This is a Request for Quotes (RFQ) issued by the US Army Corps of Engineers Savannah District for Dredge Material Containment Area (DMCA) and Bird Island maintenance services in Savannah and Brunswick Harbors. The contract requires full mowing/cutting of vegetation, environmental mowing/cutting, herbicide application in DMCAs, and herbicide application and clearing of bird islands across approximately 42 miles of dikes in Savannah Harbor and 5 miles in Brunswick Harbor, totaling about 909 acres.

The solicitation (W912HN25Q5000) is a 100% small business set-aside under NAICS code 561730 with a size standard of $9.5 million. Quotes are due by April 3, 2025 at 11:00 AM ET. The base period runs from contract award through March 13, 2026, with four one-year options plus a potential 6-month extension. Key requirements include maintaining vegetation height of 5 inches or less, herbicide application twice yearly, fire ant control, and hand clearing of bird islands. Contractors must be licensed for herbicide application in both Georgia and South Carolina. Award will be made to the lowest-priced, technically acceptable offer based on past performance, licensing, and equipment capabilities. The contract includes specific timing requirements for different maintenance activities, such as environmental mowing between April 7-July 15 during nesting season.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W912HN25Q5000 03-Mar-2025

b. TELEPHONE NUMBER

912-652-5505

8. OFFER DUE DATE/LOCAL TIME

11:00 AM 03 Apr 2025

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912HN9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

AMY L COLLINS

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

USACE - SAVANNAH DISTRICT

100 W. OGLETHORPE AVE

SAVANNAH GA 31401

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE W912HN 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

USACE - SAVANNAH DISTRICT

SEE SCHEDULE FOR DELIVERY LOCATION

100 W. OGLETHORPE AVE

SAVANNAH GA 31401

TEL: SEE SCHEDULE FAX: SEE SCHEDULE

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$9,500,000

NAICS:

561730

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF204

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W912HN25Q5000

Section A - Solicitation/Contract Form

SOLICITATION

This notice is being posted as an avenue to provide Request for Quotes, W912HN250Q5000.

This is a solicitation for commercial services in accordance with the format in FAR Subpart 12.6 as supplemented with additional information in this notice. THIS ANNOUNCEMENT

CONSTITUTES THE ONLY SOLICITATION. QUOTES ARE BEING REQUESTED. This will be solicited as 100% Small Business set-aside. The NAICS Code is 561730 with a size standard of $9.5 million. This solicitation document incorporates provisions and clauses in effect through Federal Acquisition Circular 2025-03.

Title of Requirement: Dredge Material Containment Area (DMCA) and Bird Island Mowing and Herbicide for Savannah and Brunswick Harbors

Description of Requirement: The contractor shall furnish all plant, equipment, specialist equipment and material to fulfill the requirement of this contract. The contract will include full mowing/cutting of vegetation in Dredge Material Containment Areas (DMCAs), environmental mowing/cutting of vegetation in DMCAs, herbicide application in the DMCAs, and herbicide application and clearing of bird islands.

Submission Requirements: Fill out and return pages 5 and 7-99 of the attached. In a separate attachment entitled "Past Performance" offerors shall provide project title, detailed description, point of contact and phone number for three (3) prior or current contracts/agreements for similar scoped projects performed during the previous three (3) years. To be technically acceptable, the submitting offeror must submit relevant and current past performance that is similar to the requirements described in this solicitation. The Government will evaluate each offeror's experience on the basis of its depth and its relevance to the work that will be required under the prospective contract. Projects involving the mowing and/or clearing and brush removal on slope and terrain similar to this requirement will be considered relevant past performance. If sufficient detail is not included for the government to make a determination of acceptability, the offer will be determined unresponsive.

In a separate attachment entitled "Herbicide Licensing" the offeror must provide proof of licensing in both Georgia and South Carolina. In a separate attachment entitled "Equipment List" offeror shall provide a list of equipment planned for use or being used on the jobsite, including the most recent and planned equipment inspection dates.

Quotes should be emailed to Amy.L.Collins@usace.army.mil by 03 April 2025 at 11:00 a.m.

Eastern Time with a copy to Nathan A. Aylesworth at Nathan.A.Aylesworth@usace.army.mil.

Basis for Award: The award will be made to the lowest priced, responsible, responsive quote, that meets or exceeds the requirement. This is in accordance with Federal Acquisition

Regulation (FAR) 52.212-2, Evaluation – Commercial Products and Commercial Services, and

FAR 9.104.

mailto:Nathan.A.Aylesworth@usace.army.mil

The Government reserves the right to cancel this solicitation.

REQUEST FOR QUOTE (RFQ)

US Army Corps of Engineers – Savannah District

POC: Amy Collins

Phone: (912) 652-5505

Email: amy.l.collins@usace.army.mil

QUOTES DUE BY: 11:00 am (ET) on 3 April 2025

CONTRACTOR: ______________________________________________________

UNIQUE ENTITY ID: _________________________________________________

CAGE CODE: ________________________________________________________

TAX ID NO.: _________________________________________________________

E-MAIL: ____________________________________________________________

PHONE NO.: ________________________________________________________

DATE OF QUOTE: ____________________________________________________

QUOTE PREPARED AND CERTIFIED BY:

(Printed Name and Title)

NOTES TO OFFERORS

Note 1: Quotes shall meet the specifications in the Statement of Work to be eligible for an award.

PARTIES INTERESTED IN RESPONDING TO THIS RFQ may submit their Quote in accordance with standard commercial practice (i.e. Quote form, letterhead, etc.) and MUST

INCLUDE THE FOLLOWING INFORMATION: Solicitation number; offeror's complete mailing and remittance addresses; discount terms, DUNS number, and Tax Identification

Number. Any prospective awardee shall be registered and active in the SAM database prior to any award of a contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation. Offerors may obtain information on registration and annual confirmation requirements via the Internet at http://www.acquisition.gov or by calling

866-606-8220

Note 2: All questions are to be directed no later than 11:00 a.m. Eastern time seven days prior to closing date to Amy L. Collins at Amy.L.Collins@usace.army.mil

Please CC, Nathan A. Aylesworth at Nathan.A.Aylesworth@usace.army.mil

Note 3: The Taxpayer Identification Number may be used by the Government to collect and report on any delinquent amounts arising out of the contractor’s relationship with the Government.

Note 4: This acquisition will utilize Simplified Procedures pursuant to FAR 13.1.

Note 5: If you wish to have a site visit please contact Amy L. Collins at

Amy.L.Collins@usace.army.mil and Nathan A. Aylesworth at

Nathan.A.Aylesworth@usace.army.mil.

mailto:Amy.L.Collins@usace.army.mil mailto:Nathan.A.Aylesworth@usace.army.mil mailto:Amy.L.Collins@usace.army.mil mailto:Nathan.A.Aylesworth@usace.army.mil

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 3 Each

FULL MOWING - DMCA 1N____FFP

FOB: Destination

PSC CD: S208

NET AMT

0002 3 Each

FULL MOWING - DMCA 2A____FFP

0003 3 Each

FULL MOWING - DMCA 12A____FFP

0004 3 Each

FULL MOWING - DMCA 13A____FFP

0005 3 Each

FULL MOWING - DMCA 13B____FFP

0006 Each

FULL MOWING - DMCA 14A____FFP

UNDER CONSTRUCTION

0007 3 Each

FULL MOWING - DMCA 14B____FFP

0008 3 Each

FULL MOWING - DMCA JONES____FFP

OYSTERBED ISLAND

0009 3 Each

FULL MOWING - ENTRANCE GATES TO (12A,___FFP

2A, 1N) LOWER ROAD, FRONTAGE ROAD, POWER POLES, STAGING

AREA

0010 3 Each

ENVIRONMENTAL MOWING - DMCA 1N____FFP

0011 3 Each

ENVIRONMENTAL MOWING - DMCA 2A____FFP

0012 3 Each

ENVIRONMENTAL MOWING - DMCA 12A____FFP

0013 3 Each

ENVIRONMENTAL MOWING - DMCA 13A____FFP

0014 3 Each

ENVIRONMENTAL MOWNG - DMCA 13B____FFP

0015 Each

ENVIRONMENTAL MOWING - DMCA 14A____FFP

UNDER CONSTRUCTION

0016 3 Each

ENVIRONMENTAL MOWING - DMCA 14B____FFP

0017 3 Each

ENVIRONMENTAL MOWING - DMCA JONES_____FFP

OYSTEERBED ISLAND

0018 3 Each

ENVIRONMENTAL MOWOING - ENTRANCE GATES__FFP

TO (12A, 2A, 1N), LOWER ROAD, FRONTAGE ROAD, POWER POLES,

STAGING AREA

0019 2 Each HERBICIDE - DMCAs_____FFP

0020 2 Each

HERBICIDE APPLICATION - DMCA BIRD____FFP

ISLAND 1N

0021 2 Each

ISLAND 12A

0022 2 Each

HERBICIDE APPLICATION - DMCA BIRD ____FFP

ISLAND - 13A

0023 2 Each

SILAND JONES OYSTERBED ISLAND

0024 2 Each

HERBICIDE APPLICATION - BIRD____FFP

ISLAND OFFSHORE (TOMKINS)

0025 1 Each

HAND CLEARING - BIRD ISLAND 1N____FFP

0026 1 Each

HAND CLEARING - BIRD ISLAND 12A____FFP

0027 1 Each

HAND CLEARING - BIRD ISLAND 13A____FFP

0028 1 Each

HAND CLEARING - BIRD ISLAND JONES____FFP

OYSTERBED

0029 1 Each

HAND CLEARING - BIRD ISLAND OFFSHORE____FFP

(TOMKINS ISLAND/SAVANNAH)

0030 1 Each

APPLICATION OF FIRE ANT PESTICIDE____FFP

CHEMICAL 1 (AMDRO OR EQUIVALENT) BIRD ISLAND 1N

0031 1 Each

CHEMICAL 1 (AMDRO OR EQUIVALENT) BIRD ISLAND 12A

0032 1 Each

CHEMICAL 1 (AMDRO OR EQUIVALENT) - BIRD ISLAND 13A

0033 1 Each

CHEMICAL 1 (AMDRO OR EQUIVALENT) - BIRD ISLAND JONES

0034 1 Each

APLICATION OF FIRE ANT PESTICIDE____FFP

CHEMICAL 2 (ORTHENE OR EQUIVALENT) - BIRD ISLAND OFFSHORE

(TOMKINS ISLAND/SAVANNAH

0035 1 Each

CHEMICAL 2 (ORTHENE OR EQUIVALENT) - BIRD ISLAND 1N

0036 1 Each

CHEMICAL 2 (ORTHENE OR EQUIVALENT) - BIRD ISLAND 12A

0037 1 Each

APPLICATION OF FIRE ANT PESTICIDEFFP

CHEMICAL 2 (ORTHENE OR EQUIVALENT) - BID ISLAND 13A

0038 1 Each

CHEMICAL 2 (ORTHENE OR EQUIVALENT) - BIRD ISLAND JONES

0039 1 Each

CHEMICAL 2 (ORTHENE OR EQUIVALENT) - BIRD ISLAND OFFSHORE

0040 3 Each

FULL MOWING - DMCA ANDREWS____FFP

0041 2 Each

HERBICIDE APPLICATION - DMCA ANDREWS____FFP

0042 1 Each

HERBICIDE APPLICATION - INSHORE BIRD____FFP

ISLAND

0043 1 Each

HAND CLEARIING - INSHORE BIRD ISLAND____FFP

0044 1 Each

CHEMICAL 1 (AMDRO OR EQIVALENT) - IINSHORE BIRD ISLAND

0045 1 Each

CHEMICAL 2 (ORTHENE OR EQUIVALENT) - INSHORE BIRD ISLAND

1001 4 Each

OPTION FULL MOWING - DMCA 1N____FFP

1002 4 Each

OPTION FULL MOWING - DMCA 2A____FFP

1003 4 Each

OPTION FULL MOWING - DMCA 12AFFP

1004 Each

OPTION FULL MOWING - DMCA 13A____FFP

ANTICIPATED TO BE UNDER CONSTRUCTION

1005 4 Each

OPTION FULL MOWING - DMCA 13B____FFP

1006 4 Each

OPTION FULL MOWING - DMCA 14A____FFP

1007 4 Each

OPTION FULL MOWOING - DMCA 14B____FFP

1008 4 Each

OPTION FULL MOWING - DMCA JONES OYSTERBED____FFP

1009 4 Each

OPTION FULL MOWING - ENTRANCE GATES TO (12A, __FFP

2A, 1N,, LOWER ROAD, FRONTAGE ROAD, POWER POLES, STAGING

1010 3 Each

OPTION ENVIRONMENTAL MOWING - DMCA 1N____FFP

1011 3 Each

OPTION ENVIRONMENTAL MOWING - DMCA 2A____FFP

1012 3 Each

OPTION ENVIRONMENTAL MOWING - DMCA 12A____FFP

1013 Each

OPTION ENVIRONMENTAL MOWING - DMCA 13A____FFP

1014 3 Each

OPTION ENVIRONMENTAL MOWING - DMCA 13B____FFP

1015 3 Each

OPTION ENVIRONMENTAL MOWING - DMCA 14A____FFP

1016 3 Each

OPTION ENVIRONMENTAL MOWING - DMCA 14B____FFP

1017 3 Each

OPTION ENVIRONMENTAL MOWING - DMCA JONES____FFP

1018 3 Each

OPTION ENVIRONMENTAL MOWING - ENTRANCE GATES___FFP

TO (12A, 2A, 1N) LOWER ROAD, FRONTAGE ROAD, POWER POLES,

1019 2 Each OPTION HERBICIDE DMCAs____FFP

1020 2 Each

OPTION HERBICIDE APPLICATION DMCA BIRD____FFP

1021 2 Each

OPTION HERBICIDE APPLICATION DMCA BIRD___FFP

1022 Each

ISLAND 13A

1023 2 Each

OPTION HERBICIDE APPLICATIOIN DMCA BIRD____FFP

ISLAND JONES OYSTERBED ISLAND

1024 2 Each

OPTION HERBICIDE BIRD ISLAND____FFP

OFFSHORE (TOMKINS)

1025 1 Each

OPTION HAND CLEARING - BIRD ISLAND 1N____FFP

1026 1 Each

OPTION HAND CLEARING - BIRD ISLAND 12A____FFP

1027 Each

OPTION HAND CLEARING - BIRD ISLAND 13A____FFP

1028 1 Each

OPTION HAND CLEARING - BIRD ISLAND JONES____FFP

1029 1 Each

OPTION HAND CLEARING - BIRD ISLAND OFFSHORE____FFP

1030 1 Each

OPTION APPLICATION OF FIRE ANT PESTICIDE____FFP

CHEMICAL 1 - BIRD ISLAND 1N

1031 1 Each

CHEMICAL 1 - BIRD ISLAND 12A

1032 Each

CHEMICAL 1 - BIRD ISLAND 13A

1033 1 Each

CHEMICAL 1 - BIRD ISLAND JONES OYSTERBED

1034 1 Each

CHEMICAL 2 - BIRD ISLAND OFFSHORE (TOMKINS

ISLAND/SAVANNAH)

1035 1 Each

CHEMICAL 2 - BIRD ISLAND 1N

1036 1 Each

CHEMICAL 2 - BIRD ISLAND 12A

1037 Each

CHEMICAL 2 - BIRD ISLAND 13A

1038 1 Each

CHEMICAL 2 - BIRD ISLAND JONES OYSTERBED

1039 1 Each

1040 3 Each

OPTION FULL MOWING - DMCA ANDREWS____FFP

1041 2 Each

OPTION HERBICIDE APPLICATION - DMCA ANDREWS____FFP

1042 1 Each

OPTION HERBICIDE APPLICATION - INSHORE BIRD____FFP

1043 1 Each

OPTION HAND CLEARING - INSHORE BIRD ISLAND____FFP

1044 1 Each

CHEMICAL 1 (AMDRO OR EQIVALENT) - INSHORE BIRD ISLAND

1045 1 Each

CHEMICAL 2 (ORTHENE OR EQUIVALENT) INSHORE BIRD ISLAND

2001 4 Each

2002 4 Each

2003 4 Each

OPTION FULL MOWING - DMCA 12A____FFP

2004 4 Each

2005 4 Each

2006 4 Each

2007 4 Each

OPTION FULL MOWING - DMCA 14B____FFP

2008 4 Each

2009 4 Each

OPTION FULL MOWING - ENTRANCE GATES TO ____FFP

(12A, 2A, 1N) LOWER ROAD, FRONTAGE ROAD, POWER POLES,

2010 3 Each

2011 3 Each

2012 3 Each

2013 3 Each

2014 3 Each

OPTION ENVIRONMENTAL MOWING - DMCA 13B____FFP

2015 3 Each

2016 3 Each

2017 3 Each

2018 3 Each

TO (12A, 2A, 1N) LOWER ROAD, FRONTAGE ROAD, POWER POLES,

2019 2 Each

2020 2 Each

2021 2 Each

OPTION HERBICIDE APPLICATION DMCA BRD____FFP

2022 2 Each

2023 2 Each

OPTION HERBICIDE APPLICATION DMCA BIRD ISLAND__FFP

JONES OYSTERBED ISLAND

2024 2 Each

2025 1 Each

OPTION HAND CLEARING = BIRD ISLAND 1N____FFP

2026 1 Each

2027 1 Each

2028 1 Each

OPTION HAND CLEARING - BIRD ISLAND JONES___FFP

2029 1 Each

2030 1 Each

2031 1 Each

2032 1 Each

2033 1 Each

2034 1 Each

2035 1 Each

2036 1 Each

2037 1 Each

2038 1 Each

2039 1 Each

2040 3 Each

2041 2 Each

2042 1 Each

2043 1 Each

OPTION HAND CLEARING - INSHORE BIRD____FFP

2044 1 Each

CHEMICAL 1 (AMDRO OR EQUIVALENT) INSHORE BIRD ISLAND

2045 1 Each

CHEMICAL 2 (ORTHENE OR EQUIVALENT) INSHORE BIRD ISLAND

3001 4 Each

OPTION FULL MOWING - DMCA 1N___FFP

3002 4 Each

3003 4 Each

3004 4 Each

3005 4 Each

3006 4 Each

3007 4 Each

OPTION FULL MOWING - DMCA 14B____FFP

3008 4 Each

3009 4 Each

OPTION FULL MOWING - ENTRANCE GATES (12A, 2A,__FFP

1N) LOWER ROAD, FRONTAGE ROAD, POWER POLES, STAGING AREA

3010 3 Each

3011 3 Each

OPTION ENVIRONMENTAL MOWOING - DMCA 2A____FFP

3012 3 Each

3013 3 Each

3014 3 Each

3015 3 Each

3016 3 Each

OPTION ENVIRONMENTAL MOWOING - DMCA 14B____FFP

3017 3 Each

3018 3 Each

TO (12A, 2A, 1N), LOWER ROAD, FRONTAGE ROAD, POWER POLES,

3019 2 Each

3020 2 Each

3021 2 Each

3022 2 Each

3023 2 Each

ISLAND JONES OYSTERBED ISLAND

3024 2 Each

3025 1 Each

OPTION HAND CLEARING - BIRD ISLAND 1N____FFP

3026 1 Each

3027 1 Each

OPTION HAND CLEARING - BID ISLAND 13A____FFP

3028 1 Each

3029 1 Each

OPTION HAND CLEARINGN - BIRD ISLAND____FFP

OFFSHORE (TOMKINS ISLAND/SAVANNAH)

3030 1 Each

OPTION APPLICATIOIN OF FIRE ANT PESTICIDE____FFP

3031 1 Each

3032 1 Each

3033 1 Each

CHEMICAL 1 - BIRD ISLAND JONES OYSTERED

3034 1 Each

3035 1 Each

3036 1 Each

OPTION APPLICATION OF FIRE ANT PESTICIDEFFP

3037 1 Each

3038 1 Each

3039 1 Each

3040 3 Each

3041 2 Each

3042 1 Each

OPTION HERBICIDE APPLICATION - INSHORE____FFP

BIRD ISLAND

3043 1 Each

3044 1 Each

CHEMICAL 1 (AMDRO OR EQUIVALENT) INSHORE BIRD ISLAND

3045 1 Each

4001 Each

4002 4 Each

4003 4 Each

4004 4 Each

4005 Each

4006 4 Each

4007 4 Each

OPTION FULL MOWING - DMCA 14B____FFP

4008 4 Each

4009 4 Each

OPTION FULL MOWING - ENTRANCE GATES TO (12A,FFP

2A, 1N) LOWER ROAD, FRONTAGE ROAD, POWER POLES, STAGING

4010 Each

4011 3 Each

4012 3 Each

4013 3 Each

4014 Each

4015 3 Each

4016 3 Each

4017 3 Each

4018 3 Each

(12A, 2A, 1N), LOWER ROAD, FRONTAGE ROAD, POWER POLES,

STAGIING AREA

4019 2 Each

4020 Each

OPTION HERBICIDE APPLICATION DMCA BIRD__FFP

4021 2 Each

4022 2 Each

4023 2 Each

OPTION HERBICIDE APPLICATION DMCA BIRD ISLAND__FFP

JONES OYSTERBED ISLAND

4024 2 Each

OPTION HERBICIDE BIRD ISLANDFFP

4025 Each

OPTION HAND CLEARING - BIRD ISLAND 1N____FFP

4026 1 Each

4027 1 Each

4028 1 Each

4029 1 Each

4030 Each

CHEMICAL 1- BIRD ISLAND 1N

4031 1 Each

4032 1 Each

4033 1 Each

4034 1 Each

4035 Each

4036 1 Each

4037 1 Each

4038 1 Each

CHEMICAL 2 BIRD ISLAND JONES OYSTERBED

4039 1 Each

4040 3 Each

4041 2 Each

4042 1 Each

4043 1 Each

4044 1 Each

CHEMICAL 1 (AMDRO OR EQUIVALEN) INSHORE BIRD ISLAND

4045 1 Each

4046 6 Months

OPTION OPTION TO EXTEND SERVICES 6 MONTHS____FFP

Please complete the following in addition to filliing in the above Unit Price and Amont for each individual CLIN.

TOTAL OF BASE PERIOD (CLINS 0001-0045) ____________________

TOTAL OF OPTION PERIOD 1 (CLINS 1001-1045) ____________________

TOTAL OF OPTION PERIOD 2 (CLINS 2001-2045) _____________________

TOTAL OF OPTION PERIOD 3 (CLINS 3001-3045) _____________________

TOTAL OF OPTION PERIOD 4 (CLINS 4001-4045) _____________________

TOTAL OF OPTION CLIN 4046 _____________________

TOTAL OF BASE AND ALL OPTIONS COMBINED _____________________

ALL ITEMS MUST BE FILLED IN COMPLETELY.

Section C - Descriptions and Specifications

Performance Work Statement (Includes associated Performance Requirements Summary (PRS)

PERFORMANCE WORK STATEMENT (PWS)

Dredge Material Containment Area (DMCA) and Bird Island Mowing and Herbicide for

Savannah and Brunswick Harbors

FY25

Part 1 General Information

1. SCOPE

Contractor shall furnish all plant, labor, equipment, specialized equipment, and material to fulfill the requirement of this Contract. This contract will include full mowing/cutting of vegetation in Dredge Material Containment Areas (DMCA), environmental mowing/cutting of vegetation in DMCAs, herbicide application in the DMCAs, and herbicide application and clearing of bird islands.

Mowing/Cutting shall consist of maintaining all vegetation along the dikes, dike slopes, counterweights, access ramps, access roads, underdrain stations, underdrain station ramps, weir access ramps, and weir outfalls for DMCAs 1N, 2A, 12A, 13A, 13B, 14A, 14B, Jones/Oysterbed Island. In addition to the dikes, mow/cut the entrance gates, staging area between DMCA 12A and the Back River (Sediment Basin), around the power poles at the staging area, lower road and frontage road, in Savannah Harbor.

The Contractor shall herbicide the weir areas consisting of weir walkways, and weir outfalls of DMCAs 1N, 2A, 12A, 13A, 13B, 14A, 14B, Jones/Oysterbed Island and underdrain stations of DMCAs 13A and 13B. The contractor shall herbicide and remove vegetation including roots on the interior bird islands located in DMCAs 1N, 12A, 13A, Jones/Oysterbed Island, as well as a bird island (Tompkins Island) approximately 2 miles offshore of Jones/Oysterbed Island, Savannah Harbor.

In addition to the above work, this contract will include full mowing/cutting of vegetation and herbicide application for DMCA on Andrew’s Island in Brunswick Harbor, and herbicide application and clearing of an inshore bird island in Saint Simons Sound.

The Government reserves the right to exclude all or portions of any of the DMCAs and/or bird island that may be under a separate contract for dike and weir improvements, maintenance and any other work being performed in the DMCAs that may impact mowing. DMCAs under construction will be de-obligated from the contract work item. Once the Government has determined the DMCA and mowing cycle impacted by construction the Contractor will be provided the location and dates for their concurrence.

The period of the contract for the base year is from the date of contract award through 13 March 2026 with Options for 4 additional years.

Option Year 1: 14 March 2026 – 13 March 2027 Option Year 2: 14 March 2027 – 13 March 2028 Option Year 3: 14 March 2028 – 13 March 2029 Option Year 4: 14 March 2029 – 13 March 2030

Pursuant to FAR Clause 52.217-8, Option to Extend Services the prices above will be utilized for the period in which this authority is exercised.

Each DMCA and typical cross sections of the DMCAs are laid out on the contract drawings. The Contractor shall be aware the DMCA’s dike system has areas where animals, construction equipment and pipeline installations have caused voids and ruts in the areas to be mowed. The Contractor shall notify the Government immediately if they encounter an area of the dike that has been washed out, voided, or rutted. The Contractor shall use caution while mowing/cutting these areas. The Contractor shall also be made aware that some areas of the DMCAs dike system have not been mowed on schedule and have become overgrown and may be greater than 6 feet in height.

Vegetation with a diameter of 2 inches or less measured at 6 inches from the ground are included in this contract. Contractor is required to maintain areas around existing structures including but not limited to fences, gates, settlement plates and telephone poles. The Contractor shall provide a clean cut around existing structures and utilize proper equipment to meet this requirement. Large berths around existing structures due to inadequate equipment will not be accepted. The Contractor is required to mow/trim vegetation up to a distance of 3 feet of any dredge pipe. All acreage within the maintenance surface areas as prescribed in the contract are required to be mowed/cut.

The Contractor shall also be made aware that some areas of the DMCAs dike system have not been mowed on schedule and have become overgrown and may be greater than 6 feet in height. Vegetation with a diameter of 2 inches or less when measured at 6 inches from the ground are included in this contract and is defined as “grasses.” All vegetation meeting this definition must be mowed irrespective of height.

DMCA Jones/Oysterbed Island can only be accessed by water. Cost for equipment and personnel mobilization to access is considered incidental to the contract. Access to DMCA Jones/Oysterbed Island is the Contractor’s responsibility.

Cost for boat/barge use or alternate method to access bird islands for maintenance is considered incidental to the contract. Access to DMCA bird islands, inshore bird islands, and offshore bird islands are the Contractor’s responsibility. Water depths for DMCA bird islands may vary from 0.5 inch to several feet or more. The inshore and offshore bird islands are accessible only by use of floating plant.

Mowing of the top of dikes, slopes, underdrain ramps, access ramps, access shoulders, ditches etc. shall be completed and accepted for each DMCA prior to starting the next DMCA unless otherwise directed by the Contracting Officer.

After mowing/cutting, vegetation shall have a close uniform height maximum of 5 inches above the ground. If the areas are not mowed/cut satisfactorily due to the Contractor’s quality, the Contractor shall re-mow/cut the area at no additional cost to the Government. If damaged, restore the top of dikes, slopes, shoulders, and roads to their original condition. The ground conditions vary from firm to soft. It is anticipated that the lower bench will be wet and soft, which may not support typical mowing equipment.

Mowing shall be accomplished using appropriate equipment that will prevent damage and rutting to the dikes. Any damage or rutting caused by mowing operations will be required to be repaired by the Contractor at no cost to the Government. If the Contractor’s equipment creates rutting due to wet areas, the Contractor is responsible for repairing area to level and undisturbed ground, at no cost to the Government. Avoid bird nests. Perform mowing operations in a manner that prevents spillage and leakage of fuel, oil, or materials that may contaminate the area. Clean up contamination of the area caused during mowing. The Contractor shall remove any contractor produced solid waste/trash brought on to work sites daily. The Contractor shall transport all solid waste/trash off Government property and dispose in compliance with Federal, State, and local requirements.

1.1 FULL MOWING/CUTTING OF DMCAs:

The Contractor shall give the COR seven (7) calendar days’ notice before any activity is performed on the contract for Quality Assurance representatives to allow for oversight.

This work consists of mowing the Savannah and Brunswick Harbor Dredge Material Containment Areas (DMCA)s earthen dikes and cross dikes. The exterior of the dikes rises up in steps, from the tidal marsh to various elevations. The typical dike cross section includes 1 to 3 steps, having sides with variable slopes and benches of varying widths. DMCAs and typical cross sections are laid out in the contract drawings. The ground conditions of the dikes, slopes, and benches may be uneven and vary from firm to soft. It is anticipated that areas along the lower bench will be wet and soft which cannot support typical mowing equipment. Mowing is to be accomplished using appropriate equipment that will prevent damage and rutting to the dikes. Any damage or rutting caused by mowing operations will be required to be repaired by the Contractor at no additional cost to the Government. The mowing will be completed while construction activities are taking place.

SAVANNAH:

The dike system consists of approximately 42 miles of dikes at Savannah Harbor with additional frontage roads. The combined acreage to mow in Savannah will be approximately 837 acres and will be required three (3) times a year for the base year and four (4) times a year for each option year. The Contractor shall mow/cut the vegetation located on the dikes, dike slopes, inside and outside counterweights, access ramps, underdrain stations, underdrain station ramps, weir access ramps, and weir outfalls. In addition to the dikes, mow/cut the access roads of DMCAs 1N, 2A, 12A, 13A, 13B, 14A, 14B, Jones Oyster Bed Island, entrance gates, staging area between DMCA12A and the Back River (Sediment Basin), and around the power poles at the staging area and perimeter of 12A. Mow/cut the shoulders and back slopes a minimum of 10 feet on each side of the road. Inside of curves shall be a minimum of 15 feet.

Provide all labor and special equipment required to safely accomplish mowing/cutting on the slopes, in the wet areas, on the tops of the dikes, and all other areas within DMCAs. Equipment used in the operation of mowing/cutting shall be adequate to produce the desired results. Desired results shall be defined as mowed/cut to a maximum of 5 inches above the ground. Keep the mowers in proper adjustment to eliminate destroying the turf or leaving the vegetation above 5 inches. At the weir locations, mow/cut an access path at least 16-foot wide from the weir to the end of the outfall pipe. Each path shall provide clear access to each catwalk. Vegetation that has encroached around catwalks and the outlet and inlet end of weir pipes shall be removed and disposed of the same day of trimming. All vegetation/weed clippings, and other debris caused by mowing or trimming at/around the weir locations are natural debris.

Natural debris becomes contractor property, and the Contractor is fully responsible for the removal and disposal of the natural debris.

Full mowing (as described above) shall begin within 7 days of the following dates each year. The first full mowing shall begin within 14 days of contract award for the base year. The Contractor should work continuously until completion. The next mowing event should not begin until the previous mowing event has been completed unless Government approval has been given prior to the start of work.

March 15 August 1 September 15 October 15

BRUNSWICK:

The dike system consists of approximately 5 miles of dike at Brunswick Harbor. The combined acreage to mow in Brunswick will be approximately 72 acres and required three (3) times a year. The Contractor shall mow/cut the vegetation located on the dikes, dike slopes/inside and outside counterweights, access ramps, and weir outfalls.

In addition to the dikes, mow/cut the access roads of Andrew’s Island DMCA. Mow/cut the shoulders a minimum of 10 feet on each side of the access road and minimum 15 feet around curves for the gate entrances into the DMCA.

Full mowing (as described above) shall begin within 7 days of the following date each year and be completed within 7 calendar days for the Andrew’s Island DMCA. The work shall begin within 14 days of contract award of the base year and for all subsequent option years, shall begin on the date stated below.

March 15 August 1 October 15

1.2 ENVIRONMENTAL MOWING/CUTTING OF DMCAs:

SAVANNAH:

The environmental window for mowing extends every year from April 7-July 15. The dike roads and 5 feet down the inside and outside slopes may be mowed within this period during nesting season (referred to as environmental mowing). At the weir locations, mow/cut an access path at least 16-foot wide from the weir to the end of the outfall pipe. Each path shall provide clear access to each catwalk. In addition to the dikes, mow/cut the access roads of DMCAs 1N, 2A, 12A, 13A, 13B, 14A, 14B, Jones Oyster Bed Island, staging area, entrance gates, and around the power poles at the staging area and perimeter of 12A. Environmental mowings (as described above) shall be completed within 14 days of commencement. The Contractor should work continuously until completion. The next mowing event shall not begin until the previous mowing event has been completed and Government approval of completed work has been given. Commencement of Environmental mowings shall occur on the following dates each year:

April 30 May 30 June 30

1.3 HERBICIDE APPLICATION OF DMCAs:

The Contractor shall remove dead natural debris and apply herbicide to the weir areas, weir outfalls and underdrain stations of DMCAs 1N, 2A, 12A, 13A, 13B, 14A, 14B, Jones Oysterbed Island, and Andrews Island. The Contractor shall also apply herbicide to the entrance gates at Andrews Island, 1N, 2A, 12A and the power poles at the staging area and perimeter of 12A and remove dead natural debris. Herbicide application shall be applied to within 1 foot to perimeter of structures. Ensure that spray does not drift from designated areas. The herbicide shall be one approved for aquatic use by the manufacturer if used in wet conditions. Government acceptance of herbicide application will not occur for a minimum of 14 days after application to ensure proper removal. The Contractor shall notify Government at time of application as well as 14 days after application for Government to inspect areas. Any reapplication shall be done by the original method at no additional cost to the Government. The Contractor shall be required to furnish a copy of the Safety Data Sheet for any herbicide used. The Contractor shall assure that herbicides are applied in strict accordance with the manufacturer’s recommendations and that proper protective clothing (masks, gloves, etc.) is worn during application and mixing. The Contractor shall supply to the Government a copy of his/her Herbicide Applicator's License with his quote. The Contractor shall not clean or wash herbicide spraying equipment or otherwise dispose of herbicide residues/rinsates within the areas covered by this contract. Disposal procedures will be in accordance with manufacture labeling, federal, and state hazardous waste regulations. The Government reserves the right to exclude any and all areas from herbicide application.

Herbicide application shall begin within 7 days of the following dates each year for DMCAS 1N, 2A, 12A, 13A, 13B, 14A, 14B, Jones/Oysterbed Island, and all other designate area listed for Savannah and be completed within 14 days.

April 30 October 1

Herbicide application shall begin within 7 days of the following date each year for Andrew’s Island and all other designated area listed for Brunswick and be completed within 7 days.

April 30 October 1

1.4 HERBICIDE APPLICATION OF BIRD ISLAND VEGETATION:

The Contractor shall be required to furnish a copy of the Safety Data Sheet for any herbicide used. The Contractor shall assure that herbicides are applied in strict accordance with the manufacturer’s recommendations and that proper protective clothing (masks, gloves, etc.) is worn during application and mixing. The Contractor shall not clean or wash herbicide spraying equipment or otherwise dispose of herbicide residues/rinsates within the areas covered by this contract. Disposal procedures will be in accordance with manufacture labeling, federal, and state hazardous waste regulations. The Contractor shall supply to the Government a copy of his Herbicide Applicator's License with his quote. Government acceptance of herbicide application will not occur for a minimum of 14 days after application to ensure proper removal. The Contractor shall notify Government at time of application as well as 14 days after application for Government to inspect areas.

An 8-acre bird island exist in both DMCA 12A and 13A, and a 6-acre bird island exists in Jones/Oysterbed Island. A 3-acre Bird Island exists in DMCA 1N. An offshore 5-acre bird island (Tomkins Island) is located approximately 2 miles offshore of Jones/Oysterbed Island. Remove vegetation from sides and interior of the bird islands before and after each nesting season. Ensure that spray does not drift from designated areas and strictly adhere to the manufacturer's warnings and recommendations in the application of the herbicide. Aerial helicopter application of herbicide shall be allowed.

The herbicide shall be one approved for aquatic use by the manufacturer.

Apply herbicides twice a year to these areas when birds are not nesting on the islands.

Herbicide application shall begin within 7 days of the following dates each year for the areas 1N, 12A, 13A, Jones/Oysterbed Island and the offshore bird island in Savannah Harbor and be completed within 7 days.

February 15 October 31

The first application shall include a non-selective pre-emergent.

An inshore bird island of approximately 15 acres is located in Saint Simons Sound.

Remove vegetation from sides and interior of the bird island before and after each nesting season. Ensure that spray does not drift from designated areas and strictly adhere to the manufacturer's warnings and recommendations in the application of the herbicide. Aerial helicopter application of herbicide shall be allowed. The herbicide shall be one approved for aquatic use by the manufacturer.

Herbicide application shall begin within 7 days of the following date each year for the inshore bird island in Saint Simons Sound and be completed within 7 days.

February 15

The application shall include a non-selective pre-emergent.

1.5 HAND CLEARING OF BIRD ISLAND VEGETATION:

Hand clearing requires that the vegetation be uprooted. Cutting to ground level is not acceptable. The islands are surrounded by water, and access to the islands is limited.

Water levels in the DMCAs vary throughout the year. Access to DMCA bird islands, inshore bird island, and offshore bird island is the Contractor’s responsibility. The Contractor should provide specialized equipment to access bird islands. Equipment shall not disturb more than 6 inches of the surface of the island crown. If bladed equipment is used on the slopes, additional depths may be required to establish 1:6 side slopes.

SAVANNAH:

Remove vegetation from DMCA bird island 1N, 12A, 13A, Jones Oysterbed Island, and offshore bird island (Tomkins Island). Vegetation including roots shall be completely removed from these areas, by clearing. Dead vegetation shall be removed and becomes property of the Contractor. If Contractor elects to burn, dead vegetation to be burned shall be piled at the toe of the islands and burned. Vegetation shall not be piled and burned on the crowns or side slopes of the islands. It is Contractor requirement and responsibility to contact the forestry commission of the appropriate jurisdiction to acquire a Prescribed Burn permit prior to commencement of burning. Contractor must notify COR prior to burning.

BRUNSWICK:

Remove vegetation from inshore bird island in Saint Simons Sound. Vegetation including roots shall be completely removed from this area by clearing. Dead vegetation shall be removed and becomes property of the Contractor. If Contractor elects to burn dead vegetation to be burned shall be piled at the toe of the islands and burned. Vegetation shall not be piled and burned on the crowns or side slopes of the islands. It is Contractor requirement and responsibility to contact the forestry commission of the appropriate jurisdiction to acquire a Prescribed Burn permit prior to commencement of burning. Contractor must notify COR prior to burning.

1.6 FIRE ANT CONTROL CHEMICAL 1:

The islands are surrounded by water, and access to the islands is limited. Water levels in the DMCAs vary throughout the year. Access to DMCA bird islands, inshore bird island, and offshore bird island is the Contractor’s responsibility. The Contractor should provide specialized equipment to access bird islands. Treat fire ant mounds on the nesting islands with a chemical approved for fire ant control. Strictly adhere to the manufacturer’s warnings and recommendations in the application of the fire ant control.

A granular hydramethylnon pesticide (Chemical 1 used for fire ant control) shall be broadcast at 1 lb/acre, with a soil temperature of at least 60 degrees F and air temperature of at least 75 degrees F from mid-day to afternoon.

The Contractor shall be required to furnish a copy of the Safety Data Sheet for any pesticide used. The Contractor shall assure that pesticides are applied in strict accordance with the manufacturer’s recommendations and that proper protective clothing (masks, gloves, etc.) is worn during application and mixing. The Contractor shall not clean or wash pesticide spraying equipment or otherwise dispose of pesticide residues within the areas covered by this contract. Disposal procedures will be in accordance with labeling, federal and state hazardous waste regulations.

SAVANNAH:

Apply fire ant chemical 1 to DMCA bird island 1N, 12A, 13A, Jones Oysterbed Island, and offshore bird island (Tomkins Island). Fire ant control Chemical 1 shall occur within 14 days of January 1 each year.

BRUNSWICK:

Apply fire ant chemical 1 to inshore bird island in Saint Simons Sound. Fire ant control Chemical 1 shall occur within 14 days of January 1 each year.

1.7 FIRE ANT CONTROL CHEMICAL 2:

The islands are surrounded by water, and access to the islands is limited. Water levels in the DMCAs vary throughout the year. Access to DMCA bird islands, inshore bird island, and offshore bird island is the Contractor’s responsibility. The Contractor should provide specialized equipment to access bird islands. Treat fire ant mounds on the nesting islands with a chemical approved for fire ant control. Strictly adhere to the manufacturer’s warnings and recommendations in the application of the fore ant control.

Treat each mound with 2 tablespoons each acephate dry powder pesticide (Chemical 2 used for fire ant control).

The Contractor shall be required to furnish a copy of the Safety Data Sheet for any pesticide used. The Contractor shall assure that pesticides are applied in strict accordance with the manufacturer’s recommendations and that proper protective clothing (masks, gloves, etc.) is worn during application and mixing. The Contractor shall not clean or wash pesticide spraying equipment or otherwise dispose of pesticide residues within the areas covered by this contract. Disposal procedures will be in accordance with labeling, federal and state hazardous waste regulations.

SAVANNAH:

Apply fire ant chemical to DMCA bird island 1N, 12A, 13A, Jones Oysterbed Island, and offshore bird island (Tomkins Island). Fire ant control Chemical 2 shall occur 14 days after application of fire ant control Chemical 1 outlined in section 1.6 (FIRE ANT CONTROL CHEMICAL 1) of this contract.

BRUNSWICK:

Apply fire ant chemical to inshore bird island in Saint Simons Sound. Fire ant control Chemical 2 shall occur 14 days after application of fire ant control Chemical 1 outlined in section 1.6 (FIRE ANT CONTROL CHEMICAL 1) of this contract.

1.8 ESTIMATED QUANTITIES:

Estimated quantities are for bidding purposes only. The location and estimated acreage for mowing the top of dike and the interior and exterior slopes is listed below.

FULL MOWING MAINTENANCE SURFACE AREAS SAVANNAH

Location Top and Counterweig ht (acres)

3:1 Interior and Exterior Slope (acres)

Total Full Mowing (acres)

Number of Weirs

Number of Underdrai n Stations

1N DMCA 5 21 26 4

2A DMCA 9 64 73 2

12A DMCA 27 109 136 4

13A DMCA 14 76 90 4 6

13B DMCA 7 63 70 5

14A DMCA 47 50 97 6

14B DMCA 10 82 92 5

Jones Oysterbed Island

22 148 170 5

Staging Area 12

Entrance Gate 12A

1N

2A

Jones Oysterbed Island Landing

Frontage and Perimeter Roads

Totals 837 35 6

*Total of top, counterweight, interior, and exterior, includes ramps to underdrain stations.

ENVIRONMENTAL MOWING MAINTENANCE SURFACE AREAS SAVANNAH

Location Top and Counterweight (acres)

3:1 Interior and Exterior Slope (acres)

Total Full Mowing (acres)

Number of Weirs

1N DMCA 5 2 7 4

2A DMCA 9 4 13 2

12A DMCA 10 4 14 4

13A DMCA 14 5 19 4

13B DMCA 7 3 10 5

14A DMCA 32 12 44 6

14B DMCA 11 4 15 5

Jones Oysterbed Island DMCA

16 6 22 5

Staging Area 12

Entrance Gate 12A 1

Entrance Gate 1N 1

Entrance Gate 2A 1

Jones Oysterbed Island Landing

Frontage and Perimeter Roads

Totals 227 35

FULL MOWING MAINTENANCE SURFACE AREAS BRUNSWICK

Location Exterior Slope (acres)

Top (acres)

Interior Slope (acres)

Access Road from Gate (acres)

Total Areas Full Mowing (acres)

Number of Weirs

Andrew’s Island

40 12 18 2 72 3

HERBICIDE MAINTENANCE DMCAs SAVANNAH

Location Number of structure s

Weir catwalk at top of dike area (ft^2)

Weir outfall area (ft^2)

Perimete r linear ft

Area around pole (ft^2)

Total (ft^2)

1N DMCA

Weirs

4 28 28

2A DMCA

Weirs

2 28 28

12A DMCA

Weirs

4 28 28

13A DMCA

Weirs

4 28 28

13B DMCA

Weirs

5 28 28

14A DMCA

Weirs

6 28 28

14B DMCA

Weirs

5 28 28

Jones Oysterbed Island Weirs

5 28 28

Power Poles

7 280

Entrance Gate 12A

1 315

Entrance Gate 1N

1 50

Underdrain Stations

6 70

Total 3025

HERBICIDE MAINTENANCE DMCA BRUNSWICK

Location Number of structures

Weir catwalk at top of dike area (ft^2)

Weir outfall area (ft^2)

Perimeter linear ft

Total (ft^2)

Andrews DMCA Weirs

3 28 28

Entrance Gate Andrews

1 150

Total 318

The location and estimated acreage for herbicide, ant control, and hand clearing of bird islands is listed below. Acreage may vary and be reduced due to amount of ponded water at interior of DMCA.

BIRD ISLAND MAINTENANCE SURFACE AREAS SAVANNAH AND BRUNSWICK

Location Acres

1N (SAVANNAH) 3

12A (SAVANNAH) 8

13A (SAVANNAH) 8

Jones Oysterbed Island (SAVANNAH) 6

Offshore Bird Island (SAVANNAH) 5

Inshore Bird Island St. Simons Sound

(BRUNSWICK)

2. Antiterrorist/Operations Security Review Requirements:

2.1 General Security Requirements and Guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Que

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .