This document provides details regarding a federal solicitation for the construction of a three-bay aircraft hangar and aircraft maintenance unit at Yokota Air Base in Japan. The project involves the construction of a 7,013 square meter hangar and maintenance facility, including three aircraft bays, an administrative area, shop spaces, and support facilities. Site work will include pavements, utilities, and integration with an existing airfield apron. The estimated value is between 2.5 and 10 billion Japanese Yen. A mandatory site visit is scheduled for November 17th and a virtual pre-bid conference is scheduled for November 16th. Interested parties must register in the System for Award Management and meet local source requirements to be eligible for award. The bid due date is unspecified. The soliciting agency is the Department of the Army Corps of Engineers Engineering District Japan.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912HV22B0001
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
FY22 AFSOC103007 Construction of Three-Bay Aircraft Hangar / AMU
See continuation page(s)
1. CONTRACT ID CODE PAGE OF PAGES
1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-May-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HV22B0001
X 9B. DATED (SEE ITEM 11)
27-Oct-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-May-2022
CODE
CONTRACTING DIVISION
JAPAN DISTRICT, U.S. ARMY CORPS OF ENGINEERS
RM 147, BLDG. 250
CAMP ZAMA
ZAMA 252-8511
JAPAN
W912HV 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The following have been added by full text:
AM-0005 CONTINUATION PAGES
14. DESCRIPTION OF AMENDMENT (continued)
A. CHANGES TO SPECIFICATIONS – The amendment mark “(AM-0005)” is shown on each page of the amended specification section(s).
(1) Revised Section(s) to Project Specifications. Attached hereto are the following revised section(s) to the specifications. Revised section(s) replace like numbered section(s) in the subject solicitation specifications.. All portions of the revised section(s) shall apply whether or not changes have been indicated.
Revised Section(s):
Section 01 11 00.00 10
Section 01 33 00
Section 01 74 19
Section 01 78 00
Section 03 30 00
Section 05 12 00
Section 05 30 00
Section 05 50 13
Section 05 51 33
Section 05 52 00
Section 07 41 13
Section 07 52 00
Section 07 60 00
Section 08 11 13
Section 08 33 23
Section 08 34 16.10
Section 08 34 59
Section 08 71 00
Section 08 81 00
Section 09 22 00
Section 09 29 00
Section 09 30 10
Section 09 65 00
Section 09 97 13.27
Section 10 21 13
Section 10 28 13
Section 14 21 23
Section 22 00 00
Section 23 07 00
Section 23 11 20
Section 26 20 00
Section 26 24 13
Section 26 28 01.00 10
Section 26 41 00
Section 31 00 10
Section 31 11 00
Section 32 01 19.61
Section 32 11 33.13
Section 32 12 16
Section 32 13 13.06
Section 32 13 14.13
Section 32 17 23
Section 32 92 23
Section 33 40 00
Section 33 61 14
Section 33 71 02
(2) Added Section(s). The following section(s) are attached hereto and added to the specifications:
Added Section(s):
Section 08 31 00
(3) Deleted Section(s). The following section(s) are deleted entirely from the specifications:
Deleted Section(s):
Section 08 51 15
Section 32 12 15.13
Section 34 73 13
B. CHANGES TO DRAWINGS (ISSUED) – The amendment mark “(AM-0005)” is shown on each sheet of the amended drawing sheet(s).
(1) Revised Sheet(s) to Drawings. Attached hereto are the following revised sheets to the drawings. Revised sheets will replace like-numbered sheets in the subject solicitation drawings. Changes are indicated in revision clouds. All portions of the revised sheet(s) shall apply whether or not changes have been indicated.
Revised Sheet(s) to Drawing:
GI110
G-501
CG103
CS101
CS102
CS103
CS111
CS112
CU102
CS501
CS502
CS504
CS507
CS508
L-101
L-501
L-502
L-503
S-002
S-227
S-404
S-405
S-406
S-503
S-510
S-513
S-514
S-612
S-615
S-634
S-635
S-636
S-637
S-638
A-002
A-003
A-101A.1
A-101B.1
A-101C.1
A-101E.1
A-102.1
A-111A
A-111B
A-111C
A-121A.2
A-121C.2
A-121D
A-121F.1
A-121F.2
A-206
A-209
A-210
A-211
A-321
A-326
A-401
A-402
A-403
A-502
A-503
A-521
A-522
A-523
A-525
A-526
A-531.1
A-532
A-533
A-601.1
A-601.2
A-602
A-613
A-615
A-701
A-713
A-715
A-717
I-101
I-101B
I-102
I-601
I-701B
I-701C
I-701E
I-710
I-711
M-601
C. All questions and the Government responses regarding this solicitation are to be viewed through the web-based program “Bidder Inquiry Module”. This program is located on the internet and can be accessed at https://www.projnet.org/projnet. Answers provided to the respective questions through the ProjNet do not amend the solicitation (specifications, drawings, etc.) unless revision to the specifications or drawings is specifically noted and incorporated into the solicitation via an amendment.
D. The bid due date and time is unchanged.
(End of Summary of Changes)