W912HZ-14-R-0022_06_JAN_2016.pdf
PDF 345 KB Posted
- Attached to
- R&D Services
- Solicitation number
- W912HZ-14-R-0022
About this file
Solicitation W912HZ-14-R-0022
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 04:00 PM local time 22 Feb 2016
X
A X B X C
D
EX
X G F 52 - 66
67 - 82 X H 83 - 91 allison.b.hudson@usace.army.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 91
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W912HZ 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 6 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
ALLISON B HUDSON 601-634-3063
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 5
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
6 - 34 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
35 - 37 38 - 39
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 40 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 41 - 43 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
44 - 50
PART II - CONTRACT CLAUSES
ERDC CONTRACTING OFFICE
3909 HALLS FERRY ROAD
VICKSBURG MS 39180-6199
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
06 Jan 2016
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
W912HZ-14-R-0022
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Job
IGF::OT::IGF LABOR - FFP
FFP
The Contractor shall perform Research and Development (R&D) services in accordance with Section C, all applicable attachments, and the fully loaded labor rates in Section B. Specific requirements will be identified through Performance Work Statements (PWS) to be included in each individual task order.
FOB: Destination
NET AMT
0002 Job
IGF::OT::IGF LABOR - LOE
FFP-LOE
The Contractor shall perform Research and Development (R&D) services in accordance with Section C, all applicable attachments, and the fully loaded labor rates in Section B. Specific requirements will be identified through Performance
CEILING PRICE
0003 Job
IGF::OT::IGF LABOR - CPFF
CPFF
The Contractor shall perform Research and Development (R&D) services in accordance with Section C, all applicable attachments, and the fully loaded labor rates in Section B. Specific requirements will be identified through Performance
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
0004 Job
TRAVEL
COST
Travel must be authorized by the Contracting Officer's Representative (COR) and be in conformance with the contract requirements (See travel as required by the Performance Work Statement). Contractor travel required in the performance of R&D Services must comply with the Federal Travel Regulation or Joint Travel Regulations, as applicable, in effect on the date(s) the travel is performed.
Established Federal Government per diem rates will apply to all contractor travel.
0005 Job ODCs
COST
The Contractor shall execute all requirements for authorized other direct costs (ODCs) in accordance with Section C and all applicable attachments. Specific requirements will be identified through Performance Work Statements (PWS) to be included in each individual task order.
0006 Job
TRAINING
COST
The Contractor shall perform Research and Development (R&D) services in accordance with Section C, all applicable attachments, and the fully loaded labor rates in Section B. Specific requirements will be identified through Performance
0007 Job Contractor Manpower Reporting
FFP
The Contractor shall provide all required Contractor Manpower Reporting in accordance with Section H and Attachment in Section J. Specific requirements will be identified thorugh the Performance Work Statement to be included in each Task Order.
Section C - Descriptions and Specifications
PERFORMANCE WORK STATEMENT
Performance Work Statement (PWS) ITL Information Technology Laboratory
Research and Development (R&D) Service Requirements
02/27/2015 Version 8.0
Vision Statement
1 Introduction
1.1 Mission
1.3 Scope
2 General Requirements
2.1 Non-Personal Services
2.2 Business Relations
2.3 Contract Administration and Management
2.3.1 Contract Management
2.3.2 Contract Administration
2.3.3 Personnel Administration
2.4 Subcontract Management
2.5 Contractor Personnel, Disciplines, and Specialties
2.6 Location and Hours of Work
2.7 Travel
3 Performance Requirements
3.1 Scientific Software and Engineering Application Research and Development
3.2 Sensors, Measurement and Instrumentation Research and Development
3.3 Geospatial Analysis Research and Development
3.4 Computer Aided Design/Building Information Modeling Research and Development ... 17
3.5 Data Analysis, Integration and Assessment Research and Development
3.6 Computational Analysis Research and Development
3.7 The Contractor shall comply with all ERDC security and safety requirement(s) outline in Section 4.1 of this PWS
4 Special Requirements
4.1 Security and Safety
4.2 Transition
4.3 Government Furnished Materials
4.4 Applicable Directives
4.5 Quality
4.5.1 Quality Control
4.5.2 Quality Assurance Surveillance Plan (QASP)
5 Deliverables
6 Related Documents
Performance Work Statement (PWS) ITL Information Technology Laboratory Research and Development (R&D) Service Requirements
Vision Statement
To build state of the art information technology solutions to support our customers.
1 Introduction The U. S. Army Corps of Engineers (USACE) Engineer Research and Development Center (ERDC) has responsibility for investigating, developing and maintaining the nation's water and related environmental resources; constructing and operating projects for navigation, flood control, major drainage, shore and beach restoration and protection, related hydro power development, water supply, water quality control, fish and wildlife conservation and enhancement, and outdoor recreation; responding to emergency relief activities directed by other federal agencies; and administering laws for the protection and preservation of navigable waters, emergency flood control and shore protection.
1.1 Mission
The ERDC Information Technology Laboratory (ITL) provides expertise in the science of information, the practice of information processing and the engineering of information systems to produce enabling technologies for the Corps of Engineers, U.S. Army, Department of Defense (DOD) and their customers.
The ITL conducts research and development in Informatics and Computational Science and Engineering with particular emphasis on providing high-performance computing for scientific and engineering discovery; data acquisition, analysis, and management; geospatial analysis and informatics; software engineering and evaluation; automated information systems; building information modeling.
For more information about the Information Technology Laboratory visit:
http://www.erdc.usace.army.mil/Locations/InformationTechnologyLaboratory.aspx
1.3 Scope
The ERDC ITL requires professional services for its research and development mission-critical activities.
The contractor shall provide all personnel, supervision, and services necessary to provide services for research and development (R&D) and related activities for the ERDC ITL as defined herein and in task order Performance Work Statements (PWS). This will be an indefinite delivery indefinite quantity (IDIQ) contract. The scope is defined as general requirements as outlined below in terms of areas of research and development responsibility or operational mission. Specific requirements of each customer will be detailed in individual task orders issued throughout the term of the contract.
The contractor shall perform R&D services related to the following areas:
Computer-aided Design/Building information Modeling Geospatial Analysis Web Development Application Development Data Standards and Integration Scientific Software and Engineering Application Research and Development Electronic System Research and Development Geospatial Analysis Research and Development Computer Engineering Research and Development Database Development and Administration Technical Documentation
Scientific Application Research and Development Sensors, Measurement and Instrumentation Research and Development Instrumentation research and development Data Collection and Analysis Research and Development Instrument Calibration Research and Development Application and Web Development Data Analysis, Integration and Assessment Electronic System Development Database Creation and Administration Geospatial Analysis Computational Analysis Numerical Analysis Research and Development Computational Application Research and Development Probability Analysis Research Model Simulations The default location for performance of task orders is the vendors location. Primary government sites of performance, if required, will include Vicksburg, MS, Alexandria, VA, Champaign, IL, and Hanover, NH.
2 General Requirements
2.1 Non-Personal Services
The Government shall neither supervise contractor employees nor control the method by which the contractor performs the required tasks. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual contractor employees. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services, or give the perception of personal services. If the contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the contractor's responsibility to notify the Procuring Contracting Officer (PCO) immediately.
2.2 Business Relations
The contractor shall successfully integrate and coordinate all activity needed to execute the requirement.
The contractor shall manage the timeliness, completeness, and quality of problem identification. The contractor shall provide corrective action plans, proposal submittals, timely identification of issues, and effective management of subcontractors. The contractor shall seek to ensure customer satisfaction and professional and ethical behavior of all contractor personnel.
2.3 Contract Administration and Management
The following subsections specify requirements for contract, management, and personnel administration.
2.3.1 Contract Management
The contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of the resources assigned to the requirement. When operating onsite, the contractor shall maintain continuity between ongoing activities at Vicksburg, MS, Alexandria, VA, Champaign, IL, and Hanover, NH and the contractor's corporate offices.
2.3.2 Contract Administration
The contractor shall establish processes and assign appropriate resources to effectively administer the requirement. The contractor shall respond to Government requests for contractual actions in a timely fashion. The contractor shall have a single point of contact between the Government and Contractor personnel assigned to service contracts or task orders. The contractor shall assign work to its personnel.
The contractor shall maintain proper and accurate time keeping records of personnel.
The contractor, at no additional cost to the government, shall provide a Contractor Program Manager who serves as the contract manager along with other duties and who shall be responsible for overall contract performance. The name of this person shall be designated in writing to the contracting officer's representative (COR). The contractor shall be responsible for all expenses associated with task management. The Contractors Program Manager will be available for meetings at the Vicksburg, MS ERDC site given a 48 hour notice. Contract administration functions shall not be billed directly. The contractor may also designate task/project leaders to manage individual tasks.
2.3.3 Personnel Administration
The contractor employees working on this contract shall be able to perform, in their field, at a high level of performance at the commencement of the task. Meaning that contractor employees must have the education, training, certifications and experience to perform the duties required, IAW Army Regulations and Programs. All contractor personnel shall be able to read, write, speak, and understand English, shall possess good written and verbal communications skills, and shall have sufficient knowledge of proper English grammar, spelling, capitalization, and punctuation rules to identify errors and make corrections.
The contractor shall provide sufficient management of personnel as required. The contractor shall provide for employees during designated Government non-work days or other periods where Government offices are closed due to weather or security conditions. The contractor shall maintain the currency of their employees by providing initial and refresher training as required to meet the PWS requirements. The contractor shall make necessary travel arrangements for employees. The contractor shall provide necessary infrastructure for services performed at the contractor's site(s). The contractor shall provide administrative support to employees in a timely fashion (time keeping, leave processing, pay, emergency needs).
2.4 Subcontract Management
The contractor shall be responsible for any subcontract management necessary to integrate work performed on this requirement and shall be responsible and accountable for subcontractor performance on this requirement. The prime contractor will manage work distribution to ensure there are no Organizational Conflict of Interest (OCI) considerations. Contractors may add subcontractors to their team after notification to the Procuring Contracting Officer (PCO) or Contracting Officer Representative (COR).
Cross teaming may or may not be permitted.
2.5 Contractor Personnel, Disciplines, and Specialties
The contractor shall accomplish the assigned work by employing and utilizing qualified personnel with appropriate combinations of education, training, and experience. The contractor shall match personnel skills to the work or task with a minimum of under/over employment of resources. The contractor shall ensure the labor categories as defined in the Labor Categories document utilized in the performance of each Task Order issued hereunder will be the minimum necessary to accomplish the task. The Contractor shall provide the necessary resources and infrastructure to manage, perform, and administer the contract.
Contractor Employee Conduct The contractors employees shall observe and comply with all applicable departmental and agency regulations, policies, and procedures (e.g., fire, safety, sanitation, environmental protection, security, etc.). The contractor shall ensure that all contractor employees represent a professional appearance at all times, and that their conduct does not reflect discredit on the United States Government.
When contractor employees are working on Government facilities or participating at Government meetings, they shall wear identification badges distinguishing themselves as such. The badges at a minimum must have the employee name and word "contractor displayed. Ideally, the company name will appear on the badge. Additionally, not withstanding any other provisions in the PWS, the contractor shall identify themselves as a contractor in meetings, telephone conversations, all written communications and work situations so that their actions cannot be construed as acts of a Government official. The contractor shall take no actions that bind the government to a final decision or results in the exercise of governmental discretion.
Removal of Contractor Employees for Misconduct or Security Reasons The Government may, at its sole discretion, direct the contractor to remove any contractor employee from Government facilities for misconduct or security reasons. Such removal does not relieve the contractor of the responsibility to provide sufficient qualified personnel for adequate and timely service. The Contracting Officer will provide the contractor with an immediate rationale for removal of contractor employee.
Conflict of Interest. Neither the contractor nor its on-site employees shall utilize their knowledge of access to information, sensitive or otherwise, for individual or company gain.
2.6 Location and Hours of Work
The headquarters site of the U.S. Army Corps of Engineers, ERDC is 3909 Halls Ferry Road, Vicksburg, MS 39180-6199. ERDC satellite laboratory sites are located in Alexandria, VA, Champaign, IL, Hanover, NH, and other Government facilities (mainly in the continental United States).
Core Working Hours. Government core working hours are from 0800 1645 local time Monday through Friday except US Federal Holidays. Government workers typically work eight (8) hours per day, 40 hours per week.
Government Facility Closure. In case of government facility closure as directed by the government, contractor employees shall be excused from work at no cost to the government.
2.7 Travel
Travel to other government facilities or other contractor facilities may be required. All travel requirements (including plans, agenda, itinerary, or dates) shall be pre-approved by the government (subject to local policy procedures), and is on a strictly cost reimbursable basis. Costs for travel shall be billed in accordance with the regulatory implementation of Public Law 99-234 and FAR 31.205-46 Travel Costs (subject to local policy & procedures; may reference FAR).
3 Performance Requirements The following section specifies the typical Performance Objectives and Performance Elements for the base contract.
3.1 Scientific Software and Engineering Application Research and Development The following sub-tasks will require knowledge and expertise in the research and development of algorithms for scientific data analysis programming, data mining, data retrieval, fusion, and dissemination, scientific mission proposal development, and support for large- and small-scale software system configuration, sizing, and development methodologies utilizing recognized techniques and scientific data format standards is also required. Functional requirements for the following sub-tasks will be defined within the task order.
Performance Standards
a) Standard (STD): Deliverables are made in accordance with schedule Acceptable Quality Level (AQL): 100% Compliant with schedule Deliverables A013 Status report
3.1.1 The Contractor shall perform application development for software engineering research.
This will require knowledge and expertise in designing and programming high complex scientific software applications. Requires extensive knowledge in programming languages such as, but not limited to, C++, Python, FORTRAN, C-Sharp, or Microsoft Visual Basic. Scientific parallel programming knowledge is required. Functional requirements for the applications will be defined within the task order.
Performance Standards
a) STD: Deliverables are made in accordance with schedule Deliverables A003 technical report A015 Software source code
3.1.1.1 The Contractor shall design and document algorithms for software applications.
Algorithms shall be designed using current state-of-the-art methods. This includes defining the problem the algorithm solves, model used to develop the algorithms, any specifications, process of checking for correctness, analysis and procedures used, process of implementing the algorithm, and program testing.
Algorithms shall be documented sufficiently to explain the algorithms.
Performance Standards
a) STD: Complete
b) STD: Accurate Deliverables A013 Status report A017 Documented algorithm
3.1.1.2 The Contractor shall write and document software code for software applications.
Code shall be developed in languages specified by the government at the time of awarding of task orders.
Common programming languages to be used may include, but not limited to, JAVA, C++, FORTRAN, Python, or Microsoft Visual Basic or C# using Microsoft Visual Studio as the development platform. The code shall contain sufficient comments to allow future understanding of the intended functionality of each segment of the code.
Performance Standards
a) STD: Accurate
b) STD: Executable
c) STD: Meets technical specifications
d) STD: Compliant with applicable standards Deliverables A013 Status report A015 Software source code
3.1.1.3 The Contractor shall test software code for proper functionality of software applications requirements.
Software application testing requirements will be defined in the task order. The contractor shall be capable of testing any software developed against the DoD Defense Information Systems Agency (DISA) Security Technical Implementation Guides (STIGs). The STIGs may be used to define technical requirements necessary for the resolution of vulnerabilities to a malicious computer attack of the software application. Additional testing requirements will be defined at the award of the task order.
Performance Standards
a) STD: Executable
b) STD: Identifies and corrects deficiencies
c) STD: Distributable Deliverables A013 Status report A015 Software source code
3.1.1.4 The Contractor shall debug software code for software applications.
The code may be debugged using the debugging tools in Microsoft Visual Studio or other currently acceptable debugging methods.
Performance Standards
a) STD: Identifies and corrects deficiencies Deliverables A015 Software source code A016 Debug report
3.1.2 The Contractor shall perform database administration for projects.
Requires knowledge of database administration for Microsoft SQL Server and Oracle databases.
Knowledge of Microsoft Access database development and customization also required.
Performance Standards
a) STD: Deliverables are made in accordance with schedule Deliverables A003 technical report A009 Database
3.1.3 The Contractor shall consolidate and prepare system documentation for projects.
Documentation related to the architecture design of a system and functional capability of the software comprised within the system.
Performance Standards
a) STD: Deliverables are made in accordance with schedule Deliverables A003 technical report
3.1.4 The Contractor shall proof read, format, and edit technical documentation for software engineering research projects.
Writes a variety of technical reports, briefings, and material documenting the design and functional capability of software engineering applications developed.
Performance Standards
a) STD: Accurate AQL: 100% compliant with ERDC technical report preparation guidance Deliverables A003 technical report
3.2 Sensors, Measurement and Instrumentation Research and Development These tasks involve utilizing knowledge and expertise in the research and development of the integration of sensor technologies, electronic and electro-mechanical components and systems. Instrumentation configuration, data collection and measurement methodology expertise in the areas of structural monitoring, and physical phenomenology measurement is also required.
Performance Standards
a) STD: Deliverables are made in accordance with schedule
b) STD: Meets security safeguards
c) STD: No more than 2 validated complaints per month Deliverables A013 Status report
3.2.1 The Contractor shall perform numerical or computational modeling for sensors, measurement, and instrumentation research.
The research may involve developing software code to construct mathematical models using high performance computers to integrate multiple components, (i.e. Sensors, instrumentation, and computer hardware) to solve complex scientific problems. Performing computer simulation and numerical analysis will be required.
Performance Standards
a) STD: Deliverables are made in accordance with schedule AQL: 100% Compliant with schedule Deliverables A003 technical report A011 Numerical Model A015 Software source code
3.2.2 The Contractor shall perform research and development of information web portals for data analysis and integration projects.
The research and development may involve the analysis of data collected using complex sensors and instrumentation.
Performance Standards
a) STD: Complete
AQL: 100%
b) STD: Deliverables are made in accordance with schedule AQL: 100% Compliant with schedule Deliverables A003 technical report A004 web based application A015 Software source code
3.2.3 The Contractor shall perform software engineering research for sensors, measurement, and instrumentation projects.
Code shall be developed in languages specified by the government at the time of award of task orders.
Common programming languages to be used may include, but not limited to, JAVA, C++, FORTRAN, or Microsoft Visual Basic or C# using Microsoft Visual Studio as the development platform. The code shall contain sufficient comments to allow future understanding of the intended functionality of each segment of the code.
Performance Standards
a) STD: Deliverables are made in accordance with schedule AQL: 100% Compliant with schedule Deliverables A003 technical report A010 Software Applications
3.3 Geospatial Analysis Research and Development
The following sub-tasks outline services required for Geospatial Analysis Research and Development.
3.3.1 The Contractor shall conduct geospatial analysis research for the research and development of enterprise-wide server-based mapping solution projects.
This task may involve using tools such as Google Earth Fusion, Google Earth Enterprise Server, or Google Earth Enterprise Client applications. Knowledge of Keyhole Markup Language is required.
Performance Standards
a) STD: Compliant with applicable standards AQL: Level of accuracy consistent with source data Deliverables
A005 Digital Maps
A006 Map Metadata A012 Geospatial data A015 Software source code
3.3.2 The Contractor shall develop georelational vector data models for research projects.
The georelational vector data models will be developed such that they store spatial and attribute data separately in a split systems.
Performance Standards
a) STD: Compliant with applicable standards AQL: Level of accuracy consistent with source data Deliverables A012 Geospatial data A013 Status report A018 Data model
3.3.3 The Contractor shall perform raster data analysis of mapping data for research projects.
Raster data analysis may involve the manipulation of mapping data using geospatial procedures such as performing masking of data, reclassification of raster data sets, statistical analysis of raster data, or extraction of data from raster data sets.
Performance Standards
a) STD: Media must remain in customers format.
AQL: Level of accuracy consistent with source data Deliverables A005 Digital Maps A009 Database A012 Geospatial data
3.3.4 The Contractor shall perform vector data analysis of mapping data for research projects.
Vector data analysis may involve the manipulation of mapping data using geospatial procedures such as performing buffering, creating mapping overlays, or pattern analysis.
Performance Standards
a) STD: Accurate AQL: Level of accuracy consistent with source data
b) STD: Complete AQL: Final deliverable completed in accordance with task order requirements.
Deliverables A005 Digital Maps A009 Database A012 Geospatial data
3.3.5 The Contractor shall compile, maintain, and update 2D and 3D geospatial data assets for data inventory.
This will require the contractor to maintain a collection of geospatial data, which includes raster, vector, imagery, and geospatial databases.
Performance Standards
a) STD: Timely AQL: 100% Compliant with schedule Deliverables
A005 Digital Maps
A009 Database A012 Geospatial data A018 Data model
3.3.6 The Contractor shall collect mapping data for data analysis and integration research projects.
Performance Standards
a) STD: Accurate AQL: Level of accuracy consistent with source data Deliverables A003 technical report
A012 Geospatial data
3.4 Computer Aided Design/Building Information Modeling Research and Development These tasks will require knowledge and expertise in the research and development of applications that integrate CAD, BIM, Computer Aided Facility Management (CAFM) and geospatial systems.
Performance Standards
a) STD: Deliverables are made in accordance with schedule AQL: 100% Compliant with schedule Deliverables A013 Status report
3.4.1 The Contractor shall perform research and development for web-based applications for projects.
Code shall be developed in languages specified by the government at the time of awarding of task orders.
Common programming languages to be used may include, but not limited to, JAVA, Microsoft Visual Basic .NET or C# using Microsoft Visual Studio as the development platform. The code shall contain sufficient comments to allow future understanding of the intended functionality of each segment of the code.
Performance Standards
a) STD: Compliant with applicable standards
AQL: 100%
Deliverables A004 web based application A013 Status report A015 Software source code
3.4.2 The Contractor shall perform research and development of CAD/BIM applications for the work units.
Customized applications will be developed to enhance the workflow of performing engineering design using computer aided design and building information modeling software applications. Code shall be developed in languages specified by the government at the time of awarding of task orders. Common programming languages to be used may include C++, Microsoft Visual Basic or C# using Microsoft Visual Studio as the development platform. The code shall contain sufficient comments to allow future understanding of the intended functionality of each segment of the code Performance Standards
a) STD: AEC CAD Standard AQL: Compliant
A007 CAD/BIM Application A013 Status report A015 Software source code
3.4.3 The Contractor shall manage digital library of data and perform data backup for local area networks.
Manage data backup includes scheduling, setup, configuration, install, labeling of media, and written documentation of digital library of data being maintained.
Performance Standards
a) STD: Complete
AQL: 100%
b) STD: Compliant with applicable industry standards
c) STD: Meets Schedules in accordance with service level agreement.
d) STD: Media must remain in customers format.
Deliverables A001 Dashboard Report A013 Status report
3.4.4 The Contractor shall research, develop, and design CAD/BIM systems for deployment on local area network.
This will involve development and administration of enterprise project administration applications which will integrate with computer aided design (CAD) and building information modeling (BIM) automated systems on local area networks. Autodesk and Bentley Systems are the typical CAD and BIM software products that will be used on the local area networks.
Performance Standards
a) STD: Plan can be implemented with minimum impact to system users
b) STD: Recommended solutions and procedures are implementable
c) STD: Utilizes best scientific practices and commercial data
d) STD: Deliverables are made in accordance with schedule AQL: 100% Compliant with schedule Deliverables
A013 Status report
3.5 Data Analysis, Integration and Assessment Research and Development The following sub-tasks will require knowledge and expertise in the research and development focused on data display, data analysis, data visualization, data archiving, mass storage, hardware-software integration, knowledge management, search analytics, and mobile computing.
Performance Standards
a) STD: Deliverables are made in accordance with schedule AQL: 100% Compliant with schedule Deliverables A013 Status report
3.5.1 The Contractor shall perform research and development electronic components for complex systems.
The research involved in this task will include the design, programming, and integration of electronic components necessary to perform acquisition, processing or transmission of digital data. Specifications of the electronic components and the design, programming and integration requirements will be detailed in the task order.
Performance Standards
a) STD: Compliant with applicable standards
AQL: 100%
Deliverables A008 Electronic systems A013 Status report A015 Software source code
3.5.2 The Contractor shall perform database administration for systems deployed on local area network.
Typical databases requiring administration include, but not limited to, Microsoft SQL Server and Oracle.
Performance Standards
a) STD: Deliverables are made in accordance with schedule Deliverables
A009 Database
3.6 Computational Analysis Research and Development
The following sub-tasks will require technical knowledge in the areas of numerical modeling research and development that will refine, validate, compare, and apply advanced computational methods to develop algorithms to perform simulations for modeling real world phenomena.
Performance Standards
a) STD: Deliverables are made in accordance with schedule AQL: 100% Compliant with schedule Deliverables A013 Status report
3.6.1 The Contractor shall develop computational software applications for work units.
Code shall be developed in languages specified by the government at the time of award of task orders.
Common programming languages to be used may include, but not limited to, C++, FORTRAN, or Microsoft Visual Basic or C# using Microsoft Visual Studio as the development platform. The code shall contain sufficient comments to allow future understanding of the intended functionality of each segment of the code. The specifications for the application design will be defined within the task order.
Performance Standards
a) STD: Applicable Industry Software Standards AQL: Compliant Deliverables A010 Software Applications A013 Status report A015 Software source code
3.6.1.1 The Contractor shall design and document algorithms for software applications.
Algorithms shall be designed using current state-of-the-art methods. This includes defining the problem the algorithm solves, model used to develop the algorithms, any specifications, process of checking for correctness, analysis and procedures used, process of implementing the algorithm, and program testing.
Algorithms shall be documented sufficiently to explain the algorithms.
Performance Standards
a) STD: Complete
b) STD: Accurate
A013 Status report A017 Documented algorithm
3.6.1.2 The Contractor shall write and document software code for software applications.
Code shall be developed in languages specified by the government at the time of award of task orders.
Common programming languages to be used may include JAVA, C++, FORTRAN, or Microsoft Visual Basic or C# using Microsoft Visual Studio as the development platform. The code shall contain sufficient comments to allow future understanding of the intended functionality of each segment of the code.
Performance Standards
a) STD: Accurate
b) STD: Executable
c) STD: Meets technical specifications
d) STD: Compliant with applicable standards Deliverables A013 Status report A015 Software source code
3.6.1.3 The Contractor shall test software code for proper functionality of software applications.
Software application testing requirements will be defined in the task order. The contractor shall be capable of testing any software developed against the DoD Defense Information Systems Agency (DISA) Security Technical Implementation Guides (STIGs). The STIGs may be used to define technical requirements necessary for the resolution of vulnerabilities to a malicious computer attack of the software application. Additional testing requirements will be defined at the awarding of the task order.
Performance Standards
a) STD: Executable
b) STD: Identifies and corrects deficiencies
c) STD: Distributable Deliverables A013 Status report A015 Software source code
3.6.1.4 The Contractor shall debug software code for software applications.
The code may be debugged using the debugging tools in Microsoft Visual Studio or other currently acceptable debugging methods.
Performance Standards
a) STD: Identifies and corrects deficiencies Deliverables A015 Software source code A016 Debug report
3.6.2 The Contractor shall perform research and conduct computational analysis for work units.
The research may involve constructing mathematical models and performing quantitative analysis techniques using high performance computers to solve complex scientific problems. Performing computer simulation and numerical analysis will be required.
Performance Standards
a) STD: Deliverables are made in accordance with schedule AQL: 100% Compliant with schedule Deliverables
A011 Numerical Model
3.7 The Contractor shall comply with all ERDC security and safety requirement(s) outline in Section 4.1 of this PWS.
See Section 4.1 of this PWS for Security and Safety requirements of this PWS.
Performance Standards
a) STD: Deliverables are made in accordance with schedule AQL: 100% Compliant with schedule Deliverables A019 AT Level 1 Awareness Training Certificate A020 iWATCH, Corps Watch, or See Something training certificate
4 Special Requirements This section describes the special requirements for this effort. The following sub-sections provide details of various considerations on this effort.
4.1 Security and Safety
4.1.1 All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: https://atlevel1.dtic.mil/at
4.1.2 All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
4.1.3 The contractor and all associated sub-contractors shall brief all employees on the local iWATCH, Corps Watch, or See Something, Say Something program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after contract award.
4.1.4 All contractor employees with access to a government info system must be registered in the ATCTS (Army Training Certification Tracking System) at commencement of services, and must successfully complete the DOD Information Assurance Awareness prior to access to the information systems and then annually thereafter IAW AR 380-67 (Personnel Security Program) and Homeland Security Presidential Directive 12 (Policy for a Common Identification Standard for Federal Employees and Contractors) .
4.1.5 The Contractor shall develop an OPSEC SOP/Plan within 90 days of contract award. The OPSEC SOP/Plan must be reviewed and approved by the RA OPSEC Officer. The SOP/Plan will include the government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it. In addition, the contractor shall identify an individual who will be an OPSEC Coordinator.
4.1.6 All new contractor employees will complete Level I OPSEC training within 30 calendar days of their reporting for duty. Additionally, all contractor employees must complete annual OPSEC awareness training.
4.1.7 All contractor employees and associated sub-contractor employees must complete the DoD IA awareness training before issuance of network access and annually thereafter. All contractor employees working IA/IT functions must comply with DoD and Army training requirements in DoDD 8570.01, DoD 8570.01-M and AR 25-2 within six months of employment.
4.1.8 All contractor employees supporting IA/IT functions shall be appropriately certified upon contract IAW DoD 8570.01-M, DFARS 252.239-7001 and AR 25-2. The baseline certification as stipulated in DoD 8570.01-M must be completed upon contract award.
4.9 All contractor employees shall ensure the following AT/OPSEC requirements are meet prior to deploying personnel authorized to accompany U.S. Armed Forces outside the United States: required compliance with laws and regulations, pre-deployment requirements, required training (per combatant command guidance), and personnel data required.
4.1.10 The Contractor shall comply with the Security Agreement (DD Form 441), including the National Industrial Security Program Operating Manual (DoD 5220.22-M), any revisions to DOD 5220.22-M and Army Regulation 380-49, Industrial Security. The DD254 will be attached with the contract.
4.1.11 All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.
The Prime Contractor Company must have (or will have) a Facility Clearance (FCL) at the appropriate level (IAW the NISPOM DOD 5220.22-M and AR 380-49) prior to the start of the contract awarded period of performance. Contractor personnel performing work under this contract must have the required security clearance, per AR 380-67, at the appropriate level at the start of the period of performance. Security Clearances and FCL requirements are required to be maintained for the life of the contract IAW the DD254 attached to the contract. If no FCL, the supporting Government Contracting Activity will sponsor the prime contract company in obtaining the FCL.
DD Forms 254: Overarching security requirements and Contractor access to classified information shall be as specified in the basic DD Form 254, which will be further identified in the DD Form 254 for each TO, as required. All contractor personnel with access to unclassified information systems, including e-mail, shall have at a minimum a favorable National Agency Check (NAC).
Visitor Group Security Agreement. The contractor shall sign a Contractor Visitor Group Security Agreement to protect classified information involved in performance under this contract or Task Order.
The Agreement will outline responsibilities in the following areas: Contractor security supervision;
Standard Practice Procedures; access, accountability, storage, and transmission of classified material;
marking requirements; security education; personnel security clearances; reports; security checks;
security guidance; emergency protection; protection of government resources; DD Forms 254; periodic security reviews; and other responsibilities, as required.
4.2 Transition
The contractor shall follow the transition plan submitted as part of the proposal and keep the Government fully informed of status throughout the transition period. Throughout the phase-in/phase-out periods, it is essential that attention be given to minimize interruptions or delays to work in progress that would impact the mission. The contractor must plan for the transfer of work control, delineating the method for processing and assigning tasks during the phase-in/phase-out periods. The contractor shall include the status of the transitioning of control of work as a deliverable in the monthly status report.
4.3 Government Furnished Materials
Government furnished materials will be specified in each Task Order. Unless otherwise indicated in a particular task order, the Government will provide all facilities, utilities, equipment and materials necessary to accomplish the work for "on-site employees:
Desk Chair
Access to copy machine Access to facsimile machine Telephone, including long distance and voicemail Desktop computer (PC) with access to printer Cell Phone as determined necessary by the COR Government furnished computers may be hand-receipted to the Contractor. The liability for the repair of damaged Government property shall be subject to the terms of the "Government Property clause set forth in Section I of the solicitation and resulting contract. When Government property is furnished to the Contractor, a Government property control receipt will be completed and signed by the Contractor. The property control receipt will indicate the assigned location for use of the property by the Contractor. A copy of the property control receipt will be furnished to the Contractor. Upon return of the Government property to the Government, the Government property control receipt will be completed indicating the return of the property by the Contractor. A copy of the returned property control receipt will be furnished to the Contractor. All Government property furnished to the Contractor shall be accomplished in accordance with this procedure. The Contractor shall establish a property control system for the use, control, protection, and preservation of Government property assigned to the Contractor.
Government furnished property, if required, will be identified at the task order level. A listing of the property will be included in the performance work statement and should include at a minimum:
(1) The name, part number and description, manufacturer, model number, and National Stock Number (if needed for additional item identification tracking and management, and disposition);
(2) Quantity/unit of measure;
(3) Unit acquisition cost;
(4) Unique-item identifier or equivalent (if available and necessary for individual item tracking and management); and
(5) A statement as to whether the property is to be furnished in an as-is condition and instructions for physical inspection.
4.4 Applicable Directives
The contractor shall comply with all documents listed below as mandatory and referenced under paragraph 3.0, Performance Requirements.
4.5 Quality
This section describes the Quality Control components for this effort. The following sub-sections provide details of various considerations on this effort.
4.5.1 Quality Control
The Contractor shall develop a Order Quality Control Plan (QCP) for the base and maintain an effective quality control program to ensure services are performed in accordance with the IDIQ contract and this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractors QCP is the means by which he assures himself that his work complies with the requirement of the contract.
The finalized QCP will be accepted by the Government at the time of the award of the contract. The Contracting Officer may notify the Contractor of required modifications to the plan during the period of performance. The Contractor then shall coordinate suggested modifications and obtain acceptance of the plan by the Contracting Officer.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .