This solicitation is for the construction of a three-bay aircraft hangar and aircraft maintenance unit facility at Yokota Air Base in Japan. The project includes construction of a 7,013 square meter hangar with three bays, concrete foundation and floor slab, steel frame structure, metal deck roofing, bridge cranes, motorized hangar doors and tracks, fire alarm and suppression systems. The aircraft maintenance unit requires administrative, tool, supply, storage, shop and support areas. Supporting facilities, pavements, site improvements, communications and utilities are also included. Interested parties must register in the System for Award Management and be authorized to conduct construction business in Japan with necessary licenses and permits. A mandatory site visit is scheduled for November 17, 2021 and a virtual pre-bid conference is scheduled for November 16, 2021. Responses are due by an unspecified date.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 92 PAGES

W912HV22B0001

3-Bay Hangar AMU

01 11 00.00 10 SD-01 Preconstruction Submittals

1.10Initial Site Conditions Photos

1.6 GKey Personnel Qualifications

1.9.2 GINDOOR AIR QUALITY (IAQ)

MANAGEMENT PLAN

SD-07 Certificates

1.10Monthly Progress Photos

SD-11 Closeout Submittals

1.10Construction Completion Photos

01 20 00 SD-07 Certificates

3.2 GBill Of Lading

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 GProject Scheduler Qualifications

3.4.1 GPreliminary Project Schedule

3.4.2 GInitial Project Schedule

3.6.2 GPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.8 GSubmittal Register

1.8.1 GSubmittal Register Monthly

Update

01 33 29 SD-01 Preconstruction Submittals

1.4 GQualifications for the

Sustainability Professional

3.1.1 GSustainability Implementation

Plan

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

W912HV22B0001 (AM-0006)01 33 00-B

j2ee9gsg Line

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 92 PAGES

3-Bay Hangar AMU

01 33 29 2.2 GSustainability Notebook

SD-11 Closeout Submittals

3.1.4 GFinal Sustainability Notebook

3.1.5 GFinal Sustainability Notebook

01 35 26 SD-01 Preconstruction Submittals

1.7.2.2 GStandard Lift Plan

1.7 GAccident Prevention Plan (APP)

1.7.2.3 GCritical Lift Plan

SD-06 Test Reports

1.4Monthly Exposure Reports

1.12Notifications and Reports

1.12.2 GAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates

1.6.1.3 GCrane Operators/Riggers

1.8 GActivity Hazard Analysis (AHA)

1.9.1Confined Space Entry Permit

1.9.1Hot Work Permit

1.12.4Certificate of Compliance

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control (CQC)

Plan

SD-06 Test Reports

3.9.2Verification Statement

01 45 35 SD-01 Preconstruction Submittals

3.1.1 GSIOR Letter of Acceptance

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

W912HV22B0001 (AM-0006)01 33 00-B

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 92 PAGES

3-Bay Hangar AMU

01 45 35 3.1.1 GProject Manual

3.1.1Written Practices

3.1.1NDT Procedures and Equipment

Calibration Records

SD-06 Test Reports

3.1.1Daily Reports

3.1.1Biweekly Reports

SD-07 Certificates

2.1Fabrication Plant

2.1Certificate of Compliance

1.5.20 GSpecial Inspector of Record

1.5 GSpecial Inspector

3.1.1Qualification Records

SD-11 Closeout Submittals

3.1.1Interim Final Report

3.1.1 GComprehensive Final Report

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

3.4.1 GTraffic Control Plan

3.3.2 GTemporary Utility Connections

Plan

3.5.3 GFencing Plan

3.5.11.1.4Contractor Computer

Cybersecurity Compliance

Statements

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 92 PAGES

3-Bay Hangar AMU

01 50 00 3.5.11.6Contractor Temporary Network

Cybersecurity Compliance

Statements

3.5.12Wireless Communication

Request

01 57 19.01 SD-01 Preconstruction Submittals

1.8.1Preconstruction Survey

1.8.2Regulatory Notifications

1.9 GEnvironmental Protection Plan

3.8.2.1 GEnvironmental Protection Plan

1.8.4 GEnvironmental Manager

Qualifications

3.14.3 GTemporary Fuel Storage Tank

Approval Request

3.14.4 GUnderground Fuel Storage Tank

Approval Request

1.8.3 GLicenses/Permits/Notifications

1.10General Use Permitted

Equipment

1.9.11.2 GFuel Storage Tank

Installation/Removal Report

SD-06 Test Reports

3.8.1.1.2Laboratory Analysis

3.7.2Nonhazardous Solid Waste

Diversion Report

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 92 PAGES

3-Bay Hangar AMU

01 57 19.01 1.7.1Asbestos Certification

1.7.2Lead Certification

SD-11 Closeout Submittals

1.8.5Environmental Records Binder

1.8.5Environmental Records Binder

1.11Environmental Records Binder

3.2.1Environmental Records Binder

3.8.1Environmental Records Binder

01 74 19 SD-01 Preconstruction Submittals

1.6 GWaste Management Plan

SD-11 Closeout Submittals

1.7Records

01 78 00 SD-03 Product Data

1.7.1 GWarranty Management Plan

1.7.5Warranty Tags

3.8Final Cleaning

1.5Spare Parts Data

SD-08 Manufacturer’s Instructions

1.7.1Instructions

SD-10 Operation and Maintenance

Data

3.7 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

3.3 GRecord Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 92 PAGES

3-Bay Hangar AMU

01 78 00 1.7.1 GAs-Built Record of Equipment and Materials

3.6 GAs-Built Record of Equipment

and Materials

3.4 GFinal Approved Shop Drawings

3.5 GConstruction Contract

Specifications

3.9 GInterim DD FORM 1354

3.9 GChecklist for DD FORM 1354

01 78 23 SD-10 Operation and Maintenance

Data

1.4 GO&M Database

3.1.1 GTraining Plan

3.1.3 GTraining Outline

3.1.2 GTraining Content

SD-11 Closeout Submittals

3.1.4 GTraining Video Recording

3.1.6 GValidation of Training Completion

01 91 00.15 SD-01 Preconstruction Submittals

1.7 G DOCommissioning Firm

1.7.1 G DOLead Commissioning Specialist

1.7.2 G DOTechnical Commissioning

Specialists

SD-06 Test Reports

3.2.3.1 G DOInterim Construction Phase

Commissioning Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 92 PAGES

3-Bay Hangar AMU

01 91 00.15 3.2.3.2 G DOFinal Construction Phase

Commissioning Plan

3.2.3.1.3 G DOTemplate Building Envelope

Inspection Checklists

3.2.5.2 G DOBuilding Envelope Inspection

Checklists

3.2.5.3 G DOPre-Functional Checklists

1.9Issues Log

3.3 G DOCommissioning Report

SD-07 Certificates

1.10 G DOCertificate of Readiness

SD-10 Operation and Maintenance

Data

3.2.6 G ROTraining Plan

3.2.6 G ROTraining Attendance Rosters

3.2.7 G DOSystems Manual

3.2.7 G DOSystems Manual

3.2.8 G DOMaintenance and Service Life

Plans

SD-11 Closeout Submittals

3.3 S DOFinal Commissioning Report

03 30 00 SD-01 Preconstruction Submittals

1.6.3.1Concrete Curing Plan

1.6.6 GQuality Control Plan

1.6.9 GLaboratory Accreditation

SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 92 PAGES

3-Bay Hangar AMU

03 30 00 2.1 GFormwork

1.6.2.2 GReinforcing Steel

SD-03 Product Data

2.1Formwork Materials

2.6Reinforcement

2.4.3.1 SLiquid Chemical Floor Hardeners

and Sealers

2.6.2Mechanical Reinforcing Bar

Connectors

1.6.3.2Pumping Concrete

1.6.3.3Finishing Plan

SD-04 Samples

1.6.5.1Slab Finish Sample

1.6.5.2Surface Finish Samples

SD-05 Design Data

1.6.1.1 GConcrete Mix Design

SD-06 Test Reports

1.6.1.1 GConcrete Mix Design

1.6.4.1Fly Ash

1.6.4.1Pozzolan

1.6.4.2Slag Cement

1.6.4.3Aggregates

3.14.2.3 GCompressive Strength Tests

3.14.2.5Unit Weight of Structural

Concrete

3.14.2.6Chloride Ion Concentration

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 92 PAGES

3-Bay Hangar AMU

03 30 00 3.14.2.4Air Content

3.14.2.1Slump Tests

2.3.2Water

SD-07 Certificates

2.6.1 SReinforcing Bars

1.9Welder Qualifications

1.6.3.4 SVOC Content for Form Release

Agents, Curing Compounds, and

Concrete Penetrating Sealers

1.6.3.5Safety Data Sheets

1.6.7.2Field Testing Technician and

Testing Agency

SD-08 Manufacturer’s Instructions

2.4.3.1Liquid Chemical Floor Hardeners and Sealers

2.4.5 SJoint Sealants

2.4.1Curing Compound

03 33 00 SD-02 Shop Drawings

1.4.1Detail Drawings

SD-03 Product Data

2.2 SRecycled And Regional Materials

3.4 SSurface Sealing

SD-04 Samples

2.1Materials

1.4.2Panels

05 12 00 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 92 PAGES

3-Bay Hangar AMU

05 12 00 1.6.1.1 GErection and Erection Bracing

Drawings

SD-02 Shop Drawings

1.6.2 GFabrication Drawings

SD-03 Product Data

2.6.2Shop Primer

2.4.1Welding Electrodes and Rods

2.3.2.3Direct Tension Indicator Washers

2.4.2Non-Shrink Grout

2.3.3Tension Control Bolts

1.5 SRecycled Content And Regional

Materials

SD-05 Design Data

1.6.2 GShoring and Temporary Bracing

SD-06 Test Reports

2.6.2Class A Coating

3.7.1.2Weld Inspection Reports

3.7.2.1Direct Tension Indicator Washer

Inspection Reports

3.7.3.1Bolt Testing Reports

3.7.4Embrittlement Test Reports

SD-07 Certificates

1.3MLIT Structural Steel Fabricator

Quality Certification

1.3MLIT Structural Steel Erector

Quality Certification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 92 PAGES

3-Bay Hangar AMU

05 12 00 3.4Welding Procedure Specifications

(WPS)

1.6.3.2Overhead, Under Running Crane

Rail Beam

2.2Steel

2.3Bolts, Nuts, And Washers

05 30 00 SD-02 Shop Drawings

1.3.5 GFabrication Drawings

SD-03 Product Data

2.2Accessories

2.1Deck Units

2.2.7Mechanical Fasteners

2.1.3Touch-Up Paint

1.3.3Welding Equipment

1.3.3Welding Rods And Accessories

2.1 SRecycled Content Of Steel

Products

SD-04 Samples

2.1.1Metal Roof Deck Units

SD-05 Design Data

2.1 GDeck Units

SD-07 Certificates

1.3.3Welder Qualifications

1.3.3Welding Procedures

1.3.4.1Fire Safety

1.3.4.2Wind Storm Resistance

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 92 PAGES

3-Bay Hangar AMU

05 30 00 1.3.1Manufacturer's Certificate

1.3.2Powder-Actuated Tool Operator

05 50 13 SD-02 Shop Drawings

2.3 GCover Plates and Frames

2.4 GExpansion Joint Covers

2.5 GFloor Gratings

2.6 GBollards/Pipe Guards

2.8 GAngles and Plates

SD-03 Product Data

2.3Cover Plates and Frames

2.4Expansion Joint Covers

2.5Floor Gratings

1.6 SRecycled Content And Regional

Materials

SD-04 Samples

2.4Expansion Joint Covers

05 51 33 SD-02 Shop Drawings

2.3Ladders

SD-03 Product Data

2.3Ladders

2.3.1Ladder Safety Devices

SD-07 Certificates

1.3Fabricator Certification for Ladder

Assembly

05 52 00 SD-02 Shop Drawings

1.2.1 GFabrication Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 92 PAGES

3-Bay Hangar AMU

05 52 00 3.2 GIron and Steel Hardware

3.2 GSteel Shapes, Plates, Bars and

Strips

SD-03 Product Data

3.2 GStructural-Steel Plates, Shapes, And Bars

3.2 GStructural-Steel Tubing

3.2 GCold-Finished Steel Bars

3.2 GHot-Rolled Carbon Steel Bars

3.2 GCold-Drawn Steel Tubing

2.3.7 GConcrete Inserts

3.2 GProtective Coating

3.2 GSteel Railings And Handrails

3.2 GAluminum Railings And Handrails

3.2 GAnchorage And Fastening

Systems

1.5 SRecycled Content And Regional

Materials

SD-07 Certificates

1.4.1 GWelding Procedures

1.4.2 GWelder Qualification

SD-08 Manufacturer’s Instructions

3.2Installation Instructions

06 10 00 SD-03 Product Data

1.8Fire-retardant Treatment

2.4.2 SAdhesives

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 92 PAGES

3-Bay Hangar AMU

06 10 00 SD-06 Test Reports

1.4.3Preservative-treated

SD-07 Certificates

1.11.1Certificates of Grade

1.7Preservative Treatment

2.3.1 SIndoor Air Quality for

Particleboard

2.4.2 SIndoor Air Quality for Non-aerosol

Adhesives

SD-10 Operation and Maintenance

Data

3.3Take-back Program

06 41 16.00 10 SD-02 Shop Drawings

2.10Shop Drawings

3.1Installation

SD-03 Product Data

2.10.9.3Finish Schedule

1.7.1 SLow-Emitting Materials

1.7.2 SRecycled and Regional Materials

SD-04 Samples

2.3Plastic Laminates

2.6Cabinet Hardware

06 61 16 SD-02 Shop Drawings

1.4.2Detail Fabrication Drawings

3.1Installation

2.3.5Counter Tops

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 92 PAGES

3-Bay Hangar AMU

06 61 16 SD-03 Product Data

2.1.1 GSolid Polymer

2.2.3 SIndoor air quality for solid surface

seam and sealant products

SD-04 Samples

2.1 GMaterial

SD-06 Test Reports

2.1.1Test Report Results

SD-07 Certificates

1.4.1Qualifications

2.1.1 SIndoor Air Quality for solid

surface fabrication products

SD-10 Operation and Maintenance

Data

2.1.1Solid Polymer

07 05 23 SD-01 Preconstruction Submittals

1.4 GWork Plan

SD-03 Product Data

2.2 GThermal Imaging Camera

SD-05 Design Data

3.2 GEnvelope Surface Area

Calculations

SD-07 Certificates

1.6.2.1Pressure Test Agency

1.6.2.2Thermographer Qualifications

1.6.3Test Instruments

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 92 PAGES

3-Bay Hangar AMU

07 05 23 1.6.3Date Of Last Calibration

SD-06 Test Reports

3.5 GPressure Test Procedures

3.5.7 GAir Leakage Test Report

3.6.5 GDiagnostic Test Report

07 13 53 SD-03 Product Data

1.3 GManufacturer's Standard Details

2.2 GElastomeric Waterproofing Sheet

Material

2.5 GProtection Board

SD-06 Test Reports

2.2 GElastomeric Waterproofing Sheet

Material

3.5 GProtective Coverings

SD-07 Certificates

2.2Elastomeric Waterproofing Sheet

Material

2.1.1 SCertificates Of Compliance

SD-11 Closeout Submittals

2.1.1 G SCertificates Of Compliance

07 14 00 SD-03 Product Data

2.1Fluid-Applied Membrane

2.2Membrane Primer

2.7Bond Breaker

SD-11 Closeout Submittals

1.6Warranty

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 92 PAGES

3-Bay Hangar AMU

07 14 00 3.6Information Card

3.5Instructions To Government

Personnel

07 21 13 SD-03 Product Data

1.4Manufacturer's Standard Details

2.1Block or Board Insulation

2.2Vapor retarder

2.3Pressure Sensitive Tape

2.4Accessories

SD-08 Manufacturer’s Instructions

2.1Block or Board Insulation

2.2Vapor retarder

2.4.1 SAdhesive

07 21 16 SD-03 Product Data

2.1Blanket insulation

2.3Accessories

1.3 SRecycled Content

1.3 SCertification

SD-08 Manufacturer’s Instructions

3.3.1Insulation

07 22 00 SD-03 Product Data

2.3Insulation

2.6.1Vapor Retarder

1.3Protection Board

2.7Fasteners

2.6Moisture Control

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 92 PAGES

3-Bay Hangar AMU

07 22 00 2.5.3Asphalt

1.7.1Flame Spread Rating

2.2.1 SVolatile Organic Compounds

(VOC) Contents

2.2.2 SRecycled and Regional Content

SD-07 Certificates

1.5Installer Qualifications

SD-08 Manufacturer’s Instructions

2.3Insulation

07 27 10.00 10 SD-02 Shop Drawings

2.1 GAir Barrier System Shop

Drawings

SD-03 Product Data

2.1 GAir Barrier System Product Data

SD-04 Samples

3.1.2 GMock-Up

2.1 GMaterial Samples For Air Barrier

System

SD-05 Design Data

1.8 G DODesign Data And Calculations

For The Air Barrier System

SD-06 Test Reports

1.8 G DODesign Review Report

3.1.3 G DOTesting and Inspection

SD-07 Certificates

1.7 G ROAir Barrier Inspector

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 92 PAGES

3-Bay Hangar AMU

07 41 13 SD-02 Shop Drawings

1.4.5 GRoofing Panels

1.4.5 GFlashing and Accessories

1.4.5 GGutter/Downspout Assembly

SD-03 Product Data

2.2 GRoof Panels

1.4.5 GFactory-Applied Color Finish

2.5 GAccessories

1.4.5 GFasteners

1.4.5 GPressure Sensitive Tape

2.9 GUnderlayments

2.10 GGaskets and Sealing/Insulating

Compounds

1.4.5 GCoil Stock

1.4.5 GEnamel Repair Paint

2.12 GRails and Mounting System

2.12 GLifeline

2.12 GHarnesses

2.3 SSolar Reflectivity Index (SRI)

1.4.6 SRecycled and Regional Materials

SD-04 Samples

2.2 GRoof Panels

1.4.5 GFactory-applied Color Finish

2.5Accessories

1.4.5Fasteners

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 92 PAGES

3-Bay Hangar AMU

07 41 13 1.4.5Gaskets and Sealant/Insulating

Compounds

SD-05 Design Data

1.2.1.2 GWind Uplift Resistance

SD-06 Test Reports

1.2.1.1 GLeakage Test Report

1.2.1.2 GWind Uplift Test Report

2.3 GFactory Finish and Color

Performance Requirements

3.8Fall protection

SD-07 Certificates

2.2 GRoof Panels

1.4.5Coil Stock Compatibility

2.9.1Self-Adhering Modified Bitumen

Underlayment

1.4.1 GQualification of Manufacturer

1.4.2 GQualification of Applicator

SD-08 Manufacturer’s Instructions

2.7 GInsulation

1.4.5 GInstallation Manual

SD-09 Manufacturer’s Field

Reports

3.11.1 GManufacturer's Field Inspection

Reports

SD-11 Closeout Submittals

1.8 GWarranties

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 92 PAGES

3-Bay Hangar AMU

07 41 13 3.12 GInformation Card

3.13 GDate Of Installation Wall-Mounted

Placard

07 41 63 SD-01 Preconstruction Submittals

1.4.1Qualification of Manufacturer

1.4.1Qualification of Installer

1.4.1Qualifications for Welding

1.4.1Work Plan

1.4.1On-Site Inspection and

Acceptance Procedure

SD-02 Shop Drawings

1.4.1Roofing Panels

1.4.1Flashing and Accessories

1.4.1Gutter/Downspout Assembly

SD-03 Product Data

1.4.1Sustainable Acquisition

1.4.1Factory Color Finish

1.4.1Sub-girts and Formed Shapes

1.4.1Closure Materials

1.4.1Pressure-Sensitive Tape

1.4.1Galvanizing Repair Paint

1.4.1Enamel Repair Paint

1.4.1Aluminized Steel Repair Paint

1.4.1Accessories

2.5.2 SSolar Reflectivity Index (SRI)

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 92 PAGES

3-Bay Hangar AMU

07 41 63 1.4.1Roofing Panels

2.6.1Metal Closure Strips

1.4.1 GManufacturer's Color Charts and

Chips

SD-05 Design Data

1.4.1 GWind Design Analysis

1.4.1 GSeismic Design Analysis

SD-06 Test Reports

3.4.1.2 GLeakage Tests

3.1Coatings and Base Metals of

Metal Roofing

1.4.1Factory Finish and Color

Performance Requirements

1.4.1 GWind Uplift Test Report

1.4.1 GSeismic Test Report

SD-07 Certificates

1.4.1Coil Stock

1.4.1 GSafety Data Sheets

2.5.2Coating Physical Properties:

SD-08 Manufacturer’s Instructions

1.4.1Installation of Roof Panel

Assemblies

1.4.1Application Instructions

SD-11 Closeout Submittals

1.7Warranty

3.3.5 GInformation Form and Placard

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 92 PAGES

3-Bay Hangar AMU

07 41 63 3.6.2Date of Installation Wall-Mounted

Placard

1.7 G20-Year 'No-Dollar-Limit'

Warranty For Labor And Materials

07 42 13 SD-01 Preconstruction Submittals

1.5.2Qualification of Manufacturer

SD-02 Shop Drawings

1.5.1.1Installation Drawings

SD-03 Product Data

2.1 SRecycled Content;

2.2.1Wall Panels

2.2.2Factory Color Finish

1.5.2.1Galvanizing Repair Paint

1.5.3Accessories

2.5Accessories

SD-04 Samples

2.2.1Wall Panels

2.2.2.4Color chart

07 42 63 SD-01 Preconstruction Submittals

1.6.3Qualification of Manufacturer

1.6.4Qualification of Installer

SD-03 Product Data

1.6.1 Ssustainable acquisition

1.6.1Manufacturer's catalog data

1.6.1Factory Color Finish

1.6.1Sub-girts and Formed Shapes

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 92 PAGES

3-Bay Hangar AMU

07 42 63 1.6.1Closure Materials

1.6.1Insulation

1.6.1Pressure Sensitive Tape

2.4.2.1Sealants and Caulking

1.6.1Galvanizing Repair Paint

1.6.1Accessories

1.6.1 SLow-Emitting Materials

SD-04 Samples

1.6.1Wall Panel Assemblies

1.6.1Fasteners

2.5.1Extruded Trim

1.6.1Metal Closure Strips

1.6.1manufacturer's color charts and chips

SD-05 Design Data

1.6.1wind design analysis

SD-06 Test Reports

1.6.1Factory Color Finish

SD-07 Certificates

1.6.3Qualification of Manufacturer

1.6.4Qualification of Installer

1.6.1wall system assembly wind load and fire rating classification listings

SD-08 Manufacturer’s Instructions

1.6.1Installation of Wall panels

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 92 PAGES

3-Bay Hangar AMU

07 42 63 1.6.1Instructions

1.6.1Material Safety Data Sheets

1.6.120 year 'No-Dollar-Limit' warranty

07 52 00 SD-02 Shop Drawings

1.4.6 GRoof plan

SD-07 Certificates

1.4.4 GFire Resistance

2.1.1Solar Reflectance Index (SRI)

SD-11 Closeout Submittals

1.9Warranty

3.8Information Card

3.7Instructions To Government

Personnel

07 60 00 SD-02 Shop Drawings

2.2.1Exposed Sheet Metal

3.1.12Gutters

3.1.13Downspouts

2.2.1Gravel Stops and fascia

3.1.17Splash Pans

3.1.14Flashing for Roof Drains

3.1.7Base Flashing

3.1.8Counterflashing

3.1.20Flashing at Roof Penetrations and Equipment Supports

2.2.10Reglets

3.1.15Scuppers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 92 PAGES

3-Bay Hangar AMU

07 60 00 3.1.22Copings

3.1.11Drip Edges

3.1.16Conductor Heads

SD-10 Operation and Maintenance

Data

1.4.3Instructions for Installation

1.4.3Cleaning and Maintenance

07 84 00 SD-02 Shop Drawings

2.2 GFirestopping Materials

SD-07 Certificates

1.4.2Manufacturer's Technical

Representative

2.2Firestopping Materials

1.4.1Installer Qualifications

3.3Inspection

07 92 00 SD-03 Product Data

2.1.1 SInterior Sealants

2.1.3 SFloor Joint Sealants

2.2 SPrimers

2.5 SCaulking

08 11 13 SD-02 Shop Drawings

2.1 GDoors

2.1 GDoors

2.1 SRecycled Content

08 31 00 SD-02 Shop Drawings

1.3 GAccess Doors And Panels

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 92 PAGES

3-Bay Hangar AMU

08 31 00 SD-03 Product Data

1.3 GAccess Doors And Panels

1.3.2 GHardware

2.3.8 GAccessories

2.2 SRecycled Content

SD-04 Samples

2.6 GFinishes

SD-06 Test Reports

1.3.1 GFire-rating(s) of Assemblies

08 33 13 SD-02 Shop Drawings

1.3 GDetail Drawings

SD-03 Product Data

1.5Warranty

2.2 GCoiling Counter Doors

3.1Installation

3.4Cleaning

SD-06 Test Reports

3.3Drop-test

SD-11 Closeout Submittals

2.4Coiling Counter Door

(Non-Rated)

2.5 GFire-Rated Coiling Counter Door

08 33 23 SD-02 Shop Drawings

2.2.1Overhead Coiling Doors

2.2.3Counterbalancing Mechanism

2.2.4Manual Door Operators

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 92 PAGES

3-Bay Hangar AMU

08 33 23 2.2.5 GElectric Door Operators

2.2.1.4Bottom Bars

2.1.1.1Guides

2.2.3.1Mounting Brackets

2.2.2.2Hood

2.1.1.1 GInstallation Drawings

SD-03 Product Data

2.2.1 GOverhead Coiling Doors

2.2.2 GHardware

2.2.3 GCounterbalancing Mechanism

2.2.4 GManual Door Operators

2.2.5 GElectric Door Operators

2.2.6 GFire-Rated Door Assembly

2.2.1.1 SRecycled content for steel curtain

slats

SD-05 Design Data

2.2.1 GOverhead Coiling Doors

2.2.2 GHardware

2.2.3 GCounterbalancing Mechanism

2.2.4 GManual Door Operators

2.2.5 GElectric Door Operators

1.3 GFire-Rated Door

SD-10 Operation and Maintenance

Data

1.3.2 GOperation and Maintenance

Manuals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 92 PAGES

3-Bay Hangar AMU

08 33 23 SD-11 Closeout Submittals

1.3.1 GWarranty

08 34 16.10 SD-01 Preconstruction Submittals

1.4.1 GManufacturer's Qualifications

1.4.2 GInstaller's Qualifications

SD-02 Shop Drawings

2.1 GHangar doors

SD-05 Design Data

2.1 GHangar doors

SD-10 Operation and Maintenance

Data

2.1 GHangar doors

08 34 59 SD-02 Shop Drawings

2.2 GVault Door Unit

SD-03 Product Data

2.3Vault Door and Frame

SD-07 Certificates

2.3Vault Door and Frame

SD-08 Manufacturer’s Instructions

3.1Installation

SD-11 Closeout Submittals

1.2 SLEED Documentation

08 41 13 SD-01 Preconstruction Submittals

1.2.1 GSample Warranty

1.2.1 GList of Product Installations

SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 92 PAGES

3-Bay Hangar AMU

08 41 13 3.3 GInstallation Drawings

2.2 GFabrication Drawings

SD-03 Product Data

1.2.1 GManufacturer's Catalog Data

2.2.3 GFinish

2.1.1.2 SRecycled Content of Aluminum

Material

SD-04 Samples

1.2.1 GFinish and Color Samples

SD-06 Test Reports

1.2.1 GCertified Test Reports

3.4.3Deflection

3.4.1Air Infiltration

3.4.4Condensation Resistance and

Thermal Transmittance

3.4.5Water Infiltration

SD-08 Manufacturer’s Instructions

3.3Manufacturer's Instructions

SD-11 Closeout Submittals

3.6Manufacturer's Product Warranty

08 44 00 SD-02 Shop Drawings

1.5 GGlazed Curtain Wall System

1.5Installation Drawings

SD-03 Product Data

1.5 GGlazed Curtain Wall System

2.2 GMetals For Fabrication

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 92 PAGES

3-Bay Hangar AMU

08 44 00 2.3 GNonskinning Sealing Compound

2.4.1 GMetal Accessories

2.5 GCurtain-Wall Framing Members

2.6 GAluminum Doors and Frames

2.9.4 GMasonry Anchorage Devices

2.1.1 SRecycled Content of Aluminum

Doors

2.1.1 SRecycled Content of Aluminum

Curtain-Wall Framing Members

1.7.1 GWarranties

2.4.3Exposed-to-View Aluminum

Finish

SD-05 Design Data

2.4.3 GAnodic Finish

1.5.5 GSeismic Calculations

1.3.5.1 GStructural Calculations for

Deflection

SD-06 Test Reports

1.3.5 GFactory Test Results

1.4.1 GField Water Spray Test Results

1.4.2 GAir Infiltration Test Results

1.4.2.1 GWater Penetration Test Results

SD-07 Certificates

1.3.5.5 GEnergy Performance Certificates

1.3.1 GEngineer Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 92 PAGES

3-Bay Hangar AMU

08 44 00 1.3.3 GQualifications for the Curtain-Wall

Installer

SD-08 Manufacturer’s Instructions

1.5 GGlazed Curtain Wall System

3.3.9 GInsulating Glass

3.6.2 GPreventive Maintenance and

Inspection

SD-11 Closeout Submittals

1.7 GWarranty

08 71 00 SD-02 Shop Drawings

1.3 GManufacturer's Detail Drawings

1.3 GVerification of Existing Conditions

1.5 GHardware Schedule

2.3.8 GKeying System

SD-08 Manufacturer’s Instructions

3.1Installation

SD-10 Operation and Maintenance

Data

1.5 GHardware Schedule

SD-11 Closeout Submittals

1.6.1Key Bitting

08 81 00 SD-03 Product Data

1.7.1Insulating Glass

2.4.3Sealants

2.4.4Joint Backer

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 92 PAGES

3-Bay Hangar AMU

08 81 00 1.7.1Insulating Glass

2.4.3Sealants

2.4.5Glazing Tapes

SD-08 Manufacturer’s Instructions

2.4Setting and Sealing Materials

3.2Glass Setting

SD-11 Closeout Submittals

1.7.1Insulated Glass Units

08 91 00 SD-02 Shop Drawings

1.4Wall Louvers

2.3Equipment Screen Louvers

SD-03 Product Data

2.2Metal Wall Louvers

2.3Equipment Screen Louvers

SD-04 Samples

1.5 GWall Louver Samples

1.5 GEquipment Screen Louver

Samples

09 22 00 SD-02 Shop Drawings

2.1 GMetal Support Systems

SD-03 Product Data

2.1Metal Support Systems

09 29 00 SD-03 Product Data

2.1.9 SAdhesives

SD-08 Manufacturer’s Instructions

2.1Safety Data Sheets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 92 PAGES

3-Bay Hangar AMU

09 29 00 SD-10 Operation and Maintenance

Data

2.1Manufacturer Maintenance

Instructions

09 30 10 SD-02 Shop Drawings

3.2 GDetail Drawings

SD-03 Product Data

2.1 G STile

2.2 GSetting-Bed

2.4 SMortar, Grout, and Adhesive

2.4 SIndoor air quality for adhesives

2.4.6 SIndoor air quality for sealants

2.1.1 GPorcelain Tile

3.2 GWaterproof Membrane

SD-04 Samples

2.1 GTile

2.6 GTransition Strips

SD-07 Certificates

2.1Tile

2.4Mortar, Grout, and Adhesive

SD-08 Manufacturer’s Instructions

3.7Maintenance Instructions

SD-10 Operation and Maintenance

Data

3.2 GInstallation

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 92 PAGES

3-Bay Hangar AMU

09 30 10 1.3.1.1LEED Documentation

09 51 00 SD-02 Shop Drawings

2.2Approved Detail Drawings

SD-03 Product Data

2.2.1 G SAcoustical Ceiling Systems

1.3Certification

2.6 SIndoor air quality for adhesives

2.9 SIndoor air quality for sealants

SD-04 Samples

2.3Acoustical Units

2.3.1Acoustic Ceiling Tiles

SD-07 Certificates

2.3Acoustical Units

2.3.1Acoustic Ceiling Tiles

09 65 00 SD-02 Shop Drawings

2.11Resilient Flooring and

Accessories

3.4General Installation

SD-03 Product Data

2.11Resilient Flooring and

Accessories

2.4Wall Base

2.5Stair Treads, Risers and

Stringers

1.5.3Local/Regional Materials

2.7 SIndoor air quality for adhesives

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 92 PAGES

3-Bay Hangar AMU

09 65 00 2.10 SIndoor air quality for sealants

2.7Adhesives

SD-04 Samples

2.11Resilient Flooring and

Accessories

2.8Surface Preparation Materials

SD-06 Test Reports

3.3Moisture, Alkalinity and Bond

Tests

SD-10 Operation and Maintenance

Data

2.11Resilient Flooring and

Accessories

09 67 23.16 SD-03 Product Data

1.3 GManufacturer's Catalog Data

SD-06 Test Reports

1.5.1.1 GJoint Sealant

1.5.1.2 GEpoxy Mortar Flooring System

1.5.1.3 GPrimer

1.5.1.4 GGrout Coat

1.5.1.5 GUrethane Topcoat

2.4 GWhite Aluminum Oxide Non-Skid

Grit

1.9 GPatch Test Demonstration

1.5.1.6 GDaily Inspection Report

3.11.3 GAdhesion Testing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 92 PAGES

3-Bay Hangar AMU

09 67 23.16 SD-07 Certificates

1.5.2.1 GWork Plan

1.5.2.2 GFlooring System Applicator

Qualifications

1.5.1.1 GJoint Sealant

1.5.1.2 GEpoxy Mortar Flooring System

1.5.3.3 GWater-Based Alkaline Degreaser

SD-11 Closeout Submittals

1.5.2.5 GWarranty

3.11.2.2Inspection Logbook

09 68 00 SD-02 Shop Drawings

3.4Installation Drawings

SD-03 Product Data

2.1Carpet

2.4Moldings

2.1.1 SIndoor Air Quality for Carpet

2.3 SIndoor Air Quality for Adhesives

2.1.2 SPhysical Characteristics

1.2.1 SLocal/Regional Materials

1.2.2Environmental Data

1.5.2 SRecycled Content

SD-04 Samples

2.1 GCarpet

2.4 GMoldings

SD-06 Test Reports

3.2Moisture and Alkalinity Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 92 PAGES

3-Bay Hangar AMU

09 68 00 SD-07 Certificates

1.5.1 SIndoor Air Quality

SD-08 Manufacturer’s Instructions

3.1Surface Preparation

3.4Installation

SD-10 Operation and Maintenance

Data

3.5Cleaning and Protection

SD-11 Closeout Submittals

1.8Warranty

09 90 00 SD-02 Shop Drawings

3.9Piping Identification

SD-03 Product Data

2.1 SMaterials

SD-04 Samples

1.11 GColor

3.12.1Spray Tile Finish System

SD-07 Certificates

2.1 SIndoor Air Quality for paints and

primers

SD-08 Manufacturer’s Instructions

3.5.2Mixing

3.12.1Spray Tile Finish System

SD-10 Operation and Maintenance

Data

1.3.1.1Coatings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 92 PAGES

3-Bay Hangar AMU

09 90 00 SD-11 Closeout Submittals

2.1 SMaterials

09 97 13.27 SD-05 Design Data

1.4.4.1Containment System

SD-06 Test Reports

1.4.5.1Joint Sealant Qualification Test

Reports

1.4.5.2Coatings Qualification Test

Reports

1.4.5.3Metallic Abrasive Qualification

Test Reports

3.1.3Coating Sample Test Reports

3.1.4Abrasive Sample Test Reports

3.8.2.2Inspection Report Forms

3.8.2.3Daily Inspection Reports

1.4.5.4Recycled Metallic Abrasive Field

Test Reports (Daily and Weekly)

SD-07 Certificates

1.4.1Contract Errors, Omissions, and

Other Discrepancies

1.4.2.1Corrective Action Procedures

1.4.3Coating Work Plan

1.4.6.1Qualifications of Certified

Industrial Hygienist (CIH)

1.4.6.5Qualifications Of Individuals

Performing Abrasive Blasting

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 92 PAGES

3-Bay Hangar AMU

09 97 13.27 1.4.6.2Qualifications of Certified

Protective Coatings Specialist

(PCS)

1.4.6.3Qualifications of Coating

Inspection Company

1.4.6.4Qualifications of QC Specialist

Coating Inspector

1.4.6.6Qualifications of Testing

Laboratory for Coatings

1.4.6.7Qualifications of Testing

Laboratory for Abrasive

1.4.6.8Qualifications of Coating

Contractors

1.4.6.9Joint Sealant Materials

1.4.6.10Coating Materials

1.4.6.11Coating System Component

Compatibility

1.4.6.12Non-metallic Abrasive

1.4.6.13Metallic Abrasive

SD-08 Manufacturer’s Instructions

1.5.1Joint Sealant Instructions

1.5.2Coating System Instructions

SD-11 Closeout Submittals

3.5.6Disposal of Used Abrasive

3.8.2.4 GInspection Logbook

10 11 00 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 92 PAGES

3-Bay Hangar AMU

10 11 00 2.3 G ROMarkerboard

2.5 G ROProjection Screen

2.6 G ROMonitors

SD-07 Certificates

1.2Visual Display Unit

10 14 00.10 SD-02 Shop Drawings

3.1Approved Detail Drawings

2.2Modular Exterior Signage System

SD-03 Product Data

2.2Modular Exterior Signage System

SD-08 Manufacturer’s Instructions

2.2Modular Exterior Signage System

SD-10 Operation and Maintenance

Data

3.1.2Protection and Cleaning

10 14 00.20 SD-02 Shop Drawings

1.6.2Detail Drawings

1.3Interior Signage

SD-03 Product Data

1.3Interior Signage

SD-04 Samples

1.3 GInterior Signage

SD-08 Manufacturer’s Instructions

1.3Interior Signage

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 92 PAGES

3-Bay Hangar AMU

10 14 00.20 3.1Approved Manufacturer's

Instructions

3.1.2Protection and Cleaning

SD-11 Closeout Submittals

1.3Interior Signage

10 21 13 SD-02 Shop Drawings

2.1Fabrication Drawings

3.2Installation Drawings

SD-07 Certificates

1.5Warranty

10 26 00 SD-02 Shop Drawings

2.3Wall Guards

SD-03 Product Data

2.2Corner Guards

SD-04 Samples

2.5 G ROFinish

SD-07 Certificates

2.6 SIndoor Air Quality For Adhesives

10 28 13 SD-04 Samples

2.1.2 GFinishes

2.2Accessory Items

10 44 16 SD-02 Shop Drawings

2.1.1 GFire Extinguishers

Part 2 GAccessories

Part 2 GCabinets

2.2.2 GWall Brackets

SUBMITTAL REGISTER

CONTR…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .