This document is a Bid Inquiry Contractor Report for the Hartwell Project Operations & Maintenance (O&M) Fully Firm Fixed Price (FFP) Contract, Review Number W912HN25R5009. The report contains 75 contractor inquiries and government responses covering various aspects of the solicitation, including proposal submission requirements, pricing details, technical specifications, and contract clarifications. Key points include:
The solicitation involves a five-year contract for facilities maintenance at the Hartwell Project, with a base year and four option years. Proposal requirements include detailed technical and price volumes, with specific formatting guidelines (Times New Roman, 12-point font, 1-inch margins). The contract includes Level I (routine) and Level II (non-routine) service requirements across multiple technical provisions, covering areas such as equipment maintenance, facility cleaning, infrastructure repairs, and site management. Notable clarifications addressed page limits for pricing documents (approximately 80 pages for pricing spreadsheets with an additional 200-page limit for narrative), acceptance of both Past Performance Questionnaires (PPQ) and Contractor Performance Assessment Reporting System (CPARS) records, and specific details about service requirements for various project facilities and equipment.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Third Memorandum for Record for W912HN26RA003 - Amendment 0001(with attachments).pdf | ||
| B.08 - Second Memo for Record regarding Amendment 0001(revised PWS attached).pdf | ||
| B.07 - Pre-Bid On-Site Meeting Minutes -W912HN26RA003 (25 Nov 2025).pdf | ||
| Memorandum for Record for W912HN26RA003 - Amendment 0001(with Attachments)(signed).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Controlled Unclassified Information (CUI) Only
Bid Inquiry Contractor Report All Inquiries
Project: Hartwell Project O&M Fully FFP Contract Review: W912HN25R5009 (00001) (sorted by CommentID ) Displaying 75 inquiries.
Id Discipline Sheet Detail Spec
11612071 Facilities Maintenance ADDENDUM TO 52.212-1, ATTACHMENT 1, SECTION L Section 1, Submission of Proposals File Description
Comment Classification: UNCLASSIFIED (U)
Will the Government allow compatible PDF formats (e.g., Bluebeam Revu) or must the documents be Adobe PDF?
If allowable, we suggest revised verbiage similar to "Submission shall be in Adobe PDF format or compatible equivalent PDF format to be confirmed with Contracting Specialist prior to submission of proposal documents."
This request/comment also applies to Section L.3, Directions for Submitting Proposals, which states, "All submissions shall be in Adobe PDF format."
On: Nov 19 2025.
Government Response. . All submission shall be in Adobe PDF format only. No revised verbiage will be done. On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11612076 Facilities Maintenance ADDENDUM TO 52.212-1, ATTACHMENT 1, SECTION L Section 7, Schedule B Instructions
Comment Classification: UNCLASSIFIED (U)
What is Schedule B? Is this the same as Section B – Pricing Schedule which is referenced in Section L.5?
If so, we did not see a Schedule B or Section B in this solicitation. Is this reference to the "Continuation of Supplies or Services and Prices/Costs" in the solicitation documents? Please clarify and revise the solicitation accordingly.
On: Nov 19 2025.
Government Response. . Schedule B is a typo, and will be corrected to say Section B. On: Dec 08 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11612078 Facilities Maintenance ADDENDUM TO 52.212-1, ATTACHMENT 1, SECTION L Section L.5, Proposal Format and Content
Comment Classification: UNCLASSIFIED (U)
Does the Government require a certain font, font size, and/or spacing (e.g., Times New Roman, 12-point, single-spaced, 1-inch margins) for narrative portions of the proposal? If so, please provide requirements.
On: Nov 19 2025.
Government Response. . Times New Roman, 12 point single spaced should be used. On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11612087 Facilities Maintenance ADDENDUM TO 52.212-1, ATTACHMENT 1, SECTION L Section L.5.1, Proposal Format (a)
Comment Classification: UNCLASSIFIED (U)
Item (a) states, "Price information shall be included in the price proposal only."
However, Sections L.5.1 (Proposal Format, item (c) chart) and 5.2.4 (Volume IV – Solicitation Documents) require submission of Section B – Pricing Schedule in Volume IV – Solicitation Documents, which is contrary to "the price proposal only" directive. Is this correct?
Also, Section L.5.2.3 (Volume III – Price, d. Electronic Copy) states, "The Price Volume shall contain the Pricing Spreadsheets to include all required data in the pricing schedule – Section B with a Price Volume proposal supporting narrative...If there are any discrepancies identified between the information provided in Volume III – Price and Volume IV – Solicitation Documents, the data identified in Volume IV will take precedence." And Section L.5.2.3 (Volume III – Price, e. Narrative) states, "The price proposal narrative shall contain same price volume required in 'd. electronic copy' to include Pricing Spreadsheets to include all required data in the pricing schedule-Section B." Is Section B to be included in both Volume III – Price and Volume IV – Solicitation Documents?
These instructions are conflicting and confusing. Please clarify where Section B – Pricing Schedule should be included and revise solicitation instructions if needed.
On: Nov 19 2025.
Government Response. . Section L.5.1(a) will be amended to state "Price information shall only be included in the Volume III-Price and Volume IV-Solicitation Documents.
To clarify L.5.2.3, the CLINs pricing data requested in the solicitation section "Continuation of Supplies or Services and Prices/Costs" list all CLINs that offeror shall include in both Volume III- Price and Volume IV-Solicitation Documents. On: Nov 24 2025
Current Request Status: Request Closed Information for this report is procurement sensitive.
11612093 Facilities Maintenance ADDENDUM TO 52.212-1, ATTACHMENT 1, SECTION L Section L.5.1, Proposal Format (c)
Comment Classification: UNCLASSIFIED (U)
The "Total Maximum Allowed Pages" for Volume III – Price is 20 pages. However, the required Pricing Spreadsheets are approximately 80 pages, without the required supporting narrative. Does the 20 page maximum refer to the narrative portion only? Please clarify and revise solicitation if needed.
On: Nov 19 2025.
Government Response. . Yes, the required Pricing Spreadsheets are approximately 80 pages, with an additional 200 page limit for the supporting narrative. On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11612096 Facilities Maintenance ADDENDUM TO 52.212-1, ATTACHMENT 1, SECTION L Section L.5.1, Proposal Format (c) and (e)
Comment Classification: UNCLASSIFIED (U)
The Volume IV – Solicitation Documents instructions in item c. (chart) and item e. reference "SF33." However, there is no SF33 in this solicitation, and we believe this verbiage is left over from the legacy contract writing system. Please revise to "SF1449" or provide SF33.
On: Nov 19 2025.
Government Response. . Amendment 0001 will update the verbiage from "SF33" to "SF1449" On: Nov 24 2025 Current Request Status: Request Closed https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=CommentID https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=Discipline https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=Sheet https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=Detail https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=SpecText
Information for this report is procurement sensitive.
11612515 Facilities Maintenance ADDENDUM TO 52.212-1, ATTACHMENT 1, SECTION L Section L.5.1, Proposal Format (d.4)
Comment Classification: UNCLASSIFIED (U)
Does the Government prefer the Compliance Summary Checklist to be included at the beginning or end of the volume? Also, please confirm that the Compliance Summary Checklist will not count against the overall page limit of the volume. Please revise solicitation if needed.
On: Nov 19 2025.
Government Response. . Please provide checklist at the beginning of the volume. Checklist will NOT count against page limits. On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11612519 Facilities Maintenance ADDENDUM TO 52.212-1, ATTACHMENT 1, SECTION L Section L.5.1., Proposal Format (d)
Comment Classification: UNCLASSIFIED (U)
Items e. and f. should be (5) and (6). Please revise section for clarity of reference.
On: Nov 19 2025.
Government Response. . This will be addressed in amendment 0001. On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11612521 Facilities Maintenance ADDENDUM TO 52.212-1, ATTACHMENT 1, SECTION L Section L.5.1, Proposal Format Section L.5.2, Proposal Content
Comment Classification: UNCLASSIFIED (U)
Will a cover page and table of contents count against the overall page limit of the proposal? Please clarify and revise solicitation if needed.
On: Nov 19 2025.
Government Response. . A cover page and Table of Contents will not count against specified page limits. On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11612522 Facilities Maintenance ADDENDUM TO 52.212-1, ATTACHMENT 1, SECTION L Section L.5.2.1,Volume I – Technical
Comment Classification: UNCLASSIFIED (U)
This section is missing "c" (skips from "b" to "d") and has two "i." Therefore, it does not match the Compliance Summary Checklist in Section M, Attachment 5. Please revise for clarity of reference.
On: Nov 19 2025.
Government Response. . This will be corrected in the amendment 0001. Key personnel should be c with lettering sequential following that, e.g. d is Required License/Certifications, etc. all the way down to j (which is correct for Mobilization Plan. This would match the Compliance Summary Checklist. On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11612523 Facilities Maintenance ADDENDUM TO 52.212-1, ATTACHMENT 1, SECTION L Section L.5.2.1.c, Key Personnel
Comment Classification: UNCLASSIFIED (U)
The solicitation states, "For the superintendent and quality control positions, offerors will provide qualification statements indicating the knowledge, skills, and abilities required to hold these positions. If the individuals are known, résumés may also be submitted."
However, Section L.5.2.1. – 1) Workforce (A. Organization and Staffing) states, "Submit résumés for the following key personnel...Project Manager, Contractor Quality Control (CQC) System Manager, Cleaning and Maintenance Foremen."
These instructions are conflicting and confusing. Section L.5.2.1.c. suggests only 6 pages for the Key Personnel section. However, if all documentation requested in L.5.2.1.c. and L.5.2.1-1 are provided, it would be at least 9 pages, which would then reduce the pages available for our response to other technical sections. Please clarify which résumés, if any, are required.
On: Nov 19 2025.
Government Response. . Please provide for Project Manager/Superintendent and CQC Manager only. On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11612524 Facilities Maintenance ADDENDUM TO 52.212-1, ATTACHMENT 1, SECTION L Section L.5.2.2.2, Past Performance Record a. Past Performance Questionnaire
Comment Classification: UNCLASSIFIED (U)
There appears to have been an issue with cutting and pasting in the second and third sentences of this paragraph which has caused duplication and confusing instructions. Please review and correct to be accurate and revise in consideration of the following request.
On: Nov 19 2025.
Government Response. . The Offeror shall provide a Past Performance Questionnaire (Attachment 3) to the client for each project the Offeror provides as part of Volume II - Past
Performance (described in L.5.2.2.1). Offerors shall provide information on contracts that provide the best evidence of experience in the performance of functions (TPs) in the Performance Work Statement. On: Nov 24 2025
Current Request Status: Request Closed Information for this report is procurement sensitive.
11612527 Facilities Maintenance ADDENDUM TO 52.212-1, ATTACHMENT 1, SECTION L Section L.5.2.2.2, Past Performance Record a. Past Performance Questionnaire
Comment Classification: UNCLASSIFIED (U)
Will the Government please consider revising this section to allow the offeror to submit copies of CPARS in lieu of PPQ?
If allowable, we respectfully suggest revised verbiage similar to "The Offeror shall provide a Past Performance Questionnaire...or a completed contractor performance evaluation, whether annual or final, found in the Contractor Performance Assessment Reporting System (CPARS) (www.cpars.gov).")
Thank you!
On: Nov 19 2025.
Government Response. . Both CPARS and PPQ will be acceptable. On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11612529 Facilities Maintenance ADDENDUM TO 52.212-1, ATTACHMENT 1, SECTION L Section L.5.2.3, Volume III – Price
Comment Classification: UNCLASSIFIED (U)
We did not find any reference to limitations or caps on General & Administrative (G&A) expenses. Please provide a narrative or section(s) to explain:
a. If the offeror proposes a rate, is the offeror bound by this rate throughout the entire contract, including options?
b. If no to the above question, how is the G&A rate managed upon audit?
On: Nov 19 2025.
Government Response. . There are no limitations or caps placed on G&A. It is the offeror's discretion as to what G&A to propose for each contract year. On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11612531 Facilities Maintenance ADDENDUM TO 52.212-1, ATTACHMENT 1, SECTION L Section L.5.2.3, Volume III – Price
Comment Classification: UNCLASSIFIED (U)
We did not find any reference to inflation. Please provide guidance on whether or not the Contractor should take into account inflation for materials and supplies.
On: Nov 19 2025.
Government Response. . Bidder's are not required to account for inflation, but is acceptable if inflation is calculated. On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11612533 Facilities Maintenance ADDENDUM TO 52.212-1, ATTACHMENT 1, SECTION L Section 5.2.4, Volume IV – Solicitation Documents
Comment Classification: UNCLASSIFIED (U)
This should be Section L.5.2.4. Please revise for clarity of reference.
On: Nov 19 2025.
Government Response. . This will be updated in Amendment 0001 On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11612538 Facilities Maintenance ADDENDUM TO 52.212-1, ATTACHMENT 1, SECTION L Section 5.2.4, Volume IV – Solicitation Documents
Comment Classification: UNCLASSIFIED (U)
TAB A requires submission of a completed and signed "Standard Form 33." However, as previously mentioned, there is no SF33 in this solicitation. Please revise to "SF1449" or provide SF33.
A revision here would also require a revision to Section M, Attachment 5, Compliance Summary Checklist, Solicitation Documents, which currently says, "a. Tab A – Standard Form 33."
On: Nov 19 2025.
Government Response. . This will be addressed in amendment 0001. On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11612545 Facilities Maintenance ADDENDUM TO 52.212-1, ATTACHMENT 1, SECTION L Section 5.2.4, Volume IV – Solicitation Documents
Comment Classification: UNCLASSIFIED (U)
TAB B requires submission of a completed Section B – Pricing Schedule which contradicts the Section L.5.1 Proposal Format directive that "price information shall be included in the price proposal only."
Also, please see previous questions (11612076, 11612087) requesting clarification of what "Section B" is since no document with this name was provided in the solicitation.
A revision here would also require a revision to Section M, Attachment 5, Compliance Summary Checklist, Solicitation Documents, which currently says, "b. Tab B – Section B Pricing Schedule."
On: Nov 19 2025.
Government Response. . This will be addressed in amendment 0001. On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11612547 Facilities Maintenance ADDENDUM TO 52.212-1, ATTACHMENT 1, SECTION L Section 5.2.4, Volume IV – Solicitation Documents
Comment Classification: UNCLASSIFIED (U)
TAB C requires submission of "Section K – Completed Representations and Certifications." The solicitation does not contain a Section K, and we believe this verbiage is left over from the legacy contract writing system. Please revise solicitation as needed.
A revision here would also require a revision to Section M, Attachment 5, Compliance Summary Checklist, Solicitation Documents, which currently says, "c. Tab C – Section K Completed Representations and Certification."
On: Nov 19 2025.
Government Response. . This will be addressed in amendment 0001. On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11612549 Facilities Maintenance ADDENDUM TO 52.212-1, ATTACHMENT 1, SECTION L Section 5.2.4, Volume IV – Solicitation Documents
Comment Classification: UNCLASSIFIED (U)
TAB D requires submission of a Proposal Data Sheet and instructs the Contractor to "See Attachment 12." However, no Proposal Data Sheet or Attachment 12 is included in this solicitation. Please provide the referenced document or revise solicitation accordingly.
A revision here may also require a revision to Section M, Attachment 5, Compliance Summary Checklist, Solicitation Documents, which currently says, "d. Tab D – Proposal Data Sheet" and a revision to Section L.5.1.d.e (Volume IV), which currently says, "Proposal Data Sheet (see Attachment 12).
On: Nov 19 2025.
Government Response. . This will be addressed in amendment 0001. On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11612551 Facilities Maintenance ADDENDUM TO 52.212-1, ATTACHMENT 2, SECTION M Section M.3, Special Evaluation Considerations a. Technical Evaluation
The first paragraph of this section references "Performance Risk as listed in Section 5.e.2." However, a search of the solicitation document finds no such section. Where is "Section 5.e.2"? Please revise solicitation as needed.
On: Nov 19 2025.
Government Response. . This will be addressed in amendment 0001. On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11612554 Facilities Maintenance ADDENDUM TO 52.212-1, ATTACHMENT 2, SECTION M Section M.3, Special Evaluation Considerations a. Technical Evaluation
Comment Classification: UNCLASSIFIED (U)
This section states, "Strengths, significant strengths, weaknesses, and significant weaknesses (as defined in section 5.d.1 Definitions) may also be given at the discretion of the SSEB." However, a search of the solicitation document finds no such section. Where is "Section 5.d.1"? Please revise solicitation as needed.
On: Nov 19 2025.
Government Response. . This will be addressed in amendment 0001. On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11612558 Facilities Maintenance ADDENDUM TO 52.212-1, ATTACHMENT 2, SECTION M Section M.3, Special Evaluation Considerations a. Technical Evaluation
Comment Classification: UNCLASSIFIED (U)
The last paragraph of this section references "the Performance Work Statement (PWS) in Section C." The solicitation does not contain a Section C, and we believe this verbiage is left over from the legacy contract writing system. Please revise solicitation as needed.
On: Nov 19 2025.
Government Response. . This will be addressed in amendment 0001 On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11612572 Facilities Maintenance ADDENDUM TO 52.212-1, ATTACHMENT 2, SECTION M Section M.3, Special Evaluation Considerations b. Past Performance Evaluation (Quality)
Comment Classification: UNCLASSIFIED (U)
As previously mentioned regarding Section L.5.2.2.2 (Question 11612527), we respectfully request that the Government amend the solicitation to allow submission of CPARS in lieu of PPQ. Thank you!
On: Nov 19 2025.
Government Response. . Reference response to Inquiry 11612527. Both CPARS and PPQ are acceptable. This will be addressed in amendment 001. On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11612573 Facilities Maintenance ADDENDUM TO 52.212-1, ATTACHMENT 2, SECTION M
Attachment 5, Compliance Summary Checklist, Past Performance Relevant Experience a. List of Relevant Contracts
Comment Classification: UNCLASSIFIED (U)
The seventh item in the list is "Period of Performance of Contracting Officer." Is this correct or should it be "Period of Performance of Contract?" Please revise solicitation as needed.
On: Nov 19 2025.
Government Response. . This will addressed in amendment 0001. On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11613050 Facilities Maintenance Performance Work Statement and Performance Requirements Summary
Comment Classification: UNCLASSIFIED (U)
The following discrepancies were identified while performing a cross check between the Performance Work Statement (PWS) and the Performance Requirements Summary (PRS). Some tasks are numbered incorrectly in the PRS, and some tasks are not included in the PWS that are shown in the PRS. Please revise in order for the two to correspond:
a. TP-1.23 Security in the PRS should be TP-1.22.
b. TP-5.3 Station Sump Water Analysis in the PRS should be Water Filters – Station Sump Water Analysis is not included in the PWS.
c. TP-5.4 in the PRS should be Fire Extinguishers.
d. TP-12.6.1 Fish Attractor Maintenance in the PRS should be 12.5.
e. TP-12.10 Pest Control in the PRS should be 12.7.
f. TP-13.7 Surveys in the PRS is not included in the PWS.
g. TP-15.2 Installation of Utilities is not included in the PWS.
h. TP-15.3 Buildings and Structures in the PRS should be 15.1.
i. TP-15.4 Campground and Picnic Impact Sites in the PRS should be 15.2.
j. TP-15.5 Playgrounds is not included in the PWS.
k. TP-15.6 Bulletin Boards is not included in the PWS.
l. TP-15.7 Swales and Berms is not included in the PWS.
m. TP-15.8 Bulkhead Walls is not included in the PWS.
n. TP-15.10 Riprap in the PRS should be 15.3.
o. TP-15.11 Launch Lanes is not included in the PWS.
p. TP-15.12 Plant Materials is not included in the PWS.
q. TP-15.13 Septic Systems in the PRS should be 15.4.
r. TP-16.0.1 Immediate Spill Response in the PRS should be 16.2.
s. TP-16.3 Annual Spill Response Exercise in the PRS should be 16.4.
On: Nov 19 2025.
Government Response. . Changes made. Updated PWS with PRS chart will be provided in amendment. On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11613256 Facilities Maintenance Performance Work Statement Comment Classification: UNCLASSIFIED (U)
Section J is mentioned 28 times in the PWS. However, there is no Section J in this solicitation, and we believe this verbiage is left over from the legacy contract writing system. Please delete these references and verify that remaining Appendix references are correct.
On: Nov 19 2025.
Government Response. . Correct, there is no section J, Please reference Appendices'. This will be corrected in amendment 0001. On: Nov 24 2025 Current Request Status: Request Closed
11613258 Facilities Maintenance Performance Work Statement TP-2.4.3 (Minimum Manpower Requirements) and Appendix E, PMO Cleaning Schedule/Guide
Comment Classification: UNCLASSIFIED (U)
TP-2.4.3 states that cleaning is required "on Saturday and Sunday during the period of 1 May through 31 October." However, the cleaning schedule for the PMO (Appendix E) requires cleaning to be performed on Saturday. Does the cleaning schedule change for the PMO as in the parks, or will cleaning of the PMO continue on Saturday throughout the year? Please clarify.
On: Nov 19 2025.
Government Response. . The cleaning schedule for the PMO will remain the same throughout the year. On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11613260 Facilities Maintenance Performance Work Statement TP-4.6 (Earthen Embankments) Comment Classification: UNCLASSIFIED (U)
TP-4.6 states that "In the past, the slopes have been cut successfully with a low center of gravity (LCG) tractor and flail mower." Please confirm that the mower used in the past is an actual "flail mower" and not a towed rotary mower or "batwing" as these are two totally different types of mowers and are occasionally confused with one another. Revise PWS if needed.
On: Nov 19 2025.
Government Response. . Historically slopes have been mowed with a LCG tractor or and flail mower, not a batwing. Contractor's are not bound to cutting with a flail mower as long as their method meets mowing requirements and the COR approves. On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11613261 Facilities Maintenance Performance Work Statement TP-5.1 (Pest Control) Comment Classification: UNCLASSIFIED (U)
TP-5.1 states, "Reference TP-3.16 for building square footage." However, square footage is not included in TP-3.16. Please revise PWS to include square footage to receive pest control services for each building identified in TP-5.1.
On: Nov 19 2025.
Government Response. . Square footages are included in 3.16.1.1 through 3.16.4.2 in the PWS. On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11613264 Facilities Maintenance Performance Work Statement TP-7.3.1.2 (Communication Tower Lighting) Comment Classification: UNCLASSIFIED (U)
TP-7.3.1.2 states, "A non-functioning light is an emergency, and the contractor shall respond accordingly." Please clarify what the Government's emergency time frame is for light replacement.
On: Nov 19 2025.
Government Response. . Initial response is within 24 hours, the COR will notify the FAA of the non-functioning light. The contractor will make every effort to have the light repaired as soon as possible. The Corps realizes a subcontractor may be needed to complete the repair and may take up to 30 days. On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11613268 Facilities Maintenance Performance Work Statement TP-14.1 (Navigation Aids Maintenance and Inspections) Comment Classification: UNCLASSIFIED (U)
The first sentence states, "The contractor shall be required to perform an annual inspection." However, the sixth sentence states, "...to aid in the quarterly inspection." Please clarify inspection frequency.
On: Nov 19 2025.
Government Response. . The contractor is required to perform 1 annual inspection, the quarterly inspection is provided to the contractor by the Corps, it is accomplished by volunteer organizations. On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11613274 Facilities Maintenance Performance Work Statement TP-16.6 (Site Safety and Health Plan Requirement) Comment Classification: UNCLASSIFIED (U)
The solicitation states, "The SSHP will be part of the contractor's required plan described in TP-16.2.1." However, TP-16.2.1 addresses the OSIC. Should this reference be TP-16.2.4? Please clarify or revise.
On: Nov 19 2025.
Government Response. . Reference should be 16.2.4. Revised PWS is being provided as an amendment to include this update. On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11613280 Facilities Maintenance Performance Requirements Summary C. Acceptable Quality Level Comment Classification: UNCLASSIFIED (U)
Many line items include verbiage to the effect of "receive no more than x valid customer complaints or observed deficiencies." Please provide a narrative or section(s) to explain:
a. The process by which customer complaints are received. (e.g., verbal complaints to Rangers or USACE officials in the field, phone-in, comment box in the PMO/Visitor Center, online system, etc.)
b. Do USACE project personnel (e.g., COR, QA, Ranger, etc.) verify the validity of customer complaints?
c. Do USACE project personnel compare the Contractor's service schedule to the timing of the complaint or deficiency in determining the validity of the complaint? For instance, if a visitor complains about the conditions of a sanitary facility on Tuesday afternoon, would USACE personnel take into consideration that the approved cleaning schedule for that facility is on Monday and Thursday mornings?
d. Are complaints vetted and discussed with the Contractor before escalating to a negative contractor performance rating?
e. Is the Contractor allowed to respond by providing a logical explanation for a complaint or deficiency, and, if so, is that response taken into consideration before assigning a negative contractor performance rating?
On: Nov 19 2025.
Government Response. . Brief narrative added to end of the PRS to define how complaints are handled. Changes included in revised PWS which will be provided as amendment. On: Nov 24
Current Request Status: Request Closed
Information for this report is procurement sensitive.
11613285 Facilities Maintenance Appendix C, Facilities Comment Classification: UNCLASSIFIED (U)
Volunteer Village is listed in the "Site Names" column under "Facilities." However, there is no location noted on the Hartwell Dam and Lake Map nor in any verbiage throughout the solicitation, PWS, or appendices. Please advise of the location of Volunteer Village and specify what the Contractor is responsible for cleaning (e.g., laundry building, shelter, etc.).
On: Nov 19 2025.
Government Response. . The Volunteer Village is located at 565 Little Powderbag Road, Hartwell GA approximately 2 miles from the Hartwell Project Office, half way between Watsadler
Campground and Elrod Ferry Recreation Area in Hart County, GA. Contractor is not responsible for cleaning within this area. On: Nov 24 2025 Current Request Status: Request Closed
11613287 Facilities Maintenance Appendix C, Facilities and Appendix D, Dumpster Sites
In Appendix C, Contractor's Compound is shown to be a dumpster site; however, this site is not included in Appendix D. Please clarify whether this site is to have a dumpster or not and correct whichever appendix is in error.
If the Contractor's Compound is to be a dumpster site, Appendix C shows a quantity of one (1); however, the green color coding indicates it has two (2) – "42 cu. yd. compactor & 1 roll-off." Please correct appendix as needed.
On: Nov 19 2025.
Government Response. . Appendices C and D updated to make it more clear. Contractor compound is a dumpster site with one (1) 42 cubic yard compactor and one (1) roll-off dumpster.
On: Nov 24 2025 Current Request Status: Request Closed
11613290 Facilities Maintenance Appendix C, Facilities and Appendix D, Dumpster Sites
In Appendix C, Martin Creek and Townville are shown to be dumpster sites; however, these two sites are not included in Appendix D. Please clarify whether these sites are to have dumpsters or not and correct whichever appendix is in error.
On: Nov 19 2025.
Government Response. . These two locations no longer have dumpsters. Appendix D is accurate and has been updated. On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11613904 Facilities Maintenance Technical Page Limitation Level of Discussion Comment Classification: UNCLASSIFIED (U)
For the Hartwell solicitation, there are 110 Option and Level II line items requiring pricing for each, Base Year and all five Option Years. Each of these line items will require a detailed mix of labor hours, materials and supplies, ODC quantities, fuel gallons, vehicle mileage, equipment rental or usage, subcontractor support, and other cost elements necessary to perform the work.
Can you please clarify whether the Government expects the Technical Proposal to include this level of detail for each individual item? If so, the current 75-page limit will not allow for the inclusion of all required information.
On: Nov 20 2025.
Government Response. . Please reference L.5.2 Proposal content, specifically L.5.2.1. On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11614348 Facilities Maintenance Technical Level I vs Level II Comment Classification: UNCLASSIFIED (U)
Firm-Fixed-Price (FFP) structure for Technical Provisions (TPs) 7 through 18 (excluding TP 8 – Landscape and TP 13 – Boundary Line). These TPs appear to be written verbatim from the previous Cost- Reimbursement contract. TPs 7, 9-12, 14-18.
For example, TP-1.2 defines Level I work as "routine, preventive maintenance and minor repairs," yet TP-7 assigns extensive maintenance and repair responsibilities, electrical, plumbing, HVAC, motors/pumps, sewage systems, structures, cranes, communication towers, fire suppression systems, sand traps, trash racks, etc., with no or maximum quantities, no maximum per repair $ limits, no maximum $ repair yearly limits, etc. making it unreasonable for Offerors to determine a realistic, risk-balanced price for a five-year FFP period. In addition, TPs 9-12 and 14-18 contain similar Level I pricing uncertainties.
For TPs 7, 9-12, 14-18 will the Government please provide maximum quantities, maximum per repair $ limits, maximum annual $ repairs for Level I?
On: Nov 20 2025.
Government Response. . Please reference Table I PWS quantities in the PWS and/or the solicitation in L.5.2.3 On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11614405 Facilities Maintenance Technical Level I vs Level II Comment Classification: UNCLASSIFIED (U)
Solicitation language in TP-1.2 states that fully burdened unit pricing for Level II services should assume that contractor staffing for Level II work performed during normal working hours is already included in TP-2 staffing. However, TP-2.0 states that any additional staffing not included as Level I routine work will instead be included within the applicable Level II CLIN. These statements are unreasonable, as both imply that Level II labor requirements for 90 potential tasks per year, have Labor embedded within Level I, even though Level II tasks are non-routine, unexercised, and separately priced.
How is the Offeror expected to determine the amount of Level II labor that should be embedded within the Level I labor when up to 90 potential Level II tasks may be ordered each year, and the quantities for these tasks are not guaranteed?
On: Nov 20 2025.
Government Response. . TP-1.2 will be updated and amended to read as follows:
TP-1.2 Definition of Services: Firm fixed price work requirements are grouped into two (2) categories; Level I, Routine Standard Services, and Level II, Non-Routine Services. Level I services are defined as the effort necessary to meet the standard requirement of each technical provision and include routine, preventive maintenance, and minor repairs such as inspections, testing, cleaning, adjusting, calibrating, and other minor maintenance corrections, including all scheduled and preventative maintenance recommended by the manufacturers of the systems and equipment referenced in the technical provisions. Level II work is defined as additional quantities or frequencies of tasks associated with all technical provisions or unanticipated incidences that occur, including but not limited to, theft, vandalism, severe weather and related acts of God/nature and will be generated by the government as a service request (see TP-1.2.1 for detail).
Reference Table 1 of the PWS for expected routine quantities related to Level I services. Table also identifies the technical provisions where Level II non-routine services may be requested and the anticipated quantity of such potential additional service. On: Nov 24 2025
Current Request Status: Request Closed Information for this report is procurement sensitive.
11614408 Facilities Maintenance Page Limitation Comment Classification: UNCLASSIFIED (U)
Volume III includes The Price detail, (Excel Spreadsheets) and Cost Narratives, (PDF) which will be several hundred pages.
Will the Government change, Volume III L.5.1 and L 5.2.3 – "Total Maximum Allowed Pages 20" to "No Page Limit"?
On: Nov 20 2025.
Government Response. . The required Pricing Spreadsheets are approximately 80 pages, with an additional a 200 page limit for the supporting narrative. On: Nov 24 2025
11614742 Facilities Maintenance Performance Work Statement TP-10.6 (Bulkhead and Gabion Walls)
TP-10.6 states, "See TP-15-8 for construction details." However, there is no TP-15.8 in the PWS. Please provide construction details or revise PWS accordingly.
On: Nov 20 2025.
Government Response. . TP-10.6 Bulkhead and Gabion Walls: Occasional repairs will be necessary to bulkheads and gabion walls. See TP-15.3 for construction details. As requested by the
COR, bulkheads and gabion baskets will be replaced with standard riprap as a Level II service as necessary and as described in TP-1.2.1 and Table 1. On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11614743 Facilities Maintenance Performance Work Statement TP-15.2.5 (Site Furniture) Comment Classification: UNCLASSIFIED (U)
TP-15.2.5 states, "See Section J, Appendix V for typical picnic site construction. Each campsite will typically have...as indicated in Section J, Appendix V." However, there is no Appendix V in this solicitation. Please provide Appendix V or revise PWS accordingly.
On: Nov 20 2025.
Government Response. . This will be addressed in the upcoming solicitation. On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11614748 Facilities Maintenance Performance Work Statement TP-3.15 (Solid Waste Management) and TP-7.6.1.1 (Special Provisions) Appendix D, Dumpster Sites
Comment Classification: UNCLASSIFIED (U)
Regarding the dumpster at the Clemson Pumping Station, the "Note" paragraph of TP-3.15 states, "Servicing of the dumpster will be on an as needed basis and as requested by the COR (Level I is twice per year)." Item (c) of TP-7.6.1.1 states, "Servicing of the dumpster will be on an as needed basis and as requested by the COR (typically twice per year)." Appendix D states that the CPS dumpster "will be emptied at the request of the COR under Level II services." Please clarify whether emptying of this dumpster will be under Level I or Level II services.
On: Nov 20 2025.
Government Response. . The CPS dumpster will be serviced (dumped) twice per year as a Level I requirement, any additional "servicing" in a contract year will be addressed as a Level II service. On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11614751 Facilities Maintenance Appendix P, List of Government Equipment, Implements, etc.
Comment Classification: UNCLASSIFIED (U)
The title of Appendix P includes "...To Be Maintained by Contractor in Accordance with TP-8." Please confirm that this should be TP-9 and revise as needed.
On: Nov 20 2025.
Government Response. . Correct. Appendix P should reference TP-9 and has been updated. On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11615748 Facilities Maintenance Performance Work Statement Appendix X, Work Breakdown Structure (WBS) Comment Classification: UNCLASSIFIED (U)
The following discrepancies were identified while cross checking the Performance of Work Statement (PWS) and Appendix X – WBS. Please revise in order for the two to correspond.
a. Level 3 TP-5.5 Fire Extinguishers should be 5.4 as per PWS.
b. Level 4 TP-12.2.1 Seedbed Preparation is not included in the PWS.
On: Nov 21 2025.
Government Response. . TP-5.4 is the correct TP for Fire extinguishers. As well as 5.3 being associated with water filters.
TP-12.2.1 the contractor will not be responsible for seedbed plowing. On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11616245 Contracting L.5.2.2.2 Past Performance Record Comment Classification: UNCLASSIFIED (U)
The section notes: "The Offeror shall provide a Past Performance Questionnaire (Attachment 3) to the client for each project the Offeror provides as part of Volume II - Past Performance (described in L.
5.2.2.1" In past solicitations, is has been acceptable to include completed CPARS instead of having the contact complete a PPQ. We see that this RFI has been posted, and we too would respectfully request that completed CPARS records be listed as an acceptable past Performance Record.
On: Nov 21 2025.
Government Response. . CPARS and PPQ are both acceptable. On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11616300 Contracting L.5.1.c Table / Also L.5.2.3 .d Electronic Copy; M.3.c.ii Comment Classification: UNCLASSIFIED (U)
Supporting a previously asked RFI on the page limit for Volume III of 20 pages. M.3.c.ii. states that "The offeror's proposal must be clear and convincing in demonstrating that the prices in the offeror's proposal are realistic for the work to be performed, reflect a clear understanding for the requirements, and are consistent with the various requirements of the offeror's technical proposal (FAR 15.404- 1(d))." It also states that "Insufficient details to support the determination of price reasonableness, or evaluation of unbalanced pricing, initially or subsequently, may be a consideration for excluding the offeror's proposal from the competitive range and/or further consideration for award. The burden of proof rests with the offeror." To account for the Price Narrative, the necessary supporting pricing details as noted in the requirements above, plus the Pricing Schedule(s) (such as the 70 page CLIN listing), the page limitation is far too low. Respectfully suggest that the page count for this volume be set to at least 200 pages (or no limit) to account for all of the required content, all of which is necessary for the price evaluation by the source selection team.
On: Nov 21 2025.
Government Response. . No page limit. On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11616326 Contracting L.5.2.3 (g and PWS Table 1 - Continuation of Supplies and Services (CLIN Table)
Comment Classification: UNCLASSIFIED (U)
The solicitation includes the following "Offerors shall submit a price for the potential six-month extension of services period. Section L calls for pricing OY5 as a six-month period. Table 1 only lists full year quantities. The CLIN price table (Continuation of Supplies or services and Prices/Costs) lists full year quantities for OY5 CLINS (as does the Delivery Table). Please clarify if OY5 is to cover 6 months or 12 months for CLIN 5101, and the quantities of all of the Level II CLINS applicable to OY5 if they differ from the 5 full years (Base-OY4).
On: Nov 21 2025.
Government Response. . OY5 is a six month extension period if needed (not 12 months).
Quantities for Level II CLINs listed below will be updated to zero (0) on the Continuation of Supplies or Services and Price/Cost and the Continuation of Deliveries or Performance tables.
CLINs to be updated:5222,5223,5224,5225,5226,5228,5229,5243,52 54,5263,5264,5276,5277,5278,5279,5282,and 5283. On: Nov 24 2025
Current Request Status: Request Closed Information for this report is procurement sensitive.
11616410 Contracting Solicitation (SF 1449) Continuation of Supplies or Services and Prices/Costs Comment Classification: UNCLASSIFIED (U)
Continuation of Supplies or Services and Prices/Costs (starting on Pg. 3). There are quantities for some CLINs (some years) that do not match the other years and/or that do not match the baseline quantities in PWS Table 1 (which are presumed to cover all option years unless otherwise noted). In addition, the "Option" CLINS do not state that these are Level II services, which they would appear to be based on Table I. Please clarify.
On: Nov 21 2025.
Government Response. . Please reference Table I estimated quanities table and the item description for specific detail. Question 11616326 also referenced OY5, which is being updated and will be added to the next amendment.
All "Options" are level II services, but will not be exercised/funded, unless Approved by the COR and a mod to the contract is completed. On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11616431 Contracting Solicitation (SF 1449) Continuation of Supplies or Services and Prices/Costs
Comment Classification: UNCLASSIFIED (U)
Continuation of Supplies or Services and Prices/Costs (beginning on Pg. 3). There are Level 1 CLINS in this table designated as DO NOT BID (for example CLINS 0102, 0103, 0104, and 0105), but the corresponding CLINS in the option years do not have this note (such as 1102 and 5102, etc). There also appear to be some typos or copy/past errors in some of the CLIN descriptions. Please clarify.
On: Nov 21 2025.
Government Response. . The corresponding CLINS in the option years should also be a DO NOT BID. On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11616787 Facilities Maintenance Past Performance Record PPQ L.5.2.2.2 Comment Classification: UNCLASSIFIED (U)
Would the Government please accept CPARS in lieu of PPQs as permitted in February 2025 submission?
On: Nov 21 2025.
Government Response. . The government will accept CPARS. On: Nov 24 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11616792 Facilities Maintenance Past Performance Record PPQ L.5.2.2.2 Comment Classification: UNCLASSIFIED (U)
Would the Government please accept PPQs filled out for the February 2025 submission rather than requiring offerors to request duplicative efforts from contracting officers?
On: Nov 21 2025.
Government Response. . Due to the minimal time lapse involved, this would be acceptable. On: Dec 02 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11617180 Facilities Maintenance Past Performance Attachment 5 Reference Locations Comment Classification: UNCLASSIFIED (U)
The Past Performance Compliance Checklist requires citations for contract details, such as Point of Contact. However, only one line is provided for each detail and up to 5 contracts are being submitted.
For example, Point of Contact has one line. Offerors will need to list a point of contact and identify the corresponding contract for 5 different project submissions.
Would the Government please clarify how offerors are to cite proposal locations for 5 different contracts in the current checklist format?
On: Nov 21 2025.
Government Response. . Please provide the L.5.2.2.1a requested information for each contract submitted. On: Dec 02 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11620695 Facilities Maintenance Performance Work Statement TP-12.1 General & TP-12.2 Wildlife Food Plots Performance Requirements Summary, TP-12.2 Wildlife Food Plots
Comment Classification: UNCLASSIFIED (U)
PWS TP-12.1 states, "Mow approximately 22 acres of wildlife food plots," and TP-12.2 states "At a minimum, food plots will be mowed twice a year." There is no mention of planting or otherwise maintaining food plots in PWS TP-12. However, PRS TP-12.2 states, "Maintain existing wildlife openings/food plots and/or establish new openings as directed." Please clarify whether planting and/or maintaining food plots (other than mowing) is a requirement of this contract and revise PWS and/or PRS as needed.
On: Nov 25 2025.
Government Response. . Only mowing of food plots is required by this contract in accordance with TP 12.1 and 12.2. On: Dec 02 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11622517 Facilities Maintenance ProjNet Questions 11612093, 11614408, & 11616300 Comment Classification: UNCLASSIFIED (U)
The Government's responses to ProjNet Questions 11612093 and 11614408 state, "The required Pricing Spreadsheets are approximately 80 pages, with AN ADDITIONAL 200 PAGE LIMIT for the supporting narrative." However, Section L.5.1.c (chart) only allows for 20 pages for the Volume III - Price Proposal.
Also, regarding the page limit for the Price Proposal, the Government's response to ProjNet Question 11616300 states, "No page limit."
Please clarify how many pages are allowed for the Price Proposal spreadsheets and narrative and revise solicitation as needed. Thank you!
On: Nov 26 2025.
Government Response. . The required Pricing Spreadsheets are approximately 80 pages, with AN ADDITIONAL 200 PAGE LIMIT for the supporting narrative. On: Dec 02 2025 Current Request Status: Request Closed
11622868 Facilities Maintenance SF 1449 SAM.gov Notice
The SF 1449 states that offers are due on 05 JAN 2026 at 2:00 PM local time. However, the SAM.gov Notice states that offers are due on 05 JAN 2026 at 1:00 AM EST. Please confirm that the submission time is 2:00 PM EST. Thank you!
On: Nov 28 2025.
Government Response. . Offers are due by 14:00 on 5 January. Offerors are reminded to not wait until the last minute to submit proposals as that could result in them being late. The time in
SAM.gov has been updated to reflect 5 Jan 2026 @ 1400. On: Dec 02 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11626363 Contracting PWS Table 1 Multiple Level I Items Comment Classification: UNCLASSIFIED (U)
There are at least 10 different individual Service Level I service items where the service cost is greater than the $2,500 threshold (or may cross that threshold in future years due to inflation escalation).
This creates an inherent Level I / Level II conflict for pricing proposal purposes. This affects the following: TP-6.2 Cleanout of sand trap areas at CPS; TP-6.2 Cleanout of main pond area areas at CPS;
TP-7.4.1 Cleaning of the 5-ton Bridge crane; TP-7.4.2 Cleaning of the 300 ton gantry crane; TP-7.3.7.1 Hydrostatic testing of 115 CO2 bottles; TP-10.5 Beach Sand; TP-15.10 Riprap: TP-18.1 Elevator Load Testing; TP-18.1 Elevator Inspection and Maint (2 instances - Dam and Powerhouse). We believe that the most effective resolution of the conflict would be to change these items to Service Level II.
Service Level II would be the most efficient solution administratively for both the government and the contractor, rather than managing/tracking a list of exceptions. Please advise.
On: Dec 02 2025.
Govern…
This is the start of the file's text. The full file is on GovTribe.