ATTACHMENT 3 - W912HZ26RA005 -Technical Evaluation Questionnaire.pdf
PDF 200 KB Posted
- Attached to
- Analytical Services in Poland
- Solicitation number
- W912HZ26RA005
About this file
This document is a Technical Information Questionnaire (TIQ) / Individual Technical Evaluation Form for Environmental Laboratory Analytical Services in Poland, contract number W912HZ26RA005. The document provides a detailed evaluation framework for assessing proposals across multiple technical and performance dimensions, using an Acceptable/Unacceptable rating method. Key evaluation areas include Corporate Capability, Key Personnel, Technical Approach, and Past Performance, with specific sub-requirements such as demonstrating five years of relevant experience, processing water samples within 60 days, holding appropriate laboratory accreditations (NELAC, DOD ELAP, ISO/IEC 17025), and maintaining a satisfactory work history.
The evaluation criteria require contractors to prove their capabilities in analyzing water samples for multiple constituents including biological, inorganic, pesticide, volatile organic, PFAS, and radiological elements. Contractors must show experience with projects valued at $150,000 or more, completed within the last five years, and demonstrate the ability to perform work located in Poland. The past performance assessment focuses on ensuring the contractor has no terminations for default, receives satisfactory ratings from previous clients, and can be recommended for additional work. The document serves as a comprehensive evaluation template for potential contractors bidding on this environmental laboratory analytical services contract.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 3
TECHNICAL INFORMATION QUESTIONNAIRE (TIQ) / INDIVIDUAL TECHNICAL
EVALUATION FORM
Environmental Laboratory Analytical Services in Poland – W912HZ26RA005
Offerors shall fill in the company name listed as “offeror” and they shall list their “proposal reference,” to include the proposal volume, page number, and paragraph location of their standard of proof for each technical requirement. All other information will be filled out by the government.
EVALUATORS NAME:
OFFEROR:
Evaluation Rating:
Check appropriate rating from applicable adjectival rating; e.g., Acceptable or Unacceptable in rating summary after individual Volume’s and their technical requirements are rated.
LPTA Rating Summary
Volume # Volume Name Rating (Select 1)
Volume 1 Technical Proposal
Acceptable Unacceptable
Subfactor 1 Corporate Capability ___ Acceptable ___ Unacceptable
Subfactor 2 Key Personnel ___ Acceptable ___ Unacceptable
Subfactor 3 Technical Approach ___ Acceptable ___ Unacceptable
Volume 2 Past Performance ___ Acceptable ___ Unacceptable
Overall Evaluation of all Volumes ___ Acceptable ___ Unacceptable
1. Volume 1 – Technical Proposal
Technical Acceptable/Unacceptable Rating Method
Adjectival Rating Description
Acceptable Proposal meets the requirements of the solicitation
Unacceptable Proposal does not meet the requirements of the solicitation
1.1 Subfactor 1: Corporate Capability
1.1.1 Technical Requirement: The contractor demonstrated a minimum of five (5) years of relevant experience.
RFP Requirement Reference: Proposal Evaluation, paragraph 2.1.1 (i)
Standard of Proof: The contractor demonstrated a minimum of five (5) years’ experience receiving and analyzing water samples for multiple constituents including biological, inorganics, pesticides, volatile organics, PFAS, and radiological constituents.
Proposal Reference: ________________________________________________
__ Acceptable / __ Unacceptable
Evaluators Comments/Rationale:
1.1.2 Technical Requirement: The contractor demonstrated a minimum of five (5) years of relevant experience that was also recent.
RFP Requirement Reference: Proposal Evaluation, paragraph 2.1.1 (ii)
Standard of Proof: All of the experience demonstrated by the contractor
(determined relevant in i.) was performed within the last five years and at least
50% complete preceding the date of this solicitation.
Proposal Reference: ______________________________________________
Evaluators Comments:
1.1.3 Technical Requirement: The contractor demonstrated a minimum of five (5) years of relevant experience that are of the required magnitude.
RFP Requirement Reference: Proposal Evaluation, paragraph 2.1.1 (iii)
Standard of Proof: All of the experience demonstrated by the contractor
(determined relevant in i. and recent in ii.) was valued equal or greater than
$150,000.00 per project
Proposal Reference: ______________________________________________
1.1.4 Technical Requirement: The contractor demonstrated that they have the capability to process samples within 60 days of receiving the water samples.
RFP Requirement Reference: Proposal Evaluation, paragraph 2.1.1 (iv)
Standard of Proof: The contractor demonstrated in their submitted recent, relevant experience (determined relevant in i. and recent in ii.) that they provided results of their water analyses within a maximum of 60 days.
Proposal Reference: ______________________________________________
1.1.5 Technical Requirement: The contractor demonstrated that they (and any proposed subcontractors) currently must hold NELAC and/or DOD ELAP and/or ISO/IEC 17025 and/or PN-EN ISO/IEC 17025:2018-02 accreditation for all requested analyses.
RFP Requirement Reference: Proposal Evaluation, paragraph 2.1.1 (v)
Standard of Proof: The contractor provided documentation of their accreditation for their company, and the subcontractor/s if they are proposing to use subcontractor/s.
Proposal Reference: ______________________________________________
__ Acceptable /__ Unacceptable
1.1.6 Technical Requirement: If the Offeror intends to subcontract significant portions of the effort, as described in the Instructions paragraph 3.7.4, the offeror demonstrated that their proposed subcontractor has the capability to fulfill the portion of the work that would be subcontracted to them
RFP Requirement Reference: Proposal Evaluation, paragraph 2.1.1 (vi)
Standard of Proof: All of the experience demonstrated by the contractor fulfilled the technical requirements listed above (i-v) in relation to the portion of the work that they are proposed to complete.
Proposal Reference: ______________________________________________
1.2 Subfactor 2: Key Personnel
1.2.1 Technical Requirement: The contractor demonstrated their ability to manage this contract appropriately with qualified staff.
RFP Requirement Reference: Proposal Evaluation, paragraph 2.1.2 (i)
Standard of Proof: The contractor’s Staffing Plan reflected at all levels within the project management team, at least five (5) years of recent, relevant experience receiving and analyzing water samples for multiple constituents including biological, inorganics, pesticides, volatile organics, PFAS, and radiological constituents.
Proposal Reference: ______________________________________________
1.2.2 Technical Requirement: The contractor demonstrate their ability to provide staff for this effort with the appropriate level of education to carry out the work stated in the PWS of this requirement.
RFP Requirement Reference: Proposal Evaluation, paragraph 2.1.2 (ii)
Standard of Proof: The resumes presented for technical staff consist of individuals with at least 5 years of experience in a relevant field related to biological or chemical analyses.
Proposal Reference: ______________________________________________
1.2.3 Technical Requirement: If the offeror is using subcontractors, then they provided a subcontracting plan with key personnel who are located in Poland
RFP Requirement Reference: Proposal Evaluation, paragraph 2.1.2 (iii)
Standard of Proof: The contractor shall disclose the name and physical location of all subcontractors to be utilized.
1.3 Subfactor 3: Technical Approach
1.3.1 Technical Requirement: The contractor demonstrated understanding of requirements of the Performance Work Statement.
RFP Requirement Reference: Proposal Evaluation, paragraph 2.1.3 (i)
Standard of Proof: The contractor shall provide a complete list of offered analyses and indicate in house capacity and subcontracting capacity.
Proposal Reference: ______________________________________________
1.3.2 Technical Requirement: The contractor demonstrated an acceptable approach to meet technical requirements of the Performance Work Statement
RFP Requirement Reference: Proposal Evaluation, paragraph 2.1.3 (ii)
Standard of Proof: The contractor shall demonstrate current certifications and indicate subcontract laboratory certifications.
Proposal Reference: ______________________________________________
1.3.3 Technical Requirement: The contractor demonstrated their ability to provide labor/skill mix to meet functional/technical requirements as outlined in
Performance Work Statement.
RFP Requirement Reference: Proposal Evaluation, paragraph 2.1.3 (iii)
Standard of Proof: The contractor shall provide the project management plan from sample receipt to data reporting. The contractor shall provide information about the project manager, analysis team, sample check-in and reporting teams, QA/QC team, and a copy of appropriate certifications.
Proposal Reference: ______________________________________________
1.3.4 Technical Requirement: The contractor demonstrated their ability to process samples within the required holding times that each constituent requires
RFP Requirement Reference: Proposal Evaluation, paragraph 2.1.3 (iv)
Standard of Proof: The contractor shall demonstrate the ability to extract and analyze samples within holding times.
Proposal Reference: ______________________________________________
1.3.5 Technical Requirement: The contractor demonstrated their ability to provide data results within 60 days of receiving water samples.
RFP Requirement Reference: Proposal Evaluation, paragraph 2.1.3 (v)
Standard of Proof: The contractor shall demonstrate typical data delivery times for each of the listed analyses.
Proposal Reference: ______________________________________________
1.3.6 Technical Requirement: The contractor demonstrated their ability to carry out the work of this contract while located in Poland.
RFP Requirement Reference: Proposal Evaluation, paragraph 2.1.3 (vi)
Standard of Proof: The contractor verified that they, and any proposed subcontractors, are located in Poland.
2. Volume 2 – Past Performance
Past Performance Acceptable/Unacceptable Rating Method
Adjectival Rating Description
Acceptable
Based on the offeror's performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror's performance record is unknown
Unacceptable
Based on the offeror's performance record, the Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort.
2.1 Technical Requirement: The contractor demonstrated a satisfactory work history.
RFP Requirement Reference: Proposal Evaluation, paragraph 2.2 (i)
Standard of Proof: The contractor received ratings of Satisfactory or better in each section of all recent, relevant PPQs submitted by the Offeror.
Proposal Reference: ______________________________________________
2.2 Technical Requirement: The contractor has a track record of satisfactory work history.
RFP Requirement Reference: Proposal Evaluation, paragraph 2.2 (ii)
Standard of Proof: Any past performance information retrieved by the
Government, ie. CPARS will have no more than two ratings that are less desirable than Satisfactory ratings within the last 5 five years.
Proposal Reference: ______________________________________________
2.3 Technical Requirement: There is no evidence of anyone that the contractor has performed work for which would not recommend them for additional work.
RFP Requirement Reference: Proposal Evaluation, paragraph 2.2 (iii)
Standard of Proof: There are no responses on PPQ’s or CPARS ratings, indicating that the rating official states they would not recommend the contractor for additional work, or would not do business with them again.
Proposal Reference: ______________________________________________
2.4 Technical Requirement: The contractor does not have any record of a termination for default.
RFP Requirement Reference: Proposal Evaluation, paragraph 2.2 (iv)
Standard of Proof: There are no PPQ’s indicating that the contract had been partially or completely terminated for default.
Proposal Reference: ______________________________________________
2.5 Technical Requirement: If the contractor had limited experience within the past five (5) years but does have experience beyond five (5) years, than the
Government must have confidence that the experience is still relevant and that the contractor has retained the necessary capability to fulfill the requirements of the PWS.
RFP Requirement Reference: Proposal Evaluation, paragraph 2.2 (v)
Standard of Proof: The contractor has demonstrated in their narrative a meaningful description of why the past experience is still relevant, and what steps have been taken over the intervening time span to retain the necessary technical expertise and capability to fulfill the requirements of the Performance
Work Statement.
CLARIFICATION REQUIRED: Describe nature of clarification
File details come from the government source that posted it. Updated .