This solicitation is for the construction of a three-bay aircraft hangar and aircraft maintenance unit facility at Yokota Air Base in Japan. The project includes construction of a 7,013 square meter hangar with three bays, concrete foundation and floor slab, steel frame structure, metal deck roofing, bridge cranes, motorized hangar doors and tracks, fire alarm and suppression systems. The aircraft maintenance unit requires administrative, tool, supply, storage, shop and support areas. Supporting facilities, pavements, site improvements, communications and utilities are also included. Interested parties must register in the System for Award Management and be authorized to conduct construction business in Japan with necessary licenses and permits. A mandatory site visit is scheduled for November 17, 2021 and a virtual pre-bid conference is scheduled for November 16, 2021. Responses are due by an unspecified date.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 92 PAGES
W912HV22B0001
3-Bay Hangar AMU
01 11 00.00 10 SD-01 Preconstruction Submittals
1.10Initial Site Conditions Photos
1.6 GKey Personnel Qualifications
1.9.2 GINDOOR AIR QUALITY (IAQ)
MANAGEMENT PLAN
SD-07 Certificates
1.10Monthly Progress Photos
SD-11 Closeout Submittals
1.10Construction Completion Photos
01 20 00 SD-07 Certificates
3.2 GBill Of Lading
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 GProject Scheduler Qualifications
3.4.1 GPreliminary Project Schedule
3.4.2 GInitial Project Schedule
3.6.2 GPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.8 GSubmittal Register
1.8.1 GSubmittal Register Monthly
Update
01 33 29 SD-01 Preconstruction Submittals
1.4 GQualifications for the
Sustainability Professional
3.1.1 GSustainability Implementation
Plan
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
W912HV22B0001 (AM-0006)01 33 00-B
j2ee9gsg Line
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 92 PAGES
3-Bay Hangar AMU
01 33 29 2.2 GSustainability Notebook
SD-11 Closeout Submittals
3.1.4 GFinal Sustainability Notebook
3.1.5 GFinal Sustainability Notebook
01 35 26 SD-01 Preconstruction Submittals
1.7.2.2 GStandard Lift Plan
1.7 GAccident Prevention Plan (APP)
1.7.2.3 GCritical Lift Plan
SD-06 Test Reports
1.4Monthly Exposure Reports
1.12Notifications and Reports
1.12.2 GAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates
1.6.1.3 GCrane Operators/Riggers
1.8 GActivity Hazard Analysis (AHA)
1.9.1Confined Space Entry Permit
1.9.1Hot Work Permit
1.12.4Certificate of Compliance
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control (CQC)
Plan
SD-06 Test Reports
3.9.2Verification Statement
01 45 35 SD-01 Preconstruction Submittals
3.1.1 GSIOR Letter of Acceptance
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
W912HV22B0001 (AM-0006)01 33 00-B
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 92 PAGES
3-Bay Hangar AMU
01 45 35 3.1.1 GProject Manual
3.1.1Written Practices
3.1.1NDT Procedures and Equipment
Calibration Records
SD-06 Test Reports
3.1.1Daily Reports
3.1.1Biweekly Reports
SD-07 Certificates
2.1Fabrication Plant
2.1Certificate of Compliance
1.5.20 GSpecial Inspector of Record
1.5 GSpecial Inspector
3.1.1Qualification Records
SD-11 Closeout Submittals
3.1.1Interim Final Report
3.1.1 GComprehensive Final Report
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.4.1 GTraffic Control Plan
3.3.2 GTemporary Utility Connections
Plan
3.5.3 GFencing Plan
3.5.11.1.4Contractor Computer
Cybersecurity Compliance
Statements
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 92 PAGES
3-Bay Hangar AMU
01 50 00 3.5.11.6Contractor Temporary Network
Cybersecurity Compliance
Statements
3.5.12Wireless Communication
Request
01 57 19.01 SD-01 Preconstruction Submittals
1.8.1Preconstruction Survey
1.8.2Regulatory Notifications
1.9 GEnvironmental Protection Plan
3.8.2.1 GEnvironmental Protection Plan
1.8.4 GEnvironmental Manager
Qualifications
3.14.3 GTemporary Fuel Storage Tank
Approval Request
3.14.4 GUnderground Fuel Storage Tank
Approval Request
1.8.3 GLicenses/Permits/Notifications
1.10General Use Permitted
Equipment
1.9.11.2 GFuel Storage Tank
Installation/Removal Report
SD-06 Test Reports
3.8.1.1.2Laboratory Analysis
3.7.2Nonhazardous Solid Waste
Diversion Report
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 92 PAGES
3-Bay Hangar AMU
01 57 19.01 1.7.1Asbestos Certification
1.7.2Lead Certification
SD-11 Closeout Submittals
1.8.5Environmental Records Binder
1.8.5Environmental Records Binder
1.11Environmental Records Binder
3.2.1Environmental Records Binder
3.8.1Environmental Records Binder
01 74 19 SD-01 Preconstruction Submittals
1.6 GWaste Management Plan
SD-11 Closeout Submittals
1.7Records
01 78 00 SD-03 Product Data
1.7.1 GWarranty Management Plan
1.7.5Warranty Tags
3.8Final Cleaning
1.5Spare Parts Data
SD-08 Manufacturer’s Instructions
1.7.1Instructions
SD-10 Operation and Maintenance
Data
3.7 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 GAs-Built Drawings
3.3 GRecord Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 92 PAGES
3-Bay Hangar AMU
01 78 00 1.7.1 GAs-Built Record of Equipment and Materials
3.6 GAs-Built Record of Equipment
and Materials
3.4 GFinal Approved Shop Drawings
3.5 GConstruction Contract
Specifications
3.9 GInterim DD FORM 1354
3.9 GChecklist for DD FORM 1354
01 78 23 SD-10 Operation and Maintenance
Data
1.4 GO&M Database
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
01 91 00.15 SD-01 Preconstruction Submittals
1.7 G DOCommissioning Firm
1.7.1 G DOLead Commissioning Specialist
1.7.2 G DOTechnical Commissioning
Specialists
SD-06 Test Reports
3.2.3.1 G DOInterim Construction Phase
Commissioning Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 92 PAGES
3-Bay Hangar AMU
01 91 00.15 3.2.3.2 G DOFinal Construction Phase
Commissioning Plan
3.2.3.1.3 G DOTemplate Building Envelope
Inspection Checklists
3.2.5.2 G DOBuilding Envelope Inspection
Checklists
3.2.5.3 G DOPre-Functional Checklists
1.9Issues Log
3.3 G DOCommissioning Report
SD-07 Certificates
1.10 G DOCertificate of Readiness
SD-10 Operation and Maintenance
Data
3.2.6 G ROTraining Plan
3.2.6 G ROTraining Attendance Rosters
3.2.7 G DOSystems Manual
3.2.7 G DOSystems Manual
3.2.8 G DOMaintenance and Service Life
Plans
SD-11 Closeout Submittals
3.3 S DOFinal Commissioning Report
03 30 00 SD-01 Preconstruction Submittals
1.6.3.1Concrete Curing Plan
1.6.6 GQuality Control Plan
1.6.9 GLaboratory Accreditation
SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 92 PAGES
3-Bay Hangar AMU
03 30 00 2.1 GFormwork
1.6.2.2 GReinforcing Steel
SD-03 Product Data
2.1Formwork Materials
2.6Reinforcement
2.4.3.1 SLiquid Chemical Floor Hardeners
and Sealers
2.6.2Mechanical Reinforcing Bar
Connectors
1.6.3.2Pumping Concrete
1.6.3.3Finishing Plan
SD-04 Samples
1.6.5.1Slab Finish Sample
1.6.5.2Surface Finish Samples
SD-05 Design Data
1.6.1.1 GConcrete Mix Design
SD-06 Test Reports
1.6.1.1 GConcrete Mix Design
1.6.4.1Fly Ash
1.6.4.1Pozzolan
1.6.4.2Slag Cement
1.6.4.3Aggregates
3.14.2.3 GCompressive Strength Tests
3.14.2.5Unit Weight of Structural
Concrete
3.14.2.6Chloride Ion Concentration
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 92 PAGES
3-Bay Hangar AMU
03 30 00 3.14.2.4Air Content
3.14.2.1Slump Tests
2.3.2Water
SD-07 Certificates
2.6.1 SReinforcing Bars
1.9Welder Qualifications
1.6.3.4 SVOC Content for Form Release
Agents, Curing Compounds, and
Concrete Penetrating Sealers
1.6.3.5Safety Data Sheets
1.6.7.2Field Testing Technician and
Testing Agency
SD-08 Manufacturer’s Instructions
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.4.5 SJoint Sealants
2.4.1Curing Compound
03 33 00 SD-02 Shop Drawings
1.4.1Detail Drawings
SD-03 Product Data
2.2 SRecycled And Regional Materials
3.4 SSurface Sealing
SD-04 Samples
2.1Materials
1.4.2Panels
05 12 00 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 92 PAGES
3-Bay Hangar AMU
05 12 00 1.6.1.1 GErection and Erection Bracing
Drawings
SD-02 Shop Drawings
1.6.2 GFabrication Drawings
SD-03 Product Data
2.6.2Shop Primer
2.4.1Welding Electrodes and Rods
2.3.2.3Direct Tension Indicator Washers
2.4.2Non-Shrink Grout
2.3.3Tension Control Bolts
1.5 SRecycled Content And Regional
Materials
SD-05 Design Data
1.6.2 GShoring and Temporary Bracing
SD-06 Test Reports
2.6.2Class A Coating
3.7.1.2Weld Inspection Reports
3.7.2.1Direct Tension Indicator Washer
Inspection Reports
3.7.3.1Bolt Testing Reports
3.7.4Embrittlement Test Reports
SD-07 Certificates
1.3MLIT Structural Steel Fabricator
Quality Certification
1.3MLIT Structural Steel Erector
Quality Certification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 92 PAGES
3-Bay Hangar AMU
05 12 00 3.4Welding Procedure Specifications
(WPS)
1.6.3.2Overhead, Under Running Crane
Rail Beam
2.2Steel
2.3Bolts, Nuts, And Washers
05 30 00 SD-02 Shop Drawings
1.3.5 GFabrication Drawings
SD-03 Product Data
2.2Accessories
2.1Deck Units
2.2.7Mechanical Fasteners
2.1.3Touch-Up Paint
1.3.3Welding Equipment
1.3.3Welding Rods And Accessories
2.1 SRecycled Content Of Steel
Products
SD-04 Samples
2.1.1Metal Roof Deck Units
SD-05 Design Data
2.1 GDeck Units
SD-07 Certificates
1.3.3Welder Qualifications
1.3.3Welding Procedures
1.3.4.1Fire Safety
1.3.4.2Wind Storm Resistance
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 92 PAGES
3-Bay Hangar AMU
05 30 00 1.3.1Manufacturer's Certificate
1.3.2Powder-Actuated Tool Operator
05 50 13 SD-02 Shop Drawings
2.3 GCover Plates and Frames
2.4 GExpansion Joint Covers
2.5 GFloor Gratings
2.6 GBollards/Pipe Guards
2.8 GAngles and Plates
SD-03 Product Data
2.3Cover Plates and Frames
2.4Expansion Joint Covers
2.5Floor Gratings
1.6 SRecycled Content And Regional
Materials
SD-04 Samples
2.4Expansion Joint Covers
05 51 33 SD-02 Shop Drawings
2.3Ladders
SD-03 Product Data
2.3Ladders
2.3.1Ladder Safety Devices
SD-07 Certificates
1.3Fabricator Certification for Ladder
Assembly
05 52 00 SD-02 Shop Drawings
1.2.1 GFabrication Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 92 PAGES
3-Bay Hangar AMU
05 52 00 3.2 GIron and Steel Hardware
3.2 GSteel Shapes, Plates, Bars and
Strips
SD-03 Product Data
3.2 GStructural-Steel Plates, Shapes, And Bars
3.2 GStructural-Steel Tubing
3.2 GCold-Finished Steel Bars
3.2 GHot-Rolled Carbon Steel Bars
3.2 GCold-Drawn Steel Tubing
2.3.7 GConcrete Inserts
3.2 GProtective Coating
3.2 GSteel Railings And Handrails
3.2 GAluminum Railings And Handrails
3.2 GAnchorage And Fastening
Systems
1.5 SRecycled Content And Regional
Materials
SD-07 Certificates
1.4.1 GWelding Procedures
1.4.2 GWelder Qualification
SD-08 Manufacturer’s Instructions
3.2Installation Instructions
06 10 00 SD-03 Product Data
1.8Fire-retardant Treatment
2.4.2 SAdhesives
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 92 PAGES
3-Bay Hangar AMU
06 10 00 SD-06 Test Reports
1.4.3Preservative-treated
SD-07 Certificates
1.11.1Certificates of Grade
1.7Preservative Treatment
2.3.1 SIndoor Air Quality for
Particleboard
2.4.2 SIndoor Air Quality for Non-aerosol
Adhesives
SD-10 Operation and Maintenance
Data
3.3Take-back Program
06 41 16.00 10 SD-02 Shop Drawings
2.10Shop Drawings
3.1Installation
SD-03 Product Data
2.10.9.3Finish Schedule
1.7.1 SLow-Emitting Materials
1.7.2 SRecycled and Regional Materials
SD-04 Samples
2.3Plastic Laminates
2.6Cabinet Hardware
06 61 16 SD-02 Shop Drawings
1.4.2Detail Fabrication Drawings
3.1Installation
2.3.5Counter Tops
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 92 PAGES
3-Bay Hangar AMU
06 61 16 SD-03 Product Data
2.1.1 GSolid Polymer
2.2.3 SIndoor air quality for solid surface
seam and sealant products
SD-04 Samples
2.1 GMaterial
SD-06 Test Reports
2.1.1Test Report Results
SD-07 Certificates
1.4.1Qualifications
2.1.1 SIndoor Air Quality for solid
surface fabrication products
SD-10 Operation and Maintenance
Data
2.1.1Solid Polymer
07 05 23 SD-01 Preconstruction Submittals
1.4 GWork Plan
SD-03 Product Data
2.2 GThermal Imaging Camera
SD-05 Design Data
3.2 GEnvelope Surface Area
Calculations
SD-07 Certificates
1.6.2.1Pressure Test Agency
1.6.2.2Thermographer Qualifications
1.6.3Test Instruments
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 92 PAGES
3-Bay Hangar AMU
07 05 23 1.6.3Date Of Last Calibration
SD-06 Test Reports
3.5 GPressure Test Procedures
3.5.7 GAir Leakage Test Report
3.6.5 GDiagnostic Test Report
07 13 53 SD-03 Product Data
1.3 GManufacturer's Standard Details
2.2 GElastomeric Waterproofing Sheet
Material
2.5 GProtection Board
SD-06 Test Reports
2.2 GElastomeric Waterproofing Sheet
Material
3.5 GProtective Coverings
SD-07 Certificates
2.2Elastomeric Waterproofing Sheet
Material
2.1.1 SCertificates Of Compliance
SD-11 Closeout Submittals
2.1.1 G SCertificates Of Compliance
07 14 00 SD-03 Product Data
2.1Fluid-Applied Membrane
2.2Membrane Primer
2.7Bond Breaker
SD-11 Closeout Submittals
1.6Warranty
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 92 PAGES
3-Bay Hangar AMU
07 14 00 3.6Information Card
3.5Instructions To Government
Personnel
07 21 13 SD-03 Product Data
1.4Manufacturer's Standard Details
2.1Block or Board Insulation
2.2Vapor retarder
2.3Pressure Sensitive Tape
2.4Accessories
SD-08 Manufacturer’s Instructions
2.1Block or Board Insulation
2.2Vapor retarder
2.4.1 SAdhesive
07 21 16 SD-03 Product Data
2.1Blanket insulation
2.3Accessories
1.3 SRecycled Content
1.3 SCertification
SD-08 Manufacturer’s Instructions
3.3.1Insulation
07 22 00 SD-03 Product Data
2.3Insulation
2.6.1Vapor Retarder
1.3Protection Board
2.7Fasteners
2.6Moisture Control
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 92 PAGES
3-Bay Hangar AMU
07 22 00 2.5.3Asphalt
1.7.1Flame Spread Rating
2.2.1 SVolatile Organic Compounds
(VOC) Contents
2.2.2 SRecycled and Regional Content
SD-07 Certificates
1.5Installer Qualifications
SD-08 Manufacturer’s Instructions
2.3Insulation
07 27 10.00 10 SD-02 Shop Drawings
2.1 GAir Barrier System Shop
Drawings
SD-03 Product Data
2.1 GAir Barrier System Product Data
SD-04 Samples
3.1.2 GMock-Up
2.1 GMaterial Samples For Air Barrier
System
SD-05 Design Data
1.8 G DODesign Data And Calculations
For The Air Barrier System
SD-06 Test Reports
1.8 G DODesign Review Report
3.1.3 G DOTesting and Inspection
SD-07 Certificates
1.7 G ROAir Barrier Inspector
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 92 PAGES
3-Bay Hangar AMU
07 41 13 SD-02 Shop Drawings
1.4.5 GRoofing Panels
1.4.5 GFlashing and Accessories
1.4.5 GGutter/Downspout Assembly
SD-03 Product Data
2.2 GRoof Panels
1.4.5 GFactory-Applied Color Finish
2.5 GAccessories
1.4.5 GFasteners
1.4.5 GPressure Sensitive Tape
2.9 GUnderlayments
2.10 GGaskets and Sealing/Insulating
Compounds
1.4.5 GCoil Stock
1.4.5 GEnamel Repair Paint
2.12 GRails and Mounting System
2.12 GLifeline
2.12 GHarnesses
2.3 SSolar Reflectivity Index (SRI)
1.4.6 SRecycled and Regional Materials
SD-04 Samples
2.2 GRoof Panels
1.4.5 GFactory-applied Color Finish
2.5Accessories
1.4.5Fasteners
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 92 PAGES
3-Bay Hangar AMU
07 41 13 1.4.5Gaskets and Sealant/Insulating
Compounds
SD-05 Design Data
1.2.1.2 GWind Uplift Resistance
SD-06 Test Reports
1.2.1.1 GLeakage Test Report
1.2.1.2 GWind Uplift Test Report
2.3 GFactory Finish and Color
Performance Requirements
3.8Fall protection
SD-07 Certificates
2.2 GRoof Panels
1.4.5Coil Stock Compatibility
2.9.1Self-Adhering Modified Bitumen
Underlayment
1.4.1 GQualification of Manufacturer
1.4.2 GQualification of Applicator
SD-08 Manufacturer’s Instructions
2.7 GInsulation
1.4.5 GInstallation Manual
SD-09 Manufacturer’s Field
Reports
3.11.1 GManufacturer's Field Inspection
Reports
SD-11 Closeout Submittals
1.8 GWarranties
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 92 PAGES
3-Bay Hangar AMU
07 41 13 3.12 GInformation Card
3.13 GDate Of Installation Wall-Mounted
Placard
07 41 63 SD-01 Preconstruction Submittals
1.4.1Qualification of Manufacturer
1.4.1Qualification of Installer
1.4.1Qualifications for Welding
1.4.1Work Plan
1.4.1On-Site Inspection and
Acceptance Procedure
SD-02 Shop Drawings
1.4.1Roofing Panels
1.4.1Flashing and Accessories
1.4.1Gutter/Downspout Assembly
SD-03 Product Data
1.4.1Sustainable Acquisition
1.4.1Factory Color Finish
1.4.1Sub-girts and Formed Shapes
1.4.1Closure Materials
1.4.1Pressure-Sensitive Tape
1.4.1Galvanizing Repair Paint
1.4.1Enamel Repair Paint
1.4.1Aluminized Steel Repair Paint
1.4.1Accessories
2.5.2 SSolar Reflectivity Index (SRI)
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 92 PAGES
3-Bay Hangar AMU
07 41 63 1.4.1Roofing Panels
2.6.1Metal Closure Strips
1.4.1 GManufacturer's Color Charts and
Chips
SD-05 Design Data
1.4.1 GWind Design Analysis
1.4.1 GSeismic Design Analysis
SD-06 Test Reports
3.4.1.2 GLeakage Tests
3.1Coatings and Base Metals of
Metal Roofing
1.4.1Factory Finish and Color
Performance Requirements
1.4.1 GWind Uplift Test Report
1.4.1 GSeismic Test Report
SD-07 Certificates
1.4.1Coil Stock
1.4.1 GSafety Data Sheets
2.5.2Coating Physical Properties:
SD-08 Manufacturer’s Instructions
1.4.1Installation of Roof Panel
Assemblies
1.4.1Application Instructions
SD-11 Closeout Submittals
1.7Warranty
3.3.5 GInformation Form and Placard
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 92 PAGES
3-Bay Hangar AMU
07 41 63 3.6.2Date of Installation Wall-Mounted
Placard
1.7 G20-Year 'No-Dollar-Limit'
Warranty For Labor And Materials
07 42 13 SD-01 Preconstruction Submittals
1.5.2Qualification of Manufacturer
SD-02 Shop Drawings
1.5.1.1Installation Drawings
SD-03 Product Data
2.1 SRecycled Content;
2.2.1Wall Panels
2.2.2Factory Color Finish
1.5.2.1Galvanizing Repair Paint
1.5.3Accessories
2.5Accessories
SD-04 Samples
2.2.1Wall Panels
2.2.2.4Color chart
07 42 63 SD-01 Preconstruction Submittals
1.6.3Qualification of Manufacturer
1.6.4Qualification of Installer
SD-03 Product Data
1.6.1 Ssustainable acquisition
1.6.1Manufacturer's catalog data
1.6.1Factory Color Finish
1.6.1Sub-girts and Formed Shapes
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 92 PAGES
3-Bay Hangar AMU
07 42 63 1.6.1Closure Materials
1.6.1Insulation
1.6.1Pressure Sensitive Tape
2.4.2.1Sealants and Caulking
1.6.1Galvanizing Repair Paint
1.6.1Accessories
1.6.1 SLow-Emitting Materials
SD-04 Samples
1.6.1Wall Panel Assemblies
1.6.1Fasteners
2.5.1Extruded Trim
1.6.1Metal Closure Strips
1.6.1manufacturer's color charts and chips
SD-05 Design Data
1.6.1wind design analysis
SD-06 Test Reports
1.6.1Factory Color Finish
SD-07 Certificates
1.6.3Qualification of Manufacturer
1.6.4Qualification of Installer
1.6.1wall system assembly wind load and fire rating classification listings
SD-08 Manufacturer’s Instructions
1.6.1Installation of Wall panels
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 92 PAGES
3-Bay Hangar AMU
07 42 63 1.6.1Instructions
1.6.1Material Safety Data Sheets
1.6.120 year 'No-Dollar-Limit' warranty
07 52 00 SD-02 Shop Drawings
1.4.6 GRoof plan
SD-07 Certificates
1.4.4 GFire Resistance
2.1.1Solar Reflectance Index (SRI)
SD-11 Closeout Submittals
1.9Warranty
3.8Information Card
3.7Instructions To Government
Personnel
07 60 00 SD-02 Shop Drawings
2.2.1Exposed Sheet Metal
3.1.12Gutters
3.1.13Downspouts
2.2.1Gravel Stops and fascia
3.1.17Splash Pans
3.1.14Flashing for Roof Drains
3.1.7Base Flashing
3.1.8Counterflashing
3.1.20Flashing at Roof Penetrations and Equipment Supports
2.2.10Reglets
3.1.15Scuppers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 92 PAGES
3-Bay Hangar AMU
07 60 00 3.1.22Copings
3.1.11Drip Edges
3.1.16Conductor Heads
SD-10 Operation and Maintenance
Data
1.4.3Instructions for Installation
1.4.3Cleaning and Maintenance
07 84 00 SD-02 Shop Drawings
2.2 GFirestopping Materials
SD-07 Certificates
1.4.2Manufacturer's Technical
Representative
2.2Firestopping Materials
1.4.1Installer Qualifications
3.3Inspection
07 92 00 SD-03 Product Data
2.1.1 SInterior Sealants
2.1.3 SFloor Joint Sealants
2.2 SPrimers
2.5 SCaulking
08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.1 GDoors
2.1 SRecycled Content
08 31 00 SD-02 Shop Drawings
1.3 GAccess Doors And Panels
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 92 PAGES
3-Bay Hangar AMU
08 31 00 SD-03 Product Data
1.3 GAccess Doors And Panels
1.3.2 GHardware
2.3.8 GAccessories
2.2 SRecycled Content
SD-04 Samples
2.6 GFinishes
SD-06 Test Reports
1.3.1 GFire-rating(s) of Assemblies
08 33 13 SD-02 Shop Drawings
1.3 GDetail Drawings
SD-03 Product Data
1.5Warranty
2.2 GCoiling Counter Doors
3.1Installation
3.4Cleaning
SD-06 Test Reports
3.3Drop-test
SD-11 Closeout Submittals
2.4Coiling Counter Door
(Non-Rated)
2.5 GFire-Rated Coiling Counter Door
08 33 23 SD-02 Shop Drawings
2.2.1Overhead Coiling Doors
2.2.3Counterbalancing Mechanism
2.2.4Manual Door Operators
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 92 PAGES
3-Bay Hangar AMU
08 33 23 2.2.5 GElectric Door Operators
2.2.1.4Bottom Bars
2.1.1.1Guides
2.2.3.1Mounting Brackets
2.2.2.2Hood
2.1.1.1 GInstallation Drawings
SD-03 Product Data
2.2.1 GOverhead Coiling Doors
2.2.2 GHardware
2.2.3 GCounterbalancing Mechanism
2.2.4 GManual Door Operators
2.2.5 GElectric Door Operators
2.2.6 GFire-Rated Door Assembly
2.2.1.1 SRecycled content for steel curtain
slats
SD-05 Design Data
2.2.1 GOverhead Coiling Doors
2.2.2 GHardware
2.2.3 GCounterbalancing Mechanism
2.2.4 GManual Door Operators
2.2.5 GElectric Door Operators
1.3 GFire-Rated Door
SD-10 Operation and Maintenance
Data
1.3.2 GOperation and Maintenance
Manuals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 92 PAGES
3-Bay Hangar AMU
08 33 23 SD-11 Closeout Submittals
1.3.1 GWarranty
08 34 16.10 SD-01 Preconstruction Submittals
1.4.1 GManufacturer's Qualifications
1.4.2 GInstaller's Qualifications
SD-02 Shop Drawings
2.1 GHangar doors
SD-05 Design Data
2.1 GHangar doors
SD-10 Operation and Maintenance
Data
2.1 GHangar doors
08 34 59 SD-02 Shop Drawings
2.2 GVault Door Unit
SD-03 Product Data
2.3Vault Door and Frame
SD-07 Certificates
2.3Vault Door and Frame
SD-08 Manufacturer’s Instructions
3.1Installation
SD-11 Closeout Submittals
1.2 SLEED Documentation
08 41 13 SD-01 Preconstruction Submittals
1.2.1 GSample Warranty
1.2.1 GList of Product Installations
SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 92 PAGES
3-Bay Hangar AMU
08 41 13 3.3 GInstallation Drawings
2.2 GFabrication Drawings
SD-03 Product Data
1.2.1 GManufacturer's Catalog Data
2.2.3 GFinish
2.1.1.2 SRecycled Content of Aluminum
Material
SD-04 Samples
1.2.1 GFinish and Color Samples
SD-06 Test Reports
1.2.1 GCertified Test Reports
3.4.3Deflection
3.4.1Air Infiltration
3.4.4Condensation Resistance and
Thermal Transmittance
3.4.5Water Infiltration
SD-08 Manufacturer’s Instructions
3.3Manufacturer's Instructions
SD-11 Closeout Submittals
3.6Manufacturer's Product Warranty
08 44 00 SD-02 Shop Drawings
1.5 GGlazed Curtain Wall System
1.5Installation Drawings
SD-03 Product Data
1.5 GGlazed Curtain Wall System
2.2 GMetals For Fabrication
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 92 PAGES
3-Bay Hangar AMU
08 44 00 2.3 GNonskinning Sealing Compound
2.4.1 GMetal Accessories
2.5 GCurtain-Wall Framing Members
2.6 GAluminum Doors and Frames
2.9.4 GMasonry Anchorage Devices
2.1.1 SRecycled Content of Aluminum
Doors
2.1.1 SRecycled Content of Aluminum
Curtain-Wall Framing Members
1.7.1 GWarranties
2.4.3Exposed-to-View Aluminum
Finish
SD-05 Design Data
2.4.3 GAnodic Finish
1.5.5 GSeismic Calculations
1.3.5.1 GStructural Calculations for
Deflection
SD-06 Test Reports
1.3.5 GFactory Test Results
1.4.1 GField Water Spray Test Results
1.4.2 GAir Infiltration Test Results
1.4.2.1 GWater Penetration Test Results
SD-07 Certificates
1.3.5.5 GEnergy Performance Certificates
1.3.1 GEngineer Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 92 PAGES
3-Bay Hangar AMU
08 44 00 1.3.3 GQualifications for the Curtain-Wall
Installer
SD-08 Manufacturer’s Instructions
1.5 GGlazed Curtain Wall System
3.3.9 GInsulating Glass
3.6.2 GPreventive Maintenance and
Inspection
SD-11 Closeout Submittals
1.7 GWarranty
08 71 00 SD-02 Shop Drawings
1.3 GManufacturer's Detail Drawings
1.3 GVerification of Existing Conditions
1.5 GHardware Schedule
2.3.8 GKeying System
SD-08 Manufacturer’s Instructions
3.1Installation
SD-10 Operation and Maintenance
Data
1.5 GHardware Schedule
SD-11 Closeout Submittals
1.6.1Key Bitting
08 81 00 SD-03 Product Data
1.7.1Insulating Glass
2.4.3Sealants
2.4.4Joint Backer
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 92 PAGES
3-Bay Hangar AMU
08 81 00 1.7.1Insulating Glass
2.4.3Sealants
2.4.5Glazing Tapes
SD-08 Manufacturer’s Instructions
2.4Setting and Sealing Materials
3.2Glass Setting
SD-11 Closeout Submittals
1.7.1Insulated Glass Units
08 91 00 SD-02 Shop Drawings
1.4Wall Louvers
2.3Equipment Screen Louvers
SD-03 Product Data
2.2Metal Wall Louvers
2.3Equipment Screen Louvers
SD-04 Samples
1.5 GWall Louver Samples
1.5 GEquipment Screen Louver
Samples
09 22 00 SD-02 Shop Drawings
2.1 GMetal Support Systems
SD-03 Product Data
2.1Metal Support Systems
09 29 00 SD-03 Product Data
2.1.9 SAdhesives
SD-08 Manufacturer’s Instructions
2.1Safety Data Sheets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 92 PAGES
3-Bay Hangar AMU
09 29 00 SD-10 Operation and Maintenance
Data
2.1Manufacturer Maintenance
Instructions
09 30 10 SD-02 Shop Drawings
3.2 GDetail Drawings
SD-03 Product Data
2.1 G STile
2.2 GSetting-Bed
2.4 SMortar, Grout, and Adhesive
2.4 SIndoor air quality for adhesives
2.4.6 SIndoor air quality for sealants
2.1.1 GPorcelain Tile
3.2 GWaterproof Membrane
SD-04 Samples
2.1 GTile
2.6 GTransition Strips
SD-07 Certificates
2.1Tile
2.4Mortar, Grout, and Adhesive
SD-08 Manufacturer’s Instructions
3.7Maintenance Instructions
SD-10 Operation and Maintenance
Data
3.2 GInstallation
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 92 PAGES
3-Bay Hangar AMU
09 30 10 1.3.1.1LEED Documentation
09 51 00 SD-02 Shop Drawings
2.2Approved Detail Drawings
SD-03 Product Data
2.2.1 G SAcoustical Ceiling Systems
1.3Certification
2.6 SIndoor air quality for adhesives
2.9 SIndoor air quality for sealants
SD-04 Samples
2.3Acoustical Units
2.3.1Acoustic Ceiling Tiles
SD-07 Certificates
2.3Acoustical Units
2.3.1Acoustic Ceiling Tiles
09 65 00 SD-02 Shop Drawings
2.11Resilient Flooring and
Accessories
3.4General Installation
SD-03 Product Data
2.11Resilient Flooring and
Accessories
2.4Wall Base
2.5Stair Treads, Risers and
Stringers
1.5.3Local/Regional Materials
2.7 SIndoor air quality for adhesives
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 92 PAGES
3-Bay Hangar AMU
09 65 00 2.10 SIndoor air quality for sealants
2.7Adhesives
SD-04 Samples
2.11Resilient Flooring and
Accessories
2.8Surface Preparation Materials
SD-06 Test Reports
3.3Moisture, Alkalinity and Bond
Tests
SD-10 Operation and Maintenance
Data
2.11Resilient Flooring and
Accessories
09 67 23.16 SD-03 Product Data
1.3 GManufacturer's Catalog Data
SD-06 Test Reports
1.5.1.1 GJoint Sealant
1.5.1.2 GEpoxy Mortar Flooring System
1.5.1.3 GPrimer
1.5.1.4 GGrout Coat
1.5.1.5 GUrethane Topcoat
2.4 GWhite Aluminum Oxide Non-Skid
Grit
1.9 GPatch Test Demonstration
1.5.1.6 GDaily Inspection Report
3.11.3 GAdhesion Testing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 92 PAGES
3-Bay Hangar AMU
09 67 23.16 SD-07 Certificates
1.5.2.1 GWork Plan
1.5.2.2 GFlooring System Applicator
Qualifications
1.5.1.1 GJoint Sealant
1.5.1.2 GEpoxy Mortar Flooring System
1.5.3.3 GWater-Based Alkaline Degreaser
SD-11 Closeout Submittals
1.5.2.5 GWarranty
3.11.2.2Inspection Logbook
09 68 00 SD-02 Shop Drawings
3.4Installation Drawings
SD-03 Product Data
2.1Carpet
2.4Moldings
2.1.1 SIndoor Air Quality for Carpet
2.3 SIndoor Air Quality for Adhesives
2.1.2 SPhysical Characteristics
1.2.1 SLocal/Regional Materials
1.2.2Environmental Data
1.5.2 SRecycled Content
SD-04 Samples
2.1 GCarpet
2.4 GMoldings
SD-06 Test Reports
3.2Moisture and Alkalinity Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 92 PAGES
3-Bay Hangar AMU
09 68 00 SD-07 Certificates
1.5.1 SIndoor Air Quality
SD-08 Manufacturer’s Instructions
3.1Surface Preparation
3.4Installation
SD-10 Operation and Maintenance
Data
3.5Cleaning and Protection
SD-11 Closeout Submittals
1.8Warranty
09 90 00 SD-02 Shop Drawings
3.9Piping Identification
SD-03 Product Data
2.1 SMaterials
SD-04 Samples
1.11 GColor
3.12.1Spray Tile Finish System
SD-07 Certificates
2.1 SIndoor Air Quality for paints and
primers
SD-08 Manufacturer’s Instructions
3.5.2Mixing
3.12.1Spray Tile Finish System
SD-10 Operation and Maintenance
Data
1.3.1.1Coatings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 92 PAGES
3-Bay Hangar AMU
09 90 00 SD-11 Closeout Submittals
2.1 SMaterials
09 97 13.27 SD-05 Design Data
1.4.4.1Containment System
SD-06 Test Reports
1.4.5.1Joint Sealant Qualification Test
Reports
1.4.5.2Coatings Qualification Test
Reports
1.4.5.3Metallic Abrasive Qualification
Test Reports
3.1.3Coating Sample Test Reports
3.1.4Abrasive Sample Test Reports
3.8.2.2Inspection Report Forms
3.8.2.3Daily Inspection Reports
1.4.5.4Recycled Metallic Abrasive Field
Test Reports (Daily and Weekly)
SD-07 Certificates
1.4.1Contract Errors, Omissions, and
Other Discrepancies
1.4.2.1Corrective Action Procedures
1.4.3Coating Work Plan
1.4.6.1Qualifications of Certified
Industrial Hygienist (CIH)
1.4.6.5Qualifications Of Individuals
Performing Abrasive Blasting
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 92 PAGES
3-Bay Hangar AMU
09 97 13.27 1.4.6.2Qualifications of Certified
Protective Coatings Specialist
(PCS)
1.4.6.3Qualifications of Coating
Inspection Company
1.4.6.4Qualifications of QC Specialist
Coating Inspector
1.4.6.6Qualifications of Testing
Laboratory for Coatings
1.4.6.7Qualifications of Testing
Laboratory for Abrasive
1.4.6.8Qualifications of Coating
Contractors
1.4.6.9Joint Sealant Materials
1.4.6.10Coating Materials
1.4.6.11Coating System Component
Compatibility
1.4.6.12Non-metallic Abrasive
1.4.6.13Metallic Abrasive
SD-08 Manufacturer’s Instructions
1.5.1Joint Sealant Instructions
1.5.2Coating System Instructions
SD-11 Closeout Submittals
3.5.6Disposal of Used Abrasive
3.8.2.4 GInspection Logbook
10 11 00 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 92 PAGES
3-Bay Hangar AMU
10 11 00 2.3 G ROMarkerboard
2.5 G ROProjection Screen
2.6 G ROMonitors
SD-07 Certificates
1.2Visual Display Unit
10 14 00.10 SD-02 Shop Drawings
3.1Approved Detail Drawings
2.2Modular Exterior Signage System
SD-03 Product Data
2.2Modular Exterior Signage System
SD-08 Manufacturer’s Instructions
2.2Modular Exterior Signage System
SD-10 Operation and Maintenance
Data
3.1.2Protection and Cleaning
10 14 00.20 SD-02 Shop Drawings
1.6.2Detail Drawings
1.3Interior Signage
SD-03 Product Data
1.3Interior Signage
SD-04 Samples
1.3 GInterior Signage
SD-08 Manufacturer’s Instructions
1.3Interior Signage
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 92 PAGES
3-Bay Hangar AMU
10 14 00.20 3.1Approved Manufacturer's
Instructions
3.1.2Protection and Cleaning
SD-11 Closeout Submittals
1.3Interior Signage
10 21 13 SD-02 Shop Drawings
2.1Fabrication Drawings
3.2Installation Drawings
SD-07 Certificates
1.5Warranty
10 26 00 SD-02 Shop Drawings
2.3Wall Guards
SD-03 Product Data
2.2Corner Guards
SD-04 Samples
2.5 G ROFinish
SD-07 Certificates
2.6 SIndoor Air Quality For Adhesives
10 28 13 SD-04 Samples
2.1.2 GFinishes
2.2Accessory Items
10 44 16 SD-02 Shop Drawings
2.1.1 GFire Extinguishers
Part 2 GAccessories
Part 2 GCabinets
2.2.2 GWall Brackets
SUBMITTAL REGISTER
CONTR…