010 4:37 PM 52085 Submittal Register.xls 8 of 32

Project Name: Hickam Air Force Base TFI-F-22 Squadron Operations / AMU Hangar

SUBMITTAL REGISTER

Submit Approval Material to

Spec. Section Name Description Submit Needed Needed Code Date Government Code Date Remarks Spec Sect or

Drwg #

Contractor ActionContractor Schedule Dates

DATE

Government Action

Para # or Note #

08 33 23 Overhead Coiling Doors 1.05.D Samples for Verification 08 33 23 Overhead Coiling Doors 1.05.E Qualification Data 08 33 23 Overhead Coiling Doors 1.05.F Seismic Qualification Certificates 08 33 23 Overhead Coiling Doors 1.05.G Oversize Construction Certification

08 34 16.20 Veritical Lift Fabric Doors 1.03.A As Specified in Division 1 08 34 16.20 Veritical Lift Fabric Doors 1.03.B.1 Shop and Erection drawings 08 34 16.20 Veritical Lift Fabric Doors 1.03.B.2 Performance and Characteristic Curves 08 34 16.20 Veritical Lift Fabric Doors 1.03.B.3 Finishing Specifications 08 34 16.20 Veritical Lift Fabric Doors 1.03.B.4 Design Data 08 34 16.20 Veritical Lift Fabric Doors 1.03.B.5 Design Calculations

08 34 16.20 Veritical Lift Fabric Doors 1.03.B.6 Calculations and Drawings signed and sealed 08 34 16.20 Veritical Lift Fabric Doors 1.03.B.7 List of Materials for all Control Devices 08 34 16.20 Veritical Lift Fabric Doors 1.03.B.8 Anchor bolt setting and materials

08 34 16.20 Veritical Lift Fabric Doors 1.03.B.9 Calculations, drawings, certification to proper authorities 08 34 16.20 Veritical Lift Fabric Doors 1.03.B.10 Samples

08 34 16.20 Veritical Lift Fabric Doors 1.03.B.11 Manuals containing instructions for proper operation and maintenance 08 34 73 Sound Control Door Assemblies 1.04.A As Specified in Division 1p 08 34 73 Sound Control Door Assemblies 1.04.B Product Data 08 34 73 Sound Control Door Assemblies 1.04.C LEED Submittal 08 34 73 Sound Control Door Assemblies 1.04.D Shop Drawings 08 34 73 Sound Control Door Assemblies 1.04.E Samples for Verification 08 34 73 Sound Control Door Assemblies 1.04.F Schedule 08 34 73 Sound Control Door Assemblies 1.04.G Qualification Data 08 34 73 Sound Control Door Assemblies 1.04.H Product Certificates 08 34 73 Sound Control Door Assemblies 1.04.I Product Test Reports 08 34 73 Sound Control Door Assemblies 1.04.J Field Quality - control reports 08 34 73 Sound Control Door Assemblies 1.04.K Maintenance Data 08 34 73 Sound Control Door Assemblies 1.04.L Warranties 08 41 13 Aluminum-Framed Entrances & Storefronts 1.06.A As Specified in Division 1 08 41 13 Aluminum-Framed Entrances & Storefronts 1.06.B Product Data 08 41 13 Aluminum-Framed Entrances & Storefronts 1.06.C LEED Submittal 08 41 13 Aluminum-Framed Entrances & Storefronts 1.06.D Shop Drawings 08 41 13 Aluminum-Framed Entrances & Storefronts 1.06.E Samples for Initial Selection 08 41 13 Aluminum-Framed Entrances & Storefronts 1.06.F Samples for Verification 08 41 13 Aluminum-Framed Entrances & Storefronts 1.06.G Fabrication/cutaway sample 08 41 13 Aluminum-Framed Entrances & Storefronts 1.06.H Other Action Submittals 08 41 13 Aluminum-Framed Entrances & Storefronts 1.06.I Qualification Data 08 41 13 Aluminum-Framed Entrances & Storefronts 1.06.J Seismic Qualification Certificates 08 41 13 Aluminum-Framed Entrances & Storefronts 1.06.K Blast Testing or Analysis Reports 08 41 13 Aluminum-Framed Entrances & Storefronts 1.06.L Welding Certificates 08 41 13 Aluminum-Framed Entrances & Storefronts 1.06.M Product Test Reports

08 41 13 Aluminum-Framed Entrances & Storefronts 1.06.N Quality Control Program for Structural-

Sealant-Glazed System

9/20/2010 4:37 PM 52085 Submittal Register.xls 9 of 32

Project Name: Hickam Air Force Base TFI-F-22 Squadron Operations / AMU Hangar

SUBMITTAL REGISTER

Submit Approval Material to

Spec. Section Name Description Submit Needed Needed Code Date Government Code Date Remarks Spec Sect or

Drwg #

Contractor ActionContractor Schedule Dates

DATE

Government Action

Para # or Note #

08 41 13 Aluminum-Framed Entrances & Storefronts 1.06.O Field Quality - control reports 08 41 13 Aluminum-Framed Entrances & Storefronts 1.06.P Maintenance Data 08 41 13 Aluminum-Framed Entrances & Storefronts 1.06.Q Warranties 08 44 13 Glazed Aluminum Curtain Walls 1.05.A Product Data 08 44 13 Glazed Aluminum Curtain Walls 1.05.B LEED Submittal 08 44 13 Glazed Aluminum Curtain Walls 1.05.C Shop Drawings 08 44 13 Glazed Aluminum Curtain Walls 1.05.D Samples for Initial Selection 08 44 13 Glazed Aluminum Curtain Walls 1.05.E Samples for Verification 08 44 13 Glazed Aluminum Curtain Walls 1.05.F Fabrication Sample 08 44 13 Glazed Aluminum Curtain Walls 1.05.G Delegated-Design Submittal 08 70 50 Finish Hardware 1.03.A As Specified in Division 1 08 70 50 Finish Hardware 1.03.B.1 Product Data 08 70 50 Finish Hardware 1.03.B.2 Hardware Schedule 08 70 50 Finish Hardware 1.03.B.3 Submittal Sequence 08 70 50 Finish Hardware 1.03.B.4 Submittal Sequence 08 70 50 Finish Hardware 1.03.B.5 Six month maintenance report 08 80 00 Glazing 1.06.A As Specified in Division 1 08 80 00 Glazing 1.06.B Product Data 08 80 00 Glazing 1.06.C LEED Submittal 08 80 00 Glazing 1.06.D Glass Samplesg p 08 80 00 Glazing 1.06.E Glazing Schedule 08 80 00 Glazing 1.06.F Delegated-Design Submittal 08 80 00 Glazing 1.06.G Qualification Data 08 80 00 Glazing 1.06.H Product Certificates 08 80 00 Glazing 1.06.I Product Test Reports 08 80 00 Glazing 1.06.J Preconstruction test reports 08 80 00 Glazing 1.06.K Warranties 08 83 00 Mirrors 1.04.A As Specified in Division 1 08 83 00 Mirrors 1.04.B Product Data 08 83 00 Mirrors 1.04.C Shop Drawings 08 83 00 Mirrors 1.04.D Qualifications Data 08 83 00 Mirrors 1.04.E Product Certificates 08 83 00 Mirrors 1.04.F Preconstruction test reports 08 83 00 Mirrors 1.04.G Maintenance Data 08 83 00 Mirrors 1.04.H Warranties 08 90 00 Louvers and Vents 1.04.A As Specified in Division 1 08 90 00 Louvers and Vents 1.04.B Product Data 08 90 00 Louvers and Vents 1.04.C Shop Drawings 08 90 00 Louvers and Vents 1.04.D Samples for Verification 08 90 00 Louvers and Vents 1.04.E Delegated-Design Submittal 08 90 00 Louvers and Vents 1.04.F Product Test Reports 08 90 00 Louvers and Vents 1.04.G Qualification Data 09 22 16 Non-Structural Metal Framing 1.04.A Product Data 09 22 16 Non-Structural Metal Framing 1.04.B LEED Submittal 09 24 00 Portland Cement Plastering 1.04.A Product Data 09 24 00 Portland Cement Plastering 1.04.B Material Certificates

9/20/2010 4:37 PM 52085 Submittal Register.xls 10 of 32

Project Name: Hickam Air Force Base TFI-F-22 Squadron Operations / AMU Hangar

SUBMITTAL REGISTER

Submit Approval Material to

Spec. Section Name Description Submit Needed Needed Code Date Government Code Date Remarks Spec Sect or

Drwg #

Contractor ActionContractor Schedule Dates

DATE

Government Action

Para # or Note #

09 24 00 Portland Cement Plastering 1.04.C LEED Submittal 09 24 00 Portland Cement Plastering 1.04.D Shop Drawings 09 24 00 Portland Cement Plastering 1.04.E Samples for Initial Selection 09 24 00 Portland Cement Plastering 1.04.F Samples for Verification 09 29 00 Gypsum Board 1.05.A As Specified in Division 1 09 29 00 Gypsum Board 1.05.B Product Data 09 29 00 Gypsum Board 1.05.C Samples 09 29 00 Gypsum Board 1.05.D LEED Submittal 09 30 00 Tiling 1.06.A As Specified in Division 1 09 30 00 Tiling 1.06.B Product Data 09 30 00 Tiling 1.06.C LEED Submittal 09 30 00 Tiling 1.06.D Shop Drawings 09 30 00 Tiling 1.06.E Samples for Initial Selection 09 30 00 Tiling 1.06.F Samples for Verification 09 30 00 Tiling 1.06.G Qualification Data 09 30 00 Tiling 1.06.H Master Grade Certificates 09 30 00 Tiling 1.06.I Product Certificates 09 30 00 Tiling 1.06.J Material Test Reports 09 51 23 Acoustical Panel Ceilings 1.05.A As Specified in Division 1 09 51 23 Acoustical Panel Ceilings 1.05.B Product Datag 09 51 23 Acoustical Panel Ceilings 1.05.C Coordination Drawings 09 51 23 Acoustical Panel Ceilings 1.05.D Samples for Initial Selection 09 51 23 Acoustical Panel Ceilings 1.05.E Samples for Verification 09 51 23 Acoustical Panel Ceilings 1.05.F LEED Submittal 09 51 23 Acoustical Panel Ceilings 1.05.G Qualification Data 09 51 23 Acoustical Panel Ceilings 1.05.H Field Quality - control reports 09 51 23 Acoustical Panel Ceilings 1.05.I Product Test Reports 09 51 23 Acoustical Panel Ceilings 1.05.J Research/Evaluation Reports 09 51 23 Acoustical Panel Ceilings 1.05.K Maintenance Data 09 51 33 Acoustical Metal Pan Ceilings 1.06.A As Specified in Division 1 09 51 33 Acoustical Metal Pan Ceilings 1.06.B Product Data 09 51 33 Acoustical Metal Pan Ceilings 1.06.C LEED Submittal 09 51 33 Acoustical Metal Pan Ceilings 1.06.D Samples for Initial Selection 09 51 33 Acoustical Metal Pan Ceilings 1.06.E Samples for Verification 09 51 33 Acoustical Metal Pan Ceilings 1.06.F Performance Data 09 51 33 Acoustical Metal Pan Ceilings 1.06.G Coordination Drawings 09 51 33 Acoustical Metal Pan Ceilings 1.06.H Qualification Data 09 51 33 Acoustical Metal Pan Ceilings 1.06.I Product Test Reports 09 51 33 Acoustical Metal Pan Ceilings 1.06.J Evaluation Reports 09 51 33 Acoustical Metal Pan Ceilings 1.06.K Field Quality - control reports 09 51 33 Acoustical Metal Pan Ceilings 1.06.L Maintenance Data 09 65 13 Resilient Base and Accessories 1.04.A As Specified in Division 1 09 65 13 Resilient Base and Accessories 1.04.B Product Data 09 65 13 Resilient Base and Accessories 1.04.C LEED Submittal 09 65 13 Resilient Base and Accessories 1.04.D Samples for Initial Selection 09 65 13 Resilient Base and Accessories 1.04.E Samples for Verification

9/20/2010 4:37 PM 52085 Submittal Register.xls 11 of 32

Project Name: Hickam Air Force Base TFI-F-22 Squadron Operations / AMU Hangar

SUBMITTAL REGISTER

Submit Approval Material to

Spec. Section Name Description Submit Needed Needed Code Date Government Code Date Remarks Spec Sect or

Drwg #

Contractor ActionContractor Schedule Dates

DATE

Government Action

Para # or Note #

09 65 13 Resilient Base and Accessories 1.04.F Product Schedule 09 65 19 Resilient Tile Flooring 1.04.A As Specified in Division 1 09 65 19 Resilient Tile Flooring 1.04.B.1 LEED Submittal 09 65 19 Resilient Tile Flooring 1.04.B.2 Product Data for Credit EQ 4.1 09 65 19 Resilient Tile Flooring 1.04.C Shop Drawings 09 65 19 Resilient Tile Flooring 1.04.D Samples for Initial Selection 09 65 19 Resilient Tile Flooring 1.04.E Samples for Verification 09 65 19 Resilient Tile Flooring 1.04.F Product Schedule 09 65 19 Resilient Tile Flooring 1.04.G Qualification Data 09 65 19 Resilient Tile Flooring 1.04.H Maintenance Data 09 67 23 Resinous Flooring 1.03.A As Specified in Division 1 09 67 23 Resinous Flooring 1.03.B.1 Product Data 09 67 23 Resinous Flooring 1.03.B.2 Samples 09 67 23 Resinous Flooring 1.03.B.3 Installer Certificates 09 67 23 Resinous Flooring 1.03.B.4 Material Test Reports 09 67 23 Resinous Flooring 1.03.B.5 Material Certificates 09 68 13 Tile Carpeting 1.04.A As Specified in Division 1 09 68 13 Tile Carpeting 1.04.B Product Data 09 68 13 Tile Carpeting 1.04.C Shop Drawings 09 68 13 Tile Carpeting 1.04.D Samplesp g p 09 68 13 Tile Carpeting 1.04.E LEED Submittal 09 68 13 Tile Carpeting 1.04.F Product Schedule 09 68 13 Tile Carpeting 1.04.G Qualification Data 09 68 13 Tile Carpeting 1.04.H Product Test Reports 09 68 13 Tile Carpeting 1.04.I Maintenance Data 09 69 00 Access Flooring 1.07.A As Specified in Division 1 09 69 00 Access Flooring 1.07.B Product Data 09 69 00 Access Flooring 1.07.C Shop Drawings 09 69 00 Access Flooring 1.07.D Samples for Initial Selection 09 69 00 Access Flooring 1.07.E Samples for Verification 09 69 00 Access Flooring 1.07.F LEED Submittal 09 69 00 Access Flooring 1.07.G Product Certificates 09 69 00 Access Flooring 1.07.H Qualification Data 09 69 00 Access Flooring 1.07.I Product Test Reports 09 69 00 Access Flooring 1.07.J Earthquake-load resistance data 09 77 23 Fabric Wrapped Panels 1.04.A As Specified in Division 1 09 77 23 Fabric Wrapped Panels 1.04.B Product Data 09 77 23 Fabric Wrapped Panels 1.04.C Shop Drawings 09 77 23 Fabric Wrapped Panels 1.04.D Coordination Drawings 09 77 23 Fabric Wrapped Panels 1.04.E Samples for Initial Selection 09 77 23 Fabric Wrapped Panels 1.04.F Samples for Verification 09 77 23 Fabric Wrapped Panels 1.04.G LEED Submittal 09 77 23 Fabric Wrapped Panels 1.04.H Qualification Data 09 77 23 Fabric Wrapped Panels 1.04.I Maintenance Data 09 77 23 Fabric Wrapped Panels 1.04.J Warranties 09 84 47 Modular Metal Wall System 1.04.A Product Data

9/20/2010 4:37 PM 52085 Submittal Register.xls 12 of 32

Project Name: Hickam Air Force Base TFI-F-22 Squadron Operations / AMU Hangar

SUBMITTAL REGISTER

Submit Approval Material to

Spec. Section Name Description Submit Needed Needed Code Date Government Code Date Remarks Spec Sect or

Drwg #

Contractor ActionContractor Schedule Dates

DATE

Government Action

Para # or Note #

09 84 47 Modular Metal Wall System 1.04.B Product Certificates 09 84 47 Modular Metal Wall System 1.04.C Shop Drawings 09 84 47 Modular Metal Wall System 1.04.D Samples for Verification 09 84 47 Modular Metal Wall System 1.04.E Qualification Data 09 91 13 Exterior Painting 1.04.A Product Data 09 91 13 Exterior Painting 1.04.B Samples for Initial Selection 09 91 13 Exterior Painting 1.04.C Samples for Verification 09 91 13 Exterior Painting 1.04.D Product List 09 91 23 Interior Painting 1.04.A Product Data 09 91 23 Interior Painting 1.04.B Samples for Initial Selection 09 91 23 Interior Painting 1.04.C Samples for Verification 09 91 23 Interior Painting 1.04.D Product List 09 91 23 Interior Painting 1.04.E LEED Submittal 09 96 00 High-Performance Coatings 1.04.A As Specified in Division 1 09 96 00 High-Performance Coatings 1.04.B Product Data 09 96 00 High-Performance Coatings 1.04.C Samples for Initial Selection 09 96 00 High-Performance Coatings 1.04.D Samples for Verification 09 96 00 High-Performance Coatings 1.04.E Schedule of products to be used 09 96 00 High-Performance Coatings 1.04.F Technical and material safety data sheets 09 96 00 High-Performance Coatings 1.04.G LEED Submittalg g 09 96 00 High-Performance Coatings 1.04.H Certification(s)

09 96 00 High-Performance Coatings 1.04.I

Certify in writing that applicatiors have the ability and equipment to prepare surfacs and coatings correctly

09 96 00 High-Performance Coatings 1.04.J

Certify in writing that applicatiors have the ability and equipment to prepare decorative coatings correctly

09 96 00 High-Performance Coatings 1.04.K Submittals for industrial maintenance coatings 10 11 00 Visual Display Surfaces 1.05.A As Specified in Division 1 10 11 00 Visual Display Surfaces 1.05.B Product Data 10 11 00 Visual Display Surfaces 1.05.C LEED Submittal 10 11 00 Visual Display Surfaces 1.05.D Shop Drawings 10 11 00 Visual Display Surfaces 1.05.E Samples for Initial Selection 10 11 00 Visual Display Surfaces 1.05.F Samples for Verification 10 11 00 Visual Display Surfaces 1.05.G Product Schedule 10 11 00 Visual Display Surfaces 1.05.H Qualification Data 10 11 00 Visual Display Surfaces 1.05.I Product Test Reports 10 11 00 Visual Display Surfaces 1.05.J Operation and Maintenance Data 10 11 00 Visual Display Surfaces 1.05.K Warranties 10 13 00 Directories 1.05.A As Specified in Division 1 10 13 00 Directories 1.05.B Product Data 10 13 00 Directories 1.05.C Shop Drawings 10 13 00 Directories 1.05.D Samples for Initial Selection 10 13 00 Directories 1.05.E Samples for Verification 10 13 00 Directories 1.05.F.1 Message-Strip Schedule

9/20/2010 4:37 PM 52085 Submittal Register.xls 13 of 32

Project Name: Hickam Air Force Base TFI-F-22 Squadron Operations / AMU Hangar

SUBMITTAL REGISTER

Submit Approval Material to

Spec. Section Name Description Submit Needed Needed Code Date Government Code Date Remarks Spec Sect or

Drwg #

Contractor ActionContractor Schedule Dates

DATE

Government Action

Para # or Note #

10 13 00 Directories 1.05.G Delegated-Design Submittal 10 13 00 Directories 1.05.H Qualification Data 10 13 00 Directories 1.05.I Maintenance Data 10 14 00 Signage 1.05.A As Specified in Division 1 10 14 00 Signage 1.05.B Product Data 10 14 00 Signage 1.05.C Shop Drawings 10 14 00 Signage 1.05.D Samples for Initial Selection 10 14 00 Signage 1.05.E Samples for Verification 10 14 00 Signage 1.05.F Sign Schedule 10 14 00 Signage 1.05.G Qualification Data 10 14 00 Signage 1.05.H Maintenance Data 10 14 00 Signage 1.05.I Warranties 10 21 13 Toilet Compatments 1.04.A As Specified in Division 1 10 21 13 Toilet Compatments 1.04.B Product Data 10 21 13 Toilet Compatments 1.04.C LEED Submittal 10 21 13 Toilet Compatments 1.04.D Shop Drawings 10 21 13 Toilet Compatments 1.04.E Samples for Initial Selection 10 21 13 Toilet Compatments 1.04.F Samples for Verification 10 21 13 Toilet Compatments 1.04.G Product Certificates 10 21 13 Toilet Compatments 1.04.H Maintenance Datap 10 22 19 Demountable Partitions 1.06.A As Specified in Division 1 10 22 19 Demountable Partitions 1.06.B Product Data 10 22 19 Demountable Partitions 1.06.C Shop Drawings 10 22 19 Demountable Partitions 1.06.D Coordination Drawings 10 22 19 Demountable Partitions 1.06.E Samples for Initial Selection 10 22 19 Demountable Partitions 1.06.F Samples for Verification 10 22 19 Demountable Partitions 1.06.G Product Test Reports 10 22 19 Demountable Partitions 1.06.H Maintenance Data

10 22 26.13 Accordion Folding Partitions 1.06.A As Specified in Division 1 10 22 26.13 Accordion Folding Partitions 1.06.B Product Data 10 22 26.13 Accordion Folding Partitions 1.06.C Shop Drawings 10 22 26.13 Accordion Folding Partitions 1.06.D Coordination Drawings 10 22 26.13 Accordion Folding Partitions 1.06.E Setting Drawings 10 22 26.13 Accordion Folding Partitions 1.06.F Samples for Initial Selection 10 22 26.13 Accordion Folding Partitions 1.06.G Samples for Verification 10 22 26.13 Accordion Folding Partitions 1.06.H LEED Submittal 10 22 26.13 Accordion Folding Partitions 1.06.I Product Certificates 10 22 26.13 Accordion Folding Partitions 1.06.J Material Certificates 10 22 26.13 Accordion Folding Partitions 1.06.K Qualification Data 10 22 26.13 Accordion Folding Partitions 1.06.L Field Quality - control reports 10 22 26.13 Accordion Folding Partitions 1.06.M Product Test Reports 10 22 26.13 Accordion Folding Partitions 1.06.N Maintenance Data 10 22 26.13 Accordion Folding Partitions 1.06.O Warranties

10 26 00 Wall and Door Protection 1.05.A As Specified in Division 1 10 26 00 Wall and Door Protection 1.05.B Product Data 10 26 00 Wall and Door Protection 1.05.C LEED Submittal

9/20/2010 4:37 PM 52085 Submittal Register.xls 14 of 32

Project Name: Hickam Air Force Base TFI-F-22 Squadron Operations / AMU Hangar

SUBMITTAL REGISTER

Submit Approval Material to

Spec. Section Name Description Submit Needed Needed Code Date Government Code Date Remarks Spec Sect or

Drwg #

Contractor ActionContractor Schedule Dates

DATE

Government Action

Para # or Note #

10 26 00 Wall and Door Protection 1.05.D Shop Drawings 10 26 00 Wall and Door Protection 1.05.E Samples for Initial Selection 10 26 00 Wall and Door Protection 1.05.F Samples for Verification 10 26 00 Wall and Door Protection 1.05.G Qualification Data 10 26 00 Wall and Door Protection 1.05.H Material Certificates 10 26 00 Wall and Door Protection 1.05.I Material Test Reports 10 26 00 Wall and Door Protection 1.05.J Maintenance Data 10 26 00 Wall and Door Protection 1.05.K Warranties 10 28 00 Toilet, Bath and Laundry Accessories 1.04.A Product Data 10 28 00 Toilet, Bath and Laundry Accessories 1.04.B Product Schedule 10 28 00 Toilet, Bath and Laundry Accessories 1.04.C Maintenance Data 10 44 13 Fire Extinguisher Cabinets 1.04.A As Specified in Division 1 10 44 13 Fire Extinguisher Cabinets 1.04.B Product Data 10 44 13 Fire Extinguisher Cabinets 1.04.C Shop Drawings 10 44 13 Fire Extinguisher Cabinets 1.04.D Samples for Initial Selection 10 44 13 Fire Extinguisher Cabinets 1.04.E Samples for Verification 10 44 13 Fire Extinguisher Cabinets 1.04.F Product Schedule 10 44 13 Fire Extinguisher Cabinets 1.04.G Maintenance Data 10 44 16 Fire Extinguishers 1.04.A As Specified in Division 1 10 44 16 Fire Extinguishers 1.04.B Product Datag 10 44 16 Fire Extinguishers 1.04.C Product Schedule 10 44 16 Fire Extinguishers 1.04.D Operation and Maintenance Data 10 44 16 Fire Extinguishers 1.04.E Warranties 10 51 13 Metal Lockers 1.04.A As Specified in Division 1 10 51 13 Metal Lockers 1.04.B Product Data 10 51 13 Metal Lockers 1.04.C Shop Drawings 10 51 13 Metal Lockers 1.04.D Samples for Initial Selection 10 51 13 Metal Lockers 1.04.E Samples for Verification 10 51 13 Metal Lockers 1.04.F Qualification Data 10 51 13 Metal Lockers 1.04.G Maintenance Data 10 51 13 Metal Lockers 1.04.H Warranties 10 71 13 Architectural Sunshades 1.03.A As Specified in Division 1 10 71 13 Architectural Sunshades 1.03.B Product Data 10 71 13 Architectural Sunshades 1.03.C Shop Drawings 10 71 13 Architectural Sunshades 1.03.D Samples for Verification 10 71 13 Architectural Sunshades 1.03.E Maintenance Data 11 10 16 Rooftop Fall Restraint System 1.04.A.1 Product Data 11 10 16 Rooftop Fall Restraint System 1.04.A.2 Shop Drawings 11 10 16 Rooftop Fall Restraint System 1.04.A.3 Contractor furnished System Manuals 11 10 16 Rooftop Fall Restraint System 1.04.A.3.a Maintenance Procedures 11 10 16 Rooftop Fall Restraint System 1.04.A.3.b Operation Procedures 11 10 16 Rooftop Fall Restraint System 1.04.A.3.c Test Certificates 11 10 16 Rooftop Fall Restraint System 1.04.A.3.d Product Certificates 11 10 16 Rooftop Fall Restraint System 1.04.A.3.e As-Built Drawings 11 52 13 Projection Screens 1.05.A As Specified in Division 1 11 52 13 Projection Screens 1.05.B Product Data

9/20/2010 4:37 PM 52085 Submittal Register.xls 15 of 32

Project Name: Hickam Air Force Base TFI-F-22 Squadron Operations / AMU Hangar

SUBMITTAL REGISTER

Submit Approval Material to

Spec. Section Name Description Submit Needed Needed Code Date Government Code Date Remarks Spec Sect or

Drwg #

Contractor ActionContractor Schedule Dates

DATE

Government Action

Para # or Note #

11 52 13 Projection Screens 1.05.C Shop Drawings 11 52 13 Projection Screens 1.05.D Samples for Initial Selection 11 52 13 Projection Screens 1.05.E Maintenance Data 12 10 00 Environmental Graphic Art Mural System 1.04.A As Specified in Division 1 12 10 00 Environmental Graphic Art Mural System 1.04.A.1 Shop Drawings 12 10 00 Environmental Graphic Art Mural System 1.04.A.2 Product Data 12 10 00 Environmental Graphic Art Mural System 1.04.B Samples 12 10 00 Environmental Graphic Art Mural System 1.04.C Operation and Maintenance Data 12 10 00 Environmental Graphic Art Mural System 1.04.D Closeout Submittals 12 21 13 Horizontal Louver Blinds 1.04.A As Specified in Division 1 12 21 13 Horizontal Louver Blinds 1.04.B Product Data 12 21 13 Horizontal Louver Blinds 1.04.C Shop Drawings 12 21 13 Horizontal Louver Blinds 1.04.D Samples for Initial Selection 12 21 13 Horizontal Louver Blinds 1.04.E Samples for Verification 12 21 13 Horizontal Louver Blinds 1.04.F Window Treatment Schedule 12 21 13 Horizontal Louver Blinds 1.04.G Product Certificates 12 21 13 Horizontal Louver Blinds 1.04.H Product Test Reports 12 21 13 Horizontal Louver Blinds 1.04.I Maintenance Data 12 48 13 Entrance Floor Mats and Frames 1.04.A As Specified in Division 1 12 48 13 Entrance Floor Mats and Frames 1.04.B Product Data 12 48 13 Entrance Floor Mats and Frames 1.04.C Shop Drawings 12 48 13 Entrance Floor Mats and Frames 1.04.D Samples for Initial Selection 12 48 13 Entrance Floor Mats and Frames 1.04.E Samples for Verification 12 48 13 Entrance Floor Mats and Frames 1.04.F Maintenance Data 12 61 00 Fixed Audience Seating 1.04.A As Specified in Division 1 12 61 00 Fixed Audience Seating 1.04.B Product Data 12 61 00 Fixed Audience Seating 1.04.C LEED Submittal 12 61 00 Fixed Audience Seating 1.04.D Shop Drawings 12 61 00 Fixed Audience Seating 1.04.E Samples for Initial Selection 12 61 00 Fixed Audience Seating 1.04.F Samples for Verification 12 61 00 Fixed Audience Seating 1.04.G Product Certificates 12 61 00 Fixed Audience Seating 1.04.H Field Quality - control reports 12 61 00 Fixed Audience Seating 1.04.I Maintenance Data 12 61 00 Fixed Audience Seating 1.04.J Warranties 13 28 00 Asbestos Abatement 1.03.A As Specified in Division 1

13 28 00 Asbestos Abatement 1.03.B Submit a pre-demolition asbestos survey and abatement plan.

13 28 00 Asbestos Abatement 1.03.C

Submit schedule and detailed procedure to be used in the abatement of asbestos and compliance with regulations.

13 28 00 Asbestos Abatement 1.03.D Submit evidence of worker training completion and required certifications.

13 28 00 Asbestos Abatement 1.03.E

Submit listing of previous asbestos abatement projects including owners' names and contact information 13 28 10 Lead-Based Paint Removal & Disposal 1.06.A As Specified in Division 1

9/20/2010 4:37 PM 52085 Submittal Register.xls 16 of 32

Project Name: Hickam Air Force Base TFI-F-22 Squadron Operations / AMU Hangar

SUBMITTAL REGISTER

Submit Approval Material to

Spec. Section Name Description Submit Needed Needed Code Date Government Code Date Remarks Spec Sect or

Drwg #

Contractor ActionContractor Schedule Dates

DATE

Government Action

Para # or Note #

13 28 10 Lead-Based Paint Removal & Disposal 1.06.B Manufacturer's Catalog Data 13 28 10 Lead-Based Paint Removal & Disposal 1.06.C Instructions 13 28 10 Lead-Based Paint Removal & Disposal 1.06.D Certifications and Statements 13 28 10 Lead-Based Paint Removal & Disposal 1.06.D.1 Qualifications of CIH 13 28 10 Lead-Based Paint Removal & Disposal 1.06.D.2 Testing Laboratory 13 28 10 Lead-Based Paint Removal & Disposal 1.06.D.3 Lead-Containing paint removal Plan 13 28 10 Lead-Based Paint Removal & Disposal 1.06.D.4 Field Test Reports 13 28 10 Lead-Based Paint Removal & Disposal 1.06.D.5 Records 14 24 00 Hydraulic Elevators 1.05.A As Specified in Division 1 14 24 00 Hydraulic Elevators 1.05.B Product Data 14 24 00 Hydraulic Elevators 1.05.C Shop Drawings 14 24 00 Hydraulic Elevators 1.05.C.1 Wiring Diagrams 14 24 00 Hydraulic Elevators 1.05.D Samples for Initial Selection 14 24 00 Hydraulic Elevators 1.05.E Samples for Verification 14 24 00 Hydraulic Elevators 1.05.F Manufacturer Certificates 14 24 00 Hydraulic Elevators 1.05.G Qualification Data 14 24 00 Hydraulic Elevators 1.05.H Operation and Maintenance Data

14 24 00 Hydraulic Elevators 1.05.I Inspection and Acceptance Certificates and

Operating Permits 14 24 00 Hydraulic Elevators 1.05.J Warrantiesy 14 24 00 Hydraulic Elevators 1.05.K Confirming Maintenance Proposal 21 10 00 Fire Suppression Piping 1.06.A As Specified in Division 1 21 10 00 Fire Suppression Piping 1.06.B Product Data 21 10…