PA00032 FY15 Replace Kadena Elementary School
Kadena AB, Japan
17SF0001
PROJECT TABLE OF CONTENTS Page 1
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00.00 10 GENERAL CONTRACT REQUIREMENTS
01 11 00.00 10-A A-ACCEPTABLE ALTERNATIVES FOR JAPANESE STANDARDS
01 22 00.00 10 PRICE AND PAYMENT PROCEDURES
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 00-A A-ENG FORM 4025-R
01 33 00-B B-SUBMITTAL REGISTER
01 33 29
01 33 29-A
SUSTAINABLITY REPORTING
LEED CHECKLIST
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 35 26-A UXO EMERGENCY MITIGATION STEPS FOR KADENA AB
01 35 26-B DDESB-TP-18-SEP2015
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 42 15 METRIC MEASUREMENTS
01 45 00 USACE QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 50 00-A A-PROJECT SIGN
01 50 00-B B-TEMPORARY TOILET FACILITY
01 57 19
01 57 19.00 30
TEMPORARY ENVIRONMENTAL CONTROLS
TEMPORARY ENVIRONMENTAL CONTROLS KAB SUPPLEMENT
01 57 19.11 INDOOR AIR QUALITY (IAQ) MANAGEMENT
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 23
01 78 23.30 33
01 91 00.00 40
01 91 00.00 10
01 91 00.00 20
01 91 00.00 30
OPERATION AND MAINTENANCE DATA
OPERATION AND MAINTENANCE COMMISSIONING
REQUIREMENTS
COMMISIONING
CONSTRUCTION CHECKLISTS COMMISIONING REQUIREMENTS
FUNCTIONAL PERFORMANCE TESTING COMMISSIONING
REQUIREMENTS
DEMONSTARTION AND TRAINING COMMISSIOINING
REQUIREMENTS
PROJECT TABLE OF CONTENTS Page 2
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 82 13.00 30 ASBESTOS ABATEMENT/ENGINEERING CONTROL OF ASBESTOS
CONTAINING MATERIALS
02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES
02 83 13.00 20 LEAD IN CONSTRUCTION
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs
AND MERCURY
DIVISION 03 - CONCRETE
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00.00 10 CONCRETE ACCESSORIES
03 20 00.00 10 CONCRETE REINFORCING
03 30 00.00 10 CAST-IN-PLACE CONCRETE
03 33 00 CAST-IN-PLACE ARCHITECTURAL CONCRETE
03 35 00.00 10 CONCRETE FINISHING
03 39 00.00 10 CONCRETE CURING
03 42 13.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE
CONSTRUCTION
03 45 33 PRECAST STRUCTURAL CONCRETE
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
PROJECT TABLE OF CONTENTS Page 3
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
NESS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS AND SHOJI SCREENS
08 33 23 OVERHEAD COILING DOORS
08 34 73 SOUND CONTROL DOOR ASSEMBLIES
08 36 13 SECTIONAL OVERHEAD DOORS
08 39 54 BLAST RESISTANT DOORS
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
8 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 13 CERAMIC TILING
09 35 16 CHEMICAL-RESISTANT QUARRY TILING
09 51 00 ACOUSTICAL CEILINGS
09 62 38 STATIC-CONTROL FLOORING
09 65 00 RESILIENT FLOORING
09 65 66 RESILIENT ATHLETIC FLOORING
09 68 00 CARPETING
09 72 00 WALLCOVERINGS
09 83 13 ACOUSTICAL WALL COATING
09 90 00 PAINTS AND COATINGS
9 96 00 HIGH-PERFORMANCE ARCHITECTURAL COATINGS/EXTERIOR FINISH
SYSTEM
DIVISION 10 - SPECIALTIES
10 11 00 VISUAL DISPLAY UNITS
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHT
07 08 27.00 10 BUILDING ENVELOPE COMMISSIONING REQUIREMENTS
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 32 13 ROOF TILES
07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING (VULCANIZED
RUBBER)
07 55 00 PROTECTED MEMBRANE ROOFING
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
PROJECT TABLE OF CONTENTS Page 4
10 21 23.16 CUBICLE TRACK AND HARDWARE
10 22 39 FOLDING PANEL PARTITIONS
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 51 13 METAL LOCKERS
10 71 13.00 22 EXTERIOR SUN CONTROL DEVICES
10 75 00 FLAGPOLES
DIVISION 11 - EQUIPMENT
11 06 40.13 FOODSERVICE EQUIPMENT SCHEDULE
11 31 13 ELECTRIC KITCHEN EQUIPMENT
11 41 11 REFRIGERATED AND FROZEN FOOD STORAGE EQUIPMENT
11 52 13 PROJECTION SCREENS AND LIFTS
11 68 13 PLAYGROUND EQUIPMENT
DIVISION 12 - FURNISHINGS
12 21 00 WINDOW BLINDS
12 24 13 ROLLER WINDOW SHADES
12 48 13 ENTRANCE FLOOR MATS AND TATAMI MATS
12 93 00 SITE FURNISHINGS
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT
13 48 00.00 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT
DIVISION 14 - CONVEYING EQUIPMENT
14 21 23 ELECTRIC TRACTION PASSENGER ELEVATORS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 23 00.00 20 WET CHEMICAL FIRE EXTINGUISHING FOR KITCHEN CABINET
21 30 00 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 08 00.00 10 PLUMBING SYSTEMS COMMISSIONING REQUIREMENTS
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00.10 10 HVAC SYSTEMS COMMISSIONING REQUIREMENTS
23 09 23 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER
BUILDING CONTROL SYSTEMS
23 09 24 ENERGY METERING SYSTEMS COMMISSIONING REQUIREMENTS
23 52 00 HEATING BOILERS
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
23 65 00 COOLING TOWERS (FLUID COOLERS)
23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT
PROJECT TABLE OF CONTENTS Page 5
PA00032 FY15 Replace Kadena Elementary School 17SF0001
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 05 91 RACEWAYS FOR LOW VOLTAGE SYSTEMS
26 05 93 ENCLOSURES FOR LOW VOLTAGE SYSTEMS
26 08 00.00 10 ELECTRICAL LIGHTING CONTROL SYSTEMS COMMISSIONING
REQUIREMENTS
26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 23 00 SWITCHBOARDS
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 41 00 LIGHTNING PROTECTION SYSTEM
26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 21 00.00 20 INTERCOMMUNICATION SYSTEM
27 41 00 GENERAL PROVISIONS - AUDIO VIDEO SYSTEMS
27 41 30 AUDIO SYSTEMS
27 41 40 VIDEO SYSTEM
27 41 50 REMOTE CONTROL SYSTEMS
27 41 55 AUDIO/VIDEO NETWORK COMPUTERS
27 41 70 AUDIO/VIDEO HARDWARE
27 41 72 AUDIO/VIDEO PLATES
27 41 75 AUDIO/VIDEO AC POWER DISTRIBUTION
27 53 13.00 22 MASTER CLOCK SPECIFICATION
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 13 00.00 22 AUTOMATED ACCESS CONTROL SYSTEM (AACS)
28 31 49 CARBON MONOXIDE DETECTORS
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 11 00 CLEARING AND GRUBBING
31 21 13 RADON MITIGATION
31 31 16.13 CHEMICAL TERMITE CONTROL
31 62 13.20 PRECAST/PRESTRESSED CONCRETE PILES
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 16 BASE COURSE FOR RIGID AND SUBBASES FOR FLEXIBLE PAVING
32 12 10 BITUMINOUS TACK AND PRIME COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 12 17 HOT MIX BITUMINOUS PAVEMENT
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
32 16 15 CONCRETE BLOCK PAVEMENTS
32 17 24.00 10 PAVEMENT MARKINGS
32 18 16.13 PLAYGROUND PROTECTIVE SURFACING
32 31 13 CHAIN LINK FENCES AND GATES
PROJECT TABLE OF CONTENTS Page 6
32 31 14 BARRIER GATE AND OPERATOR WITH SMART TOUCH CONTROLLER AND
CARD READER
32 92 19 SEEDING
32 92 23 SODDING
32 93 00 EXTERIOR PLANTS
32 96 00 TRANSPLANTING EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 11 00 WATER DISTRIBUTION
33 30 00 SANITARY SEWERS
33 40 00 STORM DRAINAGE UTILITIES
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 11 00.00 10
GENERAL CONTRACT REQUIREMENTS
PART 1 GENERAL
1.1 DEFINITIONS
1.2 REFERENCES
1.3 ACCEPTABLE ALTERNATIVES FOR JAPANESE STANDARDS
1.4 MANDATORY U.S. PRODUCTS
1.5 KEY PERSONNEL QUALIFICATIONS
1.5.1 Project Manager
1.5.2 Project Superintendent (Supervisor)
1.5.3 English Speaking Representative (Interpreter)
1.5.4 Contractor Quality Control System Manager (CQCSM)
1.5.5 Site Safety and Health Officer (SSHO)
1.6 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER (MAY 2013)
1.7 PERMITS AND RESPONSIBILITIES
1.8 SPECIAL CONTRACT REQUIREMENTS
1.8.1 Meetings
1.8.2 DoDEA IT Software and Hardware Approval Process
1.8.2.1 Approved Software List
1.8.2.2 Systems Requiring Software and/or Hardware Approval
1.8.2.3 Software Approval
1.8.2.4 Hardware/Architecture Approval
1.8.3 Quality Assurance Personnel Tablets
1.8.4 Conformed Awarded Contract Drawings
1.9 PROGRESS AND COMPLETION PHOTOGRAPHS
1.10 BASE REGULATIONS
1.10.1 Request for Contractor's Employee Passes and Vehicle Passes
1.10.2 No Smoking Policy
1.11 ORDER OF WORK
1.11.1 Schedule
1.11.2 Working Hours
1.11.3 Work Outside of Regular Hours
1.12 FIRE PREVENTION DURING CONSTRUCTION
1.12.1 General
1.12.2 Supply
1.12.3 Fire Extinguishers
1.12.4 Housekeeping
1.12.5 Handling of Gasoline
1.12.6 Notification of Fire
1.13 MATERIAL DISPOSAL
1.14 CONTRACTOR FURNISHED MATERIAL AND WORKMANSHIP
1.15 CORRESPONDENCE
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
W912HV-17-B-0005 SECTION 01 11 00.00 10 Page 1
SECTION 01 11 00.00 10
GENERAL CONTRACT REQUIREMENTS
PART 1 GENERAL
1.1 DEFINITIONS
The term "United States" shall appear before the word "Government" whenever the latter word appears in this Contract, except where the word "Government" refers to a different-named Government.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 10 (2013) Standard for Portable Fire Extinguishers
NFPA 241 (2013; Errata 2015) Standard for Safeguarding Construction, Alteration, and Demolition Operations
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
1.3 ACCEPTABLE ALTERNATIVES FOR JAPANESE STANDARDS
Attachment 01 11 00.00 10-A provides a listing of Japanese standards which are considered acceptable alternatives to the US standards within the Contract. Incorporation of acceptable Japanese construction methods, materials, and equipment is desired to ensure that the project is constructible and the facility can be maintained with local materials and supplies, and by local workforce. The use of products not specifically meeting these US standards is prohibited. Japanese standards not included in this list or not referenced elsewhere in these specifications as being acceptable alternatives to US standards may be submitted to the Contracting Officer for approval as acceptable alternatives. Prior to the use of such Japanese standards, written approval by the Contracting Officer is required.
1.4 MANDATORY U.S. PRODUCTS
The following fire protection related items shall be U.S. products with U.S. testing labels as required. These items shall not be substituted with Japanese manufactured products:
a. Fire suppression systems, including valves, alarm valves, sprinklers (pipes and fittings of Japanese manufacturer may meet the function requirements).
W912HV-17-B-0005 SECTION 01 11 00.00 10 Page 2
b. Fire pumps, including motors, controllers, drives, and valves.
c. Fire alarm and mass notification systems, including panels, initiating devices, notification appliances, smoke alarms (conductors and conduits of Japanese manufccturer may meet the functional requirements).
d. Engineering technician requirements for development of fire suppression systems and alarm system shop drawings, calculations, and material submittals.
e. Fire doors and frames greater than 60 minutes.
f. Fire dampers and smoke dampers.
g. Interior finishes with flame spread and smoke development ratings.
h. Insulation with flame spread and smoke development ratings.
i. Plenum rated cables.
1.5 KEY PERSONNEL QUALIFICATIONS
The Contractor's Project Key personnel shall not be assigned duties to any other Contracts (excluding the project manager) without approval from the Contracting Officer. The Superintendent, Project Manager, and CQC Manager shall all be separate persons. Within five (5) working days after receipt of the Notice to Proceed, the Contractor shall submit in writing to the Contracting Officer an organizational chart, the qualifications and background history of the proposed Key Personnel for approval. The Contracting Officer shall have the explicit right to determine acceptability (or rejection) of the proposed individuals. In addition, the Contractor shall be responsible to replace said individuals upon notification by the Government should performance become inadequate during the Contract period. Key Personnel shall attend the Preconstruction conference.
1.5.1 Project Manager
The Project Manager shall have a minimum of five (5) years experience as a Project Manager on construction projects similar in size and scope to this Contract. The Project Manager shall maintain oversight of Contract proposals prepared by the Contractor staff and be authorized to negotiate Contract terms and sign Contract documents on behalf of the Contractor.
The project manager does not need to be present on the site daily, but shall attend weekly progress meetings and be available on site within 24 hours upon request.
1.5.2 Project Superintendent (Supervisor)
The Project Superintendent shall be on the work site when on-site work is being performed and shall be available to the Contracting Officer or his representatives upon request. The Project Superintendent shall have overall responsibility for all operations at the job site and be authorized to make decisions, negotiate Contract terms and sign Contract documents on behalf of the Contractor. The Project Superintendent shall have a minimum of ten (10) years experience as a superintendent on construction projects similar in size and scope to this Contract.
W912HV-17-B-0005 SECTION 01 11 00.00 10 Page 3
1.5.3 English Speaking Representative (Interpreter)
At all times during the Contract period the Contractor shall have an employee capable of fluent bilingual speech in the Japanese and English languages at the job site. The bilingual interpreter shall have the capability to receive and issue concise and technical explanation and instructions between the Government representative(s) and Contractor supervisory personnel concerning all aspects of Contract administration and construction. Within fifteen (15) days after notice of Contract award, the Contractor shall submit in writing to the Contracting Officer's Representative the qualifications and background history of the proposed interpreter for approval. The Contracting Officer's Representative shall have the explicit right to determine acceptability or rejection of the proposed individual. In addition, the Contractor shall be responsible to replace said individual upon notification by the Government should performance become inadequate during the Contract period. The interpreter shall attend the preconstruction conference.
1.5.4 Contractor Quality Control System Manager (CQCSM)
See Section 01 45 00 USACE QUALITY CONTROL.
1.5.5 Site Safety and Health Officer (SSHO)
See Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS.
1.6 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER (MAY 2013)
a. This paragraph specifies the procedure for determination of time extensions for unusually severe weather in accordance with the Contract clause entitled "DEFAULT (FIXED-PRICE CONSTRUCTION)". In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:
(1) The weather experienced at the project site during the Contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.
(2) The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.
b. The listing below defines the monthly anticipated adverse weather days for the Contract period and is based upon 20th Weather Squadron (MAC), U.S. Air Force; Iwakuni U.S. Marine Corps Air Station, Weather Service; Sasebo Naval Pacific Meteorology and Oceanography Detachment;
JASDF (Japan Air Self Defense Force), or similar data for the geographic location of the project. (More specific information may be obtained as specified under Special Contract Requirements Clause entitled "Physical Data.")
MONTHLY ANTICIPATED ADVERSE WEATHER DELAYS
WORK DAYS BASED ON (5) DAY WORK WEEK
Misawa-area Kanto Plain Iwakuni Okinawa Sasebo
JAN 8 1 2 5 7
W912HV-17-B-0005 SECTION 01 11 00.00 10 Page 4
FEB 9 3 4 7 6
MAR 6 6 7 8 7
APR 3 6 6 6 7
MAY 4 4 6 6 6
JUN 5 9 8 6 12
JUL 6 6 6 6 9
AUG 6 6 5 9 9
SEP 6 7 6 7 9
OCT 4 5 4 4 8
NOV 6 4 4 4 5
DEC 7 1 3 5 5
The above schedule of anticipated adverse weather days shall constitute the base line for monthly (or portion thereof) weather time evaluations.
c. Upon acknowledgment of the Notice-to-Proceed (NTP) and continuing throughout the Contract, the Contractor shall record on the daily CQC report, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the Contractor's scheduled work day.
d. The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day of each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated in paragraph (b), above, the contracting Officer shall convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather work days, and issue a modification in accordance with the Contract clause entitled "DEFAULT
(FIXED PRICE CONSTRUCTION)".
e. For all work under this Contract, adverse weather is defined as:
(1) Rainfall - Number of occurrences of precipitation greater than or equal to 0.10 inches (2.54mm).
(2) Snowfall - Number of occurrences of precipitation greater than or equal to 1.00 inches (25.4mm). (Not applicable to Okinawa Area)
(3) Cold Temperature - Number of occurrences when daily maximum temperature does not exceed the monthly mean low temperature or 32 degrees Fahrenheit (0 degrees Celsius), whichever is lower. (Not applicable to Okinawa Area)
(4) Concurrence between snowfall and cold temperature is 80 percent, i.e. 80 percent of the time snow falls, the temperature is "cold".
(5) Wind - Number of occurrences when the wind is gusting 30 knots (56 kilometers/hour) or greater.
f. The Contractor's schedule must reflect the above anticipated adverse weather delays on all weather-dependent activities.
1.7 PERMITS AND RESPONSIBILITIES
The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for
W912HV-17-B-0005 SECTION 01 11 00.00 10 Page 5 complying with any laws, codes, and regulations (including the requirements of material, prefectural, and local Government of Japan, and associated military installation) applicable to the performance of work.
The Contractor shall also be responsible for all damages to persons or property that occur as a result of the Contractor's fault or negligence.
These damages shall be repaired or replaced by the Contractor at no cost to the Government. The Contractor shall take proper safety and health precautions to protect all work and workers.
Submit a schedule of planned road closures to the Contracting Officer with the initial project schedule. Notification of specific road closures shall be in writing to the Contracting Office not less than thirty (30) calendar days in advance of the intended closure. The road closure request shall include the planned traffic control measures as well as the general information about the closure. All road closures shall be coordinated with base officials and are subject to base requirements. No road closure shall be permitted until the Contractor receives written approval from the Contracting Officer. Full road closures is generally not permitted (at least one way traffic shall always be provided).
1.8 SPECIAL CONTRACT REQUIREMENTS
1.8.1 Meetings
a. Post Award Orientation. A post award orientation (often referred to as a Preconstruction Conference for Design-Bid-Build contracts or a Pre-performance Conference for Design-Build contracts) per FAR 42.503 shall be held. The chairperson shall be the Contracting Officer or his/her designee. The chairperson shall be responsible for providing minutes of the meeting.
b. Weekly Progress Meetings. A weekly progress meeting shall be conducted, with the day, time, and location to be determined at the Preconstruction Conference. The Contractor's Project Manager, Superintendent, Interpreter, and Quality Control Manager shall attend. Representatives from the Government may include, but are not limited to, Director of Public Works/Facilities Engineering personnel, Project's Resident Office personnel, and Project Manager. The Contractor shall be prepared to discuss work completed during the previous week, work currently in progress, and work forecasted for the following week, as well as the status of any construction issues and open action items. Provide electronic copies of the meeting minutes in English within two (2) working days of the progress meeting and corrected meeting minutes with two (2) days of receipt of Government comments.
c. Red Zone Meeting. A Red Zone meeting shall be conducted for Contracts with a value in excess of 55,000,000 JPY or those deemed sufficiently complex by the Contracting Officer to warrant one.
The purpose of the Red Zone meeting is to discuss closeout requirements for the contract and to establish a timeline to get those items completed (see Section 01 78 00 CLOSEOUT SUBMITTALS for typical closeout requirements). The meeting is a good time for the Contractor to gain approval on format for items such as Operations and Maintenance manuals, the equipment-in-place list, the warranty plan, and any other items. The Red Zone is typically be scheduled for 90 calendar days prior to the Contract completion date. The Contractor is responsible for providing electronic copies of meeting minutes in English within four (4) working days
W912HV-17-B-0005 SECTION 01 11 00.00 10 Page 6 of the Red Zone meeting.
d. Safety and Quality Control Meetings. Safety and quality control meetings shall be held as needed and determined by the Contractor. See Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS and Section 01 45 00 USACE QUALITY CONTROL for specific requirements.
1.8.2 DoDEA IT Software and Hardware Approval Process
All special systems (equipment, technology, controls, security devices, clock/PA, energy dashboards, electronic signage and marquees, both hardware and software that will interface or connect (either directly or indirectly) with DoDEA school communication networks (both wired and wireless) are subject to the security and approval protocols outlined in the Department of Defense Information Technology Security requirements and require DoDEA Headquarters approval. These systems shall be independent of the DoDEA network when initially installed, but shall allow connectivity to the network after Beneficial Occupancy when the DoDEA network is operational.
The contract documents may indicate a "basis of design" to show the desired functionality of the system, but this is not intended to limit bids and does not imply software or hardware approval.
Any cost associated with submittal and approval and any schedule impacts are the responsibility of the contractor and shall incur no additional cost to the government. Software and hardware/architecture approval requires four to six months from the time it is submitted to HQ DoDEA, so it must be initiated as early in the construction process as possible.
1.8.2.1 Approved Software List
DoDEA maintains an Approved Software List (ASL), which is separate and distinct from any other DoD ASL. Approval of a particular software program at another DoD location does not guarantee approval for this project. The ASL is updated on a continual basis and will be made available at the Preconstruction Conference. The software/hardware on this list does not require further testing or approval, as long as it is the exact version number that is shown on the list. (i.e. each version of the software must go thru the testing and approval process.)
1.8.2.2 Systems Requiring Software and/or Hardware Approval
All software that will interface with the DoDEA Network must have DoDEA approval. If proposed software is not on the ASL, then software approval is required. The following list of facility systems which may contain such software is provided for information, but is not intended to be a comprehensive list. The contractor is responsible for initiating the software approval process in a timely manner for ALL software that will interface with the DoDEA Network.
a. BAS/DDC system (New schools in DoDEA-Americas will be connected to the DoDEA Network so that they can be remotely monitored from the District Superintendent's Office and the Area Office in Peachtree City, GA)
b. Energy Dashboard System (Students and Teachers shall be able to
W912HV-17-B-0005 SECTION 01 11 00.00 10 Page 7 view data from the Energy Dashboard on their DoDEA devices.)
c. Access Control System (both Proximity Card system and Access-Intercom Phone/AI-Phone shall be connected to the DoDEA Network for remote monitoring by the Safety-Security Office at the District Superintendent's Office and Area Office in Peachtree City, GA)
d. Lighting Controls systems (if automated)
e. PA/Intercom/Clock/Bell systems
f. AV/Sound Systems (projectors, marquee sign, message signs, LED food service menu, performance sound/lighting, etc.)
g. Operating systems or server software required for systems above (Windows OS, SQL Server, etc.)
h. Kitchen Equipment Alarms (freezers/refrigerators)
1.8.2.3 Software Approval
The Contractor shall submit the following information to the Contracting Officer's Representative (COR) for each piece of software. The COR will forward the package to the DoDEA PM or School/District designee who will submit the online software approval request form to HQ DoDEA.
a. Software Title: Identical name of the software title as it appears in the documentation.
b. Version: Exact version number of the software
c. Software Publisher: Name of software publisher
d. ISBN: non-mandatory field - Usually located on the cover of the CD over the bar code or the publisher website.
e. Publisher Web Site: Web address/URL
f. Software Description: What does the software do?
1. Provide a complete description of the functionality of the software
2. Number of characters must be greater than 250 and less than or equal to 4,000
g. CD, DVD, or download link (with User ID and password, if required) of the proposed software.
1.8.2.4 Hardware/Architecture Approval
In addition to software approval, and prior to connecting the system to the DoDEA Network, obtain IT hardware/architecture approval by submitting a wiring-cabling riser diagram depicting: the wiring/cabling type proposed and the make/model of each device to be connected to the system. A PDF format sketch/drawing submitted via email is sufficient. The contractor shall submit to the Contracting Officer's Representative (COR) for each type of hardware. The COR will forward the package to the DoDEA PM who will submit it to HQ DoDEA for approval.
1.8.3 Quality Assurance Personnel Tablets
Provide three (3) tablets with minimum diagonal 9.7 inch screen size, having latest version of iOS or Android operating system, preloaded with an application capable of opening PDF files. One full set of final conformed drawings, specifications, other contract related documents, and a current copy of EM 385-1-1 for Government Field Team use, shall be preloaded onto tablets. Contractor shall regularly update the tablets with changes to drawings/specifications resulting from RFI responses, modifications, or variations from shop drawings, etc. Tablets shall be Wi-Fi enabled to permit emailing. Tablets will be used in the field on-site and shall come with suitable protective measures to prevent damage from mishaps that may occur (i.e. short drops, bumps, etc.). Tablets will
W912HV-17-B-0005 SECTION 01 11 00.00 10 Page 8 be returned to the Contractor when project is completed.
1.8.4 Conformed Awarded Contract Drawings
Provide Resident Engineer two (2) book bound half-size copies of the conformed set of awarded contract drawings based on Government-provided CAD files within two weeks of receipt of CAD files.
1.9 PROGRESS AND COMPLETION PHOTOGRAPHS
Photographically document site conditions prior to start of construction operations. Provide monthly, and within one month of the completion of work, digital photographs, 1600 by 1200 by 24 bit true color 300 DPI minimum resolution in JPEG file format showing the sequence and progress of work. Take a minimum of 20 digital photographs each week throughout the entire project from a minimum of ten views from points located by the Contracting Officer. Submit with the monthly invoice two sets of digital photographs, each set on a separate compact disc (CD) or data versatile disc (DVD), cumulative of all photos to date. Indicate photographs demonstrating environmental procedures. Provide photographs for each month in a separate monthly directory and name each file to indicate its location on the view location sketch. Also provide the view location sketch on the CD or DVD as a digital file. Include a date designator in file names. Cross reference submittals in the appropriate daily report. Photographs provided are for unrestricted use by the Government.
1.10 BASE REGULATIONS
The Contractor and Subcontractor(s) shall become familiar with and obey all base regulations, including fire, traffic, safety, and security regulations. All Contractors shall keep within the limits of the work (and avenues of ingress and egress), and shall not enter any restricted areas unless required to do so and are cleared for such entry. The Contractor's equipment shall be conspicuously marked for identification.
1.10.1 Request for Contractor's Employee Passes and Vehicle Passes
No employee or representative of the Contractor shall be admitted to the work site without a Contracting Officer's furnished authorized admittance. Prior to the start of on-site work, submit applications for base passes to the Contracting Officer for key employees (project manager, site supervisor, interpreter, etc.) for long term passes. The Contractor, with assistance from the Resident Office, is responsible for securing sufficient passes for other workers, including Subcontractor's employees and vehicles, required to access the base for the project duration.
Additional personnel data shall also be furnished.
Provide all information required for background checks to meet base access requirements to be accomplished by Base Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. The Government reserves the right to make changes to the Contractor security requirements or processes due to a change in the Force Protection Condition (FPCON).
Upon completion of this Contract, return all employee and vehicle passes to the base, and obtain a certification of receipt. Final payment shall be withheld until all passes have been returned.
W912HV-17-B-0005 SECTION 01 11 00.00 10 Page 9
1.10.2 No Smoking Policy
Smoking is prohibited anywhere on Kadena Air Base except in designated smoking areas. This applies to existing buildings, buildings under construction, and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer shall identify designated smoking areas.
1.11 ORDER OF WORK
1.11.1 Schedule
Schedule all work to cause the least amount of interference with activity operations. Permission to interrupt any activity, roads, or utility services shall be requested in writing a minimum of 30 calendar days prior to the desired date of interruption. Interruptions of activities, roads, and utility services shall be allowed only when they will not cause interference with the operations of the activity. The Contractor shall remove and dispose off Government property all Contractor generated debris at the end of each shift, or more frequently if required, to keep the space usable. Upon award of this Contract, the Contractor shall begin and complete all required work; ready for use and including cleanup, within the time period specified on this Contract. All work scheduled in occupied areas shall be accomplished in such a manner as to cause the least possible inconvenience to the occupants.
1.11.2 Working Hours
Normal Working Hours and Days are Monday through Saturday, 0800 hours through 1800 hours.
1.11.3 Work Outside of Regular Hours
If the Contractor desires to carry on work outside the regular hours, on Sundays, or holidays, a written application shall be submitted to the Contracting Officer or his representative for approval. The Contractor shall allow three working days notice to enable satisfactory arrangements to be made by the Government for inspecting the work in progress. If work is to be accomplished after daylight hours, the Contractor shall illuminate the area in a manner approved by the Contracting Officer or his representative. Unless directed by a Contracting Officer, work accomplished outside regular working hours shall be at no additional cost to the Government.
1.12 FIRE PREVENTION DURING CONSTRUCTION
1.12.1 General
Comply with all pertinent fire prevention provisions of the US Army Corps of Engineers Manual EM 385-1-1 , NFPA 241 and shall follow the Installation fire regulations. Prior to commencement of welding or other hot work operations, obtain approval from the Installation Fire Chief.
1.12.2 Supply
No more than one day's supply of paint, paint materials, or compounds shall be allowed within the area of the building, and shall be removed
W912HV-17-B-0005 SECTION 01 11 00.00 10 Page 10 from the job site after each working day. No gasoline or similar low flash point flammable liquid shall be allowed within the building area.
1.12.3 Fire Extinguishers
Provide, as a minimum, the number, size, and type of fire extinguishers in accordance with the latest NFPA 10 . The Contractor shall comply with the Installation Fire Chief's policies if they are more stringent than NFPA 10 .
Fire extinguishers shall remain the property of the Contractor and shall be removed upon completion of the project.
1.12.4 Housekeeping
Accumulations of combustible material shall be removed from the building area on a daily basis.
1.12.5 Handling of Gasoline
Gasoline shall be stored in U.L. (Underwriter's Laboratory) approved safety containers. Adequate ventilation shall be provided to safely dispose of flammable vapors where flammable liquids are utilized.
Gasoline powered equipment shall be refueled a minimum 20 feet away from the building area.
1.12.6 Notification of Fire
Be familiar with methods for notifying the Installation Fire Department.
The Installation's fire poster shall be posted in conspicuous locations and at telephones in construction shacks.
1.13 MATERIAL DISPOSAL
Where materials are to be turned over to the Contractor for disposal, every effort shall be made to obtain credit from the disposal to reduce the cost of the Contract. The Contractor's material disposal costs shall include hauling and disposal costs for work performed in accordance with all applicable local and U.S. laws and regulations.
1.14 CONTRACTOR FURNISHED MATERIAL AND WORKMANSHIP
The Contractor shall furnish all materials necessary for performance of the work of this contract unless otherwise specified. Materials procured shall be new and shall meet any specifications and standards listed in these specifications. If no specification for a material needed to perform this contract are stated, the material shall be new, of acceptable industrial grade and quality, equal to or better than the manufacturer's original equipment for equipment being repaired or replaced, and will be compatible with existing materials and systems. All materials provided under this contract shall be free of asbestos, lead in paint, and PCB.
The Contracting Officer reserves the right to request submittal of any material being provided under this contract. The Contracting Office shall make the final determination of the acceptability of any material used on this contract.
1.15 CORRESPONDENCE
All correspondence addressed to the Government shall be made through serialized letters furnished with one original and two copies. Serialized letters shall begin with the number S-0001 and shall be continuous without
W912HV-17-B-0005 SECTION 01 11 00.00 10 Page 11 a break in numbering. Serialized letters shall include the contract title and number, date, subject, and shall be signed by an authorized representative of the Contractor.
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
-- End of Section --
W912HV-17-B-0005 SECTION 01 11 00.00 10 Page 12
Section Section Title/Material Description US Standard Acceptable Alternative
Japanese Standard
Year JIS published
(revised)
Japanese Standard Title in English
03 20 00.00 10 Concrete Reinforcement
Welded Wire Fabric ASTM A1064/A1064M JIS G 3551 1960, (R)2005 Welded steel wire and bar fabrics
Reinforcing Steel ASTM A615 JIS G 3112 SD295A (D16 &
Less)
1964, (R)2010 Steel bars for concrete reinforcement, SD295A (D16 & Less)
Reinforcing Steel ASTM A615 JIS G 3112 SD345 (D19 &
Larger)
1964, (R)2010 Steel bars for concrete reinforcement, SD345 (D19 & Larger)
03 30 00.00 10 Cast‐In‐Place Concrete
Chemical Admixtures for Use in
Producing Flowing Concrete
ASTM C1017/C1017M JIS A 6204 1982, (R)2011 Chemical admixtures for concrete
Test Method for Potential Alkali
Reactivity of Aggregates
ASTM C1260 JIS A 1146 2001, (R)2007 Method of test for alkali‐silica reactivity of aggregates by mortar‐bar method
Test Method for Sieve Analysis of
Fine and Coarse Aggregates
ASTM C136 JIS A 1102 1950, (R)2014 Method of test for sieve analysis of aggregates
Test Method for Slump of Hydraulic‐
Cement Concrete
ASTM C143/C143M JIS A 1101 1950, (R)2014 Method of test for slump of concrete
Portland Cement ASTM C150 JIS R 5210 1950, (R)2009 Portland cement
Practice for Sampling Freshly Mixed
Concrete
ASTM C172/C172M JIS A 1115 1951, (R)2014 Method of sampling fresh concrete
Practice for Making and
Curing Concrete Test Specimens
ASTM C192/C192M JIS A 1132 1963, (R)2014 Method of making and curing concrete specimens
Test Method for Air Content of
Freshly Mixed Concrete by the
Pressure Method
ASTM C231/C231M JIS A 1128 1960, (R)2014 Method of test for air content of fresh concrete by pressure method
Practice for Making and Curing
Concrete Test Specimens in the Field
ASTM C31/C31M JIS A 1132 1963, (R)2014 Method of making and curing concrete specimens
Test Method for Compressive
Strength of Cylindrical Concrete
Specimens
ASTM C39/C39M JIS A 1108 1950, (R)2006 Method of test for compressive strength of concrete
Chemical Admixtures for Concrete ASTM C494/C494M JIS A 6204 1982, (R)2011 Chemical admixtures for concrete
Cellular Glass Thermal Insulation ASTM C552 JIS A 9521 1979, (R)2014 Thermal insulation materials for buildings
Rigid, Cellular Polystyrene Thermal
Insulation
ASTM C578 JIS A 9521 1979, (R)2014 Thermal insulation materials for buildings
Unfaced Preformed Rigid Cellular
Polyisocyanurate Thermal Insulation
ASTM C591 JIS A 9521 1979, (R)2014 Thermal insulation materials for buildings
Fly ash for use in concrete ASTM C618 JIS A 6201 1958, (R)2015 Fly ash for use in concrete
Portland pozzolan cement ASTM C618 JIS R 5212 1950, (R)2009 Portland pozzolan cement
Test Method for Flexural Strength of
Concrete
ASTM C78/C78M JIS A 1106 1950, (R)2006 Method of test for flexural strength of concrete
Ready Mix Concrete ASTM C94 JIS A 5308 1953, (R)2014 Ready‐mixed concrete
Slag Aggregate for Concrete ASTM C989 JIS A 5011 Part 1 Blast furnace slag aggregate:
1997, (R)2013
Part 2 Ferronickel slag aggregate:
1997, (R)2016
Part 3 Copper slag aggregate): 1997, (R)2016
Part 4 Electric arc furnace oxidizing slag aggregate:
2003, (R)2013
Slag aggregate for concrete
Concrete Aggregates ASTM C33 JIS A 5005 1961, (R)2009 Crushed stone and manufactured sand for concrete
Air‐Entrained Admixture for
Concretre
ASTM C260 JIS A 6204 1982, (R)2011 Chemical admixtures for concrete
Test Methods for Water Vapor
Transmission of Materials
ASTM E96/E96M JIS A 9511 1958, (R)2009 Preformed cellular plastics thermal insulation materials
03 30 53 Miscellaneous Cast‐In‐Place
Concrete
Slag Aggregate for Concrete ASTM C989 JIS A 5011 Part 1 Blast furnace slag aggregate:
1997, (R)2013
Part 2:Ferronickel slag aggregate:
1997, (R)2016
Part 3 Copper slag aggregate: 1997, (R)2016
Part 4 Electric arc furnace oxidizing slag aggregate:
2003, (R)2013
Slag aggregate for concrete
Portland Cement ASTM C150 JIS R 5210 1950, (R)2009 Portland cement
Ready Mix Concrete ASTM C94 JIS A 5308 1953, (R)2014 Ready‐mixed concrete
Steel Bars for Concrete ASTM A615/A615M JIS G 3112 1964, (R)2010 Steel bars for concrete reinforcement
Last updated 3/28/2017 Section 01 11 00.00 10-A Page 1
01 11 00.00 10-A ACCEPTABLE ALTERNATIVE JAPNAESE STANDARDS (AAJS)
Year JIS published
(revised)
Japanese Standard Title in English
Welded Wire Fabric ASTM A185 JIS G 3551 1960, (R)2005 Welded steel wire and bar fabrics
Concrete Aggregates ASTM C33 JIS A 5005 1961, (R)2009 Crushed stone and manufactured sand for concrete
Air‐Entrained Admixture for
Concrete
ASTM C260 JIS A 6204 1982, (R)2011 Chemical admixtures for concrete
Polyethylene Sheet ASTM C171 JIS K 6781 1956, r 1994 Polyethylene films for agriculture
Test Method for Slump of Hydraulic‐
Cement
ASTM C143/C143M JIS A 1101 1950, (R)2014 Method of test for slump of concrete
Practice for Sampling Fresh
Concrete
ASTM C172 JIS A 1115 1951, (R)2014 Method of sampling fresh concrete
Test Method for Air Content by
Volume
ASTM C173/ C173M JIS A 1118 1952, (R)2017 Method of test for air content of fresh concrete by volumetric method
Test Method for Air Content by
Pressure Method
ASTM C231 JIS A 1128 1960, (R)2014 Method of test for air content of fresh concrete by pressure method
Practice for Making and Curing
Concrete Test Specimens in the Field
ASTM C31/C31M JIS A 1132 1963, (R)2014 Method of making and curing concrete specimens
Standard Test Method for
Compressive Strength of Cylindrical
Concrete Specimens
ASTM C39/C39M JIS A 1108 1950, (R)2006 Method of test for compressive strength of concrete
04 20 00 Unit Masonry
Concrete Blocks ASTM C90 JIS A 5406 1952, (R)2010 Concrete blocks for buildings
Bricks ASTM C62 JIS R 1250 1951, (R)2011 Common bricks and facing bricks
05 12 00 Structural Steel
Rolled Steel for General Structure ASTM A36/A36M JIS G 3101 1952, (R)2015 Rolled steels for general structure
Rolled Steel for Welded Structure ASTM A36/A36M JIS G 3106 1952, (R)2015 Rolled steels for welded structure
Hot Rolled Atmospheric Corrosion
Resisting Steel for Welded Structure
ASTM A36/A36M JIS G 3114 1968, (R)2016 Hot‐rolled atmospheric corrosion resisting steels for welded structure
Rolled Steel for Building Structure ASTM A36/A36M JIS G 3136 1994, (R)2012 Rolled steels for building structure
Rolled Bars for Building Structure ASTM A6/A6M JIS G 3138 1996, (R)2005 Rolled steel bars for building structure
Light Gage Steel for General
Structure
ASTM C955 JIS G 3350 1957, (R)2009 Light gauge steel sections for general structure
Carbon Steel Tubes for General
Structural
ASTM A500 JIS G 3444 1961, (R)2016 Carbon steel tubes for general structure
Carbon Steel Square Pipes for
General
ASTM A53 JIS G 3466 1966, (R)2016 Carbon steel square and rectangular tubes for general structure
Bolts ASTM A307 JIS B 1180 1961, (R)2014 Hexagon head bolts and hexagon head screws
High‐Strength Bolts ASTM A325 JIS B 1186 1964, (R)2013 Sets of high strength hexagon bolt, hexagon nut and plain washers for friction grip joints
Washer ASTM F436 JIS B 1256 1959, (R)2008 Plain washers
05 52 00 Metal Railings
Bolts ASTM A307 JIS B 1180 1961, (R)2014 Hexagon head bolts and hexagon head screws
Carbon Steel Tubes for General
Structure
ASTM A500/A500M JIS G 3444 1961, (R)2016 Carbon steel tubes for general structure
Carbon Steel Square Pipes for
General Structure
ASTM A53/A53M JIS G 3466 1966, (R)2016 Carbon steel square and rectangular tubes for general structure
06 10 00 Rough Carpentry
Structural Plywood APA PS2 JAS No. 1637 (R)2016 Notification No. 1637 of the Ministry of Agriculture, Forestry and
Fisheries, Japanese Agricultural Standard Plywood
Plywood for Concrete Form APA PS1 JAS No. 1637 (R)2016 Notification No. 1637 of the Ministry of Agriculture, Forestry and
Fisheries, Japanese Agricultural Standard Plywood
Laminated Wood ANSI/AITC A190.1 JAS No. 1638 (R)2016 Notification No. 1638 of the Ministry of Agriculture, Forestry and
Fisheries, Japanese Agricultural Standard Laminated Wood
Structural Laminated Wood ANSI/AITC A190.1 JAS No. 1638 (R)2016 Notification No. 1638 of the Ministry of Agriculture, Forestry and
Fisheries, Japanese Agricultural Standard Laminated Wood
Softwood Finish Lumber ALSC PS 20 JAS No. 1920 (R)2013 Notification No. 1920 of the Ministry of Agriculture, Forestry and
Fisheries, Japanese Agricultural Standard Lumber
Softwood Seathing JAS No. 1085 Notification No. 1085 of the Ministry of Agriculture, Forestry and
Fisheries
Hardwood Lumber AHA A135.4 JAS No. 1920 (R)2013 Notification No. 1920 of the Ministry of Agriculture, Forestry and
Fisheries, Japanese Agricultural Standard Lumber
07 21 16 Mineral Fiber Blanket Insulation
Mineral Fiber Block and Board
Thermal Insulation
ASTM C612 JIS A 9504 1952, (R)2011 Man‐made mineral fibre thermal insulation materials
07 41 13 Metal Roof Panels
Last updated 3/28/2017 Section 01 11 00.00 10-A Page 2
Year JIS published
(revised)
Japanese Standard Title in English
Non‐Structural Metal Roofing ASTM A755/A755M JIS A6514 1977, (R)1995 Components for metal roof‐decks
07 61 14.00 20 Steel Standing Seam Roofing
Formed Japanese Metal Roofing ASTM A755/A755M JIS A6514 1977, (R)1995 Components for metal roof‐decks
08 11 16 Aluminum Doors and Frames
Carbon Structural Steel, Aluminum and Aluminum‐Alloy Sheet and Plate
(Metric)
ASTM A36/A36M,
B209M
JIS A4702, A4704, A4705 JIS A4702:
1957, (R)2015
JIS A4704:
1961, (R)2015
JIS A4705:
1963, (R)2015
Doorsets, Components of light‐weight rolling door for buildings, Components of rolling door for buildings
Aluminum and Aluminum‐Alloy
Extruded Bars, Rods, Wire, Profiles, and Tubes (Metric), Standard Test
Method for Determining Rate of Air
Leakage Through Exterior Windows, Curtain Walls, and Doors Under
Specified Pressure Differences
Across the Specimen, Standard Test
Method for Water Penetration of
Exterior Windows, Skylights, Doors, and Curtain Walls by Uniform Static
Air Pressure Difference
ASTM B221M, E283,
E331
JIS A4706, A4709, A4713 JIS A4706:
1966, (R)2015
JIS A4709:
1979, (R)2004
JIS A4713:
1981, (R)2004
Windows, Screens for windows, Residential sliding storm window panel
09 22 00 Supports for Plaster and Gympsum
Board
Nonstructural Steel Framing
Members
ASTM C645 JIS A 6517 1979, (R)2010 Steel furrings for wall and ceiling in buildings
09 29 00 Gypsum Board
Gypsum Board ASTM C1396/C1396M JIS A 6901 1951, (R)2014 Gypsum boards
09 30 10 Ceramic, Quarry, and Glass Tiling
Ceramic Tile ANSI A137.1 JIS A 5209 1957, (R)2014 Ceramic tiles
09 51 00 Acoustical Ceilings
Acoustical Ceiling ASTM E1264 JIS A 6301 1966, (R)2015 Sound absorbing materials
Metal Ceiling Suspension System ASTM C645 JIS A 6517 1979, (R)2010 Steel furrings for wall and ceiling in buildings
09 65 00 Resilient Flooring
Resilient (Vinyl Composition Floor
Tile)
ASTM F1066 JIS A 5705 1966, (R)2016 Polyvinyl chloride floorcoverings
09 90 00 Paints and Coatings
Anti Rust Paint MPI 101, MPI 107, MPI
JIS K5621, JASS 18 M‐109 JIS K5621:
1952, (R)2008
JASS 18:
1959, (R)2013
Anticorrosive paints for general use, Japan Architectural Standard
Specification 18 M‐109
EP ‐ Exterior Latex, Semi‐Gloss, MPI
Gloss Level 5
MPI 11 JIS K 5663 1956, (R)2008 Synthetic resin emulsion paint & sealer
SOP ‐ Interior Latex, Semi‐Gloss, MPI
Gloss Level 5
MPI 54 JIS K 5516 1965, (R)2014 Ready mixed paints (Synthetic resin type)
OS ‐ Interior Oil Modified Urethane
Clear Satin
MPI 57 JASS 18 Paragraph 5.9, JIS
K5421
JASS 18:
1952, (R)2013
JIS K5421:
1951, (R)2000
Japan Architectural Standard Specification 18 Paragraph 5.9, Boiled oil and boiled linseed oil
NAD ‐ Interior Alkyd, Semi‐Gloss, MPI Gloss Level 5
MPI 47 JIS K5516 1965, (R)2014 Ready mixed paints (Synthetic resin type)
VP ‐ Interior Latex, Semi‐Gloss, MPI
Gloss Level 5
MPI 54 JIS K 5670 2003, (R)2008 Non aqueous dispersion acrylic paint
10 28 13 Toilet Accessories
Mirrors ASTM C1036 JIS R 3220 1986, (R)2011 Glass in building ‐‐ Silvered, flat‐glass mirror
21 13 13.00 10 Wet Pipe Sprinkler System, Fire
Protection
Steel Pipe Black ASTM A53/A53M JIS G 3452/JIS G 3454 JIS G3452:
1962, (R)2016
JIS G3454:
1962, (R)2012
Carbon steel pipes for ordinary piping/Carbon steel tubes for pressure service
Malleable Iron Threaded Fittings ASME B16.3 JIS B 2301 1950, (R)2013 Screwed type malleable cast…