AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

FY15 Renovate Edgren High School, Misaw a AB, Japan

The purpose of this amendment is to:

1) Revise a draw ing and spec pages

2) Provide responses to bidder’s inquiries

3) Provide As-Built Draw ings for informational purposes only

4) Provide Geotechinical Report and Memo Regarding Soil Liquefaction for informational purposes only

5) Extend the bid opening date to 30 August 2016

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HV-16-B-0001

X 9B. DATED (SEE ITEM 11)

13-Jun-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

2-Aug-2016

CODE

CONTRACTING DIVISION

USACE-JAPAN DISTRICT

RM 147, BLDG. 250

CAMP ZAMA

ZAMA-CITY, KANAGAWA 252-8511

JAPAN

W912HV 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912HV-16-B-0001

SF 30, BLOCK 14, DESCRIPTION OF AMENDMENT (continued)

A. CHANGES TO SPECIFICATIONS – The amendment mark “(Am-0001)” is shown on each page of the amended specification section(s).

1) Revised Page(s) to Project Specifications. Attached hereto are the following revised page(s) to specifications. Revised page(s) will replace like-numbered page(s) in the subject specifications. Changes are indicated by an asterisk (*) in the left margin opposite the beginning of the revision and an asterisk in the right margin opposite the end of the revision, or by a red line in the left margin of revised areas. All portions of the revised pages shall apply whether or not changes have been indicated.

Section Page No(s).

Standard Form 1442 Page 1 00 10 00 Page 3 00 21 00 Page 8 00 70 00 Page 28 and 39 01 50 00 Page 13 01 91 00.00 40 Page 6 03 30 00.00 10 Page 14

B. CHANGES TO DRAWINGS

1) Revised Drawing(s) to Project Specifications. Attached hereto are the following revised drawing(s) to specifications. Revised drawing(s) will replace like-numbered drawing(s) in the subject specifications.

Sheet No. Revision No. Revision Date

M-603 1 7/27/2016

C. QUESTIONS AND ANSWERS: The Government’s response(s) to question(s) submitted by prospective bidder(s)/offeror(s) are provided in an attachment to this amendment. Questions/Answers 1 – 18. The following questions were submitted by potential bidder (s). Answers provided below do not amend the solicitation (specifications, drawings, etc.) unless revision to the specifications or drawings is specifically noted and incorporated into the solicitation.

D. AS-BUILT DRAWINGS (provided separately) – “As-Built” Drawings are provided for informational purposes only. These “As-Built” Drawings are not part of the solicitation (and will not become part of the contract) and do not amend the solicitation (Specifications, Drawings, etc.). “As-built” drawings may not be complete or depict existing conditions.

The contractor will be responsible for verifying actual conditions at the site.

E. Geotechinical Report Edgren High School, Misawa Air Base, Japan by Masa Fujioka & Associates dated March 6, 2013 and Memo Regarding Soil Liquefaction by Masa Fujioka & Associates Dated April 10, 2014 (provided separately) – The report and memo are provided for informational purposes only. The report and memo are not part of the solicitation (and will not become part of the contract) and do not amend the solicitation (Specifications, Drawings, etc.).

F. Bid opening date and time of August 9, 2016 (02:00 PM), Japan Standard Time, is revised to August 30, 2016 (2:00 PM), Japan Standard Time.

FY15 Renovate Edgren High School, Misaw a AB, Japan

SECTION 00 10 00, SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE

SECTION 00 21 00, INSTRUCTION TO BIDDERS

SECTION 00 45 00, REPRESENTATIONS AND CERTIFICATIONS

SECTION 00 70 00, CONDITIONS OF THE CONTRACT

SECTION 00 73 00, SUPPLEMENTARY CONDITIONS

SPECIFICATIONS

DRAWINGS

NOTES:

a. See DELIVERY OF BIDS/OFFERS. Hand-carried bids/proposals shall be delivered to Room 147, as indicated in Block 8.

b. The Bidder is required to compete and return this form (Standard Form 1442), Section 00 10 00, and 00 45 00 in paper form.

X

JIRO MIYAIRI 046-407-8837

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

13-Jun-2016

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________840 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________30 Aug 2016 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

CONTRACTING DIVISION

USACE-JAPAN DISTRICT

RM 147, BLDG. 250

CAMP ZAMA

ZAMA-CITY, KANAGAWA 252-8511

JAPAN

W912HV

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

TEL: 046-252-0994 TEL: FAX:

(Am-0001)

SECTION 00 10 00

BIDDING SCHEDULE

RENOVATE EDGREN HIGH SCHOOL

MISAWA AIR BASE, JAPAN

Item No. Description Quant Unit Amount

0001 All work for the Renovate Edgren High School(Primary Facility) and within a 5 foot perimeter of the Primary Facility

1 JB ¥_______________

0002 Site Work – all work outside the 5 foot Primary Facility perimeter

1 JB ¥_______________

TOTAL BASE SCHEDULE (Item No. 0001 thru 0002) ¥_______________

OPTION ITEMS

0003 High-Volume Low-Speed (HVLS) Fans as indicated (6 units).

1 JB ¥_______________

TOTAL OPTION ITEMS (Item No. 0003) ¥_______________

TOTAL BASE SCHEDULE (ITEM NO. 0001 thru 0002) ¥__________________

TOTAL OPTION ITEMS (ITEM NO. 0003) ¥__________________

TOTAL BIDDING SCHEDULE (ITEM NO. 0001 thru 0003) ¥__________________

Notes:

1. Failure of the bidder to bid prices for all line items in the Bidding Schedule may be cause for rejection of the bid as nonresponsive.

2. See Section 01 22 00.00 10, Subparagraph 1.2 for additional line item description.

3. LEGEND: JB = Job

4. EXERCISE OF OPTIONS. The Government may exercise the option(s) by written notice to the Contractor either singularly or in any combination at the time of award of the Base Bid at the prices stated in the Bidding Schedule. Completion of added options shall continue at the same schedule as the Base Bid unless otherwise noted in Section 00 70 00, Commencement, Prosecution, and Completion of Work.

5. Evaluation of Options at Time of Contract Award: (FAR 52.217-4) Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate the total price for the basic requirement together with any option(s) exercised at the time of award.

(Am-0001)

c. These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.

20. MODIFICATIONS PRIOR TO CLOSING DATE SET FOR OPENING OF BIDS. The right is reserved, as the interest of the Government may require, to revise or amend the specifications or drawings or both prior to the date set for opening of bids. Such revisions and amendments, if any, will be announced by an amendment or amendments to this invitation for bids. If the revisions and amendments are of a nature which requires material changes in quantities or prices of bid or both, the date set for opening of bids may be postponed by such number of days as in the opinion of the issuing officer will enable bidders to revise their bids. In such cases, the amendment will include an announcement of the new date for opening bids.

21. ORGANIZATIONAL CONFLICTS OF INTEREST (DEC 2015)

In order to prevent a potential conflict of interest under FAR subpart 9.5, firms that prepared or assisted in preparing a statement of work, specifications, or plans for this project in any capacity (to include as a prime contractor, partner, subcontractor, or consultant) under any prior contract shall not be a bidder/offeror under this solicitation and shall not be a part of the bidder's/offeror's team in any capacity (to include as a prime contractor, partner, subcontractor, or consultant).

Failure to comply with this provision may result in termination for default.

CLAUSES INCORPORATED BY REFERENCE

52.204-7 JUL 2013

52.204-16 JUL 2015

52.211-2 APR 2014

52.214-3 DEC 1989

52.214-4 APR 1984

52.214-5 MAR 1997

52.214-6 APR 1984

52.214-7 NOV 1999

52.214-18 APR 1984

52.214-19 AUG 1996

52.217-4 JUN 1998

52.222-56 MAR 2015

252.204-7004 Alt A

System for Award Management Commercial and Government Entity Code Reporting Availability of Specifications, Standards, and Data Item Descriptions Listed in the Acquisition Streamlining and Standardization Information System (ASSIST) Amendments To Invitations For Bids False Statements In Bids Submission Of Bids Explanation To Prospective Bidders Late Submissions, Modifications, and Withdrawals of Bids Preparation of Bids-Construction Contract Award-Sealed Bidding-Construction Evaluation of Options Exercised at Time of Contract Award Certification Regarding Trafficking in Persons Compliance Plan.

System for Award Management Alternate A FEB 2014

W912HV-16-B-0001

(Am-0001)

(1) The Contractor shall include the substance of this clause, including this paragraph (d), in subcontracts that have a value in excess of $5.5 million and a performance period of more than 120 days.

(2) In altering this clause to identify the appropriate parties, all disclosures of violation of the civil False Claims Act or of Federal criminal law shall be directed to the agency Office of the Inspector General, with a copy to the Contracting Officer.

(End of clause)

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR

1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 840 calendar days after the receipt of the Notice to Proceed. The time stated for completion shall include final cleanup of the premises.

(End of clause)

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of ¥120,000 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR

EPA-DESIGNATED ITEMS (MAY 2008)

(a) Definitions. As used in this clause--

Postconsumer material means a material or finished product that has served its intended use and has been discarded for disposal or recovery, having completed its life as a consumer item.

Postconsumer material is a part of the broader category of “recovered material.”

W912HV-16-B-0001

(Am-0001)

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

Drawing No. G-002 through G-004

(End of clause)

52.236-5009 Partnering (FEB 2000)

In order to most effectively accomplish this contract, the Government proposes to form a partnership with the Contractor to develop a cohesive building team. It is anticipated that this partnership would involve the DODEA, 35th CE Squadron, the Contractor, primary subcontractors and the Corps of Engineers. This partnership would strive to develop a cooperative management team drawing on the strengths of each team member in an effort to achieve a quality project within budget and on schedule. This partnership would be bilateral in membership and participation will be totally voluntary. Any cost associated with effectuating this partnership, excluding travel and lodging cost of Government personnel, will be borne by the Contractor. The partnering meetings shall be held at the Misawa Resident Office.

(End of clause)

W912HV-16-B-0001

(Am-0001)

Renovate Edgren High School, Project #: PA00023 Misawa AB, Japan 100% Design Submittal

3.8 TEMPORARY PROJECT SAFETY FENCING

As soon as practicable, but not later than 15 days after the date established for commencement of work, furnish and erect temporary project safety fencing at the work site. The safety fencing shall be a high-visibility, orange-colored, high-density polyethylene grid, at a minimum of 1.1 m high, supported and tightly secured to steel posts located on maximum 3 m centers, constructed at approved locations.

Maintain the safety fencing during the life of the Contract and, upon completion and acceptance of the work, shall become the property of the Contractor and be removed from the work site.

3.9 CLEANUP

Remove construction debris, waste materials, packaging material and the like from the work site daily. Any dirt or mud which is tracked onto paved or surfaced roadways must be cleaned away. Store any salvageable materials resulting from demolition activities within the fenced area described above or at the supplemental storage area. Neatly stack stored materials not in trailers, whether new or salvaged.

3.10 RESTORATION OF STORAGE AREA

Upon completion of the project remove the bulletin board, signs, barricades, haul roads, and any other temporary products from the site.

All tools, equipment, and materials not the property of the Government shall be removed from the premises and properly disposed of off Government property. After removal of trailers, materials, and equipment from within the fenced area, remove the fence that will become the property of the Contractor. Restore areas used by the Contractor for the storage of equipment or material, or other use to the original or better condition.

Remove gravel used to traverse grassed areas and restore the area to its original condition, including top soil and seeding sodding as necessary.

Upon completion of the work, notify the Contracting Officer for final inspection.

-- End of Section --

SECTION 01 50 00 Page 13 (Am-0001) j2ee9wwh Line

1.4.3 Functional Testing Co-ordination

Do not "temporarily" start equipment for commissioning. Do not conduct functional performance testing until a pre-functional, start-up and TAB is completed for a given system. Do not functionally test the controls system and equipment it controls until all points have been calibrated and the pre-functional checklists are completed.

1.5 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Commissioning Plan; G

Commissioning Schedule; G

SD-05 Design Data

Basis of Design; G

SD-06 Test Reports

Functional Performance Testing Results; G

Seasonal Testing; G

Short-Term Diagnostic Testing; G

Deficiency Report and Resolution Record; G

SD-07 Certificates

Commissioning Authority's Qualifications; G

SD-10 Operation and Maintenance Data

Operations and Maintenance Manuals; G

Training Plan; G

Operations and Maintenance Database; G

SD-11 Closeout Submittals

Final Commissioning Report; G

LEED Documentation; G

Warranty; G

SECTION 01 91 00.00 40 Page 6 (Am-0001)

Floor Profile Quality Classification From

ACI 117

This Section

Flat Float Finish or Trowel Finish

Very Flat Same. Use only with F-system

Levelness tolerance does not apply where design requires floors to be sloped to drains or sloped for other reasons.

2.1.8.1 Floors by the F-Number System

The flatness and levelness of floors shall be carefully controlled and the tolerances shall be measured by the F-Number system of Paragraph 4.8.5 and

4.8.5.1 of ACI 117 . Furnish an approved floor profilograph or other equipment capable of measuring the floor flatness (FF) number and the floor levelness (FL) number in accordance with ASTM E1155M. Perform the tolerance measurements within 72 hours after floor slab construction while being observed by the Contracting Officer. The tolerances of surfaces beyond the limits of ASTM E1155M (the areas within 600 mm of embedments and construction joints) will be acceptable to the Contracting Officer.

Tolerances of the following areas shall meet the requirements for the listed surfaces as specified in paragraphs 4.8.5 and 4.8.5.1 of ACI 117 .

Surface Areas

Bullfloated Flat

Straightedged Flat

Float Finish Flat

Trowel Finish Flat

Very Flat Not Applicable

2.1.9 Strength Requirements

Specified compressive strength (f'c) shall be as follows:

COMPRESSIVE STRENGTH STRUCTURE OR PORTION OF STRUCTURE

27.5 MPa at 28 days Walls , Columns, Beams and Slab-on- Ground Grade

271 MPa at 28 days Footings and Continuous Footings, Pile Caps

21 MPa at 28 days All Other Concrete

Concrete slabs on-grade shall have a 28-day flexural strength of 4.5 MPa.

Concrete made with high-early strength cement shall have a 7-day strength equal to the specified 28-day strength for concrete made with Type I or II portland cement. Compressive strength shall be determined in accordance with ASTM C39/C39M. Flexural strength shall be determined in accordance with ASTM C78/C78M.

SECTION 03 30 00.00 10 Page 14 (Am-0001)

Contractors' Questions

Item Sheet No. or Specs Contractor Question or Information Needed Government Response 1 There is no mentioning of Partnering process in the Specifications but our usual experience with USACE projects with the same magnitude includes formal Partnering. We believe it will be an advantage to have this formal Partnering for all parties involved in the project. Please confirm

A Partnering clause has been added to the section 00 70 00.

Please refer to revised section 00 70 00 in this amendment (Am- 0001).

2 As-Built DWG Typically in the renovation work there are many unforseen conditions and objects that complicate especially the demolition work. In order for us to avoid unforseen conditions and quote accurately, we need to have as-built drawing to confirm the as-built condition. Can you please provide As-Built drawings?

The Government provided As-Built drawings in the amendment (Am-0001). The As-Built drawings are for informational purposes only. Contractor must verify the actual site conditions.

3 SF1442

Block 11 52.211-10

Although this project is quite large in size, the construction period of 700 calendar days seems too short for all the required work.

Could the Government consider extending the project duration?

The construction duration has been extended to 840 days. Please refer to revised SF1442 and revised section 00 70 00 in this amendment (Am-0001).

4 52.211-10 Based on our experiences in Misawa Air Base projects, we know that It is extremely difficult to do the work for exterior and confined space areas due to sever weather from the middle of December to middle of March. In fairness to the contractors, could we suggest to make these winter days non-working time and start the contract (NTP) in spring, April 2018?

The bulk of the work is interior with limited roof work. With proper scheduling, late start should not be necessary.

5 SECTION

32 92 23

Is it possible to apply seeding instead of sodding for all the applicable area?

No. The contractor must follow the specification requirements.

6 SECTION

33 30 00 para.3.2.2

Usually gravity sewer lines in Japan are not commonly tested for leaks and deflection. Is it possible to waive this paragraph 3.2.2.1 and 3.2.2.2 from the specs?

The test is required per section 33 30 00, par 3.2.2.

7 SECTION

31 63 33

Is it possible to use Japanese standard or method for the Drilled micropiles?

After award, the contractor may propose a variation in accordance with Specification Section 01 33 00.

8 SECTION

31 63 33

DWG. S-012

Could you provide drilled micropiles qty. for bid purpose? Please see Sheet S-012 for micropile quantity.

9 SECTION

31 63 33

DWG. S-012

Could you provide the length of test piles for bid purpose? Please see Sheet S-012 for minimum micropile length.

10 DWG. S-001

Foundation A-1,2

Regarding "Geotechnical Investigation report", we cannot locate below "Geotechnical report" as indicated in the S-001. Can you provide them for cost estimation?

1.Geotechinical Report Edgren High School, Misawa Air Base, Japan by Masa Fujioka & Associates Dated March 6, 2013.

2. Memo Regarding Soil Liquefaction by Masa Fujioka & Associates Dated April 10, 2014.

The Government provided the Geotechnical report and memo in this amendment (Am-0001) for informational purposes only.

W912HV-16-B-0001 (Am-0001) Page 1 of 3

11 Spec. Section 01 57

20.20 33 "Contaminated Soil & UXO" Are there any possibility for contractors to encounter any contaminated soil and/or UXO in this project? If yes, please provide information.

There are no known UXOs in the area, and soil contamination is not expected to be an issue within the limits of this project.

12 SECTION 23 08 00.00

COMMISSIONING OF

HVAC SYSTEMS

Page 7, 8, 9, 27, 28 & 29

The pages 7, 8, 9, 27, 28 & 29 have blank spaces and pages, is there any contents missing? please confirm.

The Government confirms that there is no missing content on pages 7, 8, 9, 27, 28 & 29 of section 23 08 00.00 10; the blank pages and spaces were due to a formatting error.

13 SECTION 01 50 00

TEMPORARY

CONSTRUCTION

FACILITIES AND

CONTROLS

Para. 3.10

Restoration of temporary storage areas states seeding as necessary, but there is no seeding specs section and we have only sodding section. Please confirm if we could also use hydro-seeding to restore disturbed turf and newly graded finished earth surfaces.

The contractor shall restore any disturbed turf area and newly graded finished earth surfaces to original condition by applying sodding. Please refer to revised section 01 50 00 paragraph 3.10 in this amendment (Am-0001).

14 drawing GI-001, Ref. drawing GI-001,on the last part of this sheet, a list of fire protection related items is provided and SHALL be U.S. products with U.S. testing labels as required. However, building code notes on this same sheet indicate 0 hrs fire resistance ratings for structural frame, both exterior and interior walls, floor and roof construction. Please confirm if these structural components need not to have fire ratings; or if needed, please provide fire resistance ratings for each.

For fire-rated construction, please see sheets GI-002, GI-003, GI-

004, GI-005, GI-006, GI-007.

15 Submittal Register and

SECTION 01 91 00.00

40 Para. 1.5 SD-07 Certificates Commissioning Authority's Qualifications;

G

Same section paragraphs 1.4.1 and 1.6 states that Commissioning Authority is provided by the Government, please confirm if contractor will submit the Qualification’s submittal. We believe that Government should provide contractor the qualifications document for the Sustainability Notebook.

The Commissioning Authority will be provided by the US Government; therefore, the requirement will be deleted from the specifications. Please refer to revised section 01 91 00.00 40 paragraph 1.5 in this amendment (Am-0001)

16 Section 03 30 00.00 10 Para. 2.1.9 Drawing S-001 Concrete Notes Item B.

Regarding Concrete compressive strength, section paragraph and Drawing note have concrete compressive strength discrepancies, please confirm correct strength per structure.

Concrete compressive strengths shall be per drawing S-001.

Specification section 03 30 00.00 10, 2.1.9 was in error. Please refer to revised section 03 30 00.00 10 paragraph 2.1.9 in this amendment (Am-0001)

W912HV-16-B-0001 (Am-0001) Page 2 of 3

17 DWG W912HV-16-B-

0001_Drawings_Vol_2 M- 603 SHEET 360 of 569

Cooling Tower schedule As per the schedule M-603, the capacity and flow rate of the cooling water is 345kW and 19.0L/s respectively.

However, based on the flow rate and the water temp conditions provided, the heat rejection is 476kW.

Therefore, the two parameters cannot be maintained at the same time.

Please advise which parameter we should follow when selecting the equipment.

Select Cooling Tower based on flow and temperature requirements, or 476 kW. Please refer to revised drawing M-603 in this amendment (Am-0001)

18 DWG M701~715 Please provide us as-build drawing of this building. Having as-build drawing, every contractors can provide competitive and accurate pricing for mechanical and DDC systems.

The Government provided As-Built drawings in the amendment (Am-0001). The As-Built drawings are for informational purposes only. Contractor must verify the actual site conditions.