SOF_TEMF_RTA_Specifications_10-30-18.pdf

PDF 11 MB Posted

Attached to
SOF (TEMF) Tactical Equipment Maintenance Complex W912HV-19-B-0003 Federal contract opportunity
Solicitation number
W912HV-19-B-0003
Issued by
Department of the Army Corps of Engineers Engineering District Japan

About this file

SPECIFICATIONS

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. W912HV-19-B-0003

US Army Corps of Engineers Japan District

PN81903 FY19 SOF TEMF

TORII STAION OKINAWA, JAPAN

SPECIFICATIONS

RTA

27 AUG 2018

This page was intentionally left blank for duplex printing.

PN81903 FY19 SOF TEMF 18AR0001

Torii Station Okinawa, Japan

W912HV-19-B-0003 PROJECT TABLE OF CONTENTS Page 1

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00.00 10 GENERAL CONTRACT REQUIREMENTS

01 11 00.00 10-A ACCEPTABLE ALTERNATIVE JAPANESE STANDARDS LIST

01 11 00.00 10-B JAPANESE PROFESSIONAL REGISTRATION EQUIVALENCIES

01 11 00.00 10-C AUTHORIZATION FOR UNESCORTED BASE ACCESS

01 22 00.00 10 PRICE AND PAYMENT PROCEDURES

01 32 01.00 10 PROJECT SCHEDULE

01 32 16.00 20 SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES

01 33 00 SUBMITTAL PROCEDURES

01 33 00-A SUBMITTAL REGISTER

01 33 29 SUSTAINABILITY REPORTING

01 33 29-A GUIDING PRINCIPLES TEMPLATE

01 33 29-B HPSB CHECKLIST

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 42 15 METRIC MEASUREMENTS

01 45 00 USACE QUALITY CONTROL

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 50 00-A PROJECT SIGN

01 50 00-B TEMPORARY TOILET FACILITY

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMITTALS

01 78 00-A DRAFT DD 1354

01 78 23 OPERATION AND MAINTENANCE DATA

01 91 00.00 40 COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

DIVISION 03 - CONCRETE

03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 15 00.00 10 CONCRETE ACCESSORIES

03 20 00.00 10 CONCRETE REINFORCING

03 30 00.00 10 CAST-IN-PLACE CONCRETE

03 35 00.00 10 CONCRETE FINISHING

03 39 00.00 10 CONCRETE CURING

DIVISION 05 - METALS

05 05 23 WELDING, STRUCTURAL

05 05 23.13 10 ULTRASONIC INSPECTION OF WELDMENTS

05 12 00 STRUCTURAL STEEL

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 00 METAL STAIRS

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS AND COMPOSITES

W912HV-19-B-0003 PROJECT TABLE OF CONTENTS Page 2

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

06 61 16 SOLID SURFACING FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS

07 13 53 ELASTOMERIC SHEET WATERPROOFING

07 14 00 FLUID-APPLIED WATERPROOFING

07 21 16 MINERAL FIBER BLANKET INSULATION

07 22 10 SPRAYED APPLIED POLYURETHANE INSULATION

07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

07 56 00 FLUID-APPLIED ROOFING SYSTEM

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 – OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 11 16 ALUMINUM DOORS AND FRAMES

08 33 23 OVERHEAD COILING DOORS

08 34 59 VAULT DOORS AND DAY GATES

08 34 73 SOUND CONTROL DOOR ASSEMBLIES

08 51 13 ALUMINUM WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL AND DOOR LOUVERS

DIVISION 09 – FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC, QUARRY, AND GLASS TILING

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 90 00 PAINTS AND COATINGS

DIVISION 10 – SPECIALTIES

10 10 00 VISUAL COMMUNICATIONS SPECIALTIES

10 14 00 PLAQUE SIGNAGE

10 14 01 EXTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 22 13 WIRE MESH PARTITIONS

10 22 39 FOLDING PANEL PARTITIONS

10 26 13 WALL AND DOOR GUARDS

10 28 13 TOILET ACCESSORIES

10 51 14.00 29 PLASTIC LOCKERS

DIVISION 12 - FURNISHINGS

12 24 13 ROLLER WINDOW SHADES

12 93 00 SITE FURNISHING

DIVISION 13 - SPECIAL CONSTRUCTION

13 34 23.13 PREFABRICATED HAZMAT BUILDING

W912HV-19-B-0003 PROJECT TABLE OF CONTENTS Page 3

13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT

13 48 00.00 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

22 05 48.00 20 MECHANICAL SOUND, VIBRATION, AND SEISMIC CONTROL

22 13 36 PNEUMATIC SEWAGE EJECTORS

22 15 14.00 40 GENERAL SERVICE COMPRESSED-AIR SYSTEMS, LOW PRESSURE

22 15 19.19 20 NONLUBRICATED ROTARY SCREW AIR COMPRESSORS (OVER 300 HP)

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 23 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING CONTROL

SYSTEMS

23 11 14 TEMF, VEHICLE FLUID PIPING AND EQUIPMENT

23 23 00 REFRIGERANT PIPING

23 35 00.00 10 OVERHEAD VEHICLE TAILPIPE [AND WELDING FUME] EXHAUST REMOVAL

SYSTEM(S)

23 81 00.00 20 UNITARY AIR CONDITIONING EQUIPMENT

DIVISION 25 - INTEGRATED AUTOMATION

25 50 00.00 20 CYBERSECURITY OF FACILITY-RELATED CONTROL SYSTEMS

DIVISION 26 - ELECTRICAL

26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

26 08 00 APPARATUS INSPECTION AND TESTING

26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 23 00 LOW VOLTAGE SWITCHGEAR

26 27 13.10 30 ELECTRIC METERS

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM

27 05 28.36 40 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

27 05 29.00 10 PROTECTIVE DISTRIBUTION SYSTEM (PDS) FOR SIPRNET COMMUNICATION

SYSTEMS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

27 51 16 RADIO AND PUBLIC ADDRESS SYSTEMS

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING

28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)

W912HV-19-B-0003 PROJECT TABLE OF CONTENTS Page 4

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 11 00 CLEARING AND GRUBBING

31 21 13 RADON MITIGATION

31 32 40 SOIL MIXING (WET METHOD)

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 11 23 AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASE COURSE

32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE FACILITIES

32 17 23 PAVEMENT MARKINGS

32 31 13 CHAIN LINK FENCES AND GATES

DIVISION 33 - UTILITIES

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 30 00 SANITARY SEWERS

33 40 00 STORM DRAINAGE UTILITIES

33 52 10 SERVICE PIPING, FUEL SYSTEMS

33 56 10 FACTORY-FABRICATED FUEL STORAGE TANKS

33 58 00 LEAK DETECTION FOR FUELING SYSTEMS

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT

41 22 13.14 BRIDGE CRANES, OVERHEAD ELECTRIC, TOP RUNNING

-- End of Project Table of Contents --

PN81903 FY18 SOF TEMF 18AR0001

Tor i i St at i on, Japan

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 11 00. 00 10

GENERAL CONTRACT REQUI REMENTS

PART 1 GENERAL

1. 1 DEFI NI TI ONS

1. 2 REFERENCES

1. 3 ACCEPTABLE ALTERNATI VES FOR JAPANESE STANDARDS

1. 4 MANDATORY U. S. PRODUCTS

1. 5 KEY PERSONNEL QUALI FI CATI ONS

1. 5. 1 Pr oj ect Manager

1. 5. 2 Pr oj ect Super i nt endent ( Super vi sor )

1. 5. 3 Engl i sh Speaki ng Repr esent at i ve ( I nt er pr et er )

1. 5. 4 Cont r act or Qual i t y Cont r ol Syst em Manager ( CQCSM)

1. 5. 5 Si t e Saf et y and Heal t h Of f i cer ( SSHO)

1. 6 TI ME EXTENSI ONS FOR UNUSUALLY SEVERE WEATHER ( MAY 2013)

1. 7 PERMI TS AND RESPONSI BI LI TI ES

1. 8 SPECI AL CONTRACT REQUI REMENTS

1. 8. 1 Meet i ngs

1. 9 PROGRESS AND COMPLETI ON PHOTOGRAPHS

1. 10 BASE REGULATI ONS

1. 10. 1 Request f or Cont r act or ' s Empl oyee Passes and Vehi c l e Passes

1. 10. 2 No Smoki ng Pol i cy

1. 11 ORDER OF WORK

1. 11. 1 Schedul e

1. 11. 2 Wor ki ng Hour s

1. 11. 3 Wor k Out si de of Regul ar Hour s

1. 12 FI RE PREVENTI ON DURI NG CONSTRUCTI ON

1. 12. 1 Gener al

1. 12. 2 Suppl y

1. 12. 3 Fi r e Ext i ngui sher s

1. 12. 4 Housekeepi ng

1. 12. 5 Handl i ng of Gasol i ne

1. 12. 6 Not i f i cat i on of Fi r e

1. 13 MATERI AL DI SPOSAL

1. 14 CONTRACTOR FURNI SHED MATERI AL AND WORKMANSHI P

1. 15 CORRESPONDENCE

PART 2 PRODUCTS

PART 3 EXECUTI ON

- - End of Sect i on Tabl e of Cont ent s - -

W912HV-19-B-0003 SECTI ON 01 11 00. 00 10 Page 1

SECTI ON 01 11 00. 00 10

GENERAL CONTRACT REQUI REMENTS

PART 1 GENERAL

1. 1 DEFINITIONS

The t er m " Gover nment " r ef er s t o " Uni t ed St at es Gover nment " whenever t he t er m " Gover nment " appear s i n t hi s Cont r act , except as ot her wi se i ndi cat ed wi t hi n t he Cont r act .

1. 2 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

NATI ONAL FI RE PROTECTI ON ASSOCI ATI ON ( NFPA)

NFPA 10 ( 2013) St andar d f or Por t abl e Fi r e Extinguishers

NFPA 241 ( 2013; Er r at a 2015) St andar d f or Saf eguar di ng Const r uct i on, Al t er at i on, and Demol i t i on Oper at i ons

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 385- 1- 1 ( 2014) Saf et y and Heal t h Requi r ement s Manual

U. S. ARMY GARRI SON JAPAN ( USAG- J)

Regul at i on 190- 13 ( 2013) I nst al l at i on Access and Cont r ol Procedures

1. 3 ACCEPTABLE ALTERNATI VES FOR JAPANESE STANDARDS

At t achment 01 11 00. 00 10- A pr ovi des a l i s t i ng of " Accept abl e Al t er nat i ve Japanese St andar ds" whi ch ar e consi der ed accept abl e al t er nat i ves t o t he US st andar ds wi t hi n t he Cont r act speci f i cat i ons. Ot her por t i ons of t he speci f i cat i ons al so aut hor i ze t he use of speci f i ed accept abl e al t er nat i ve Japanese st andar ds. I ncor por at i on of accept abl e ( aut hor i zed by t he Cont r act ) Japanese const r uct i on met hods, mat er i al s , and equi pment i s desi r ed t o ensur e t hat t he pr oj ect i s const r uct i bl e and t he f aci l i t y can be mai nt ai ned wi t h l ocal mat er i al s and suppl i es. The use of pr oduct s not meet i ng t he appl i cabl e US st andar ds of t he Cont r act or accept abl e al t er nat i ve Japanese st andar ds speci f i cal l y aut hor i zed by t he Cont r act i s pr ohi bi t ed unl ess aut hor i zed by t he Cont r act i ng Of f i cer . Japanese st andar ds not i ncl uded i n t he " Accept abl e Al t er nat i ve Japanese St andar ds" l i s t , or not r ef er enced el sewher e i n t hese speci f i cat i ons as bei ng accept abl e al t er nat i ves t o US st andar ds, may be submi t t ed t o t he Cont r act i ng Of f i cer f or consi der at i on as accept abl e al t er nat i ves af t er awar d usi ng t he var i at i on r equest pr ocess set f or t h i n Sect i on 01 33 00 SUBMI TTAL PROCEDURES. Pr i or t o t he use of such pr oposed addi t i onal

W912HV-19-B-0003 SECTI ON 01 11 00. 00 10 Page 2 al t er nat i ve Japanese st andar ds, wr i t t en appr oval by t he Cont r act i ng Of f i cer i s r equi r ed.

1. 4 MANDATORY U. S. PRODUCTS

The f ol l owi ng f i r e pr ot ect i on r el at ed i t ems shal l be U. S. pr oduct s wi t h U. S. t est i ng l abel s as r equi r ed. These i t ems shal l not be subst i t ut ed wi t h Japanese manuf act ur ed pr oduct s:

a. Fi r e suppr essi on syst ems, i nc l udi ng val ves, al ar m val ves, spr i nkl er s ( pi pes and f i t t i ngs of Japanese manuf act ur er may meet t he f unct i on requirements).

b. Fi r e pumps, i ncl udi ng mot or s, cont r ol l er s, dr i ves, and val ves.

c. Fi r e al ar m and mass not i f i cat i on syst ems, i ncl udi ng panel s, i ni t i at i ng devi ces, not i f i cat i on appl i ances, smoke al ar ms ( conduct or s and condui t s of Japanese manuf act ur er may meet t he f unct i onal r equi r ement s) .

d. Engi neer i ng t echni c i an r equi r ement s f or devel opment of f i r e suppr essi on syst ems and al ar m syst em shop dr awi ngs, cal cul at i ons, and mat er i al submittals.

e. Fi r e door s and f r ames gr eat er t han 60 mi nut es.

f . Fi r e damper s and smoke damper s.

g. I nt er i or f i ni shes wi t h f l ame spr ead and smoke devel opment r at i ngs.

h. I nsul at i on wi t h f l ame spr ead and smoke devel opment r at i ngs.

i . Pl enum r at ed cabl es.

1. 5 KEY PERSONNEL QUALI FI CATI ONS

The Cont r act or ' s Pr oj ect Key per sonnel shal l not be assi gned dut i es t o any ot her Cont r act s ( excl udi ng t he pr oj ect manager ) wi t hout appr oval f r om t he Cont r act i ng Of f i cer . The Super i nt endent , Pr oj ect Engi neer , and CQC Manager shal l al l be separ at e per sons. Wi t hi n f i ve ( 5) wor ki ng days af t er r ecei pt of t he Not i ce t o Pr oceed, t he Cont r act or shal l submi t i n wr i t i ng t o t he Cont r act i ng Of f i cer an or gani zat i onal char t , t he qual i f i cat i ons and backgr ound hi st or y of t he pr oposed Key Per sonnel f or appr oval . The Cont r act i ng Of f i cer shal l have t he expl i c i t r i ght t o det er mi ne accept abi l i t y ( or r ej ect i on) of t he pr oposed i ndi v i dual s. I n addi t i on, t he Cont r act or shal l be r esponsi bl e t o r epl ace sai d i ndi v i dual s upon not i f i cat i on by t he Gover nment shoul d per f or mance become i nadequat e dur i ng t he Cont r act per i od. Key Per sonnel shal l at t end t he Pr econst r uct i on conference.

1. 5. 1 Pr oj ect Manager

The Pr oj ect Manager shal l have a mi ni mum of f i ve ( 5) year s exper i ence as a Pr oj ect Manager on const r uct i on pr oj ect s s i mi l ar i n s i ze and scope t o t hi s Cont r act . The Pr oj ect Manager shal l mai nt ai n over si ght of Cont r act pr oposal s pr epar ed by t he Cont r act or st af f and be aut hor i zed t o negot i at e Cont r act t er ms and si gn Cont r act document s on behal f of t he Cont r act or .

The pr oj ect manager does not need t o be pr esent on t he s i t e dai l y, but shal l at t end weekl y pr ogr ess meet i ngs and be avai l abl e on s i t e wi t hi n 24 hour s upon r equest .

W912HV-19-B-0003 SECTI ON 01 11 00. 00 10 Page 3

1. 5. 2 Pr oj ect Super i nt endent ( Super vi sor )

The Pr oj ect Super i nt endent shal l be on t he wor k s i t e when on- si t e wor k i s bei ng per f or med and shal l be avai l abl e t o t he Cont r act i ng Of f i cer or hi s r epr esent at i ves upon r equest . The Pr oj ect Super i nt endent shal l have over al l r esponsi bi l i t y f or al l oper at i ons at t he j ob s i t e and be aut hor i zed t o make deci s i ons, negot i at e Cont r act t er ms and si gn Cont r act document s on behal f of t he Cont r act or . The Pr oj ect Super i nt endent shal l have a mi ni mum of f i ve ( 5) year s exper i ence as a super i nt endent on const r uct i on pr oj ect s s i mi l ar i n s i ze and scope t o t hi s Cont r act .

1. 5. 3 Engl i sh Speaki ng Repr esent at i ve ( I nt er pr et er )

At al l t i mes dur i ng t he Cont r act per i od t he Cont r act or shal l have an empl oyee capabl e of f l uent bi l i ngual speech i n t he Japanese and Engl i sh l anguages at t he j ob s i t e. The bi l i ngual i nt er pr et er shal l have t he capabi l i t y t o r ecei ve and i ssue conci se and t echni cal expl anat i on and i nst r uct i ons bet ween t he Gover nment r epr esent at i ve( s) and Cont r act or super vi sor y per sonnel concer ni ng al l aspect s of Cont r act admi ni st r at i on and const r uct i on. Wi t hi n f i f t een ( 15) days af t er not i ce of Cont r act awar d, t he Cont r act or shal l submi t i n wr i t i ng t o t he Cont r act i ng Of f i cer ' s Repr esent at i ve t he qual i f i cat i ons and backgr ound hi st or y of t he pr oposed i nt er pr et er f or appr oval . The Cont r act i ng Of f i cer ' s Repr esent at i ve shal l have t he expl i c i t r i ght t o det er mi ne accept abi l i t y or r ej ect i on of t he pr oposed i ndi v i dual . I n addi t i on, t he Cont r act or shal l be r esponsi bl e t o r epl ace sai d i ndi v i dual upon not i f i cat i on by t he Gover nment shoul d per f or mance become i nadequat e dur i ng t he Cont r act per i od. The i nt er pr et er shal l at t end t he pr econst r uct i on conf er ence.

1. 5. 4 Cont r act or Qual i t y Cont r ol Syst em Manager ( CQCSM)

See Sect i on 01 45 00 USACE QUALI TY CONTROL.

1. 5. 5 Si t e Saf et y and Heal t h Of f i cer ( SSHO)

See Sect i on 01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS.

1. 6 TI ME EXTENSI ONS FOR UNUSUALLY SEVERE WEATHER ( MAY 2013)

a. Thi s par agr aph speci f i es t he pr ocedur e f or det er mi nat i on of t i me ext ensi ons f or unusual l y sever e weat her i n accor dance wi t h t he Cont r act c l ause ent i t l ed " DEFAULT ( FI XED- PRI CE CONSTRUCTI ON) " . I n or der f or t he Cont r act i ng Of f i cer t o awar d a t i me ext ensi on under t hi s c l ause, t he f ol l owi ng condi t i ons must be sat i sf i ed:

( 1) The weat her exper i enced at t he pr oj ect s i t e dur i ng t he Cont r act per i od must be f ound t o be unusual l y sever e, t hat i s , mor e sever e t han t he adver se weat her ant i c i pat ed f or t he pr oj ect l ocat i on dur i ng any gi ven mont h.

( 2) The unusual l y sever e weat her must act ual l y cause a del ay t o t he compl et i on of t he pr oj ect . The del ay must be beyond t he cont r ol and wi t hout t he f aul t or negl i gence of t he Cont r act or .

b. The l i s t i ng bel ow def i nes t he mont hl y ant i c i pat ed adver se weat her days f or t he Cont r act per i od and i s based upon 20t h Weat her Squadr on ( MAC) , U. S. Ai r For ce; I wakuni U. S. Mar i ne Cor ps Ai r St at i on, Weat her Ser v i ce;

Sasebo Naval Paci f i c Met eor ol ogy and Oceanogr aphy Det achment ; JASDF

W912HV-19-B-0003 SECTI ON 01 11 00. 00 10 Page 4

( Japan Ai r Sel f Def ense For ce) , or s i mi l ar dat a f or t he geogr aphi c l ocat i on of t he pr oj ect . ( Mor e speci f i c i nf or mat i on may be obt ai ned as speci f i ed under Speci al Cont r act Requi r ement s Cl ause ent i t l ed " Physi cal Data.")

MONTHLY ANTI CI PATED ADVERSE WEATHER DELAYS

WORK DAYS BASED ON ( 5) DAY WORK WEEK

Mi sawa- ar ea Kant o Pl ai n I wakuni Oki nawa Sasebo

JAN 8 1 2 5 7

FEB 9 3 4 7 6

MAR 6 6 7 8 7

APR 3 6 6 6 7

MAY 4 4 6 6 6

JUN 5 9 8 6 12

JUL 6 6 6 6 9

AUG 6 6 5 9 9

SEP 6 7 6 7 9

OCT 4 5 4 4 8

NOV 6 4 4 4 5

DEC 7 1 3 5 5

The above schedul e of ant i c i pat ed adver se weat her days shal l const i t ut e t he base l i ne f or mont hl y ( or por t i on t her eof ) weat her t i me eval uat i ons.

c. Upon acknowl edgment of t he Not i ce- t o- Pr oceed ( NTP) and cont i nui ng t hr oughout t he Cont r act , t he Cont r act or shal l r ecor d on t he dai l y CQC r epor t , t he occur r ence of adver se weat her and r esul t ant i mpact t o nor mal l y schedul ed wor k. Act ual adver se weat her del ay days must pr event wor k on cr i t i cal act i v i t i es f or 50 per cent or mor e of t he Cont r act or ' s schedul ed wor k day.

d. The number of act ual adver se weat her del ay days shal l i ncl ude days i mpact ed by act ual adver se weat her ( even i f adver se weat her occur r ed i n pr evi ous mont h) , be cal cul at ed chr onol ogi cal l y f r om t he f i r st t o t he l ast day of each mont h, and be r ecor ded as f ul l days. I f t he number of act ual adver se weat her del ay days exceeds t he number of days ant i c i pat ed i n par agr aph ( b) , above, t he cont r act i ng Of f i cer shal l conver t any qual i f y i ng del ays t o cal endar days, gi v i ng f ul l consi der at i on f or equi val ent f ai r weat her wor k days, and i ssue a modi f i cat i on i n accor dance wi t h t he Cont r act c l ause ent i t l ed " DEFAULT

( FI XED PRI CE CONSTRUCTI ON) " .

e. For al l wor k under t hi s Cont r act , adver se weat her i s def i ned as:

( 1) Rai nf al l - Number of occur r ences of pr eci pi t at i on gr eat er t han or equal t o 0. 10 i nches ( 2. 54mm) .

( 2) Snowf al l - Number of occur r ences of pr eci pi t at i on gr eat er t han or equal t o 1. 00 i nches ( 25. 4mm) . ( Not appl i cabl e t o Oki nawa Ar ea)

( 3) Col d Temper at ur e - Number of occur r ences when dai l y maxi mum t emper at ur e does not exceed t he mont hl y mean l ow t emper at ur e or 32 degr ees Fahr enhei t ( 0 degr ees Cel s i us) , whi chever i s l ower . ( Not appl i cabl e t o Oki nawa Ar ea)

( 4) Concur r ence bet ween snowf al l and col d t emper at ur e i s 80 per cent , i . e. 80 per cent of t he t i me snow f al l s , t he t emper at ur e i s " col d" .

W912HV-19-B-0003 SECTI ON 01 11 00. 00 10 Page 5

( 5) Wi nd - Number of occur r ences when t he wi nd i s gust i ng 30 knot s ( 56 k i l omet er s/ hour ) or gr eat er .

f . The Cont r act or ' s schedul e must r ef l ect t he above ant i c i pat ed adver se weat her del ays on al l weat her - dependent act i v i t i es.

1. 7 PERMI TS AND RESPONSI BI LI TI ES

The Cont r act or shal l , wi t hout addi t i onal expense t o t he Gover nment , be r esponsi bl e f or obt ai ni ng any necessar y l i censes and per mi t s, and f or compl yi ng wi t h any l aws, codes, and r egul at i ons ( i ncl udi ng t he r equi r ement s of mat er i al , pr ef ect ur al , and l ocal Gover nment of Japan, and associ at ed mi l i t ar y i nst al l at i on) appl i cabl e t o t he per f or mance of wor k. The Cont r act or shal l al so be r esponsi bl e f or al l damages t o per sons or pr oper t y t hat occur as a r esul t of t he Cont r act or ' s f aul t or negl i gence. These damages shal l be r epai r ed or r epl aced by t he Cont r act or at no cost t o t he Gover nment . The Cont r act or shal l t ake pr oper saf et y and heal t h pr ecaut i ons t o pr ot ect al l wor k and wor ker s.

Submi t a schedul e of pl anned r oad cl osur es t o t he Cont r act i ng Of f i cer wi t h t he i ni t i al pr oj ect schedul e. Not i f i cat i on of speci f i c r oad cl osur es shal l be i n wr i t i ng t o t he Cont r act i ng Of f i ce not l ess t han t hi r t y ( 30) cal endar days i n advance of t he i nt ended c l osur e. The r oad cl osur e r equest shal l i ncl ude t he pl anned t r af f i c cont r ol measur es as wel l as t he gener al i nf or mat i on about t he c l osur e. Al l r oad c l osur es shal l be coor di nat ed wi t h base of f i c i al s and ar e subj ect t o base r equi r ement s. No r oad cl osur e shal l be per mi t t ed unt i l t he Cont r act or r ecei ves wr i t t en appr oval f r om t he Cont r act i ng Of f i cer . Ful l r oad c l osur es i s gener al l y not per mi t t ed ( at l east one way t r af f i c shal l al ways be pr ovi ded) .

1. 8 SPECI AL CONTRACT REQUI REMENTS

1. 8. 1 Meetings

a. Post Awar d Or i ent at i on. A post awar d or i ent at i on ( of t en r ef er r ed t o as a Pr econst r uct i on Conf er ence f or Desi gn- Bi d- Bui l d cont r act s or a Pr e- per f or mance Conf er ence f or Desi gn- Bui l d cont r act s) per FAR 42. 503 shal l be hel d. The chai r per son shal l be t he Cont r act i ng Of f i cer or hi s/ her desi gnee. The chai r per son shal l be r esponsi bl e f or pr ovi di ng mi nut es of t he meet i ng.

b. Weekl y Pr ogr ess Meet i ngs. A weekl y pr ogr ess meet i ng shal l be conduct ed, wi t h t he day, t i me, and l ocat i on t o be det er mi ned at t he Pr econst r uct i on Conf er ence. The Cont r act or ' s Pr oj ect Manager , Super i nt endent , I nt er pr et er , and Qual i t y Cont r ol Manager shal l at t end.

Repr esent at i ves f r om t he Gover nment may i ncl ude, but ar e not l i mi t ed t o, Di r ect or of Publ i c Wor ks/ Faci l i t i es Engi neer i ng per sonnel , Pr oj ect ' s Resi dent Of f i ce per sonnel , and Pr oj ect Manager . The Cont r act or shal l be pr epar ed t o di scuss wor k compl et ed dur i ng t he pr evi ous week, wor k cur r ent l y i n pr ogr ess, and wor k f or ecast ed f or t he f ol l owi ng week, as wel l as t he st at us of any const r uct i on i ssues and open act i on i t ems. Pr ovi de el ect r oni c copi es of t he meet i ng mi nut es i n Engl i sh wi t hi n f our ( 4) wor ki ng days of t he pr ogr ess meet i ng.

c. Red Zone Meet i ng. A Red Zone meet i ng shal l be conduct ed f or Cont r act s wi t h a val ue i n excess of 55, 000, 000 JPY or t hose deemed suf f i c i ent l y compl ex by t he Cont r act i ng Of f i cer t o war r ant one. The pur pose of t he Red Zone meet i ng i s t o di scuss c l oseout r equi r ement s f or t he cont r act

W912HV-19-B-0003 SECTI ON 01 11 00. 00 10 Page 6 and t o est abl i sh a t i mel i ne t o get t hose i t ems compl et ed ( see Sect i on 01 78 00 CLOSEOUT SUBMI TTALS f or t ypi cal c l oseout r equi r ement s) . The meet i ng i s a good t i me f or t he Cont r act or t o gai n appr oval on f or mat f or i t ems such as Oper at i ons and Mai nt enance manual s, t he equi pment - i n- pl ace l i s t , t he war r ant y pl an, and any ot her i t ems. The Red Zone i s t ypi cal l y schedul ed 90 cal endar days pr i or t o t he Cont r act compl et i on dat e. The Cont r act or i s r esponsi bl e f or pr ovi di ng el ect r oni c copi es of meet i ng mi nut es i n Engl i sh wi t hi n f our ( 4) wor ki ng days of t he Red Zone meet i ng.

d. Saf et y and Qual i t y Cont r ol Meet i ngs. Saf et y and qual i t y cont r ol meet i ngs shal l be hel d as needed and det er mi ned by t he Cont r act or . See Sect i on 01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS and Sect i on 01 45 00 USACE QUALI TY CONTROL f or speci f i c r equi r ement s.

1. 9 PROGRESS AND COMPLETI ON PHOTOGRAPHS

Phot ogr aphi cal l y document s i t e condi t i ons pr i or t o st ar t of const r uct i on oper at i ons. Pr ovi de mont hl y, and wi t hi n one mont h of t he compl et i on of wor k, di gi t al phot ogr aphs, 1600 by 1200 by 24 bi t t r ue col or 300 DPI mi ni mum r esol ut i on i n JPEG f i l e f or mat showi ng t he sequence and pr ogr ess of wor k. Take a mi ni mum of 20 di gi t al phot ogr aphs each week t hr oughout t he ent i r e pr oj ect f r om a mi ni mum of t en v i ews f r om poi nt s l ocat ed by t he Cont r act i ng Of f i cer . Submi t wi t h t he mont hl y i nvoi ce t wo set s of di gi t al phot ogr aphs, each set on a separ at e compact di sc ( CD) or dat a ver sat i l e di sc ( DVD) , cumul at i ve of al l phot os t o dat e. I ndi cat e phot ogr aphs demonst r at i ng envi r onment al pr ocedur es. Pr ovi de phot ogr aphs f or each mont h i n a separ at e mont hl y di r ect or y and name each f i l e t o i ndi cat e i t s l ocat i on on t he v i ew l ocat i on sket ch. Al so pr ovi de t he v i ew l ocat i on sket ch on t he CD or DVD as a di gi t al f i l e. I ncl ude a dat e desi gnat or i n f i l e names. Cr oss r ef er ence submi t t al s i n t he appr opr i at e dai l y r epor t . Phot ogr aphs pr ovi ded ar e f or unr est r i c t ed use by t he Government.

1. 10 BASE REGULATI ONS

The Cont r act or and Subcont r act or ( s) shal l become f ami l i ar wi t h and obey al l base r egul at i ons, i ncl udi ng f i r e, t r af f i c , saf et y, and secur i t y r egul at i ons. Al l Cont r act or s shal l keep wi t hi n t he l i mi t s of t he wor k ( and avenues of i ngr ess and egr ess) , and shal l not ent er any r est r i c t ed ar eas unl ess r equi r ed t o do so and ar e c l ear ed f or such ent r y. The Cont r act or ' s equi pment shal l be conspi cuousl y mar ked f or i dent i f i cat i on.

1. 10. 1 Request f or Cont r act or ' s Empl oyee Passes and Vehi c l e Passes

No empl oyee or r epr esent at i ve of t he Cont r act or shal l be admi t t ed t o t he wor k s i t e wi t hout a Cont r act i ng Of f i cer ' s f ur ni shed aut hor i zed admi t t ance.

Ref er t o USAG- J Regul at i on 190- 13. Pr i or t o t he st ar t of on- si t e wor k, submi t appl i cat i ons f or base passes t o t he Cont r act i ng Of f i cer f or key empl oyees ( pr oj ect manager , s i t e super vi sor , i nt er pr et er , et c. ) f or l ong t er m passes. The Cont r act or , wi t h assi st ance f r om t he Resi dent Of f i ce, i s r esponsi bl e f or secur i ng suf f i c i ent passes f or ot her wor ker s, i ncl udi ng Subcont r act or ' s empl oyees and vehi c l es, r equi r ed t o access t he base f or t he pr oj ect dur at i on. Addi t i onal per sonnel dat a shal l al so be f ur ni shed.

Pr ovi de al l i nf or mat i on r equi r ed f or backgr ound checks t o meet base access r equi r ement s t o be accompl i shed by Base Pr ovost Mar shal Of f i ce, Di r ect or of Emer gency Ser vi ces or Secur i t y Of f i ce. Cont r act or wor kf or ce must compl y wi t h al l per sonal i dent i t y ver i f i cat i on r equi r ement s as di r ect ed by DOD, W912HV-19-B-0003 SECTI ON 01 11 00. 00 10 Page 7

HQDA and/ or l ocal pol i cy. The Gover nment r eser ves t he r i ght t o make changes t o t he Cont r act or secur i t y r equi r ement s or pr ocesses due t o a change i n t he For ce Pr ot ect i on Condi t i on ( FPCON) .

Upon compl et i on of t hi s Cont r act , r et ur n al l empl oyee and vehi c l e passes t o t he base, and obt ai n a cer t i f i cat i on of r ecei pt . Fi nal payment shal l be wi t hhel d unt i l al l passes have been r et ur ned.

1. 10. 2 No Smoki ng Pol i cy

Smoki ng i s pr ohi bi t ed wi t hi n al l bui l di ngs on i nst al l at i ons except i n desi gnat ed smoki ng ar eas. Thi s appl i es t o exi st i ng bui l di ngs, bui l di ngs under const r uct i on, and bui l di ngs under r enovat i on. Di scar di ng t obacco mat er i al s ot her t han i nt o desi gnat ed t obacco r ecept acl es i s consi der ed l i t t er i ng and i s subj ect t o f i nes. The Cont r act i ng Of f i cer shal l i dent i f y desi gnat ed smoki ng ar eas.

1. 11 ORDER OF WORK

1. 11. 1 Schedule

Schedul e al l wor k t o cause t he l east amount of i nt er f er ence wi t h act i v i t y oper at i ons. Per mi ssi on t o i nt er r upt any act i v i t y, r oads, or ut i l i t y ser vi ces shal l be r equest ed i n wr i t i ng a mi ni mum of 30 cal endar days pr i or t o t he desi r ed dat e of i nt er r upt i on. I nt er r upt i ons of act i v i t i es, r oads, and ut i l i t y ser v i ces shal l be al l owed onl y when t hey wi l l not cause i nt er f er ence wi t h t he oper at i ons of t he act i v i t y. The Cont r act or shal l r emove and di spose of f Gover nment pr oper t y al l Cont r act or gener at ed debr i s at t he end of each shi f t , or mor e f r equent l y i f r equi r ed, t o keep t he space usabl e. Upon awar d of t hi s Cont r act , t he Cont r act or shal l begi n and compl et e al l r equi r ed wor k; r eady f or use and i ncl udi ng c l eanup, wi t hi n t he t i me per i od speci f i ed on t hi s Cont r act . Al l wor k schedul ed i n occupi ed ar eas shal l be accompl i shed i n such a manner as t o cause t he l east possi bl e i nconveni ence t o t he occupant s.

1. 11. 2 Wor ki ng Hour s

Nor mal Wor ki ng Hour s and Days ar e Monday t hr ough Fr i day, 0800 hour s t hr ough 1700 hour s.

1. 11. 3 Wor k Out si de of Regul ar Hour s

I f t he Cont r act or desi r es t o car r y on wor k out s i de t he r egul ar hour s, on Sundays, or hol i days, a wr i t t en appl i cat i on shal l be submi t t ed t o t he Cont r act i ng Of f i cer or hi s r epr esent at i ve f or appr oval . The Cont r act or shal l al l ow t hr ee wor ki ng days not i ce t o enabl e sat i sf act or y ar r angement s t o be made by t he Gover nment f or i nspect i ng t he wor k i n pr ogr ess. I f wor k i s t o be accompl i shed af t er dayl i ght hour s, t he Cont r act or shal l i l l umi nat e t he ar ea i n a manner appr oved by t he Cont r act i ng Of f i cer or hi s r epr esent at i ve. Unl ess di r ect ed by a Cont r act i ng Of f i cer , wor k accompl i shed out s i de r egul ar wor k i ng hour s shal l be at no addi t i onal cost t o t he Gover nment .

1. 12 FI RE PREVENTI ON DURI NG CONSTRUCTI ON

1. 12. 1 General

Compl y wi t h al l per t i nent f i r e pr event i on pr ovi s i ons of t he US Ar my Cor ps of Engi neer s Manual EM 385- 1- 1, NFPA 241 and shal l f ol l ow t he I nst al l at i on

W912HV-19-B-0003 SECTI ON 01 11 00. 00 10 Page 8 f i r e r egul at i ons. Pr i or t o commencement of wel di ng or ot her hot wor k oper at i ons, obt ai n appr oval f r om t he I nst al l at i on Fi r e Chi ef .

1. 12. 2 Supply

No mor e t han one day' s suppl y of pai nt , pai nt mat er i al s, or compounds shal l be al l owed wi t hi n t he ar ea of t he bui l di ng, and shal l be r emoved f r om t he j ob s i t e af t er each wor ki ng day. No gasol i ne or s i mi l ar l ow f l ash poi nt f l ammabl e l i qui d shal l be al l owed wi t hi n t he bui l di ng ar ea.

1. 12. 3 Fi r e Ext i ngui sher s

Pr ovi de, as a mi ni mum, t he number , s i ze, and t ype of f i r e ext i ngui sher s i n accor dance wi t h t he l at est NFPA 10. The Cont r act or shal l compl y wi t h t he I nst al l at i on Fi r e Chi ef ' s pol i c i es i f t hey ar e mor e st r i ngent t han NFPA 10.

Fi r e ext i ngui sher s shal l r emai n t he pr oper t y of t he Cont r act or and shal l be r emoved upon compl et i on of t he pr oj ect .

1. 12. 4 Housekeeping

Accumul at i ons of combust i bl e mat er i al shal l be r emoved f r om t he bui l di ng ar ea on a dai l y basi s.

1. 12. 5 Handl i ng of Gasol i ne

Gasol i ne shal l be st or ed i n U. L. ( Under wr i t er ' s Labor at or y) appr oved saf et y cont ai ner s. Adequat e vent i l at i on shal l be pr ovi ded t o saf el y di spose of f l ammabl e vapor s wher e f l ammabl e l i qui ds ar e ut i l i zed. Gasol i ne power ed equi pment shal l be r ef uel ed a mi ni mum 20 f eet away f r om t he bui l di ng ar ea.

1. 12. 6 Not i f i cat i on of Fi r e

Be f ami l i ar wi t h met hods f or not i f y i ng t he I nst al l at i on Fi r e Depar t ment .

The I nst al l at i on' s f i r e post er shal l be post ed i n conspi cuous l ocat i ons and at t el ephones i n const r uct i on shacks.

1. 13 MATERI AL DI SPOSAL

Wher e mat er i al s ar e t o be t ur ned over t o t he Cont r act or f or di sposal , ever y ef f or t shal l be made t o obt ai n cr edi t f r om t he di sposal t o r educe t he cost of t he Cont r act . The Cont r act or ' s mat er i al di sposal cost s shal l i ncl ude haul i ng and di sposal cost s f or wor k per f or med i n accor dance wi t h al l appl i cabl e l ocal and U. S. l aws and r egul at i ons.

1. 14 CONTRACTOR FURNI SHED MATERI AL AND WORKMANSHI P

The Cont r act or shal l f ur ni sh al l mat er i al s necessar y f or per f or mance of t he wor k of t hi s cont r act unl ess ot her wi se speci f i ed. Mat er i al s pr ocur ed shal l be new and shal l meet any speci f i cat i ons and st andar ds l i s t ed i n t hese speci f i cat i ons. I f no speci f i cat i on f or a mat er i al needed t o per f or m t hi s cont r act ar e st at ed, t he mat er i al shal l be new, of accept abl e i ndust r i al gr ade and qual i t y , equal t o or bet t er t han t he manuf act ur er ' s or i gi nal equi pment f or equi pment bei ng r epai r ed or r epl aced, and wi l l be compat i bl e wi t h exi st i ng mat er i al s and syst ems. Al l mat er i al s pr ovi ded under t hi s cont r act shal l be f r ee of asbest os, l ead i n pai nt , and PCB. The Cont r act i ng Of f i cer r eser ves t he r i ght t o r equest submi t t al of any mat er i al bei ng pr ovi ded under t hi s cont r act . The Cont r act i ng Of f i ce shal l make t he f i nal det er mi nat i on of t he accept abi l i t y of any mat er i al used on t hi s contract.

W912HV-19-B-0003 SECTI ON 01 11 00. 00 10 Page 9

1. 15 CORRESPONDENCE

Al l cor r espondence addr essed t o t he Gover nment shal l be made t hr ough ser i al i zed l et t er s f ur ni shed wi t h one or i gi nal and t wo copi es. Ser i al i zed l et t er s shal l begi n wi t h t he number 001 and shal l be cont i nuous wi t hout a br eak i n number i ng. Ser i al i zed l et t er s shal l i ncl ude t he cont r act t i t l e and number , dat e, subj ect , and shal l be s i gned by an aut hor i zed r epr esent at i ve of t he Cont r act or .

PART 2 PRODUCTS ( NOT USED)

PART 3 EXECUTI ON ( NOT USED)

- - End of Sect i on - -

W912HV-19-B-0003 SECTI ON 01 11 00. 00 10 Page 10

Section Section Title/Material Description US Standard Acceptable Alternative Japanese Standard

Japanese Standard Title in English

03 20 00.00 10 Concrete Reinforcement Welded Wire Fabric ASTM A1064/A1064M JIS G 3551 Welded steel wire and bar fabrics

Reinforcing Steel ASTM A615 JIS G 3112 SD295A (D16 & Less)

Steel bars for concrete reinforcement, SD295A (D16 & Less)

Reinforcing Steel ASTM A615 JIS G 3112 SD345 (D19 & Larger)

Steel bars for concrete reinforcement, SD345 (D19 & Larger)

03 30 00.00 10 Cast-In-Place Concrete Chemical Admixtures for Use in Producing Flowing Concrete

ASTM C1017/C1017M JIS A 6204 Chemical admixtures for concrete

Test Method for Potential Alkali Reactivity of Aggregates

ASTM C1260 JIS A 1146 Method of test for alkali-silica reactivity of aggregates by mortar-bar method

Test Method for Sieve Analysis of Fine and Coarse Aggregates

ASTM C136 JIS A 1102 Method of test for sieve analysis of aggregates

Test Method for Slump of Hydraulic- Cement Concrete

ASTM C143/C143M JIS A 1101 Method of test for slump of concrete

Portland Cement ASTM C150 JIS R 5210 Portland cement Practice for Sampling Freshly Mixed Concrete

ASTM C172/C172M JIS A 1115 Method of sampling fresh concrete

Practice for Making and Curing Concrete Test Specimens

ASTM C192/C192M JIS A 1132 Method of making and curing concrete specimens

Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method

ASTM C231/C231M JIS A 1128 Method of test for air content of fresh concrete by pressure method

Practice for Making and Curing Concrete Test Specimens in the Field

ASTM C31/C31M JIS A 1132 Method of making and curing concrete specimens

Test Method for Compressive Strength of Cylindrical Concrete Specimens

ASTM C39/C39M JIS A 1108 Method of test for compressive strength of concrete

Chemical Admixtures for Concrete ASTM C494/C494M JIS A 6204 Chemical admixtures for concrete

Cellular Glass Thermal Insulation ASTM C552 JIS A 9521 Thermal insulation materials for buildings Rigid, Cellular Polystyrene Thermal Insulation

ASTM C578 JIS A 9521 Thermal insulation materials for buildings

Unfaced Preformed Rigid Cellular Polyisocyanurate Thermal Insulation

ASTM C591 JIS A 9521 Thermal insulation materials for buildings

Fly ash for use in concrete ASTM C618 JIS A 6201 Fly ash for use in concrete Portland pozzolan cement ASTM C618 JIS R 5212 Portland pozzolan cement Test Method for Flexural Strength of Concrete

ASTM C78/C78M JIS A 1106 Method of test for flexural strength of concrete

Ready Mix Concrete ASTM C94 JIS A 5308 Ready-mixed concrete Slag Aggregate for Concrete ASTM C989 JIS A 5011 Slag aggregate for concrete Concrete Aggregates ASTM C33 JIS A 5005 Crushed stone and manufactured sand for concrete Air-Entrained Admixture for

Concretre ASTM C260 JIS A 6204 Chemical admixtures for concrete

Test Methods for Water Vapor Transmission of Materials

ASTM E96/E96M JIS A 9511 Preformed cellular plastics thermal insulation materials

03 30 53 Miscellaneous Cast-In-Place Concrete Slag Aggregate for Concrete ASTM C989 JIS A 5011 Slag aggregate for concrete Portland Cement ASTM C150 JIS R 5210 Portland cement Ready Mix Concrete ASTM C94 JIS A 5308 Ready-mixed concrete

Steel Bars for Concrete

ASTM A615/A615M JIS G 3112 Steel bars for concrete reinforcement Welded Wire Fabric ASTM A185 JIS G 3551 Welded steel wire and bar fabrics Concrete Aggregates ASTM C33 JIS A 5005 Crushed stone and manufactured sand for concrete Air-Entrained Admixture for Concrete ASTM C260 JIS A 6204 Chemical admixtures for concrete

Polyethylene Sheet ASTM C171 JIS K 6781 Polyethylene films for agriculture Test Method for Slump of Hydraulic- Cement

ASTM C143/C143M JIS A 1101 Method of test for slump of concrete

Practice for Sampling Fresh Concrete ASTM C172 JIS A 1115 Method of sampling fresh concrete

Test Method for Air Content by Volume

ASTM C173/ C173M JIS A 1118 Method of test for air content of fresh concrete by volumetric method

Test Method for Air Content by Pressure Method

ASTM C231 JIS A 1128 Method of test for air content of fresh concrete by pressure method

SOF TACTICAL EQUIPMENT MAINTENANCE FACILITY (TEMF)

FY18 SOCOM, PN 81903

W912HV-18-B-0004

Section 01 11 00.00 10 Attch A Page 1 of 7

Japanese Standard Title in English

Practice for Making and Curing Concrete Test Specimens in the Field

ASTM C31/C31M JIS A 1132 Method of making and curing concrete specimens

Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens

ASTM C39/C39M JIS A 1108 Method of test for compressive strength of concrete

04 20 00 Unit Masonry Concrete Blocks ASTM C90 JIS A 5406 Concrete blocks for buildings Bricks ASTM C62 JIS R 1250 Common bricks and facing bricks

05 12 00 Structural Steel Rolled Steel for General Structure ASTM A36/A36M JIS G 3101 Rolled steels for general structure

Rolled Steel for Welded Structure ASTM A36/A36M JIS G 3106 Rolled steels for welded structure

Hot Rolled Atmospheric Corrosion Resisting Steel for Welded Structure

ASTM A36/A36M JIS G 3114 Hot-rolled atmospheric corrosion resisting steels for welded structure

Rolled Steel for Building Structure ASTM A36/A36M JIS G 3136 Rolled steels for building structure

Rolled Bars for Building Structure ASTM A6/A6M JIS G 3138 Rolled steel bars for building structure

Light Gage Steel for General Structure

ASTM C955 JIS G 3350 Light gauge steel sections for general structure

Carbon Steel Tubes for General Structural

ASTM A500 JIS G 3444 Carbon steel tubes for general structure

Carbon Steel Square Pipes for General

ASTM A53 JIS G 3466 Carbon steel square and rectangular tubes for general structure

Bolts ASTM A307 JIS B 1180 Hexagon head bolts and hexagon head screws

High-Strength Bolts ASTM A325 JIS B 1186 Sets of high strength hexagon bolt, hexagon nut and plain washers for friction grip joints

Washer ASTM F436 JIS B 1256 Plain washers

05 52 00 Metal Railings Bolts ASTM A307 JIS B 1180 Hexagon head bolts and hexagon head screws Carbon Steel Tubes for General Structure

ASTM A500/A500M JIS G 3444 Carbon steel tubes for general structure

Carbon Steel Square Pipes for General Structure

ASTM A53/A53M JIS G 3466 Carbon steel square and rectangular tubes for general structure

06 10 00 Rough Carpentry Structural Plywood APA PS2 JAS No. 516 Notification No. 516 of the Ministry of Agriculture, Forestry and

Fisheries, partial revision of Japanese Agriculture and Forestry standard etc about plywood for fire prevention doors

Plywood for Concrete Form APA PS1 JAS No. 932 Notification No. 932 of the Ministry of Agriculture, Forestry and Fisheries, definition of Japanese Agriculture and Forestry standard about plywood for concrete form

Laminated Wood ANSI/AITC A190.1 JAS No. 112 Notification No. 112 of the Ministry of Agriculture, Forestry and Fisheries, partial revision of Japanese Agriculture and Forestry standard

Structural Laminated Wood ANSI/AITC A190.1 JAS No. 111 Notification No. 111 of the Ministry of Agriculture, Forestry and Fisheries, Japanese Agriculture and Forestry standard about structural

Softwood Finish Lumber ALSC PS 20 JAS No. 1084 Notification No. 1084 of the Ministry of Agriculture and Forestry, Japanese Agriculture and Forestry standard about softwood finish

Hardwood Lumber AHA A135.4 JAS No. 1086 Notification No. 1086 of the Ministry of Agriculture and Forestry, Japanese Agriculture and Forestry standard about hardwood lumber

07 21 16 Mineral Fiber Blanket Insulation Mineral Fiber Block and Board Thermal Insulation

ASTM C612 JIS A 9504 Man made mineral fibre thermal insulation materials

07 41 13 Metal Roof Panels Non-Structural Metal Roofing ASTM A755/A755M JIS A6514 Components for metal roof-decks

07 61 14.00 20 Steel Standing Seam Roofing Formed Japanese Metal Roofing ASTM A755/A755M JIS A6514 Components for metal roof-decks

08 11 16 Aluminum Doors and Frames Carbon Structural Steel, Aluminum and Aluminum-Alloy Sheet and Plate (Metric)

ASTM A36/A36M, B209M JIS A4702, A4704, A4705 Doorsets, Components of light-weight rolling door for buildings, Components of rolling door for buildings

SOF TACTICAL EQUIPMENT MAINTENANCE FACILITY (TEMF)

FY18 SOCOM, PN 81903

W912HV-18-B-0004

Section 01 11 00.00 10 Attch A Page 2 of 7

Japanese Standard Title in English

Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes (Metric), Standard Test Method for Determining Rate of Air Leakage Through Exterior Windows, Curtain Walls, and Doors Under Specified Pressure Differences Across the Specimen, Standard Test Method for Water Penetration of Exterior Windows, Skylights, Doors, and Curtain Walls by Uniform Static Air Pressure Difference

ASTM B221M, E283, E331 JIS A4706, A4709, A4713 Windows, Screens for windows, Residential sliding storm window panel

09 22 00 Supports for Plaster and Gympsum Board Nonstructural Steel Framing Members

ASTM C645 JIS A 6517 Steel furrings for wall and ceiling in buildings

09 29 00 Gypsum Board Gypsum Board ASTM C1396/C1396M JIS A 6901 Gypsum boards

09 30 10 Ceramic, Quarry, and Glass Tiling

Ceramic Tile ANSI A137.1 JIS A 5209 Ceramic tiles

09 51 00 Acoustical Ceilings

Acoustical Ceiling ASTM E1264 JIS A 6301 Sound absorbing materials Metal Ceiling Suspension System ASTM C645 JIS A 6517 Steel furrings for wall and ceiling in buildings

09 65 00 Resilient Flooring

Resilient (Vinyl Composition Floor Tile)

ASTM F1066 JIS A 5705 Polyvinyl chloride floorcoverings

09 90 00 Paints and Coatings Anti Rust Paint MPI 101, MPI 107, MPI 79 JIS K5621, JASS 18 M-109 Anticorrosive paints for general use, Japan Architectural Standard

Specification 18 M-109

EP - Exterior Latex, Semi-Gloss, MPI Gloss Level 5

MPI 11 JIS K 5663 Synthetic resin emulsion paint & sealer

SOP - Interior Latex, Semi-Gloss, MPI Gloss Level 5

MPI 54 JIS K 5516 Ready mixed paints (Synthetic resin type)

OS - Interior Oil Modified Urethane Clear Satin

MPI 57 JASS 18 Paragraph 5.9, JIS K5421

Japan Architectural Standard Specification 18 Paragraph 5.9, Boiled oil and boiled linseed oil

NAD - Interior Alkyd, Semi-Gloss, MPI Gloss Level 5

MPI 47 JIS K5516 Ready mixed paints (Synthetic resin type)

VP - Interior Latex, Semi-Gloss, MPI Gloss Level 5

MPI 54 JIS K 5670 Non aqueous dispersion acrylic paint

10 28 13 Toilet Accessories

Mirrors ASTM C1036 JIS R 3220 Glass in building -- Silvered, flat-glass mirror

21 13 13.00 10 Wet Pipe Sprinkler System, Fire

Protection Steel Pipe Black ASTM A53/A53M JIS G 3452/JIS G 3454 Carbon steel pipes for ordinary piping/Carbon steel tubes for pressure service Malleable Iron Threaded Fittings ASME B16.3 JIS B 2301 Screwed type malleable cast iron pipe fittings

Steel Buttwelding Fittings ASME B16.9 JIS B 2311 Steel butt-welding pipe fittings for ordinary use

22 00 00 Plumbing, General Purpose Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless

ASTM A53/A53M, Sch 40 JIS G 3452/JIS G 3454/JIS B

Carbon steel pipes for ordinary piping/Carbon steel tubes for pressure service/Screwed type malleable cast iron pipe fittings

Valves, Cast Iron MSS SP-70 JIS B 2031 Gray cast iron valves Cast Iron Pipe and Fittings, Hub and

Spigot ASTM A74 JIS G 5525 Cast-iron drainage pipes and fittings

Cast Iron Pipe and Fittings, Hubless CISPI 301/ASTM A888 JIS G 5525 Cast-iron drainage pipes and fittings

SOF TACTICAL EQUIPMENT MAINTENANCE FACILITY (TEMF)

FY18 SOCOM, PN 81903

W912HV-18-B-0004

Section 01 11 00.00 10 Attch A Page 3 of 7

Japanese Standard Title in English

Steel Pipe, Galvanized ASTM A53/A53M JIS G 3452/JIS G 3454/JIS B

Carbon steel pipes for ordinary piping/Carbon steel tubes for pressure service/Screwed type malleable cast iron pipe fittings

Copper Pipe, Seamless ASTM B42 JIS H 3300/JIS H 3401 Copper and copper alloy seamless pipes and tubes/Pipe fittings of copper and copper alloys

Poly(Vinyl Chloride) (PVC) Plastic Drain, Waste, and Vent Pipe and Fittings

ASTM D2665 JIS K 6739/JIS K 6741 Unplasticized poly (vinyl chloride) (PVC-U) pipe fittings for drain/Unplasticized poly (vinyl chloride) (PVC-U) pipes

Coextruded Poly (Vinyl Chloride) (PVC) Plastic Pipe with a Cellular Core

ASTM F891 JIS K 6739/JIS K 6741 Unplasticized poly (vinyl chloride) (PVC-U) pipe fittings for drain/Unplasticized poly (vinyl chloride) (PVC-U) pipes

Coextruded Poly(Vinyl Chloride) (PVC) Non-Pressure Plastic Pipe Having Reprocessed-Recycled Content

ASTM F1760 JIS K 6739/JIS K 6741 Unplasticized poly (vinyl chloride) (PVC-U) pipe fittings for drain/Unplasticized poly (vinyl chloride) (PVC-U) pipes

23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems Duct, Galvanized Steel Sheet ASTM A653/A653M JIS G 3302 Hot-dip zinc-coated steel sheet and strip

23 07 00 Thermal Insulation for Mechanical Systems

Aluminum and Aluminum-Alloy Sheet and Plate

ASTM B209M JIS H 4000 Aluminium and aluminium alloy sheets, strips and plates

Pipe Insulation, Mineral Fiber ASTM C547 JIS A 9504 Man made mineral fibre thermal insulation materials Duct Insulation, Mineral Fiber ASTM C553 JIS A 9504 Man made mineral fibre thermal insulation materials

23 64 26 Chilled, Chilled-Hot, and Condenser Water Piping Systems

Steel Pipe, Black ASTM A53/A53M, Sch 40 JIS G 3452/JIS G 3454/JIS B

Carbon steel pipes for ordinary piping/Carbon steel tubes for pressure service/Screwed type malleable cast iron pipe fittings

Copper Tubing ASTM B88M, Type M JIS H 3300 Copper and copper alloy seamless pipes and tubes Copper and Bronze Fittings ASME B16.22 JIS H 3300/JIS H 3401 Copper and copper alloy seamless pipes and tubes/Pipe fittings of copper and copper alloys Bronze Gate, Globe, Angle and Check

Valves MSS SP-80 JIS B 2011 Bronze, gate, globe, angle, and check valves

26 12.19 10 Three-Phase Pad-Mounted Transformers Pad mounted transformer station

3PH4W

ANSI C57.12.90 JIS C 4620 Cubicle type high voltage power receiving units

26 20 00 Interior Distribution System Electrical Nonmetallic tubing UL 1653 JIS C 8411 class PF Pliable plastics conduits, class PF Panelboard UL 67 JIS C 8480 Box-type switchgear assemblies for low-voltage distribution purpose Fusible Disconnect Switch UL 98 JIS C 4606 Indoor use disconnectors for 3.3 kV or 6.6 kV

Outlet boxes Non-metallic UL 514C JIS C 8435 Boxes and box covers of plastic conduits

Cast metal hub type boxes UL 514A JIS C 8340 Boxes and box covers for rigid metal conduits

Bonding conductors, bare copper, solid, ATSM B1 JIS C 3101 Hard-drawn copper wires for electrical purposes

Bonding conductors, bare copper ATSM B8 JIS C…