1999 Bryan Street, Suite 1200 Dallas, Texas 75201-3616
(214) 583-8500
Replace E. C. Killin Elementary School
RTA Design Deliverable
Volume 2 of 3: RTA Design Specifications Divisions 05 - 21
Camp Foster, Okinawa, Japan April 16, 2016 Solicitation Number: W912HV-15-D-0002 Project Number: PA00017
Japan Engineer District
41616
Designer
Engineer
SEALS PAGE FOR
REPLACE E.C. KILLIN ELEMENTARY SCHOOL
RTA DESIGN DELIVERABLE – SPECIFICATIONS
CAMP FOSTER, OKINAWA, JAPAN
SOLICITATION NUMBER: W912HV-15-D-0002
PROJECT NUMBER: PA00017
4/16/16
This document was prepared by me or under my direct personal supervision and that I am a duly registered Professional Architect under the laws of the State of Florida.
Name: Mike Cahill
License Number: FL43673
Firm:
Jacobs Engineering Group Inc.
Florida Registered Engineering Firm - AAC001790
Name: Ashley Good
License Number: ID5246
Firm:
Name: Matthew Minjack
License Number: FL56963
Firm:
the laws of the State of Wisconsin.
Name: Matthew L. Narus
License Number: E-37247-6
Firm:
Wisconsin Registered Engineering Firm - 1201
4.16.16
Engineer
Engineer
Interior Designer under the laws of the State of Florida.
EC Killin Elementary School Camp Foster, Okinawa, Japan
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 01 50 PHASING OF WORK
01 10 26.70 33 CONTRACT ADMINISTRATION DATA
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 20 00.00 20 PRICE AND PAYMENT PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 32 16.00 20 CONSTRUCTION PROGRESS DOCUMENTATION
01 32 17.00 20 NETWORK ANALYSIS SCHEDULES (NAS)
01 33 00 SUBMITTAL PROCEDURES
01 33 29 LEED(TM) DOCUMENTATION
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 42 00.00 10 SUSTAINABLE REFERENCES
01 42 15 METRIC MEASUREMENTS
01 45 00.00 10 QUALITY CONTROL
01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS)
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 16 TEMPORARY PEST CONTROL
01 57 20.00 10 ENVIRONMENTAL PROTECTION
01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL
01 58 00 PROJECT IDENTIFICATION
01 62 35 RECYCLED/RECOVERED/BIOBASED MATERIALS
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 75 00 STARTING AND ADJUSTING
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 23.30 33 OPERATION AND MAINTENANCE COMMISSIONING REQUIREMENTS
01 78 24.00 20 FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT
INFORMATION (eOMSI)
01 81 09 TESTING FOR INDOOR AIR QUALITY
01 91 00.00 40 GENERAL COMMISSIONING REQUIREMENTS
01 91 00.10 40 CONSTRUCTION CHECKLISTS COMMISSIONING REQUIREMENTS
01 91 00.20 40 FUNCTIONAL PERFORMANCE TESTING COMMISSIONING REQUIREMENTS
01 91 00.30 40 DEMONSTRATION AND TRAINING COMMISSIONING REQUIREMENTS
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES
02 83 13.00 20 LEAD IN CONSTRUCTION
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs
AND MERCURY
02 84 33 REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS (PCBs)
DIVISION 03 - CONCRETE
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00.00 10 CONCRETE ACCESSORIES
PROJECT TABLE OF CONTENTS Page 1 Deliverable RTA Design PROJECT TABLE OF CONTENTS Page 1 April 16, 2016 Submittal
03 20 00.00 10 CONCRETE REINFORCING
03 30 00.00 10 CAST-IN-PLACE CONCRETE
03 35 00.00 10 CONCRETE FINISHING
03 39 00.00 10 CONCRETE CURING
DIVISION 05 - METALS
05 05 23.16 STRUCTURAL WELDING
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 LAMINATE CLAD ARCHITECTURAL CASEWORK
06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 08 27.00 10 BUILDING ENVELOPE COMMISSIONING REQUIREMENTS
07 13 53 ELASTOMERIC SHEET WATERPROOFING
07 15 00 FLUID-APPLIED MEMBRANE
07 16 19 METALLIC OXIDE WATERPROOFING
07 19 00 WATER REPELLENTS
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 33 23 OVERHEAD COILING DOORS
08 39 54 BLAST RESISTANT DOORS
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 24 23 STUCCO
09 29 00 GYPSUM BOARD
09 30 13 CERAMIC TILING
09 35 16 CHEMICAL-RESISTANT QUARRY TILE
09 51 00 ACOUSTICAL CEILINGS
09 62 38 STATIC-CONTROL FLOORING
09 65 00 RESILIENT FLOORING
PROJECT TABLE OF CONTENTS Page 2 Deliverable RTA Design PROJECT TABLE OF CONTENTS Page 2 April 16, 2016
09 65 66 RESILIENT ATHLETIC FLOORING
09 68 00 CARPETING
09 72 00 WALLCOVERINGS
09 83 13 ACOUSTICAL WALL TREATMENT
09 90 00 PAINTS AND COATINGS
09 96 00 HIGH-PERFORMANCE COATINGS
DIVISION 10 - SPECIALTIES
10 10 00 VISUAL COMMUNICATIONS SPECIALTIES
10 14 00 SIGNAGE
10 14 01 EXTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 21 23.16 CUBICLE TRACK AND HARDWARE
10 22 13 WIRE MESH PARTITIONS
10 22 39 OPERABLE PANEL/VERTICAL LIFT PARTITIONS
10 26 13 WALL AND CORNER GUARDS
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 51 13 METAL LOCKERS
10 56 13 STEEL SHELVING
10 75 00 FLAGPOLES
DIVISION 11 - EQUIPMENT
11 05 40 COMMON WORK RESULTS FOR FOODSERVICE EQUIPMENT
11 06 40.13 FOODSERVICE EQUIPMENT SCHEDULE
11 41 11 REFRIGERATED AND FROZEN FOOD STORAGE EQUIPMENT
11 42 00 FOOD PREPARATION EQUIPMENT
11 44 00 FOOD COOKING EQUIPMENT
11 46 00 FOOD DISPENSING EQUIPMENT
11 47 00 ICE MACHINES
11 48 00 CLEANING AND DISPOSAL EQUIPMENT
11 66 23 GYMNASIUM EQUIPMENT
11 68 13 PLAYGROUND EQUIPMENT
DIVISION 12 - FURNISHINGS
12 21 00 WINDOW BLINDS
12 24 13 ROLLER WINDOW SHADES
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
12 59 00 SYSTEMS FURNITURE
12 93 00 SITE FURNISHINGS
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT
13 48 00.00 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT
DIVISION 14 - CONVEYING EQUIPMENT
14 24 00 HYDRAULIC ELEVATORS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 23 00.00 20 WET CHEMICAL FIRE EXTINGUISHING FOR KITCHEN CABINET
21 30 00 FIRE PUMPS
PROJECT TABLE OF CONTENTS Page 3 Deliverable RTA Design PROJECT TABLE OF CONTENTS Page 3 April 16, 2016
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 07 19.00 40 PLUMBING PIPING INSULATION
22 08 00.00 10 PLUMBING SYSTEMS COMMISSIONING REQUIREMENTS
22 31 00 WATER SOFTENERS, CATION-EXCHANGE (SODIUM CYCLE)
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND
EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00.10 10 HVAC SYSTEMS COMMISSIONING REQUIREMENTS
23 09 13.34 40 CONTROL VALVES, SELF-CONTAINED
23 09 23 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER
BUILDING CONTROL SYSTEMS
23 09 24 ENERGY METERING SYSTEMS COMMISSIONING REQUIREMENTS
23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM
23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS
23 31 13.00 40 METAL DUCTS
23 34 23.00 40 HVAC POWER VENTILATORS
23 36 00.00 40 AIR TERMINAL UNITS
23 37 13.00 40 DIFFUSERS, REGISTERS, AND GRILLS
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED, HEATING, AND CONDENSER WATER PIPING SYSTEMS
23 65 00 COOLING TOWERS
23 69 00.00 20 REFRIGERATION EQUIPMENT FOR COLD STORAGE
23 73 13.00 40 MODULAR INDOOR CENTRAL-STATION AIR-HANDLING UNITS
23 81 00.00 20 UNITARY AIR CONDITIONING EQUIPMENT
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 19.00 10 INSULATED WIRE AND CABLE
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 05 73.13 OVERCURRENT PROTECTIVE DEVICE SHORT-CIRCUIT STUDY
26 05 73.16 OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY
26 05 73.19 OVERCURRENT PROTECTIVE DEVICE ARC-FLASH STUDY
26 08 00.00 10 ELECTRICAL LIGHTING CONTROL SYSTEMS COMMISSIONING
REQUIREMENTS
26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 23 00 SWITCHBOARDS AND SWITCHGEAR
26 27 14.00 20 ELECTRICITY METERING
26 51 00 INTERIOR LIGHTING
26 55 61 THEATRICAL LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 21 00.00 40 VIDEO INTERCOMMUNICATION SYSTEM
27 51 16 INDEPENDENT SOUND SYSTEM
27 51 19 AREA OF RESCUE INTERCOMMUNICATION SYSTEM
27 51 23.10 INTEGRATED INTERCOM, PUBLIC ADDRESS AND MASTER CLOCK
PROJECT TABLE OF CONTENTS Page 4 Deliverable RTA Design PROJECT TABLE OF CONTENTS Page 4 April 16, 2016
SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 20 00.00 20 ELECTRONIC SECURITY SYSTEMS (ESS), COMMERCIAL
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 05 19 GEOTEXTILE
31 11 00 CLEARING AND GRUBBING
31 31 16.13 CHEMICAL TERMITE CONTROL
31 32 40 SOIL MIXING (WET METHOD)
31 50 00 EXCAVATION SUPPORT AND PROTECTION
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 16 BASE COURSE FOR RIGID AND SUBBASES FOR FLEXIBLE PAVING
32 12 10 BITUMINOUS TACK AND PRIME COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 12 43 POROUS PAVEMENT SYSTEM
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 13 73 COMPRESSION JOINT SEALS FOR CONCRETE PAVEMENTS
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
32 16 15 CONCRETE BLOCK PAVEMENTS
32 17 24.00 10 PAVEMENT MARKINGS
32 18 16.13 PLAYGROUND PROTECTIVE SURFACING
32 31 13 CHAIN LINK FENCES AND GATES
32 31 13.53 HIGH-SECURITY CHAIN LINK FENCES AND GATES
32 31 16 VERTICAL ARM BARRIER GATE
32 31 26 WIRE FENCES AND GATES
32 92 19 SEEDING
32 93 00 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 11 00 WATER DISTRIBUTION
33 16 19 FIRE WATER RESERVOIR
33 30 00 SANITARY SEWERS
33 40 00 STORM DRAINAGE UTILITIES
33 46 16 SUBDRAINAGE SYSTEM
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 5 Deliverable RTA Design PROJECT TABLE OF CONTENTS Page 5 April 16, 2016
SECTION 05 05 23.16
STRUCTURAL WELDING
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
AISC 360 (2010) Specification for Structural Steel Buildings
AMERICAN SOCIETY FOR NONDESTRUCTIVE TESTING (ASNT)
ANSI/ASNT CP-189 (2011) ASNT Standard for Qualification and Certification of Nondestructive Testing Personnel (ANSI/ASNT CP-105-2006)
AMERICAN WELDING SOCIETY (AWS)
AWS A2.4 (2012) Standard Symbols for Welding, Brazing and Nondestructive Examination
AWS D1.1/D1.1M (2010; Errata 2011) Structural Welding Code - Steel
AWS D1.3/D1.3M (2008; Errata 2008) Structural Welding Code - Sheet Steel
AWS D1.4/D1.4M (2011) Structural Welding Code - Reinforcing Steel
AWS D1.8/D1.8M (2009) Structural Welding Code—Seismic Supplement
AWS D14.4/D14.4M (2012) Specification for Welded Joints for Machinery and Equipment
AWS Z49.1 (2012) Safety in Welding and Cutting and Allied Processes
ASTM INTERNATIONAL (ASTM)
ASTM E165/E165M (2012) Standard Practice for Liquid Penetrant Examination for General Industry
ASTM E709 (2014) Standard Guide for Magnetic Particle Examination
RTA Design SECTION 05 05 23.16 Page 1 April 16, 2016 Deliverable
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Welding Quality Assurance Plan
SD-03 Product Data
Welding Procedure Qualifications Welder, Welding Operator, and Tacker Qualification Inspector Qualification Previous Qualifications Pre-qualified Procedures Welding Electrodes and Rods
SD-06 Test Reports
Nondestructive Testing
SD-07 Certificates
Certified Welding Procedure Specifications (WPS) Certified Brazing Procedure Specifications (BPS) Certified Procedure Qualification Records (PQR) Certified Welder Performance Qualifications (WPQ) Certified Brazer Performance Qualifications (BPQ)
1.3 QUALITY ASSURANCE
Except for pre-qualified (in accordance with AWS D1.1/D1.1M ) and previously qualified procedures, each Contractor performing welding must record in detail and qualify the welding procedure specification for any welding procedure followed in the fabrication of weldments. Conform welding procedure qualifications to AWS D1.1/D1.1M , AWS D1.8/D1.8M for elements comprising the seismic force resisting system as noted in the drawings. and to the specifications in this section. Submit for approval copies of the welding procedure specification and the results of the procedure qualification test records for each type of welding which requires procedure qualification and the welder, welding operator, or tacker qualification test records.. Approval of any procedure, however, does not relieve the Contractor of the sole responsibility for producing a finished structure meeting all the specified requirements. Submit this information on the forms in Annex M of AWS D1.1/D1.1M . Individually identify and clearly reference on the detail drawings and erection drawings all welding procedure specifications, or suitably key them to the contract drawings. In case of conflict between this specification and AWS D1.1/D1.1M , this specification governs.
1.3.1 General Requirements
a. For Structural Projects, provide documentation of the following:
RTA Design SECTION 05 05 23.16 Page 2 April 16, 2016
(1) Component Thickness 3 mm and greater: Qualification documents (WPS, PQR, and WPQ) in accordance with AWS D1.1/D1.1M and AWS D1.8/D1.8M for elements indicated on the drawings to be part of the seismic force resisting system.
(2) Component Thickness Less than 3 mm: Qualification documents (WPS, PQR, and WPQ) in accordance with AWS D1.3/D1.3M .
(3) Reinforcing Steel: Qualification documents (WPS, PWR, and WPQ) in accordance with AWS D1.4/D1.4M .
b. For other applications, provide documentation of the following:
(1) Submit two copies of the Certified Welding Procedure Specifications (WPS), Certified Brazing Procedure Specifications (BPS) and Certified Procedure Qualification Records (PQR) to the Contracting Officer for review.
(2) Submit two copies of the Certified Welder Performance Qualifications (WPQ)and Certified Brazer Performance Qualifications (BPQ) to the Contracting Officer for review within fifteen calendar days prior to any employee welding on the project material.
(3) Machinery: Qualification documents (WPS, PQR, and WPQ) in accordance with AWS D14.4/D14.4M .
1.3.2 Previous Qualifications
Welding procedures previously qualified by test may be accepted for this contract without re-qualification, upon receipt of the test results, if the following conditions are met:
a. Testing was performed by an approved testing laboratory, technical consultant, or the Contractor's approved quality control organization.
b. The qualified welding procedure conforms to the requirements of this specification and is applicable to welding conditions encountered under this contract.
c. The welder, welding operator, and tacker qualification tests conform to the requirements of this specification and are applicable to welding conditions encountered under this contract.
1.3.3 Pre-qualified Procedures
Welding procedures which are considered pre-qualified as specified in AWS D1.1/D1.1M will be accepted without further qualification. Submit for approval a listing or an annotated drawing to indicate the joints not pre-qualified. Procedure qualification is mandatory for these joints.
1.3.4 Retests
If welding procedure fails to meet the requirements of AWS D1.1/D1.1M , revise and re-qualify the procedure specification, or at the Contractor's option, welding procedure may be retested in accordance with AWS D1.1/D1.1M .
If the welding procedure is qualified through retesting, submit all test results, including those of test welds that failed to meet the
RTA Design SECTION 05 05 23.16 Page 3 April 16, 2016 requirements, with the welding procedure.
1.3.5 Welder, Welding Operator, and Tacker Qualification
Each welder, welding operator, and tacker assigned to work on this contract must be qualified in accordance with the applicable requirements of AWS D1.1/D1.1M , and AWS D1.8/D1.8M for elements indicated on the drawings to be part of the seismic force resisting system, and as specified in this section. Welders, welding operators, and tackers who make acceptable procedure qualification test welds will be considered qualified for the welding procedure used.
1.3.5.1 Previous Personnel Qualifications
At the discretion of the Contracting Officer, welders, welding operators, and tackers qualified by test within the previous 6 months may be accepted for this contract without re-qualification if all the following conditions are met:
a. Copies of the welding procedure specifications, the procedure qualification test records, and the welder, welding operator, and tacker qualification test records are submitted and approved in accordance with the specified requirements for detail drawings.
b. Testing was performed by an approved testing laboratory, technical consultant, or the Contractor's approved quality control organization.
c. The previously qualified welding procedure conforms to the requirements of this specification and is applicable to welding conditions encountered under this contract.
d. The welder, welding operator, and tacker qualification tests conform to the requirements of this specification and are applicable to welding conditions encountered under this contract.
1.3.5.2 Certificates
Before assigning any welder, welding operator, or tacker to work under this contract, submit the names of the welders, welding operators, and tackers to be employed, and certification that each individual is qualified as specified. State in the certification the type of welding and positions for which the welder, welding operator, or tacker is qualified, the code and procedure under which the individual is qualified, the date qualified, and the name of the firm and person certifying the qualification tests. Keep the certification current, on file, and furnish 3 copies.
1.3.5.3 Renewal of Qualification
Re-qualification of a welder or welding operator is required under any of the following conditions:
a. It has been more than 6 months since the welder or welding operator has used the specific welding process for which he is qualified.
b. There is specific reason to question the welder or welding operator's ability to make welds that meet the requirements of these specifications.
RTA Design SECTION 05 05 23.16 Page 4 April 16, 2016
c. The welder or welding operator was qualified by an employer other than those firms performing work under this contract, and a qualification test has not been taken within the past 12 months. Submit as evidence of conformance all records showing periods of employment, name of employer where welder, or welding operator, was last employed, and the process for which qualified.
d. A tacker who passes the qualification test is considered eligible to perform tack welding indefinitely in the positions and with the processes for which he/she is qualified, unless there is some specific reason to question the tacker's ability. In such a case, the tacker is required to pass the prescribed tack welding test.
1.3.6 Inspector Qualification
Submit inspector qualifications that are in accordance with AWS D1.1/D1.1M and AWS D1.8/D1.8M . Qualify all nondestructive testing personnel in accordance with the requirements of ANSI/ASNT CP-189 for Levels I or II in the applicable nondestructive testing method. The inspector may be supported by assistant welding inspectors who are not qualified to AWS D1.1/D1.1M , and assistant inspectors may perform specific inspection functions under the supervision of the qualified inspector, as allowed by
AWS D1.1/D1.1M .
1.3.7 Symbols and Safety
Use symbols in accordance with AWS A2.4 , unless otherwise indicated.
Follow safe welding practices and safety precautions during welding in conformance with AWS Z49.1 .
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
Conform the design of welded connections to AISC 360 , unless otherwise indicated or specified. Material with welds will not be accepted unless the welding is specified or indicated on the drawings or otherwise approved. Perform welding as specified in this section, except where additional requirements are shown on the drawings or are specified in other sections. Do not commence welding until welding procedures, inspectors, nondestructive testing personnel, welders, welding operators, and tackers have been qualified and the submittals approved by the Contracting Officer. Perform all testing at or near the work site.
Maintain records of the test results obtained in welding procedure, welder, welding operator, and tacker performance qualifications.
2.1.1 Pre-erection Conference
Hold a pre-erection conference prior to the start of the field welding, to bring all affected parties together and to gain a naturally clear understanding of the project and the Welding Procedure Specifications (WPS) (submitted for all welding, including welding done using pre-qualified procedures). Mandatory attendance is required by all Contractor's welding production and inspection personnel and appropriate Government personnel. Include as items for discussion: responsibilities of various parties; welding procedures and processes to be followed;
welding sequence (both within a joint and joint sequence within the building); inspection requirements and procedures, both visual and nondestructive testing; welding schedule; and other items deemed necessary
RTA Design SECTION 05 05 23.16 Page 5 April 16, 2016 by the attendees.
2.2 WELDING EQUIPMENT AND MATERIALS
Provide all welding equipment, welding electrodes and rods, welding wire, and fluxes capable of producing satisfactory welds when used by a qualified welder or welding operator performing qualified welding procedures. Provide welding equipment and materials that comply with the applicable requirements of AWS D1.1/D1.1M and AWS D1.8/D1.8M for elements indicated on the drawings to be part of the seismic force resisting system.
Submit product data on welding electrodes and rods.
PART 3 EXECUTION
3.1 WELDING OPERATIONS
3.1.1 Requirements
Conform workmanship and techniques for welded construction to the requirements of AWS D1.1/D1.1M , AWS D1.8/D1.8M for elements indicated on the drawings to be part of the seismic force resisting system and AISC 360 .
When AWS D1.1/D1.1M , AWS D1.8/D1.8M for elements indicated on the drawings to be part of the seismic force resisting system and the AISC 360 specification conflict, the requirements of AWS D1.1/D1.1M , AWS D1.8/D1.8M for elements indicated on the drawings to be part of the seismic force resisting system govern.
3.1.2 Identification
Identify all welds in one of the following ways:
a. Submit written records to indicate the location of welds made by each welder, welding operator, or tacker.
b. Identify all work performed by each welder, welding operator, or tacker with an assigned number, letter, or symbol to identify welds made by that individual. The Contracting Officer may require welders, welding operators, and tackers to apply their symbol next to the weld by means of rubber stamp, felt-tipped marker with waterproof ink, or other methods that do not cause an indentation in the metal. Place the identification mark for seam welds adjacent to the weld at 1 m intervals. Identification with die stamps or electric etchers is not allowed.
3.2 QUALITY CONTROL
Perform testing using an approved inspection or testing laboratory or technical consultant; or if approved, the Contractor's inspection and testing personnel may be used instead of the commercial inspection or testing laboratory or technical consultant. Perform visual and ultrasonic and magnetic particle, inspections to determine conformance with paragraph STANDARDS OF ACCEPTANCE. Conform procedures and techniques for inspection with applicable requirements of AWS D1.1/D1.1M , AWS D1.8/D1.8M for elements indicated on the drawings to be part of the seismic force resisting system, ASTM E165/E165M , and ASTM E709. Submit a Welding Quality Assurance Plan and records of tests and inspections.
RTA Design SECTION 05 05 23.16 Page 6 April 16, 2016
3.3 STANDARDS OF ACCEPTANCE
Conform dimensional tolerances for welded construction, details of welds, and quality of welds with the applicable requirements of AWS D1.1/D1.1M , AWS D1.8/D1.8M for elements indicated on the drawings to be part of the seismic force resisting system and the contract drawings. Perform nondestructive testing by visual inspection and ultrasonic, magnetic particle, methods. The minimum extent of nondestructive testing must be random 15 percent of welds or joints, as indicated on the drawings.
Submit all records of nondestructive testing. Visual inspection is required at all welds.
3.3.1 Nondestructive Testing
The welding is subject to inspection and tests in the mill, shop, and field. Inspection and tests in the mill or shop do not relieve the Contractor of the responsibility to furnish weldments of satisfactory quality. When materials or workmanship do not conform to the specification requirements, the Government reserves the right to reject material or workmanship or both at any time before final acceptance of the structure containing the weldment. Any indication of a defect is regarded as a defect, unless re-evaluation by nondestructive methods or by surface conditioning shows that no unacceptable defect is present. Submit all records of nondestructive testing in accordance with paragraph STANDARDS
OF ACCEPTANCE.
3.3.2 Destructive Tests
Make all repairs when metallographic specimens are removed from any part of a structure. Employ only qualified welders or welding operators, and use the proper joints and welding procedures, including peening or heat treatment if required, to develop the full strength of the members and joints cut and to relieve residual stress.
3.4 GOVERNMENT INSPECTION AND TESTING
In addition to the inspection and tests performed by the Contractor for quality control, the Government will perform inspection and testing for acceptance to the extent determined by the Contracting Officer. The costs of such inspection and testing will be borne by the Contractor if unsatisfactory welds are discovered, or by the Government if the welds are satisfactory. The work may be performed by the Government's own forces or under a separate contract for inspection and testing. The Government reserves the right to perform supplemental nondestructive and destructive tests to determine compliance with paragraph STANDARDS OF ACCEPTANCE.
3.5 CORRECTIONS AND REPAIRS
If inspection or testing indicates defects in the weld joints, repair defective welds using a qualified welder or welding operator as applicable. Conduct corrections in accordance with the requirements of AWS D1.1/D1.1M , AWS D1.8/D1.8M for elements indicated on the drawings to be part of the seismic force resisting system, and the specifications.
Repair all defects in accordance with the approved procedures. Repair defects discovered between passes before additional weld material is deposited. Wherever a defect is removed and repair by welding is not required, blend the affected area into the surrounding surface to eliminate sharp notches, crevices, or corners. After a defect is thought to have been removed, and before re-welding, examine the area by suitable
RTA Design SECTION 05 05 23.16 Page 7 April 16, 2016 methods to ensure that the defect has been eliminated. Repaired welds must meet the inspection requirements for the original welds.
-- End of Section --
RTA Design SECTION 05 05 23.16 Page 8 April 16, 2016
SECTION 05 12 00
STRUCTURAL STEEL
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
AISC 201 (2006) AISC Certification Program for Structural Steel Fabricators
AISC 303 (2010) Code of Standard Practice for Steel Buildings and Bridges
AISC 325 (2011) Steel Construction Manual
AISC 326 (2009) Detailing for Steel Construction
AISC 341 (2010) Seismic Provisions for Structural Steel Buildings
AISC 360 (2010) Specification for Structural Steel Buildings
AISC 810 (1997) Design Guide 10: Erection Bracing of Low-Rise Structural Steel Buildings
AMERICAN WELDING SOCIETY (AWS)
AWS A2.4 (2012) Standard Symbols for Welding, Brazing and Nondestructive Examination
AWS D1.1/D1.1M (2010; Errata 2010) Structural Welding Code - Steel
AWS D1.8/D1.8M (2009) Structural Welding Code—Seismic Supplement
ASME INTERNATIONAL (ASME)
ASME B46.1 (2009) Surface Texture, Surface Roughness, Waviness and Lay
ASTM INTERNATIONAL (ASTM)
ASTM A325M (2009) Standard Specification for Structural Bolts, Steel, Heat Treated, 830 MPa Minimum Tensile Strength (Metric)
ASTM A36/A36M (2008) Standard Specification for Carbon Structural Steel
RTA Design SECTION 05 12 00 Page 1 April 16, 2016
ASTM A500/A500M (2010a) Standard Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes
ASTM A53/A53M (2010) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A563M (2007) Standard Specification for Carbon and Alloy Steel Nuts (Metric)
ASTM A6/A6M (2011) Standard Specification for General Requirements for Rolled Structural Steel Bars, Plates, Shapes, and Sheet Piling
ASTM A992/A992M (2011) Standard Specification for Structural Steel Shapes
ASTM C1107/C1107M (2011) Standard Specification for Packaged Dry, Hydraulic-Cement Grout (Nonshrink)
ASTM C827/C827M (2010) Change in Height at Early Ages of Cylindrical Specimens from Cementitious Mixtures
ASTM F1554 (2007ae1) Standard Specification for Anchor Bolts, Steel, 36, 55, and 105-ksi Yield Strength
ASTM F436M (2011) Hardened Steel Washers (Metric)
JAPANESE INDUSTRIAL STANDARDS (JIS)
JIS B 1186 (2009) High Strength Hexagon Bolts
JIS G 3101 SSC400 (2004) Steel Plate/Sheet for General Purpose Structural Steels
JIS G 3136 SN490B (2005) Rolled Steels for Building Structure
JIS G 3138 (2005) Rolled Steel Bars for Building Structure
JIS G 3444 (2010) Carbon Steel Tubes for General Structure
JIS G 3466 STKR4010 (2005) Carbon Steel Square for General Structural Purposes
THE SOCIETY FOR PROTECTIVE COATINGS (SSPC)
SSPC PA 1 (2000; E 2004) Shop, Field, and Maintenance Painting of Steel
SSPC PS 13.01 (1982; E 2004) Epoxy Polyamide Painting System
RTA Design SECTION 05 12 00 Page 2 April 16, 2016
SSPC Paint 25 (1997; E 2004) Zinc Oxide, Alkyd, Linseed Oil Primer for Use Over Hand Cleaned Steel, Type I and Type II
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1926.756 Steel Erection; Beams and Columns
1.2 SYSTEM DESCRIPTION
Provide the structural steel system, including shop primer, complete and ready for use. Structural steel systems including design, materials, installation, workmanship, fabrication, assembly, erection, inspection, quality control, and testing shall be provided in accordance with AISC 360 except as modified in this contract. Structural steel comprising the seismic force resisting system as indicated in the drawings shall be provided in accordance with AISC 341 .
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval and for Government information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Erection Plan, including description of temporary supports; G
Fabrication drawings including description of connections; G
SD-03 Product Data
Shop primer
Welding electrodes and rods
Non-Shrink Grout
SD-06 Test Reports
Bolts, nuts, and washers
Supply the certified manufacturer's mill reports which clearly show the applicable ASTM mechanical and chemical requirements together with the actual test results for the supplied fasteners.
SD-07 Certificates
Steel
Bolts, nuts, and washers
AISC Quality Certification
Welding procedures and qualifications
RTA Design SECTION 05 12 00 Page 3 April 16, 2016
1.4 AISC QUALITY CERTIFICATION
Work shall be fabricated in an AISC certified Category Std fabrication plant.
1.5 SEISMIC PROVISIONS
Structural steel comprising the seismic force resisting system as indicated in the drawings shall be provided in accordance with AISC 341 .
1.6 QUALITY ASSURANCE
1.6.1 Drawing Requirements
Submit fabrication drawings for approval prior to fabrication. Prepare in accordance with AISC 326 and AISC 325 . Fabrication drawings shall not be reproductions of contract drawings. Include complete information for the fabrication and erection of the structure's components, including the location, type, and size of bolts, welds, member sizes and lengths, connection details, blocks, copes, and cuts. Double connections that require an erection seat to comply with OSHA 29 CFR 1926.756 (c)(1) shall be shown on the shop drawings. Use AWS A2.4 standard welding symbols.
Shoring and temporary bracing shall be designed and sealed by a registered professional engineer and submitted for record purposes. Member substitutions of details shown on the contract drawings shall be clearly highlighted on the fabrication drawings. Explain the reasons for any deviations from the contract drawings.
1.6.2 Certifications
1.6.2.1 Erection Plan
Submit for record purposes. Indicate the sequence of erection, temporary shoring and bracing.
1.6.2.2 Welding Procedures and Qualifications
Prior to welding, submit certification for each welder stating the type of welding and positions qualified for, the code and procedure qualified under, date qualified, and the firm and individual certifying the qualification tests. If the qualification date of the welding operator is more than one-year old, the welding operator's qualification certificate shall be accompanied by a current certificate by the welder attesting to the fact that he has been engaged in welding since the date of certification, with no break in welding service greater than 6 months.
Conform to all requirements specified in AWS D1.1/D1.1M , as supplemented by AWS D1.8/D1.8M for structural steel elements that are part of the seismic force resisting system as indicated in the drawings.
PART 2 PRODUCTS
2.1 STEEL
2.1.1 Structural Steel
ASTM A36/A36M or JIS G 3101 SSC400 .
RTA Design SECTION 05 12 00 Page 4 April 16, 2016
2.1.2 High-Strength Structural Steel
2.1.3 Structural Shapes for Use in Building Framing
Wide flange shapes, ASTM A992/A992M or JIS G 3136 SN490B .
2.1.4 Structural Steel Tubing
ASTM A500/A500M or JIS G 3466 STKR4010 , Grade B 46.
2.1.5 Steel Pipe
ASTM A53/A53M, Type E or S, Grade B, weight class STD (Standard) or
JIS G 3444 .
2.2 BOLTS, NUTS, AND WASHERS
Provide the following unless indicated otherwise.
2.2.1 Structural Steel
2.2.1.1 Bolts
ASTM A325M, Type 1 minimum, or JIS B 1186 F10T. The bolt heads and the nuts of the supplied fasteners must be marked with the manufacturer's identification mark, the strength grade and type specified by ASTM specifications.
2.2.1.2 Nuts
ASTM A563M or JIS B 1186 F10, Grade A, heavy hex style.
2.2.1.3 Washers
ASTM F436M or JIS B 1186 F35 washers for ASTM A325M minimum or JIS B 1186 F10T bolts.
2.2.2 Foundation Anchorage
2.2.2.1 Anchor Bolts
ASTM F1554 Gr 36, Class 1A or JIS G 3138 SNR400A (Fy=235 MPa).
2.3 STRUCTURAL STEEL ACCESSORIES
2.3.1 Welding Electrodes and Rods
AWS D1.1/D1.1M , as supplemented by AWS D1.8/D1.8M for structural steel elements that are part of the seismic force resisting system as indicated in the drawings.
2.3.2 Non-Shrink Grout
ASTM C1107/C1107M , with no ASTM C827/C827M shrinkage. Grout shall be nonmetallic.
2.3.3 Welded Shear Stud Connectors
AWS D1.1/D1.1M .
RTA Design SECTION 05 12 00 Page 5 April 16, 2016
2.4 SHOP PRIMER
SSPC Paint 25 , (alkyd primer) or SSPC PS 13.01 epoxy-polyamide, green primer (Form 150) type 1. Primer shall conform to Federal, State, and local VOC regulations. If flash rusting occurs, re-clean the surface prior to application of primer.
2.5 FABRICATION
2.5.1 Markings
Prior to erection, members shall be identified by a painted erection mark.
Connecting parts assembled in the shop for reaming holes in field connections shall be match marked with scratch and notch marks. Do not locate erection markings on areas to be welded. Do not locate match markings in areas that will decrease member strength or cause stress concentrations.
2.5.2 Shop Primer
Shop prime structural steel, except as modified herein, in accordance with SSPC PA 1 . Do not prime steel surfaces embedded in concrete, surfaces to receive sprayed-on fireproofing, or surfaces within 13 mm of the toe of the welds prior to welding (except surfaces on which metal decking is to be welded). Prior to assembly, prime surfaces which will be concealed or inaccessible after assembly. Do not apply primer in foggy or rainy weather; when the ambient temperature is below 7 degrees C or over 35 degrees C; or when the primer may be exposed to temperatures below 4 degrees C within 48 hours after application, unless approved otherwise by the Contracting Officer.
2.5.2.1 Cleaning
SSPC SP6/NACE No. 3 maintain steel surfaces free from rust, dirt, oil, grease, and other contaminants through final assembly.
2.5.2.2 Primer
Apply primer to a minimum dry film thickness of 0.05 mm. Repair damaged primed surfaces with an additional coat of primer.
2.5.3 Fireproofing
Surfaces to receive epoxy coatings shall be cleaned and prepared in accordance with the manufacturer's recommendations.
2.6 DRAINAGE HOLES
Adequate drainage holes shall be drilled to eliminate water traps. Hole diameter shall be 13 mm and location shall be indicated on the detail drawings. Hole size and location shall not affect the structural integrity.
PART 3 EXECUTION
3.1 FABRICATION
Fabrication shall be in accordance with the applicable provisions of
RTA Design SECTION 05 12 00 Page 6 April 16, 2016
AISC 325 . Fabrication and assembly shall be done in the shop to the greatest extent possible. The fabricating plant shall be certified under the AISC 201 for Category STD structural steelwork.
Compression joints depending on contact bearing shall have a surface roughness not in excess of 13 micrometer as determined by ASME B46.1 , and ends shall be square within the tolerances for milled ends specified in ASTM A6/A6M or JIS G 3138 .
Structural steelwork, except surfaces of steel to be encased in concrete, surfaces to be field welded, surfaces to be fireproofed shall be prepared for painting in accordance with endorsement "P" of AISC 201 and primed with the specified paint.
Shop splices of members between field splices will be permitted only where indicated on the Contract Drawings. Splices not indicated require the approval of the Contracting Officer.
3.2 ERECTION
a. For low-rise structural steel buildings (18 m tall or less and a maximum of 2 stories), the erection plan shall conform to AISC 303 and the structure shall be erected in accordance with AISC 810 .
b. Do not splice truss top and bottom chords except where indicated on drawings or as approved by the Contracting Officer.
Provide for drainage in structural steel. After final positioning of steel members, provide full bearing under base plates and bearing plates using nonshrink grout. Place nonshrink grout in accordance with the manufacturer's instructions.
3.2.1 STORAGE
Material shall be stored out of contact with the ground in such manner and location as will minimize deterioration.
3.3 CONNECTIONS
Except as modified in this section, connections not detailed shall be designed in accordance with AISC 360 . Build connections into existing work. Do not tighten anchor bolts set in concrete with impact torque wrenches. Punch, subpunch and ream, or drill bolt holes perpendicular to the surface of the member. Holes shall not be cut or enlarged by burning. Bolts, nuts, and washers shall be clean of dirt and rust, and lubricated immediately prior to installation.
3.3.1 High-Strength Bolts
ASTM A325M or JIS B 1186 F10T bolts shall be fully tensioned to 70 percent of their minimum tensile strength. Bolts shall be installed in connection holes and initially brought to a snug tight fit. After the initial tightening procedure, bolts shall then be fully tensioned, progressing from the most rigid part of a connection to the free edges.
3.4 GAS CUTTING
Use of gas-cutting torch in the field for correcting fabrication errors will not be permitted on any major member in the structural framing. Use
RTA Design SECTION 05 12 00 Page 7 April 16, 2016 of a gas cutting torch will be permitted on minor members not under stress only after approval has been obtained from the Contracting Officer.
3.5 WELDING
AWS D1.1/D1.1M Grind exposed welds smooth as indicated. Provide AWS D1.1/D1.1M qualified welders, welding operators, and tackers.
The Contractor shall develop and submit the Welding Procedure Specifications (WPS) for all welding, including welding done using prequalified procedures. Prequalified procedures may be submitted for information only; however, procedures that are not prequalified shall be submitted for approval. Comply with AWS D1.8/D1.8M for structural steel elements that are part of the seismic force resisting system as indicated in the drawings.
3.5.1 Removal of Temporary Welds, Run-Off Plates, and Backing Strips
Remove from finished areas where steel is exposed to view and elsewhere as indicated.
3.6 SHOP PRIMER REPAIR
Repair shop primer in accordance with the paint manufacturer's recommendation for surfaces damaged by handling, transporting, cutting, welding, or bolting.
3.7 FIELD QUALITY CONTROL
Perform field tests, and provide labor, equipment, and incidentals required for testing. The Contracting Officer shall be notified in writing of defective welds, bolts, nuts, and washers within 7 working days of the date of weld inspection.
3.7.1 Welds
3.7.1.1 Visual Inspection
AWS D1.1/D1.1M , as supplemented by AWS D1.8/D1.8M for structural steel elements that are part of the seismic force resisting system as indicated in the drawings. Furnish the services of AWS-certified welding inspectors for fabrication and erection inspection and testing and verification inspections. Welding inspectors shall visually inspect and mark welds, including fillet weld end returns.
The Contractor shall inspect proper preparation, size, gaging location, and acceptability of welds; identification marking; operation and current characteristics of welding sets in use.
3.7.1.2 Nondestructive Testing
AWS D1.1/D1.1M , as supplemented by AWS D1.8/D1.8M for structural steel elements that are part of the seismic force resisting system as indicated in the drawings. Test locations shall be selected by the Contracting Officer. If more than 20 percent of welds made by a welder contain defects identified by testing, then all welds made by that welder shall be tested by radiographic or ultrasonic testing, as approved by the Contracting Officer. When all welds made by an individual welder are required to be tested, magnetic particle testing shall be used only in
RTA Design SECTION 05 12 00 Page 8 April 16, 2016 areas inaccessible to either radiographic or ultrasonic testing. Retest defective areas after repair.
Testing frequency: Provide the following types and number of tests:
Test Type Number of Tests
Radiographic
Ultrasonic 100 percent of penetration groove welds
Magnetic Particle
Dye Penetrant
3.7.2 High-Strength Bolts
3.7.2.1 Testing Bolt, Nut, and Washer Assemblies
Test a minimum of 3 bolt, nut, and washer assemblies from each mill certificate batch in a tension measuring device at the job site prior to the beginning of bolting start-up. Demonstrate that the bolts and nuts, when used together, can develop tension not less than the provisions specified in AISC 360 , depending on bolt size and grade. The bolt tension shall be developed by tightening the nut. A representative of the manufacturer or supplier shall be present to ensure that the fasteners are properly used, and to demonstrate that the fastener assemblies supplied satisfy the specified requirements.
3.7.2.2 Inspection
Inspection procedures shall be in accordance with AISC 360 . Inspection for structural steel comprising the seismic force resisting system as indicated in the drawings shall be in accordance with AISC 341 . Confirm and report to the Contracting Officer that the materials meet the project specification and that they are properly stored. Confirm that the faying surfaces have been properly prepared before the connections are assembled. Observe the specified job site testing and calibration, and confirm that the procedure to be used provides the required tension.
Monitor the work to ensure the testing procedures are routinely followed on joints that are specified to be fully tensioned.
3.7.2.3 Testing
The Government has the option to perform nondestructive tests on 5 percent of the installed bolts to verify compliance with pre-load bolt tension requirements. The nondestructive testing will be done in-place using an ultrasonic measuring device or any other device capable of determining in-place pre-load bolt tension. The test locations shall be selected by the Contracting Officer. If more than 10 percent of the bolts tested contain defects identified by testing, then all bolts used from the batch from which the tested bolts were taken, shall be tested. Retest new bolts after installation.
RTA Design SECTION 05 12 00 Page 9 April 16, 2016
3.8 SPECIAL INSPECTION AND TESTING FOR SEISMIC-RESISTING SYSTEMS
Special inspections and testing for seismic-resisting systems and components shall be done in accordance with Section 01 45 35 SPECIAL
INSPECTION FOR SEISMIC-RESISTING SYSTEMS.
-- End of Section --
RTA Design SECTION 05 12 00 Page 10 April 16, 2016
SECTION 05 30 00
STEEL DECKS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
AISC 360 (2010) Specification for Structural Steel Buildings
AMERICAN IRON AND STEEL INSTITUTE (AISI)
AISI SG03-3 (2002; Suppl 2001-2004; R 2008) Cold-Formed Steel Design Manual Set
AMERICAN WELDING SOCIETY (AWS)
AWS D1.1/D1.1M (2010; Errata 2010) Structural Welding Code - Steel
AWS D1.3/D1.3M (2008; Errata 2008) Structural Welding Code - Sheet Steel
ASTM INTERNATIONAL (ASTM)
ASTM A1008/A1008M (2011) Standard Specification for Steel, Sheet, Cold-Rolled, Carbon, Structural, High-Strength Low-Alloy and High-Strength Low-Alloy with Improved Formability, Solution Hardened, and Bake Hardened
ASTM A108 (2007) Standard Specification for Steel Bar, Carbon and Alloy, Cold-Finished
ASTM A123/A123M (2009) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
ASTM A36/A36M (2008) Standard Specification for Carbon Structural Steel
ASTM A653/A653M (2011) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
ASTM A780/A780M (2009) Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings
RTA Design SECTION 05 30 00 Page 1 April 16, 2016
ASTM D1056 (2007) Standard Specification for Flexible Cellular Materials - Sponge or Expanded Rubber
ASTM D1149 (2007) Standard Test Method for Rubber Deterioration - Surface Ozone Cracking in a Chamber
ASTM D746 (2007) Standard Test Method for Brittleness Temperature of Plastics and Elastomers by Impact
ASTM E84 (2012) Standard Test Method for Surface Burning Characteristics of Building Materials
FM GLOBAL (FM)
FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/
FM DS 1-28 (2002) Design Wind Loads
JAPANESE INDUSTRIAL STANDARDS (JIS)
JIS G 3350 (2009) Light gauge steel sections for general structure
JIS G 3352 (2003) Steel Decks
STEEL DECK INSTITUTE (SDI)
SDI 31 (2007) Design Manual for Composite Decks, Form Decks, and Roof Decks
SDI DDMO3 (2004; Errata 2006; Add 2006) Diaphragm Design Manual; 3rd Edition
SDI DDP (1987; R 2000) Deck Damage and Penetrations
SDI MOC2 (2006) Manual of Construction with Steel Deck
THE SOCIETY FOR PROTECTIVE COATINGS (SSPC)
SSPC Paint 20 (2002; E 2004) Zinc-Rich Primers (Type I, Inorganic, and Type II, Organic)
U.S. DEPARTMENT OF DEFENSE (DOD)
UFC 3-301-01 (2014) Structural Engineering
UNDERWRITERS LABORATORIES (UL)
UL 209 (2011) Cellular Metal Floor Raceways and Fittings
UL 580 (2006; Reprint Jul 2009) Tests for Uplift Resistance of Roof Assemblies
RTA Design SECTION 05 30 00 Page 2 April 16, 2016
UL Bld Mat Dir (2011) Building Materials Directory
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. and for Government information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Fabrication Drawings
Metal Floor Deck Units
Ca…