Amendment 0001 W912HN25Q5000.pdf
PDF 1 MB Posted
- Solicitation number
- W912HN25Q5000
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912HN25Q5000 03-Mar-2025
b. TELEPHONE NUMBER
912-652-5505
8. OFFER DUE DATE/LOCAL TIME
11:00 AM 03 Apr 2025
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912HN9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
AMY L COLLINS
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
USACE - SAVANNAH DISTRICT
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W912HN 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
USACE - SAVANNAH DISTRICT
SEE SCHEDULE FOR DELIVERY LOCATION
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
TEL: SEE SCHEDULE FAX: SEE SCHEDULE
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$9,500,000
NAICS:
561730
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF204
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W912HN25Q5000
Section A - Solicitation/Contract Form
SOLICITATION
This notice is being posted as an avenue to provide Request for Quotes, W912HN250Q5000.
This is a solicitation for commercial services in accordance with the format in FAR Subpart 12.6 as supplemented with additional information in this notice. THIS ANNOUNCEMENT
CONSTITUTES THE ONLY SOLICITATION. QUOTES ARE BEING REQUESTED. This will be solicited as 100% Small Business set-aside. The NAICS Code is 561730 with a size standard of $9.5 million. This solicitation document incorporates provisions and clauses in effect through Federal Acquisition Circular 2025-03.
Title of Requirement: Dredge Material Containment Area (DMCA) and Bird Island Mowing and Herbicide for Savannah and Brunswick Harbors
Description of Requirement: The contractor shall furnish all plant, equipment, specialist equipment and material to fulfill the requirement of this contract. The contract will include full mowing/cutting of vegetation in Dredge Material Containment Areas (DMCAs), environmental mowing/cutting of vegetation in DMCAs, herbicide application in the DMCAs, and herbicide application and clearing of bird islands.
Submission Requirements: Fill out and return pages 5 and 7-99 of the attached. In a separate attachment entitled "Past Performance" offerors shall provide project title, detailed description, point of contact and phone number for three (3) prior or current contracts/agreements for similar scoped projects performed during the previous three (3) years. To be technically acceptable, the submitting offeror must submit relevant and current past performance that is similar to the requirements described in this solicitation. The Government will evaluate each offeror's experience on the basis of its depth and its relevance to the work that will be required under the prospective contract. Projects involving the mowing and/or clearing and brush removal on slope and terrain similar to this requirement will be considered relevant past performance. If sufficient detail is not included for the government to make a determination of acceptability, the offer will be determined unresponsive.
In a separate attachment entitled "Herbicide Licensing" the offeror must provide proof of licensing in both Georgia and South Carolina. In a separate attachment entitled "Equipment List" offeror shall provide a list of equipment planned for use or being used on the jobsite, including the most recent and planned equipment inspection dates.
Quotes should be emailed to Amy.L.Collins@usace.army.mil by 03 April 2025 at 11:00 a.m.
Eastern Time with a copy to Nathan A. Aylesworth at Nathan.A.Aylesworth@usace.army.mil.
Basis for Award: The award will be made to the lowest priced, responsible, responsive quote, that meets or exceeds the requirement. This is in accordance with Federal Acquisition
Regulation (FAR) 52.212-2, Evaluation – Commercial Products and Commercial Services, and
FAR 9.104.
mailto:Nathan.A.Aylesworth@usace.army.mil
The Government reserves the right to cancel this solicitation.
REQUEST FOR QUOTE (RFQ)
US Army Corps of Engineers – Savannah District
POC: Amy Collins
Phone: (912) 652-5505
Email: amy.l.collins@usace.army.mil
QUOTES DUE BY: 11:00 am (ET) on 3 April 2025
CONTRACTOR: ______________________________________________________
UNIQUE ENTITY ID: _________________________________________________
CAGE CODE: ________________________________________________________
TAX ID NO.: _________________________________________________________
E-MAIL: ____________________________________________________________
PHONE NO.: ________________________________________________________
DATE OF QUOTE: ____________________________________________________
QUOTE PREPARED AND CERTIFIED BY:
(Printed Name and Title)
NOTES TO OFFERORS
Note 1: Quotes shall meet the specifications in the Statement of Work to be eligible for an award.
PARTIES INTERESTED IN RESPONDING TO THIS RFQ may submit their Quote in accordance with standard commercial practice (i.e. Quote form, letterhead, etc.) and MUST
INCLUDE THE FOLLOWING INFORMATION: Solicitation number; offeror's complete mailing and remittance addresses; discount terms, DUNS number, and Tax Identification
Number. Any prospective awardee shall be registered and active in the SAM database prior to any award of a contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation. Offerors may obtain information on registration and annual confirmation requirements via the Internet at http://www.acquisition.gov or by calling
866-606-8220
Note 2: All questions are to be directed no later than 11:00 a.m. Eastern time seven days prior to closing date to Amy L. Collins at Amy.L.Collins@usace.army.mil
Please CC, Nathan A. Aylesworth at Nathan.A.Aylesworth@usace.army.mil
Note 3: The Taxpayer Identification Number may be used by the Government to collect and report on any delinquent amounts arising out of the contractor’s relationship with the Government.
Note 4: This acquisition will utilize Simplified Procedures pursuant to FAR 13.1.
Note 5: If you wish to have a site visit please contact Amy L. Collins at
Amy.L.Collins@usace.army.mil and Nathan A. Aylesworth at
Nathan.A.Aylesworth@usace.army.mil.
mailto:Amy.L.Collins@usace.army.mil mailto:Nathan.A.Aylesworth@usace.army.mil mailto:Amy.L.Collins@usace.army.mil mailto:Nathan.A.Aylesworth@usace.army.mil
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 3 Each
FULL MOWING - DMCA 1N____FFP
FOB: Destination
PSC CD: S208
NET AMT
0002 3 Each
FULL MOWING - DMCA 2A____FFP
0003 3 Each
FULL MOWING - DMCA 12A____FFP
0004 3 Each
FULL MOWING - DMCA 13A____FFP
0005 3 Each
FULL MOWING - DMCA 13B____FFP
0006 Each
FULL MOWING - DMCA 14A____FFP
UNDER CONSTRUCTION
0007 3 Each
FULL MOWING - DMCA 14B____FFP
0008 3 Each
FULL MOWING - DMCA JONES____FFP
OYSTERBED ISLAND
0009 3 Each
FULL MOWING - ENTRANCE GATES TO (12A,___FFP
2A, 1N) LOWER ROAD, FRONTAGE ROAD, POWER POLES, STAGING
AREA
0010 3 Each
ENVIRONMENTAL MOWING - DMCA 1N____FFP
0011 3 Each
ENVIRONMENTAL MOWING - DMCA 2A____FFP
0012 3 Each
ENVIRONMENTAL MOWING - DMCA 12A____FFP
0013 3 Each
ENVIRONMENTAL MOWING - DMCA 13A____FFP
0014 3 Each
ENVIRONMENTAL MOWNG - DMCA 13B____FFP
0015 Each
ENVIRONMENTAL MOWING - DMCA 14A____FFP
UNDER CONSTRUCTION
0016 3 Each
ENVIRONMENTAL MOWING - DMCA 14B____FFP
0017 3 Each
ENVIRONMENTAL MOWING - DMCA JONES_____FFP
OYSTEERBED ISLAND
0018 3 Each
ENVIRONMENTAL MOWOING - ENTRANCE GATES__FFP
TO (12A, 2A, 1N), LOWER ROAD, FRONTAGE ROAD, POWER POLES,
STAGING AREA
0019 2 Each HERBICIDE - DMCAs_____FFP
0020 2 Each
HERBICIDE APPLICATION - DMCA BIRD____FFP
ISLAND 1N
0021 2 Each
ISLAND 12A
0022 2 Each
HERBICIDE APPLICATION - DMCA BIRD ____FFP
ISLAND - 13A
0023 2 Each
SILAND JONES OYSTERBED ISLAND
0024 2 Each
HERBICIDE APPLICATION - BIRD____FFP
ISLAND OFFSHORE (TOMKINS)
0025 1 Each
HAND CLEARING - BIRD ISLAND 1N____FFP
0026 1 Each
HAND CLEARING - BIRD ISLAND 12A____FFP
0027 1 Each
HAND CLEARING - BIRD ISLAND 13A____FFP
0028 1 Each
HAND CLEARING - BIRD ISLAND JONES____FFP
OYSTERBED
0029 1 Each
HAND CLEARING - BIRD ISLAND OFFSHORE____FFP
(TOMKINS ISLAND/SAVANNAH)
0030 1 Each
APPLICATION OF FIRE ANT PESTICIDE____FFP
CHEMICAL 1 (AMDRO OR EQUIVALENT) BIRD ISLAND 1N
0031 1 Each
CHEMICAL 1 (AMDRO OR EQUIVALENT) BIRD ISLAND 12A
0032 1 Each
CHEMICAL 1 (AMDRO OR EQUIVALENT) - BIRD ISLAND 13A
0033 1 Each
CHEMICAL 1 (AMDRO OR EQUIVALENT) - BIRD ISLAND JONES
0034 1 Each
CHEMICAL 1 (AMDRO OR EQUIVALENT) - BIRD ISLAND OFFSHORE
(TOMKINS ISLAND/SAVANNAH
0035 1 Each
CHEMICAL 2 (ORTHENE OR EQUIVALENT) - BIRD ISLAND 1N
0036 1 Each
CHEMICAL 2 (ORTHENE OR EQUIVALENT) - BIRD ISLAND 12A
0037 1 Each
APPLICATION OF FIRE ANT PESTICIDEFFP
CHEMICAL 2 (ORTHENE OR EQUIVALENT) - BID ISLAND 13A
0038 1 Each
CHEMICAL 2 (ORTHENE OR EQUIVALENT) - BIRD ISLAND JONES
0039 1 Each
CHEMICAL 2 (ORTHENE OR EQUIVALENT) - BIRD ISLAND OFFSHORE
0040 3 Each
FULL MOWING - DMCA ANDREWS____FFP
0041 2 Each
HERBICIDE APPLICATION - DMCA ANDREWS____FFP
0042 1 Each
HERBICIDE APPLICATION - INSHORE BIRD____FFP
ISLAND
0043 1 Each
HAND CLEARIING - INSHORE BIRD ISLAND____FFP
0044 1 Each
CHEMICAL 1 (AMDRO OR EQIVALENT) - IINSHORE BIRD ISLAND
0045 1 Each
CHEMICAL 2 (ORTHENE OR EQUIVALENT) - INSHORE BIRD ISLAND
1001 4 Each
OPTION FULL MOWING - DMCA 1N____FFP
1002 4 Each
OPTION FULL MOWING - DMCA 2A____FFP
1003 4 Each
OPTION FULL MOWING - DMCA 12AFFP
1004 Each
OPTION FULL MOWING - DMCA 13A____FFP
ANTICIPATED TO BE UNDER CONSTRUCTION
1005 4 Each
OPTION FULL MOWING - DMCA 13B____FFP
1006 4 Each
OPTION FULL MOWING - DMCA 14A____FFP
1007 4 Each
OPTION FULL MOWOING - DMCA 14B____FFP
1008 4 Each
OPTION FULL MOWING - DMCA JONES OYSTERBED____FFP
1009 4 Each
OPTION FULL MOWING - ENTRANCE GATES TO (12A, __FFP
2A, 1N,, LOWER ROAD, FRONTAGE ROAD, POWER POLES, STAGING
1010 3 Each
OPTION ENVIRONMENTAL MOWING - DMCA 1N____FFP
1011 3 Each
OPTION ENVIRONMENTAL MOWING - DMCA 2A____FFP
1012 3 Each
OPTION ENVIRONMENTAL MOWING - DMCA 12A____FFP
1013 Each
OPTION ENVIRONMENTAL MOWING - DMCA 13A____FFP
1014 3 Each
OPTION ENVIRONMENTAL MOWING - DMCA 13B____FFP
1015 3 Each
OPTION ENVIRONMENTAL MOWING - DMCA 14A____FFP
1016 3 Each
OPTION ENVIRONMENTAL MOWING - DMCA 14B____FFP
1017 3 Each
OPTION ENVIRONMENTAL MOWING - DMCA JONES____FFP
1018 3 Each
OPTION ENVIRONMENTAL MOWING - ENTRANCE GATES___FFP
TO (12A, 2A, 1N) LOWER ROAD, FRONTAGE ROAD, POWER POLES,
1019 2 Each OPTION HERBICIDE DMCAs____FFP
1020 2 Each
OPTION HERBICIDE APPLICATION DMCA BIRD____FFP
1021 2 Each
OPTION HERBICIDE APPLICATION DMCA BIRD___FFP
1022 Each
ISLAND 13A
1023 2 Each
OPTION HERBICIDE APPLICATIOIN DMCA BIRD____FFP
ISLAND JONES OYSTERBED ISLAND
1024 2 Each
OPTION HERBICIDE BIRD ISLAND____FFP
OFFSHORE (TOMKINS)
1025 1 Each
OPTION HAND CLEARING - BIRD ISLAND 1N____FFP
1026 1 Each
OPTION HAND CLEARING - BIRD ISLAND 12A____FFP
1027 Each
OPTION HAND CLEARING - BIRD ISLAND 13A____FFP
1028 1 Each
OPTION HAND CLEARING - BIRD ISLAND JONES____FFP
1029 1 Each
OPTION HAND CLEARING - BIRD ISLAND OFFSHORE____FFP
1030 1 Each
OPTION APPLICATION OF FIRE ANT PESTICIDE____FFP
CHEMICAL 1 - BIRD ISLAND 1N
1031 1 Each
CHEMICAL 1 - BIRD ISLAND 12A
1032 Each
CHEMICAL 1 - BIRD ISLAND 13A
1033 1 Each
CHEMICAL 1 - BIRD ISLAND JONES OYSTERBED
1034 1 Each
CHEMICAL 1 - (AMDRO OR EQUIVALENT) - BIRD ISLAND OFFSHORE
1035 1 Each
CHEMICAL 2 - BIRD ISLAND 1N
1036 1 Each
CHEMICAL 2 - BIRD ISLAND 12A
1037 Each
CHEMICAL 2 - BIRD ISLAND 13A
1038 1 Each
CHEMICAL 2 - BIRD ISLAND JONES OYSTERBED
1039 1 Each
CHEMICAL 2 - BIRD ISLAND OFFSHORE (TOMKINS
ISLAND/SAVANNAH)
1040 3 Each
OPTION FULL MOWING - DMCA ANDREWS____FFP
1041 2 Each
OPTION HERBICIDE APPLICATION - DMCA ANDREWS____FFP
1042 1 Each
OPTION HERBICIDE APPLICATION - INSHORE BIRD____FFP
1043 1 Each
OPTION HAND CLEARING - INSHORE BIRD ISLAND____FFP
1044 1 Each
CHEMICAL 1 (AMDRO OR EQIVALENT) - INSHORE BIRD ISLAND
1045 1 Each
CHEMICAL 2 (ORTHENE OR EQUIVALENT) INSHORE BIRD ISLAND
2001 4 Each
2002 4 Each
2003 4 Each
OPTION FULL MOWING - DMCA 12A____FFP
2004 4 Each
2005 4 Each
2006 4 Each
2007 4 Each
OPTION FULL MOWING - DMCA 14B____FFP
2008 4 Each
2009 4 Each
OPTION FULL MOWING - ENTRANCE GATES TO ____FFP
(12A, 2A, 1N) LOWER ROAD, FRONTAGE ROAD, POWER POLES,
2010 3 Each
2011 3 Each
2012 3 Each
2013 3 Each
2014 3 Each
OPTION ENVIRONMENTAL MOWING - DMCA 13B____FFP
2015 3 Each
2016 3 Each
2017 3 Each
2018 3 Each
TO (12A, 2A, 1N) LOWER ROAD, FRONTAGE ROAD, POWER POLES,
2019 2 Each
2020 2 Each
2021 2 Each
OPTION HERBICIDE APPLICATION DMCA BRD____FFP
2022 2 Each
2023 2 Each
OPTION HERBICIDE APPLICATION DMCA BIRD ISLAND__FFP
JONES OYSTERBED ISLAND
2024 2 Each
2025 1 Each
OPTION HAND CLEARING = BIRD ISLAND 1N____FFP
2026 1 Each
2027 1 Each
2028 1 Each
OPTION HAND CLEARING - BIRD ISLAND JONES___FFP
2029 1 Each
2030 1 Each
2031 1 Each
2032 1 Each
2033 1 Each
2034 1 Each
2035 1 Each
2036 1 Each
2037 1 Each
2038 1 Each
2039 1 Each
2040 3 Each
2041 2 Each
2042 1 Each
2043 1 Each
OPTION HAND CLEARING - INSHORE BIRD____FFP
2044 1 Each
CHEMICAL 1 (AMDRO OR EQUIVALENT) INSHORE BIRD ISLAND
2045 1 Each
CHEMICAL 2 (ORTHENE OR EQUIVALENT) INSHORE BIRD ISLAND
3001 4 Each
OPTION FULL MOWING - DMCA 1N___FFP
3002 4 Each
3003 4 Each
3004 4 Each
3005 4 Each
3006 4 Each
3007 4 Each
OPTION FULL MOWING - DMCA 14B____FFP
3008 4 Each
3009 4 Each
OPTION FULL MOWING - ENTRANCE GATES (12A, 2A,__FFP
1N) LOWER ROAD, FRONTAGE ROAD, POWER POLES, STAGING AREA
3010 3 Each
3011 3 Each
OPTION ENVIRONMENTAL MOWOING - DMCA 2A____FFP
3012 3 Each
3013 3 Each
3014 3 Each
3015 3 Each
3016 3 Each
OPTION ENVIRONMENTAL MOWOING - DMCA 14B____FFP
3017 3 Each
3018 3 Each
TO (12A, 2A, 1N), LOWER ROAD, FRONTAGE ROAD, POWER POLES,
3019 2 Each
3020 2 Each
3021 2 Each
3022 2 Each
3023 2 Each
ISLAND JONES OYSTERBED ISLAND
3024 2 Each
3025 1 Each
OPTION HAND CLEARING - BIRD ISLAND 1N____FFP
3026 1 Each
3027 1 Each
OPTION HAND CLEARING - BID ISLAND 13A____FFP
3028 1 Each
3029 1 Each
OPTION HAND CLEARINGN - BIRD ISLAND____FFP
OFFSHORE (TOMKINS ISLAND/SAVANNAH)
3030 1 Each
OPTION APPLICATIOIN OF FIRE ANT PESTICIDE____FFP
3031 1 Each
3032 1 Each
3033 1 Each
CHEMICAL 1 - BIRD ISLAND JONES OYSTERED
3034 1 Each
3035 1 Each
3036 1 Each
OPTION APPLICATION OF FIRE ANT PESTICIDEFFP
3037 1 Each
3038 1 Each
3039 1 Each
3040 3 Each
3041 2 Each
3042 1 Each
OPTION HERBICIDE APPLICATION - INSHORE____FFP
BIRD ISLAND
3043 1 Each
3044 1 Each
CHEMICAL 1 (AMDRO OR EQUIVALENT) INSHORE BIRD ISLAND
3045 1 Each
4001 Each
4002 4 Each
4003 4 Each
4004 4 Each
4005 Each
4006 4 Each
4007 4 Each
OPTION FULL MOWING - DMCA 14B____FFP
4008 4 Each
4009 4 Each
OPTION FULL MOWING - ENTRANCE GATES TO (12A,FFP
2A, 1N) LOWER ROAD, FRONTAGE ROAD, POWER POLES, STAGING
4010 Each
4011 3 Each
4012 3 Each
4013 3 Each
4014 Each
4015 3 Each
4016 3 Each
4017 3 Each
4018 3 Each
(12A, 2A, 1N), LOWER ROAD, FRONTAGE ROAD, POWER POLES,
STAGIING AREA
4019 2 Each
4020 Each
OPTION HERBICIDE APPLICATION DMCA BIRD__FFP
4021 2 Each
4022 2 Each
4023 2 Each
OPTION HERBICIDE APPLICATION DMCA BIRD ISLAND__FFP
JONES OYSTERBED ISLAND
4024 2 Each
OPTION HERBICIDE BIRD ISLANDFFP
4025 Each
OPTION HAND CLEARING - BIRD ISLAND 1N____FFP
4026 1 Each
4027 1 Each
4028 1 Each
4029 1 Each
4030 Each
CHEMICAL 1- BIRD ISLAND 1N
4031 1 Each
4032 1 Each
4033 1 Each
4034 1 Each
4035 Each
4036 1 Each
4037 1 Each
4038 1 Each
CHEMICAL 2 BIRD ISLAND JONES OYSTERBED
4039 1 Each
4040 3 Each
4041 2 Each
4042 1 Each
4043 1 Each
4044 1 Each
CHEMICAL 1 (AMDRO OR EQUIVALEN) INSHORE BIRD ISLAND
4045 1 Each
4046 6 Months
OPTION OPTION TO EXTEND SERVICES 6 MONTHS____FFP
Please complete the following in addition to filliing in the above Unit Price and Amont for each individual CLIN.
TOTAL OF BASE PERIOD (CLINS 0001-0045) ____________________
TOTAL OF OPTION PERIOD 1 (CLINS 1001-1045) ____________________
TOTAL OF OPTION PERIOD 2 (CLINS 2001-2045) _____________________
TOTAL OF OPTION PERIOD 3 (CLINS 3001-3045) _____________________
TOTAL OF OPTION PERIOD 4 (CLINS 4001-4045) _____________________
TOTAL OF OPTION CLIN 4046 _____________________
TOTAL OF BASE AND ALL OPTIONS COMBINED _____________________
ALL ITEMS MUST BE FILLED IN COMPLETELY.
Section C - Descriptions and Specifications
Performance Work Statement (Includes associated Performance Requirements Summary (PRS)
PERFORMANCE WORK STATEMENT (PWS)
Dredge Material Containment Area (DMCA) and Bird Island Mowing and Herbicide for
Savannah and Brunswick Harbors
FY25
Part 1 General Information
1. SCOPE
Contractor shall furnish all plant, labor, equipment, specialized equipment, and material to fulfill the requirement of this Contract. This contract will include full mowing/cutting of vegetation in Dredge Material Containment Areas (DMCA), environmental mowing/cutting of vegetation in DMCAs, herbicide application in the DMCAs, and herbicide application and clearing of bird islands.
Mowing/Cutting shall consist of maintaining all vegetation along the dikes, dike slopes, counterweights, access ramps, access roads, underdrain stations, underdrain station ramps, weir access ramps, and weir outfalls for DMCAs 1N, 2A, 12A, 13A, 13B, 14A, 14B, Jones/Oysterbed Island. In addition to the dikes, mow/cut the entrance gates, staging area between DMCA 12A and the Back River (Sediment Basin), around the power poles at the staging area, lower road and frontage road, in Savannah Harbor.
The Contractor shall herbicide the weir areas consisting of weir walkways, and weir outfalls of DMCAs 1N, 2A, 12A, 13A, 13B, 14A, 14B, Jones/Oysterbed Island and underdrain stations of DMCAs 13A and 13B. The contractor shall herbicide and remove vegetation including roots on the interior bird islands located in DMCAs 1N, 12A, 13A, Jones/Oysterbed Island, as well as a bird island (Tompkins Island) approximately 2 miles offshore of Jones/Oysterbed Island, Savannah Harbor.
In addition to the above work, this contract will include full mowing/cutting of vegetation and herbicide application for DMCA on Andrew’s Island in Brunswick Harbor, and herbicide application and clearing of an inshore bird island in Saint Simons Sound.
The Government reserves the right to exclude all or portions of any of the DMCAs and/or bird island that may be under a separate contract for dike and weir improvements, maintenance and any other work being performed in the DMCAs that may impact mowing. DMCAs under construction will be de-obligated from the contract work item. Once the Government has determined the DMCA and mowing cycle impacted by construction the Contractor will be provided the location and dates for their concurrence.
The period of the contract for the base year is from the date of contract award through 13 March 2026 with Options for 4 additional years.
Option Year 1: 14 March 2026 – 13 March 2027 Option Year 2: 14 March 2027 – 13 March 2028 Option Year 3: 14 March 2028 – 13 March 2029 Option Year 4: 14 March 2029 – 13 March 2030
Pursuant to FAR Clause 52.217-8, Option to Extend Services the prices above will be utilized for the period in which this authority is exercised.
Each DMCA and typical cross sections of the DMCAs are laid out on the contract drawings. The Contractor shall be aware the DMCA’s dike system has areas where animals, construction equipment and pipeline installations have caused voids and ruts in the areas to be mowed. The Contractor shall notify the Government immediately if they encounter an area of the dike that has been washed out, voided, or rutted. The Contractor shall use caution while mowing/cutting these areas. The Contractor shall also be made aware that some areas of the DMCAs dike system have not been mowed on schedule and have become overgrown and may be greater than 6 feet in height.
Vegetation with a diameter of 2 inches or less measured at 6 inches from the ground are included in this contract. Contractor is required to maintain areas around existing structures including but not limited to fences, gates, settlement plates and telephone poles. The Contractor shall provide a clean cut around existing structures and utilize proper equipment to meet this requirement. Large berths around existing structures due to inadequate equipment will not be accepted. The Contractor is required to mow/trim vegetation up to a distance of 3 feet of any dredge pipe. All acreage within the maintenance surface areas as prescribed in the contract are required to be mowed/cut.
The Contractor shall also be made aware that some areas of the DMCAs dike system have not been mowed on schedule and have become overgrown and may be greater than 6 feet in height. Vegetation with a diameter of 2 inches or less when measured at 6 inches from the ground are included in this contract and is defined as “grasses.” All vegetation meeting this definition must be mowed irrespective of height.
DMCA Jones/Oysterbed Island can only be accessed by water. Cost for equipment and personnel mobilization to access is considered incidental to the contract. Access to DMCA Jones/Oysterbed Island is the Contractor’s responsibility.
Cost for boat/barge use or alternate method to access bird islands for maintenance is considered incidental to the contract. Access to DMCA bird islands, inshore bird islands, and offshore bird islands are the Contractor’s responsibility. Water depths for DMCA bird islands may vary from 0.5 inch to several feet or more. The inshore and offshore bird islands are accessible only by use of floating plant.
Mowing of the top of dikes, slopes, underdrain ramps, access ramps, access shoulders, ditches etc. shall be completed and accepted for each DMCA prior to starting the next DMCA unless otherwise directed by the Contracting Officer.
After mowing/cutting, vegetation shall have a close uniform height maximum of 5 inches above the ground. If the areas are not mowed/cut satisfactorily due to the Contractor’s quality, the Contractor shall re-mow/cut the area at no additional cost to the Government. If damaged, restore the top of dikes, slopes, shoulders, and roads to their original condition. The ground conditions vary from firm to soft. It is anticipated that the lower bench will be wet and soft, which may not support typical mowing equipment.
Mowing shall be accomplished using appropriate equipment that will prevent damage and rutting to the dikes. Any damage or rutting caused by mowing operations will be required to be repaired by the Contractor at no cost to the Government. If the Contractor’s equipment creates rutting due to wet areas, the Contractor is responsible for repairing area to level and undisturbed ground, at no cost to the Government. Avoid bird nests. Perform mowing operations in a manner that prevents spillage and leakage of fuel, oil, or materials that may contaminate the area. Clean up contamination of the area caused during mowing. The Contractor shall remove any contractor produced solid waste/trash brought on to work sites daily. The Contractor shall transport all solid waste/trash off Government property and dispose in compliance with Federal, State, and local requirements.
1.1 FULL MOWING/CUTTING OF DMCAs:
The Contractor shall give the COR seven (7) calendar days’ notice before any activity is performed on the contract for Quality Assurance representatives to allow for oversight.
This work consists of mowing the Savannah and Brunswick Harbor Dredge Material Containment Areas (DMCA)s earthen dikes and cross dikes. The exterior of the dikes rises up in steps, from the tidal marsh to various elevations. The typical dike cross section includes 1 to 3 steps, having sides with variable slopes and benches of varying widths. DMCAs and typical cross sections are laid out in the contract drawings. The ground conditions of the dikes, slopes, and benches may be uneven and vary from firm to soft. It is anticipated that areas along the lower bench will be wet and soft which cannot support typical mowing equipment. Mowing is to be accomplished using appropriate equipment that will prevent damage and rutting to the dikes. Any damage or rutting caused by mowing operations will be required to be repaired by the Contractor at no additional cost to the Government. The mowing will be completed while construction activities are taking place.
SAVANNAH:
The dike system consists of approximately 42 miles of dikes at Savannah Harbor with additional frontage roads. The combined acreage to mow in Savannah will be approximately 837 acres and will be required three (3) times a year for the base year and four (4) times a year for each option year. The Contractor shall mow/cut the vegetation located on the dikes, dike slopes, inside and outside counterweights, access ramps, underdrain stations, underdrain station ramps, weir access ramps, and weir outfalls. In addition to the dikes, mow/cut the access roads of DMCAs 1N, 2A, 12A, 13A, 13B, 14A, 14B, Jones Oyster Bed Island, entrance gates, staging area between DMCA12A and the Back River (Sediment Basin), and around the power poles at the staging area and perimeter of 12A. Mow/cut the shoulders and back slopes a minimum of 10 feet on each side of the road. Inside of curves shall be a minimum of 15 feet.
Provide all labor and special equipment required to safely accomplish mowing/cutting on the slopes, in the wet areas, on the tops of the dikes, and all other areas within DMCAs. Equipment used in the operation of mowing/cutting shall be adequate to produce the desired results. Desired results shall be defined as mowed/cut to a maximum of 5 inches above the ground. Keep the mowers in proper adjustment to eliminate destroying the turf or leaving the vegetation above 5 inches. At the weir locations, mow/cut an access path at least 16-foot wide from the weir to the end of the outfall pipe. Each path shall provide clear access to each catwalk. Vegetation that has encroached around catwalks and the outlet and inlet end of weir pipes shall be removed and disposed of the same day of trimming. All vegetation/weed clippings, and other debris caused by mowing or trimming at/around the weir locations are natural debris.
Natural debris becomes contractor property, and the Contractor is fully responsible for the removal and disposal of the natural debris.
Full mowing (as described above) shall begin within 7 days of the following dates each year. The first full mowing shall begin within 14 days of contract award for the base year. The Contractor should work continuously until completion. The next mowing event should not begin until the previous mowing event has been completed unless Government approval has been given prior to the start of work.
March 15 August 1 September 15 October 15
BRUNSWICK:
The dike system consists of approximately 5 miles of dike at Brunswick Harbor. The combined acreage to mow in Brunswick will be approximately 72 acres and required three (3) times a year. The Contractor shall mow/cut the vegetation located on the dikes, dike slopes/inside and outside counterweights, access ramps, and weir outfalls.
In addition to the dikes, mow/cut the access roads of Andrew’s Island DMCA. Mow/cut the shoulders a minimum of 10 feet on each side of the access road and minimum 15 feet around curves for the gate entrances into the DMCA.
Full mowing (as described above) shall begin within 7 days of the following date each year and be completed within 7 calendar days for the Andrew’s Island DMCA. The work shall begin within 14 days of contract award of the base year and for all subsequent option years, shall begin on the date stated below.
March 15 August 1 October 15
1.2 ENVIRONMENTAL MOWING/CUTTING OF DMCAs:
SAVANNAH:
The environmental window for mowing extends every year from April 7-July 15. The dike roads and 5 feet down the inside and outside slopes may be mowed within this period during nesting season (referred to as environmental mowing). At the weir locations, mow/cut an access path at least 16-foot wide from the weir to the end of the outfall pipe. Each path shall provide clear access to each catwalk. In addition to the dikes, mow/cut the access roads of DMCAs 1N, 2A, 12A, 13A, 13B, 14A, 14B, Jones Oyster Bed Island, staging area, entrance gates, and around the power poles at the staging area and perimeter of 12A. Environmental mowings (as described above) shall be completed within 14 days of commencement. The Contractor should work continuously until completion. The next mowing event shall not begin until the previous mowing event has been completed and Government approval of completed work has been given. Commencement of Environmental mowings shall occur on the following dates each year:
April 30 May 30 June 30
1.3 HERBICIDE APPLICATION OF DMCAs:
The Contractor shall remove dead natural debris and apply herbicide to the weir areas, weir outfalls and underdrain stations of DMCAs 1N, 2A, 12A, 13A, 13B, 14A, 14B, Jones Oysterbed Island, and Andrews Island. The Contractor shall also apply herbicide to the entrance gates at Andrews Island, 1N, 2A, 12A and the power poles at the staging area and perimeter of 12A and remove dead natural debris. Herbicide application shall be applied to within 1 foot to perimeter of structures. Ensure that spray does not drift from designated areas. The herbicide shall be one approved for aquatic use by the manufacturer if used in wet conditions. Government acceptance of herbicide application will not occur for a minimum of 14 days after application to ensure proper removal. The Contractor shall notify Government at time of application as well as 14 days after application for Government to inspect areas. Any reapplication shall be done by the original method at no additional cost to the Government. The Contractor shall be required to furnish a copy of the Safety Data Sheet for any herbicide used. The Contractor shall assure that herbicides are applied in strict accordance with the manufacturer’s recommendations and that proper protective clothing (masks, gloves, etc.) is worn during application and mixing. The Contractor shall supply to the Government a copy of his/her Herbicide Applicator's License with his quote. The Contractor shall not clean or wash herbicide spraying equipment or otherwise dispose of herbicide residues/rinsates within the areas covered by this contract. Disposal procedures will be in accordance with manufacture labeling, federal, and state hazardous waste regulations. The Government reserves the right to exclude any and all areas from herbicide application.
Herbicide application shall begin within 7 days of the following dates each year for DMCAS 1N, 2A, 12A, 13A, 13B, 14A, 14B, Jones/Oysterbed Island, and all other designate area listed for Savannah and be completed within 14 days.
April 30 October 1
Herbicide application shall begin within 7 days of the following date each year for Andrew’s Island and all other designated area listed for Brunswick and be completed within 7 days.
April 30 October 1
1.4 HERBICIDE APPLICATION OF BIRD ISLAND VEGETATION:
The Contractor shall be required to furnish a copy of the Safety Data Sheet for any herbicide used. The Contractor shall assure that herbicides are applied in strict accordance with the manufacturer’s recommendations and that proper protective clothing (masks, gloves, etc.) is worn during application and mixing. The Contractor shall not clean or wash herbicide spraying equipment or otherwise dispose of herbicide residues/rinsates within the areas covered by this contract. Disposal procedures will be in accordance with manufacture labeling, federal, and state hazardous waste regulations. The Contractor shall supply to the Government a copy of his Herbicide Applicator's License with his quote. Government acceptance of herbicide application will not occur for a minimum of 14 days after application to ensure proper removal. The Contractor shall notify Government at time of application as well as 14 days after application for Government to inspect areas.
An 8-acre bird island exist in both DMCA 12A and 13A, and a 6-acre bird island exists in Jones/Oysterbed Island. A 3-acre Bird Island exists in DMCA 1N. An offshore 5-acre bird island (Tomkins Island) is located approximately 2 miles offshore of Jones/Oysterbed Island. Remove vegetation from sides and interior of the bird islands before and after each nesting season. Ensure that spray does not drift from designated areas and strictly adhere to the manufacturer's warnings and recommendations in the application of the herbicide. Aerial helicopter application of herbicide shall be allowed.
The herbicide shall be one approved for aquatic use by the manufacturer.
Apply herbicides twice a year to these areas when birds are not nesting on the islands.
Herbicide application shall begin within 7 days of the following dates each year for the areas 1N, 12A, 13A, Jones/Oysterbed Island and the offshore bird island in Savannah Harbor and be completed within 7 days.
February 15 October 31
The first application shall include a non-selective pre-emergent.
An inshore bird island of approximately 15 acres is located in Saint Simons Sound.
Remove vegetation from sides and interior of the bird island before and after each nesting season. Ensure that spray does not drift from designated areas and strictly adhere to the manufacturer's warnings and recommendations in the application of the herbicide. Aerial helicopter application of herbicide shall be allowed. The herbicide shall be one approved for aquatic use by the manufacturer.
Herbicide application shall begin within 7 days of the following date each year for the inshore bird island in Saint Simons Sound and be completed within 7 days.
February 15
The application shall include a non-selective pre-emergent.
1.5 HAND CLEARING OF BIRD ISLAND VEGETATION:
Hand clearing requires that the vegetation be uprooted. Cutting to ground level is not acceptable. The islands are surrounded by water, and access to the islands is limited.
Water levels in the DMCAs vary throughout the year. Access to DMCA bird islands, inshore bird island, and offshore bird island is the Contractor’s responsibility. The Contractor should provide specialized equipment to access bird islands. Equipment shall not disturb more than 6 inches of the surface of the island crown. If bladed equipment is used on the slopes, additional depths may be required to establish 1:6 side slopes.
SAVANNAH:
Remove vegetation from DMCA bird island 1N, 12A, 13A, Jones Oysterbed Island, and offshore bird island (Tomkins Island). Vegetation including roots shall be completely removed from these areas, by clearing. Dead vegetation shall be removed and becomes property of the Contractor. If Contractor elects to burn, dead vegetation to be burned shall be piled at the toe of the islands and burned. Vegetation shall not be piled and burned on the crowns or side slopes of the islands. It is Contractor requirement and responsibility to contact the forestry commission of the appropriate jurisdiction to acquire a Prescribed Burn permit prior to commencement of burning. Contractor must notify COR prior to burning.
BRUNSWICK:
Remove vegetation from inshore bird island in Saint Simons Sound. Vegetation including roots shall be completely removed from this area by clearing. Dead vegetation shall be removed and becomes property of the Contractor. If Contractor elects to burn dead vegetation to be burned shall be piled at the toe of the islands and burned. Vegetation shall not be piled and burned on the crowns or side slopes of the islands. It is Contractor requirement and responsibility to contact the forestry commission of the appropriate jurisdiction to acquire a Prescribed Burn permit prior to commencement of burning. Contractor must notify COR prior to burning.
1.6 FIRE ANT CONTROL CHEMICAL 1:
The islands are surrounded by water, and access to the islands is limited. Water levels in the DMCAs vary throughout the year. Access to DMCA bird islands, inshore bird island, and offshore bird island is the Contractor’s responsibility. The Contractor should provide specialized equipment to access bird islands. Treat fire ant mounds on the nesting islands with a chemical approved for fire ant control. Strictly adhere to the manufacturer’s warnings and recommendations in the application of the fire ant control.
A granular hydramethylnon pesticide (Chemical 1 used for fire ant control) shall be broadcast at 1 lb/acre, with a soil temperature of at least 60 degrees F and air temperature of at least 75 degrees F from mid-day to afternoon.
The Contractor shall be required to furnish a copy of the Safety Data Sheet for any pesticide used. The Contractor shall assure that pesticides are applied in strict accordance with the manufacturer’s recommendations and that proper protective clothing (masks, gloves, etc.) is worn during application and mixing. The Contractor shall not clean or wash pesticide spraying equipment or otherwise dispose of pesticide residues within the areas covered by this contract. Disposal procedures will be in accordance with labeling, federal and state hazardous waste regulations.
SAVANNAH:
Apply fire ant chemical 1 to DMCA bird island 1N, 12A, 13A, Jones Oysterbed Island, and offshore bird island (Tomkins Island). Fire ant control Chemical 1 shall occur within 14 days of January 1 each year.
BRUNSWICK:
Apply fire ant chemical 1 to inshore bird island in Saint Simons Sound. Fire ant control Chemical 1 shall occur within 14 days of January 1 each year.
1.7 FIRE ANT CONTROL CHEMICAL 2:
The islands are surrounded by water, and access to the islands is limited. Water levels in the DMCAs vary throughout the year. Access to DMCA bird islands, inshore bird island, and offshore bird island is the Contractor’s responsibility. The Contractor should provide specialized equipment to access bird islands. Treat fire ant mounds on the nesting islands with a chemical approved for fire ant control. Strictly adhere to the manufacturer’s warnings and recommendations in the application of the fore ant control.
Treat each mound with 2 tablespoons each acephate dry powder pesticide (Chemical 2 used for fire ant control).
The Contractor shall be required to furnish a copy of the Safety Data Sheet for any pesticide used. The Contractor shall assure that pesticides are applied in strict accordance with the manufacturer’s recommendations and that proper protective clothing (masks, gloves, etc.) is worn during application and mixing. The Contractor shall not clean or wash pesticide spraying equipment or otherwise dispose of pesticide residues within the areas covered by this contract. Disposal procedures will be in accordance with labeling, federal and state hazardous waste regulations.
SAVANNAH:
Apply fire ant chemical to DMCA bird island 1N, 12A, 13A, Jones Oysterbed Island, and offshore bird island (Tomkins Island). Fire ant control Chemical 2 shall occur 14 days after application of fire ant control Chemical 1 outlined in section 1.6 (FIRE ANT CONTROL CHEMICAL 1) of this contract.
BRUNSWICK:
Apply fire ant chemical to inshore bird island in Saint Simons Sound. Fire ant control Chemical 2 shall occur 14 days after application of fire ant control Chemical 1 outlined in section 1.6 (FIRE ANT CONTROL CHEMICAL 1) of this contract.
1.8 ESTIMATED QUANTITIES:
Estimated quantities are for bidding purposes only. The location and estimated acreage for mowing the top of dike and the interior and exterior slopes is listed below.
FULL MOWING MAINTENANCE SURFACE AREAS SAVANNAH
Location Top and Counterweig ht (acres)
3:1 Interior and Exterior Slope (acres)
Total Full Mowing (acres)
Number of Weirs
Number of Underdrai n Stations
1N DMCA 5 21 26 4
2A DMCA 9 64 73 2
12A DMCA 27 109 136 4
13A DMCA 14 76 90 4 6
13B DMCA 7 63 70 5
14A DMCA 47 50 97 6
14B DMCA 10 82 92 5
Jones Oysterbed Island
22 148 170 5
Staging Area 12
Entrance Gate 12A
1N
2A
Jones Oysterbed Island Landing
Frontage and Perimeter Roads
Totals 837 35 6
*Total of top, counterweight, interior, and exterior, includes ramps to underdrain stations.
ENVIRONMENTAL MOWING MAINTENANCE SURFACE AREAS SAVANNAH
Location Top and Counterweight (acres)
3:1 Interior and Exterior Slope (acres)
Total Full Mowing (acres)
Number of Weirs
1N DMCA 5 2 7 4
2A DMCA 9 4 13 2
12A DMCA 10 4 14 4
13A DMCA 14 5 19 4
13B DMCA 7 3 10 5
14A DMCA 32 12 44 6
14B DMCA 11 4 15 5
Jones Oysterbed Island DMCA
16 6 22 5
Staging Area 12
Entrance Gate 12A 1
Entrance Gate 1N 1
Entrance Gate 2A 1
Jones Oysterbed Island Landing
Frontage and Perimeter Roads
Totals 227 35
FULL MOWING MAINTENANCE SURFACE AREAS BRUNSWICK
Location Exterior Slope (acres)
Top (acres)
Interior Slope (acres)
Access Road from Gate (acres)
Total Areas Full Mowing (acres)
Number of Weirs
Andrew’s Island
40 12 18 2 72 3
HERBICIDE MAINTENANCE DMCAs SAVANNAH
Location Number of structure s
Weir catwalk at top of dike area (ft^2)
Weir outfall area (ft^2)
Perimete r linear ft
Area around pole (ft^2)
Total (ft^2)
1N DMCA
Weirs
4 28 28
2A DMCA
Weirs
2 28 28
12A DMCA
Weirs
4 28 28
13A DMCA
Weirs
4 28 28
13B DMCA
Weirs
5 28 28
14A DMCA
Weirs
6 28 28
14B DMCA
Weirs
5 28 28
Jones Oysterbed Island Weirs
5 28 28
Power Poles
7 280
Entrance Gate 12A
1 315
Entrance Gate 1N
1 50
Underdrain Stations
6 70
Total 3025
HERBICIDE MAINTENANCE DMCA BRUNSWICK
Location Number of structures
Weir catwalk at top of dike area (ft^2)
Weir outfall area (ft^2)
Perimeter linear ft
Total (ft^2)
Andrews DMCA Weirs
3 28 28
Entrance Gate Andrews
1 150
Total 318
The location and estimated acreage for herbicide, ant control, and hand clearing of bird islands is listed below. Acreage may vary and be reduced due to amount of ponded water at interior of DMCA.
BIRD ISLAND MAINTENANCE SURFACE AREAS SAVANNAH AND BRUNSWICK
Location Acres
1N (SAVANNAH) 3
12A (SAVANNAH) 8
13A (SAVANNAH) 8
Jones Oysterbed Island (SAVANNAH) 6
Offshore Bird Island (SAVANNAH) 5
Inshore Bird Island St. Simons Sound
(BRUNSWICK)
2. Antiterrorist/Operations Security Review Requirements:
2.1 General Security Requirements and Guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employee
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .