AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
FY15 DODEA MILCON PA00017 Replace Killin Elementary School, Camp Foster, Okinaw a, Japan
The purpose of this amendment is to:
1) Revise Draw ings and Specifications
2) Provide responses to bidder’s inquiries
3) Extend the bid opening date to 13 December 2016
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HV-16-B-0002
X 9B. DATED (SEE ITEM 11)
15-Jul-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Nov-2016
CODE
CONTRACTING DIVISION
USACE-JAPAN DISTRICT
RM 147, BLDG. 250
CAMP ZAMA
ZAMA-CITY, KANAGAWA 252-8511
JAPAN
W912HV 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HV-16-B-0002
14. DESCRIPTION OF AMENDMENT (continued)
1. CHANGES TO SPECIFICATIONS. Attached hereto are revisions to the specifications. The revision mark "(Am-0006)" is shown on each page.
A. Revised Page(s) to Project Specifications. Attached hereto are the following revised page(s) to specifications. Revised page(s) will replace like-numbered page(s) in the subject specifications. Changes are indicated by an asterisk (*) in the left margin opposite the beginning of the revision and an asterisk in the right margin opposite the end of the revision. All portions of the revised pages shall apply whether or not changes have been indicated.
Section Page No(s).
Standard Form 1442 Page 1 Section 00 10 00 Page 5 and 6 Section 00 70 00 Page 21 Section 00 73 00 Page 46
B. Revised Section(s) to Project Specifications. Attached hereto are the following revised section(s) to the specifications. Revised section(s) will replace like- numbered section(s) in the subject solicitation specifications. Changes are indicated by a red line in the left margin of revised areas. All portions of the revised section(s) shall apply whether or not changes have been indicated.
Revised Section(s)
Section 01 01 50 Section 01 10 26.70 33 Section 01 30 00 Section 01 33 00 Section 01 33 29 Section 01 35 26 Section 01 45 00.00 10 Section 01 78 00 Section 01 78 24.00 20 Section 01 91 00.00 40 Section 02 83 13.00 20 Section 03 15 00.00 10 Section 05 52 00 Section 07 21 13 Section 07 22 00 Section 07 53 23 Section 08 33 23 Section 08 51 13 Section 08 71 00 Section 08 81 00 Section 09 24 23 Section 09 51 00 Section 10 22 39 Section 12 21 00 Section 12 24 13 Section 23 65 00 Section 23 73 13.00 40 Section 23 81 00.00 20
Section 26 05 73.16 Section 26 05 73.19 Section 26 20 00 Section 26 51 00 Section 26 56 00 Section 28 31 76 Section 33 71 02
C. Added Section(s). Attached hereto are new sections to specifications for Solicitation.
Section 11 06 00 Section 14 21 23
D. Deleted Section(s). The following section(s) are deleted from the specifications:
Section 07 16 19 (Deleted Section) Section 07 19 00 (Deleted Section) Section 14 24 00 (Deleted Section)
2. CHANGES TO DRAWINGS - The amendment mark “(Am-0006)” is shown on each sheet of the amended drawing sheet(s).
A. REVISED DRAWINGS (ISSUED). Attached hereto are the following revised sheets to the drawings. Revised sheets will replace like-numbered sheets in the subject solicitation drawings. Changes are indicated in revision clouds. All portions of the revised sheet(s) shall apply whether or not changes have been indicated.
DRAWING NO. REVISION DATE DESCRIPTION
G-00A 10/10/16 Revised Sheet Index G-001 9/1/16 Sheet Index Volume 1 G-002 Sheet Index Volume 2 G-101 9/1/16 Site Base Bid Plan G-102 9/1/16 Bid Items GC100 11/2/16 General Notes GC101 11/2/16 Revised Notes CS102 10/10/16 Site Plan Area 2 CS103 10/10/16 Site Plan Area 3 CS103A 9/1/16 Site Plan Area 3 (Bid Option) CS104 10/10/16 Site Plan Area 4 CS105 11/2/16 Site Plan Area 5 CS105A 9/1/16 Site Plan Area 5 (Bid Option) CS306 9/1/16 Fire Lane Profile (Bid Option) CS307 9/1/16 Fire Lane Profile (Bid Option) CS502 10/10/16 Site Details CS504 11/2/16 Site Details CU100 10/10/16 Overall Utility Plan CU101 10/10/16 Utility Plan Area 1 CU502 10/10/16 Utility Details CP100 10/10/16 Paving and Jointing Plan
CP501 9/1/16 Paving Details CG101 9/1/16 Grading Plan Area 1 CG102 11/2/16 Grading Plan Area 2 CG103 9/1/16 Grading Plan Area 3 CG103A 9/1/16 Grading Plan Area 3 (Option) CG105 9/1/16 Grading Plan Area 5 CG105A 9/1/16 Grading Plan Area 5 (Option) L-100 9/1/16 Overall Site Plan L-101 11/2/16 Hardscape Enlargement 1 L-102 11/2/16 Hardscape Enlargement 2 L-103 11/2/16 Hardscape Enlargement 3 L-105 11/2/16 Hardscape Enlargement 5 L-110 11/2/16 Hardscape Enlarge. Details L-111 11/2/16 Hardscape Enlarge. Details L-112 11/2/16 Hardscape Enlarge. Details L-113 11/2/16 Hardscape Enlarge. Details L-114 11/2/16 Hardscape Enlarge. Details L-115 11/2/16 Hardscape Enlarge. Details L-116 11/2/16 Hardscape Enlarge. Details L-117 11/2/16 Hardscape Enlarge. Details L-118 11/2/16 Hardscape Enlarge. Details L-200 9/1/16 Hardscape Details L-206 9/1/16 Hardscape Details L-300 11/2/16 Overall Planting Plan L-302 11/2/16 Planting Enlargement Area 2 L-303 11/2/16 Planting Enlargement Area 3 L-305 9/1/16 Planting Enlargement Details L-311 11/2/16 Planting Details S-002 11/2/16 General Notes S-003 11/2/16 General Notes S-114 9/1/16 Foundation Plan Area D S-142 9/1/16 Clerestory Framing Plan S-301 9/1/16 Typical Reinforcing Details S-303 9/1/16 Typical Foundation Details S-305 11/20/16 Foundation Sect. and Details S-521 9/1/16 Steel Typical Details S-601 9/1/16 Column Concrete Schedule A-001 9/1/16 Abbreviations A-100 9/1/16 Life Safety Overall A-102 9/1/16 Life Safety Plan First Floor A-104 9/1/16 Life Safety Plan Sec. Floor A-105 11/2/16 Air Barrier Envelope Plants A-106 11/2/16 Air Barrier Sections A-114 11/10/16 Floor Plan First Floor Area D A-115 9/1/16 Floor Plan First Floor Area E A-116 9/1/16 Floor Plan First Floor Area F A-121 9/1/16 Floor Plan Sec. Floor Area A A-124 9/1/16 Floor Plan Sec. Floor Area D A-125 9/1/16 Floor Plan Sec. Floor Area E A-126 9/1/16 Floor Plan Sec. Floor Area F A-127 9/1/16 Bridge Level – Floor Plans A-131 9/1/16 Roof Plan Area A A-132 9/1/16 Roof Plan Area B A-133 9/1/16 Roof Plan Area C A-134 9/1/16 Roof Plan Area D
A-135 9/1/16 Roof Plan Area E A-136 9/1/16 Roof Plan Area F A-141 9/1/16 Floor Plan Penthouse Level A-161 11/2/16 Reflected Ceiling Plan A-162 11/2/16 Reflected Ceiling Plan A-163 11/2/16 Reflected Ceiling Plan A-164 11/2/16 Reflected Ceiling Plan A-165 11/2/16 Reflected Ceiling Plan A-166 11/2/16 Reflected Ceiling Plan A-171 11/2/16 Reflected Ceiling Plan A-172 11/2/16 Reflected Ceiling Plan A-173 11/2/16 Reflected Ceiling Plan A-174 11/2/16 Reflected Ceiling Plan A-175 11/2/16 Reflected Ceiling Plan A-176 11/2/16 Reflected Ceiling Plan A-177 11/2/16 Reflected Ceiling Plan A-178 11/2/16 Bus Canopy A-403 9/1/16 Enlarged Plans Stairs A-522 9/1/16 Roof Details A-534 9/1/16 Plan Details A-611 9/1/16 Door Schedule A-612 9/1/16 Door Schedule and Types A-613 10/28/16 Window Schedules A-622 9/1/16 Window Details AT001 9/1/16 AT/FP Site Plan I-110 11/8/16 Finish Plan First Floor I-111 11/8/16 Finish Plan First Floor A I-116 11/10/16 Finish Plan First Floor F I-121 11/10/16 Finish Plan Sec. Floor A I-124 11/10/16 Finish Plan Sec. Floor D I-126 11/10/16 Finish Plan Sec. Floor F I-128 11/10/16 Finish Plan Penthouse Level I-601 11/8/16 Finish Schedule I-602 11/2/16 Finish Details P-111 11/10/16 Plumbing Plan First Floor A P-112 11/10/16 Plumbing Plan First Floor B P-113 11/10/16 Plumbing Plan First Floor C P-114 11/10/16 Plumbing Plan First Floor D P-115 11/10/16 Plumbing Plan First Floor E P-116 11/10/16 Plumbing Plan First Floor F P-701 10/10/16 Plumbing Fixture Schedule QF501 9/1/16 Food Service Equipment Sch T-507 10/27/16 Telecomm & Manhole M-608 9/23/16 HVAC Control M-610 9/1/16 HVAC Point Function Sch.
M-701 10/10/16 HVAC Schedules M-702 9/1/16 HVAC Schedules E-001 10/20/16 Electrical Abbreviations E-142 10/2016 Bridge Plans Electrical E-404 11/2/16 Stage Lighting Plan RM 141 E-501 10/20/16 Electrical Details E-502 9/1/16 Electrical Details E-503 9/1/16 Electrical Details E-505 9/1/16 Electrical Details E-507 9/1/16 Electrical Details
E-509 9/1/16 Lighting Fixture Details E-601 10/27/16 Single Light Diagrams E-701 10/27/16 Lighting Fixture Schedule E-704 10/20/16 Panel Schedules E-708 9/1/16 Panel Schedules E-709 10/20/16 Panel Schedules E-720 9/1/16 Mechanical Equipment Sch.
EL111 10/20/16 First Floor Lighting Plan A EL113 10/20/16 First Floor Lighting Plan C EL114 11/2/16 First Floor Lighting Plan D EL115 11/2/16 First Floor Lighting Plan E EL116 11/2/16 First Floor Lighting Plan F EL121 10/20/16 Second Floor Lighting Plan A EL123 10/20/16 Second Floor Lighting Plan C EL124 10/20/16 Second Floor Lighting Plan D EL125 10/20/16 Second Floor Lighting Plan E EL126 10/20/16 Second Floor Lighting Plan F EP111 10/20/16 First Floor Power Plan A ES101 10/20/16 Electrical Site Plan 1 ES102 10/27/16 Electrical Site Plan 2 ES103 10/20/16 Electrical Site Plan 3 ES104 10/27/16 Electrical Site Plan 4
3. QUESTIONS AND ANSWERS: The Government’s response(s) to question(s) submitted by prospective bidder(s)/offeror(s) are provided in an attachment to this amendment.
Questions/Answers 1 – 497. The following questions were submitted by potential bidder (s).
Answers provided below do not amend or alter the solicitation itself, unless a revision to a specification or drawing is noted specifically by Amendment.
4. Additional important Information from Government related to Bid Bond Form (SF 24) and Performance Bond Form (SF 25). Bid Bond Form (SF 24) and Performance Bond Form (SF 25) have been updated recently. Prospective bidders/contractors are required to use the most current version of the form(S). The most current forms are available at the following web sites:
http://www.gsa.gov/portal/forms/type/TOP\ http://www.gsa.gov/portal/forms/download/115982 http://www.gsa.gov/portal/forms/download/115986
5. Bid opening date and time of December 2, 2016 (02:00 PM), Japan Standard Time, is revised to December 13, 2016 (2:00 PM), Japan Standard Time.
Contractors' Questions
Item Sheet No. or Specs Contractor Question or Information Needed Government Response 1 S-002 There is an indication for lean concrete to be t=50. However, there is no indication for lean concrete for slab on grade. Is t=50 acceptable for slab on grade lean concrete?
The offeror shall make their own determination based on the solicitation and any means and methods shall be determined by the contractor. Contractor shall determine if a lean concrete slab is required below the first floor slab to provide a suitable working surface. Bid as advertised
2 S-003 Concrete Strength for Structural Concrete is indicated as 27MPa U.O.N., however, we cannot find any notes indicating another strength requirement. Shall all structural concrete be constructed as 27MPa?
See amended drawing S-003. Revised concrete note A.1 (a) stating that all concrete unless otherwise noted to "all structural concrete".
3 S-601 D36 rebar is indicated on the column schedule, however, D36 is not available in Japan. Will D35 bar be acceptable in lieu of D36?
See amended drawings S-301 and S-601. D36 information and callouts have been replaced with D35.
4 A-127, I-127 There is no indication for the finishing of the concrete bridge. Shall the finishing be steel trowel finish?
See amended drawing A-127. Added finishing to concrete bridge slab.
5 A-535, A-111 The drawing legend indicates that Downspout shall be stainless steel. Please confirm whether all downspouts pipes are to be stainless steel or if this note refers to just the mounting hardware.
Will painted PVC pipe be acceptable for downspouts in lieu of stainless steel?
Refer to drawings A-521 and A-535 for information indicating all downspout pipes and brackets are to be stainless steel. PVC pipe is not an acceptable alternative.
6 I-113 There is no indication of cove base at the stairs. Is it acceptable to use vinyl cove base with H=100~250
Vinyl cove base is not acceptable for use at the stairs. Conduct work in accordance with drawing and specifications.
7 A-504<A1> There is no indication of the stainless steel finish for the stair handrail. Is hairline finish acceptable?
See amended specification section 05 52 00, paragraphs 2.12 and
2.12.1. Added finish to stair handrail.
8 A-111, I-111<255>, I- 111<257>
The finishing schedule indicates wall mounted markerboards, however, there are no sizes shown. Please indicate sizes and mounting details for all wall mounted markerboards.
See amended drawings I-111, I-121, and I-124. Revised keynotes to indicate size and mounting requirements.
9 I-401 Finishing schedule indicates that bathroom wall tile is to be 200 x
200. However, the elevation drawings show that the wall tile shall be 300 x 300. Please clarify the correct size for bathroom wall tile.
Also, there is no elevation drawing for 1F120A and 1F120B. Will the tile pattern for 1F130 be acceptable?
See amended drawing I-601. Revised dimensions in finish schedule. Yes, tile pattern for 1F130 is acceptable.
10 A-622, I-601, spec 12 11
Specification indicates to follow the window treatment schedule for types and locations of roller shades and curtains. However, there is no window treatment schedule provided. Please provide window treatment schedule indicating the types and locations of window treatment.
Refer to drawings A-611 through A-613 for locations of window treatment. Refer to drawing I-601 and specification section 12 21 00 for window blinds. Refer to interior finish drawings and specification section 12 24 31 for window roller shades. See revised specification section 12 21 00, paragraph 1.4. Revised reference to window treatment placement schedule.
11 A-613 There is no detail for C2 window type. Is the detail for C1 the same for C2?
See amended drawing A-613. Deleted C2 window type in Blast Rated Windows schedule.
W912HV-16-B-0002 (Am-0006) Page 1 of 77
12 H-100 thru H-115 We request dimensions for floor area for each building in order to estimate demolition work.
Refer to "As-Built" Drawings provided in previous amendment (Am- 0002). These "As-Built" Drawings are provided for informational purposes only and may not be complete or depict existing conditions. The Contractor will be responsible for verifying actual conditions at the site.
13 H-100 thru H-115 We cannot determine the height of each of the existing buildings.
Is it possible to receive the as-built sectional detail drawings?
Refer to "As-Built" Drawings provided in previous amendment (Am- 0002). These "As-Built" Drawings are provided for informational purposes only and may not be complete or depict existing conditions. The Contractor will be responsible for verifying actual conditions at the site.
14 H-100 thru H-115 Does the existing building contain piles? If so, will the piles need to be removed per scope of the contract?
Refer to "As-Built" Drawings provided in previous amendment (Am- 0002). These "As-Built" Drawings are provided for informational purposes only and may not be complete or depict existing conditions. The Contractor will be responsible for verifying actual conditions at the site. See amended specification section 01 10
26.70 33, paragraph 3.3.2, Base Bid Item 0002: Demolition entails the removal of all above and below ground construction associated with the existing school building.
15 H-100 thru H-115 Would it be possible to receive the elevation drawings for the existing buildings?
Refer to "As-Built" Drawings provided in previous amendment (Am- 0002). These "As-Built" Drawings are provided for informational purposes only and may not be complete or depict existing conditions. The Contractor will be responsible for verifying actual conditions at the site.
16 H-100 thru H-115 Please provide as-built drawings of the existing buildings finish schedules.
Refer to "As-Built" Drawings provided in previous amendment (Am- 0002). These "As-Built" Drawings are provided for informational purposes only and may not be complete or depict existing conditions. The Contractor will be responsible for verifying actual conditions at the site.
17 A-612, A-011 Door Schedule on A-612 indicates Door #223 Material as "ST" and Finish as "PT." However, the abbreviations list on A-011 does not match material and finishing for doors. Please clarify the meaning of "ST" and "PT" indicated on the door schedule.
See amended drawings A-001 and A-612. Revised abbreviations list and updated door material for door #223.
18 A-611, A-612 Door thickness shown on the door schedule for sound resistant doors are indicated as 50mm. Are all other doors not specifically rated for sound transmission acceptable as 45mm thick?
See amended drawings A-611 and A-612. Added general note K for guidance on door thickness.
19 A-613 Window Schedule indicates that Window A2 is a LAMINATED, ANNEALED Window. However, the Window Types detail A-613, A2 indicates a "609" glazing type which is "Interior Fire-Rated Safety Glazing." Please clarify which is correct. If Fire-Rated Glazing is required, please indicate the fire rating required. Also, will the aluminum window frame be required to have fire-rating properties?
See amended drawing A-613. Revised glazing type from 609 to 601.
W912HV-16-B-0002 (Am-0006) Page 2 of 77
20 Spec.
Division 11 Equipment Will it be acceptable to provide an elevator with Japanese specifications?
Elevator shall meet all performance and safety requirements as indicated in the drawings and specifications.
21 Spec.
Division 22 Plumbing, Division 33 Utility
There is no specification for Radon system. Please provide specifications if required.
Refer to drawings P-111 through P-116, detail A1/P-501, and specification section 23 00 00, paragraph 3.2.5.1 for information regarding the passive radon system.
22 Spec.
Division 02 Existing Condition
During site visit, there are many unitary air conditioning equipment.
Is removal and disposal of these machines within the KTR scope?
Refer to drawing AD101, General Note 9 and Keynote 920.
"Remove all existing above and below grade mechanical and plumbing equipment and components including but not limited to piping, ductwork, controls, instrumentation, etc." Also, "Prior to the start of demolition, coordinate with the owner which mechanical equipment shall be salvaged. Decommission any equipment deemed salvageable by the owner and prepare equipment for removal."
23 Spec.
Division 02 Existing Condition
During site visit, there are many kitchen equipment. Is removal and disposal of all kitchen equipment within KTR scope?
Refer to drawing AD101, Keynote 903. "Remove all existing kitchen equipment, shelving, cabinets, coolers, heaters, lockers, and all associated components, recycle materials wherever possible."
24 Spec. 22 00 00 Plumbing Para.2.1 Material, Table Ⅱ
As per the specifications, all domestic cold water pipe materials are called out to be copper. However, to consider quality, costs, and ease for future maintenance, will substituting copper for PVC(HIVP, JIS K6741) be acceptable? We believe that PVC would be better suited for this application.
No, please provide material as specified in specification section 22 00 00, paragraph 2.1.
25 Spec. 22 00 00 Plumbing Para.2.1 Material, Table Ⅱ
As per the specifications, all domestic hot water pipes, materials are called out to be copper. However, to consider quality, costs, and ease for future maintenance, will substituting copper for PVC(HTVP JIS K6776) be acceptable? We believe that PVC would be better suited for this application.
No, please provide material as specified in specification section 22 00 00, paragraph 2.1. (Duplicate of RFI #24)
26 Spec.
Division 33 Utility
As per the specifications, under ground conduit, materials is called out to be PVC. However, to consider quality, costs, and ease for future maintenance, will substituting FEP for PVC be acceptable?
We believe that FEP (JIS C 3653) would be better suited for this application.
No, please provide material as specified in specification section 33 71 02, paragraph 2.1 regarding underground conduits.
27 Spec. 26 20 00 Para. 2.6.3 Insulation
Specification allows the substitution for JIS C3317(HIV), however, HIV wire is not commonly used in recent industry practices. In more recent industry standards, JIS C 3612 (IE) wire is more mainstream. The properties of the wire and insulation are very similar between the IE and HIV products. Also, the IE wire is considered more environmentally friendly and is considered an "Eco Cable." Please confirm is JIS C 3612 would be an acceptable alternative in lieu of the JIS C3317.
No, please provide material as specified in specification section 26 20 00, paragraph 2.6.3 regarding insulation.
W912HV-16-B-0002 (Am-0006) Page 3 of 77
28 Spec. 26 20 00
Para. 3.1.4 Conduit Installation
As per the specifications, concrete embedded conduit materials is called out to be rigid PVC. However, to consider cost will substituting pliable plastic conduit (JIS C8411) type PF for PVC be acceptable? We believe that PF type would be better suited for this application.
See amended specification section 26 20 00, paragraph 3.1.4.
Added pliable plastic conduit Type PF as an acceptable alternative based on JIS C 8411.
29 Spec. 33 71 02 Spec. 33 82 00
As per the specifications, under ground conduit, materials is called out to be PVC. However, to consider quality, costs, and ease for future maintenance, will substituting FEP(JIS C3653) for PVC be acceptable? We believe that FEP would be better suited for this application.
No, please provide material as specified in specification sections 33 71 02 and 33 82 00 regarding underground conduits.
30 G-101 This drawing is to be followed when Option Bid 004 and 005 are not awarded. Is it acceptable to understand this drawing to be the landscaping drawing for Base Bid 001?
Yes, sheet G-101 (site plan) shows the landscaping included in Base Bid Item 0001. For landscaping details, refer to drawings L- 001 through L-401.
31 G-101, GC-100 Based on Base Bid 001, the access road from the east side is considered temporary. Shall we follow drawing GC100 Phasing Note 6 for the specification of the temporary road? In this case, no retaining wall will be required?
Correct, no retaining wall is required for the temporary road for Base Bid Item 0001. See amended drawings CG103 and CG105.
32 G-101, GC-100 Temporary Parking Lot is included in Base Bid 001. Please provide the parameters required for the Temporary Parking Lot. Also, please clarify which bid item is to include the scope of the new permanent parking lot. Also, please provide the specifications for the new parking lot.
See new drawing CS105 in amendment. Added limits and construction items for temporary parking lot. Refer to drawing G- 101 and specification section 01 10 26.70 33, paragraph 3.3.2 for inclusion of permanent parking lot in Base Bid 0001. Refer to specification sections 32 11 16, 32 12 10, and 32 12 16 for parking lot information.
33 G-101, G-102 Please provide the legend for drawing G-101 and G-102 Drawings G-101 and G-102 are site plans for overview and bid clarification purposes. Refer to civil and landscape drawing sheets for in-depth information and keynotes/legends.
34 G-102 General Note Bid Item 007, references Drawing No CS-103B and CG-105B which were not received. Shall we follow CS-103A and CG-105A in lieu of CS-103B and CG-105B?
See amended drawings G-101 and G-102, and revised references in specification section 01 10 26.70, paragraph 3.3.2.
35 GC-100 Based on the existing condition, there is no section of fence existing for the area that the access road. Will the fence portion (behind the existing gate guard) need to be replaced after construction is complete?
See amended drawing GC101. Clarified work regarding fencing near the existing gate guard.
36 GC-100 Is the full height opaque fabric to be installed as per Phase IA Note 3 to be installed on the existing fence along the site boundary line?
See amended drawing GC100, Phasing Note #2. Revised note to install opaque fabric on new fence only.
37 GC-100, CS-505 Is a visual impairing sheet needed for the fence to be constructed as per Phase IA Note 1? Also, is the temporary controlled perimeter fence type to be constructed as indicated on CS-505?
Yes, visual impairing sheet is required as indicated on GC-100.
Yes, construct temporary controlled perimeter fence as indicated on CS-505.
W912HV-16-B-0002 (Am-0006) Page 4 of 77
38 GC-100, CG-110 The length of the temporary road differs on drawing GC-100 and
CG-110. Please clarify which drawing we should follow for the length of the temporary road.
Drawing CG110 (initial erosion control plan) shows the area for the stabilized construction entrance (with hatching), which is different than the temporary construction access road as shown in Phase IA on drawing GC100.
39 GC-100, CG-105 Is the fence level indicated on the drawings adjusted to the existing level or is it adjusted to the level of Option 007?
Fencing shall be adjusted to match finished grades based on either drawing CG105 (Base Bid only, Option Bid 0007 not exercised) or CG105A (Option Bid 0007 exercised).
40 GC-100 Please indicate the parameters and location of the temporary parking area to be constructed as per Phase 1B Note No4.
See new drawing CS105 in amendment. Added limits and construction items for temporary parking lot.
41 GC-100, CG-501 Is Phase 1B Notes No5 and Phase 1A Temporary Access Road the same? Phase 1A does not indicate the road to be rated for Fire Emergency Access, however is it the same as CG-501?
1. Yes.
2. See amended drawing GC-100, Phase 1-B Note #4 and amended new drawing CS-105. Updated info to show temporary access road to be rated for fire emergency access.
42 GC-100 Please indicate the section of fence to be demolished per Phase 1B Note 6.
Refer to amended drawing GC100, note 5 for section of fence to be demolished.
43 GC-100 Please indicate the location and specification of the new sidewalk indicated per Phase 1B Note 7.
See new drawing CS105. Added location of new sidewalk as indicated per Phase 1B. Refer to specification section 32 16 13 for sidewalk information.
44 GC-100, CD-100, CD-
Please indicate on the drawing, the demolition portion indicated on Phase 1B Notes No8 Building No 370. Also, indicate the location and specification of the temporary canopy.
Refer to drawing GC100, phasing plan - Phase 1-B for portion of building 370 to be demolished. Canopy shall be provided in conformance to EM 385-1-1 (as indicated in specification section 01 35 26) for safety. The offeror shall make their own determination for canopies based on the solicitation and any means and methods shall be determined by the contractor.
45 GC-100 Phase 1B Note No 10 Summer Break from June 1 to August 30 or does it end August 15?
See amended drawing GC100 and specification section 01 01 50.
Revised date of summer break to end on August 22, 2019.
46 Spec 01 01 50 Is building 371 indicated on 1.1.2.h supposed to be building 370? See amended specification section 01 01 50, paragraph 1.1.2 (h).
Revised Building number from 371 to 370.
47 Spec 01 01 50 1.1.3 There is a gap of 9 days between the completion of Phase I and the start of Phase II. Is construction prohibited during this gap?
Is this 9 day period intended for the moving of existing school materials to the newly constructed school?
Any gaps between phases are to allow for possible time growth and/or contractor mobilization efforts from Phase I to Phase II.
The objective of the project phasing is to have the new school constructed, outfitted, and ready to open by the 2019 school year.
Phase II, which includes the demolition of the existing school, cannot commence until the customer has moved out of the existing school and into the new school. This move to the new school can only happen when school is not is session during the summer months.
48 GC-101 May we use the existing fence for PhaseII Note No2? If we must install a temporary fence, when should the temporary fence be removed?
No, the existing fence cannot serve as controlled perimeter fencing. See amended drawings GC100 and GC101. Clarified labeling of new fencing and existing fencing.
W912HV-16-B-0002 (Am-0006) Page 5 of 77
49 GC-101 Phase II drawing indicates the installation of temporary gates, however, Not No2 does not indicate the installation of the temporary gates. Please provide the size parameters for the east and west temporary gates.
See amended drawing CS504. Revised detail to include temporary construction gate width.
50 Spec 01 01 50, para 1.1.4
Please clarify the date of end of "SY 19/20." Also, based on the actual NTP date, there is a possibility that construction will not complete by the end of SY 19/20 (total 1406).
See amended specification section 01 01 50, paragraph 1.1.4.
Deleted reference to end of SY 19/20 as date of work completion.
51 GC-100 Please clarify if Phase IB Note No7 is referring to installing ABA parking. Also, is the temporary parking to be demolished Phase III?
See amended drawing GC100 and GC101. Modified phasing notes regarding temporary ABA parking area and sidewalk.
Amended Phase I-B Note 6 for installation of new sidewalk in addition to temp ABA parking area per detail A4 on drawing CS505. Restore temp ABA parking area and sidewalk to final condition as shown in GC101, Phase III, Note 6.
52 GC-101, CS-505 Is the existing fence to be removed during the installation of the temporary fence indicated on Phase II Note 2? Also, is the temporary fence to be constructed as per CS-505?
No, the existing fence cannot serve as controlled perimeter fencing, and will not be removed. See amended drawings GC100 and GC101. Clarified labeling of new fencing and existing fencing.
53 Spec 01 01 50, para
1.1.3 and 1.1.4
As per para 1.1.3 and 1.1.4, it is stated that the Phase of construction for Phase II and III shall not commence until the prior phase of construction is completed. Will it be acceptable to start Phase III without the completion of Phase II? This would be in an effort to complete by the end of SY19/20.
See amended specification section 01 01 50, paragraph 1.1.4.
Deleted reference to end of SY 19/20 as date of work completion.
54 G-101 Is the East side Access road indicated on Option 007 included within the scope of Base Bid Item No 1 & 2?
Temporary site access on the east side is included in Base Bid 0001 as stated in specification section 01 10 26.70 33, paragraph
3.3.2. Permanent access road is included in Option Bid 0007, as stated in specification section 01 10 26.70 33. See amended drawings G-101 and G-102 for revised wording.
55 L-100, G-101 Is L-100 to be considered Option Bid No 004, 005, and 007? Is G- 101 to be considered Base Bid Item No 001 and 002?
Drawing L-100 includes all site features and all base and option bid items.
Yes, G-101 is the base bid site plan. G-102 is the base plus option bid site plan.
56 L-101, L-112, L-118 Are details A1 and A3 on L-112; and A1 and A2 on L-118 to be considered Option 004?
Yes. Drawing G-101 (site plan) shows the landscaping included in Base Bid Item 0001. Drawing G-102 shows the landscaping for Option Bid Items 0004 and 0005. For landscaping details, refer to drawings L-001 through L-401. See amended drawings G-101 and G-102 for revised wording.
57 L-101 Is Key Note No 241 part of Base Bid or is it part of Option 004? The weather station (keynote 241) is not included in the Option Bid areas as shown on Drawing G-102, and therefore is part of Base Bid 0001.
W912HV-16-B-0002 (Am-0006) Page 6 of 77
58 L-101, L-115 Are details A1 and D1 of L-115 to be considered as part of Base
Bid 1?
Details A1 and D1 of L-115 are not included in the Option Bid areas as shown on Drawing G-103, and therefore are part of Base Bid 0001.
59 L-101, L-115 Is detail A1 of L-115 Play equipment to be considered as part of Base Bid 1?
Detail A1 of L-115 is not included in the Option Bid areas as shown on Drawing G-103, and therefore is part of Base Bid 0001.
60 L-101 Please indicate the area of the fence and the location of the door indicated on Key Note 213.
See amended drawing L-115. Clarified location of fence and gate.
61 L-100, L-102 Is landscaping to be included for Site Area 1 and Area 2 for Bid Item 004? Is landscaping for Site Area 3 to be included with Bid Item 005?
Drawing G-101 (site plan) shows the landscaping included in Base Bid Item 0001. Drawing G-102 shows the landscaping for Option Bid Items 0004 and 0005. For landscaping details, refer to drawings L-001 through L-401. See amended drawings G-101 and G-102 for revised wording. Please note that the "Hardscape Enlargement - Area 1" in L-101, "Hardscape Enlargement - Area 2" in L-102, and "Hardscape Enlargement - Area 3" in L-103 do not necessarily correspond to the same locations as the "bid areas" noted in G-102, as these are distinct and different references.
62 L-305, L-311 L-305 indicates an "AR" tree and L-311 indicates an "AP" tree on the tree schedules and appear to be the same tree. Is this correct?
See amended drawings L-305 and L-311. Revised drawings to define areca palm as "AP".
63 L-305 A3/L-305 and C4/L-305 indicates the same description, "CL."
However, there is a unit designation of "EA" and "square meter."
Which unit of measure is correct?
See amended drawing L-305. Revised unit of measurement to
"SM".
64 L-305 Detail drawing A3/L-305 indicates 5EA - "GA" and the schedule list indicates 7EA - GA. Please clarify which quantity is correct.
See amended drawings L-305 and L-311. Revised GA quantity to 7 EA and relocated schedule to L-311.
65 L-302, L-303 Should we understand Ground Covers "SB" shown on drawings L- 302 and L-303 to be Sedum?
See amended drawing L-311. "SB" to remain as sedum. Revised "Monkey Grass/Liriope muscari" to be "LM".
66 L-302, L-303 Should we understand Ground Covers "LC" shown on L-302 and L- 303 to be Lantana?
"LC" is designated as "Lantana/Lantana camara", see amended drawing L-311. Relocated and consolidated schedules.
67 L-303 Please indicate the plant name of "FI" shown on drawing L-303. See amended drawing L-311. Added "FI" symbol designation as "Fig Ivy/Ficus pumila" in the Base Bid Planting Schedule.
68 ES103, E-508, E-509 &
E-701
On detail drawing E-508, LED Handrail Light and Driver are shown but they are not included on E-509 and E-701.
Also the details are not found in the specifications.
Please provide LED Handrail Light and Driver information and the information of manufacturer that was referenced during the design.
See amended drawings ES-103 and E-701, E-704 and E-709, and specification section 26 56 00, paragraph 2.4. Added handrail information and image, and updated circuit panel SL and timeclock control.
W912HV-16-B-0002 (Am-0006) Page 7 of 77
69 ES101~ES104, E-501 &
T-506 Concerning the route of underground conduit:
1. Please provide the detailed drawing of underground electrical duct bank for new outdoor light.
2. Please provide the detailed drawing of underground communication duct bank from existing TMH133 to TMH137.
1. Refer to drawings ES101 to ES103 which identifies the underground conduit routing to the light poles.
2. Refer to drawing E-501, typical ductbank installation detail B4.
Contractor shall install the underground lighting branch circuit conduits per specification section 33 71 02.
70 EL111 ~ EL126, E-402,
E-502 & E-601
All circuits of outdoor light for 1st and 2nd floor will be connected to "Panel SL" located in RM115 through Time Switch (TC1 & TC2).
The farthest fixture on 2nd floor is 80m away and there is a concern for difficulty of maintenance and a voltage drop issue if the power source is supplied from 1st floor.
It is recommended to add the Time Switch in 2nd floor electrical room and connect to spare circuit on distribution panel. Please consider it and advise us.
Provide work as required in drawings and specifications. Refer to drawing E-001, General Notes L, M, and N for different wire sizes depending on length of circuit conductor.
71 EL110~EL126, E-502, E-
503 & E-506
On detailed drawing E-502, E-503 and E-506, Single Relay controller, Dual Relay Controller, Three Relay Controller and One- Relay Room Controller are shown but they are not included on floor plan (EL-110 thru EL-126). Also the details are not included in Spec either.
Please indicate each device on plan and please provide device information and the information of manufacturer that was referred at the design stage.
See amended drawings EL111, 113-116, 121, and 123-126, and specification section 26 51 00. Added typical relay symbols.
72 E-507 & F501, Spec 26 51 00 & 28 31
On drawing E-507 and F-501, Emergency Lighting Interface Controller is shown but they are not included in Spec.
Please provide device specification and the information of manufacturer that was referred at the design stage.
Provide work as required in drawings and specifications. Refer to drawing E-507, detail A4, General Design Note: "Diagram shown, reflects a generic system layout, and required components. Final components and requirements shall be coordinated with final lighting control and fire alarm manufacturer systems per specifications."
W912HV-16-B-0002 (Am-0006) Page 8 of 77
73 EL114, EP114, E-404, E-
504 & E-507
1. The location of 5-Button, DMX Input station for Stage Lighting equipment is not shown.
Please indicate it on floor plan.
2. Fixture "TA", "TB" and "TC" are required to be controlled by DMX but there is no DMX control wiring indicated.
Please indicate the DMX connection on floor plan and distribution diagram.
3. Should the DMX Output station for Stage Lighting be located near Fixture "TA", "TB" and "TC"?
4. Please indicate House Downlight shown in E-404, General Note C.
5. On E-507, Stage Light Panel distribution diagram, it says "refer to E-708" but there is no information for Stage Light on specified E- 708.
Please advise where to refer.
1. See amended drawing E-404. Added the 5 button DMX input stations.
2 and 3. The offeror shall make their own determination on DMX connection and output stations for stage lighting locations based on the solicitation and any means and methods shall be determined by the contractor.
4. See amended drawing E-404, General Note C. Corrected reference to drawing EL124, and detail A1/E-507.
5. See amended drawing E-708. Added "Branch Panel: DIM
PNL".
74 EP110~EP135, E-602 &
E-702
There are no conduit and wiring route of feeder line shown on floor plan.
Please indicate the feeder line route on floor plan in consideration of voltage drop considered at the design stage.
The cost would differ greatly between ground burial and concealing indoor so a fair solicitation is not possible.
At the construction stage, we will submit the Shop Drawing after reconsider the route on design drawing for approval.
The offeror shall make their own determination based on the solicitation and any means and methods shall be determined by the contractor. Refer to drawing E-001, General Note H: "The electrical drawings are diagrammatical in nature and indicate the general location of outlets, equipment, and the circuit arrangement of the required wiring. Although the drawings do not necessarily indicate the actual routes of conduits, where indicated, they shall be followed as closely as proper coordination with the work of other trades and space will permit. The drawings are not intended to be scaled and the electrical contractor shall refer to the complete set of construction drawings for coordination."
75 Electrical Drawings As there is only one electrical room/mechanical room each on 1st and 2nd floor, huge amount of conduits are needed for electrical room/mechanical room. To reduce penetrations, would it be acceptable to combine circuits into large size conduits as much as possible?
The offeror shall make their own determination based on the solicitation and any means and methods shall be determined by the contractor.
76 M-609, M610, E-601 & E-
On E-601, Single Line Note #12, it is indicated to connect wattmeter to BAS Controller but destination is not indicated.
Please indicate where the BAS Controller is to be connected.
Refer to drawing M-606 HVAC control diagrams and specification division 23 HVAC for interface of the meter to the LONworks DDC system. Also refer to drawing M-610 for Energy Usage Meter control points.
77 E-142, E-508, E-509 & E-
There are no details for Bridge Light (Color and Watt) on E-509 and E-701.
Please provide LED tape lighting or the information of manufacturer that was referenced during the design stage.
Refer to drawing E-142 for LED handrail layout. See amended drawings E-509 and E-701. Revised LED tape light from Type "K1" to Type "K", revised lighting schedule notes, and added "9.5W per meter" to Type "K" remarks.
W912HV-16-B-0002 (Am-0006) Page 9 of 77
78 A-535, EL114, E-509 &
E-701
1. The equipment specification for "EL" on the drawing is not clear.
Please provide the details.
2. EL114, Key Note #245 says to refer to A-535. Which one among "A1", "A3", "A4", "A5", "B4" on A-535 is to be referred?
1. "EL" is not shown on any drawings. "FL" is a small LED floodlight, refer to drawing E-701 for light fixture schedule. See amended drawing E-701. Revised voltage information and deleted "remarks" for "FL" in lighting fixture schedule.
2. See amended drawing EL114. Added correct reference to detail A5 for key note #245 on drawing A-535.
79 E-001 & E-502 Concerning "SK" and "GYM Switch", there is no details for Key switch on Spec.
Please provide the detailed information and/or the information of manufacturer that was referred at the design stage.
See amended drawing E-502. Added note for detail C4: "keyed switches shall be 20A, 120/277 Volt rated, extra heavy duty, specification grade with two mating keys per switch".
The GYM key switches are identified as "Sk" (4 total) with keynote 333 on drawing EP112. The GYM lighting scene switch is identified as "Ssc" with keynote 221 on drawing EL112. Keynotes 221 and 333 both refers to Detail C4 on E-502 for the switch configuration.
80 E-701 & Spec 26 51 00, 26 56 00
Lighting fixture -S3, S5, T2-T5, WS4 says "Field Replace SPD" but no details are shown on Spec.
Please provide the specification of SPD or reference model number.
"Field replaceable" means the SPD (surge protection device, as defined in drawing E-001) shall be provided with means to remove and replace it without any special tools. Refer to specification section 26 56 00, paragraph 2.2.1 (m).
81 E-502 Can the US made Astronomical Time Switch adopted at the design stage be used in Japan?
Please provide the manufacturer information for reference.
Yes. The astronomical program covers all areas of the globe, not just the U.S. Confirm programming capabilities prior to purchase of product.
82 E-502 & Spec 26 56 00 Para 2.3
For the control of outdoor lighting, it requires the interface that is compatible with the existing utility control device.
On drawing E-502, it says the Time Switch should have function to "Remote control and monitoring via Ethernet".
Please provide the detailed information of compatible Time Switch product or interface.
If unacceptable, we consider that connecting and setting to the existing utility should be performed by the Government.
See amended drawing E-502. Removed statement "with remote control and monitoring via ethernet" from detail C2, note #1.
83 E-503 & Spec 26 12 19.10 Para 2.2.1.1
The specification of the transformer differs from E-503 and Spec. E- 503 says Loop feed and Spec says Radial feed.
Which one is correct?
See amended drawing E-503. Revised detail C3 to show radial feed configuration instead of loop feed.
84 E-505 Seismic calculation is required for the pole of outdoor lighting on D5/E-505 but it is not possible for the pole. (Manufacturer can perform only survival wind speed calculation.) Please advise the purpose and calculation method.
See amended drawing E-505. Removed engineering calculations requirement from detail B5.
85 E-505 Please provide the size of the foundation and bar arrangement drawing for outdoor lighting as it is not Design-Build contract.
Refer to Drawing E-505, detail B5. Dimensions are referenced by "* Foundation dimensions shall be: A=4m; B=0.6m dia.". Also, "anchor bots shall be as recommended by manufacturer".
W912HV-16-B-0002 (Am-0006) Page 10 of 77
86 E-505 Please provide the operational explanation of Kitchen Hood
Controller like stated on M-608 (Sequence of Operation).
Also the specification is not clear. The note states that the "relays shall be electrically held contactors" which is vague. Please provide the model number and manufacturer information that was referred during the design stage.
See amended drawing E-505. Added sequence of operation information in detail A1.
Electrically held means voltage to the control coil of the relay needs to be maintained in order for the relay contacts to remain energized closed. This is a common relay application which can be obtained from most major manufacturers.
87 E-509 & E-701 There is no profile sketch for the lighting fixture B4, BE4, EM, FL, T, V, WS4.
Please provide the profile sketch and reference fixture model number.
See amended drawings E-507 and E-509. Added/updated lighting fixture details to include B4, B4E, EM, FL, T, V. WS4 is already included in drawing E-509, grid B4.
88 E-601 T-Splice connection is required but it is not permitted on the US military construction.
Please confirm if installing a new CJP if required or connecting by T-Splice is acceptable.
Refer to drawing E-601. Provide T-splice/Y-splice connection as indicated.
89 E-601 Monitoring both transformer feeder line and fire pump feeder line with one meter is impossible.
1. Is meter/CT (2-sets) needed for each transformer feeder line and fire pump feeder line?
2. Fire pump only activates in an emergency, is the meter/CT needed to be installed?
1. See amended drawing E-601. Included a larger 2500/5 CT to accommodate both feeder conductors.
2. Yes, provide work as shown on drawing E-601.
90 E-601 The details of CAM-LOCK RECEPT for the connection of generator are not clear.
Please provide the model number referred during the design stage or manufacturer information.
Refer to E-601, Single Line Note #5. The offeror shall make their own determination based on the solicitation and any means and methods shall be determined by the contractor.
91 E-603 Grounding for Cold Water Pipe is required but the connecting location is not clear.
Please indicate the connecting location on the floor drawing.
See amended drawing EP111. Added grounding location for cold water pipe in keynote #395.
92 E-601 & E-602 Individual meter will be installed on the Panelboard but the specification of the meter is not specified on Spec 26 20 00.
Shall Spec 26 23 00 (Switchboard) be followed for the details of meter?
See amended specification section 26 20 00, paragraph 2.13.
Added panelboard metering reference to specification section 26 23 00, paragraph 2.26.
93 E-720 Where shall we reference for "WT" shown on Note of Chiller #2 on Mechanical Equipment Schedule?
See amended drawing E-720. Revised notes for Chiller #2 to read "A,B".
94 T-503 Using each conduit running from communication outlet to cable rack requires many wall penetrations.
To reduce wall penetrations, would it be acceptable to group the circuits by classroom together into a large size conduit?
The offeror shall make their own determination based on the solicitation and any means and methods shall be determined by the contractor.
95 T-603 We consider the work stated on General Note "C", CATV devices (Splitter and Amp) as Mediatti (Base Cable TV Company) work.
Please clarify if this work…