B.06 Comments from Industry.xlsx
XLSX spreadsheet 30 KB Posted
- Attached to
- IDIQ Multiple Award Task Order Contract (MATOC) to Support the Environmental Remediation Services (ERS)
- Solicitation number
- W912HN24R1000
About this file
This document summarizes industry feedback on a draft solicitation for an Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) to support Environmental Remediation Services (ERS) issued by the U.S. Army Corps of Engineers, Savannah District. Key details include that the MATOC will have a maximum value of $5 million per task order and $100 million total. The base period of performance is one year with four one-year options. The solicitation includes a seed task order with a period of performance of three years to complete a Remedial Investigation and Feasibility Study at Camp Sibert in Alabama. Industry feedback focused on requesting additional details on the seed task order scope of work, past performance requirements, evaluation criteria, and price proposal instructions. Comments also covered recommendations for expanding the list of labor categories and applying overhead and general and administrative costs to all cost elements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B.06 ProjNet_ Q&A.pdf | ||
| B.01 Draft RFP Questions for Industry.docx | DOCX document | |
| B.01 DRAFT RFP W912HN24R1000 07 September 2023.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Question | Aleut | Credere Associates, LLC | GRK-Halff 8(a) JV | Dawson | SRS-Ayuda | ERS | Hanna | Tanaq-MES | Tepa | Wichita | Ahtna-Arcadis | Leisnoi Diversified-Kemron JV | Northwind | GHD | Aerostar | KGS-Seres | Disposition |
| 1. Are the Instructions to Offerors clear and provide enough detail to submit proposals? | - Would like to allow submission of CPARS instead of PPQs when available. - would like more than 3 PPQs. - suggest the below to preclude duplication: (1) Technical Approach: |
a) Summary that reflects the offeror’s proposed approach and justification
b) Technical approach demonstrating understanding of Government and regulatory requirements to achieve the objectives and deliverables
i) Objectives and deliverables
ii) Investigation phase – demonstrate understanding and capability to perform all tasks required to characterize the nature and extent of potential contamination such that a well-informed FS, PP, and ROD can be attained
iii) Remedial Action phase – demonstrate understanding and capability to achieve remedial action objectives in a timely manner
c) Integrated Master Schedule and Milestone Payment Schedule (without cost)
i) Integrated Master Schedule – include/address the following:
o Realistic sequence and timing of activities and documents to demonstrate achievement of objectives within the period of performance o Logical incorporation of realistic Government and Regulatory review periods o Timing of decision points specifically addressing risk mitigation and/or contingency strategies
ii) Milestone Payment Schedule that addresses the following:
o Presents appropriate milestone payments considered integral and necessary to the achievement of the POs o Includes a reasonable number of milestone payments based on scope and anticipated duration o Excludes unacceptable milestone payments representing a progress payment or monthly payment for level of effort expended as well as management or overhead costs o Includes final CLIN/Sub-CLIN milestone payments demonstrating achievement of the objectives
(2) Comprehensive Management Plan
a) Clear identification of roles, responsibilities, and communication strategies for key personnel, subcontractors, and other relevant team members
b) Organizational chart depicting prime and subcontractor personnel
c) Key personnel qualifications for designated roles
d) Relevant team experience with the remediation technologies proposed
e) Description of change and risk management, including management of multiple and concurrent events
f) Description of processes/procedures to ensure services that result in submission of high-quality technical documents and deliverables Page 75 of 115, Section D, 1.b – Can you provide more information on what is to be submitted and what is acceptable for entry-gate screening?
Page 77 or 115, D, 2, c – It seems like there no opportunity to provide more documentation on experience beyond the 3 PPQs. The sole use of PPQs (especially 3), seems insufficient for the government to determine the skills, experience, and past performance for such a large project. Please consider allowing at least 5 projects.
Page 91 of 115 Attachment 5, Is this to be filled out or is the rate table on page 4 the correct one to fill out. I assume the notes on page 4 table should also be applicable to this table in Attachment 5? Yes Yes There are a few inconsistencies within the RFP instructions, and we have submitted questions regarding those via ProjNet. It would be beneficial for offerors to have a better idea of the key personnel/resumes required for submission. Additionally, the draft RFP states that offerors should submit a “technical approach based on the Performance Work Scope (PWS).”
However, additional information would be extremely beneficial to prepare accurate and technically sound proposals. Namely, it would be beneficial if the government could furnish the documents noted in Seed Task Section 8.0 References. Section C, PWS, 2.3.2 [page 8] – There is mention of a contractor being available within 2 hours during normal business hours to meet Government personnel to discuss problem areas. After normal business hours, the contractor shall be available within twenty-four hours or by the next business morning whichever is earlier. In order to full fill this on-call requirement please clarify that phone and/or virtual meeting meets this requirement. Section L, Proposal Submission, C.3 [page 73] – Suggest definitively stating that font for text shall not be smaller than 11 pt. Section L, Proposal Requirements, D.2.c [Page 77] – Please accept CPARS in lieu of PPQs. PPQs are time consuming due to the contractor having minimal control over the customer completing and returning the PPQ in a timely manner; it is difficult to obtain PPQs from a customer that is no longer actively involved; to ensure PPQs are completed contractors must engage the customer frequently which can put a strain on small business customer relationships. Section L, Proposal Requirements, D.2.b [Pages 76 & 77] and Attachment 5 [page 91, 95, 103 & 108] Refer to Key Personnel Qualifications, with demonstrated relevant experience, and the Seed Project requests/refers to the following key personnel: Registered Professional Engineer, Registered Professional Geologist, Certified Industrial Hygienist (CIH) or Certified Safety Professional (CSP) – Please identify and define key personnel categories for the MATOC and/or Seed Project. Section M, Evaluation Criteria, C.3.b(3) [Page 113] - Suggest giving higher weight to past performance demonstrated by bidding entity. The instructions to Offerors are clear and provide sufficient detail to submit proposals. • In general, yes, the Instructions to Offerors clear and provide enough detail to submit proposals. Note that the first sentence in Paragraph C.2 states: “Proposals shall not exceed 50 pages for volume II (Technical Proposal) with the following exceptions. The IMS and MPS in Factor 1 (Technical Approach) and the PPQs in Factor 2 (Past Performance) will not count towards the 70-page limitation in the Technical Proposal.” It is not clear if the technical proposal is limited to 50 or 70 pages. Yes • As written, it is unclear if the evaluation criteria in Section M is for the seed task, the contract or both. • Page 112-113: Under Factor 2 Past Performance, Relevant Projects there is a statement “All three projects shall meet the characteristics listed in paragraph (d) below.” However, only (a), (b), and (c) are in the following paragraphs. Can you add (d) or remove the reference to it? • Page 112-113: Under Factor 2 Past Performance, Relevant Projects, item (a) lists “Remediation of contaminants of concern (COC) for Polycyclic Aromatic Hydrocarbons (PAHs), Semi-Volatile Organic Compounds (SVOCs) Volatile Organic Compounds (VOC), metals, and pesticides. Within surface soils, subsurface soils, surface and groundwater.” Can you please add explosives to the list to be consistent with what is listed in Section 3.1 on page 10? As it reads now, it is not clear if projects with explosives as COCs would be relevant. • Page 3 of 115 indicates that the maximum task order amount under this contract will be $5,000,000. Item (f.) on Page 20 of 115 states that post-award debriefing for task orders exceeding $6,000,000 will be given to requesting contractors. Please consider lowering the task order value for requesting a debrief, as the current value implies that contractors will not be able to receive any debriefs on this contract. Basis for Award. The criteria listed in this section are geared towards the award of a task order and not a MATOC. The first sentence states “Contract award will be made to the responsible Offeror whose proposal represents the best value to the Government utilizing the Tradeoff process,” which may represent how the seed task order will be awarded. However, this statement does not describe how USACE will select firms for the overall MATOC. Subsection C. Evaluation Criteria, 3. Factor 2 – Past Performance, b. Evaluation Criteria. The statement is followed by a list enumerated (a), (b), and (c), which is missing item (d) referenced in the statement above. Please clarify the characteristics that all three projects should meet. Page 113 of Draft Solicitation states “If a firm has multiple functions or divisions, the Government will only evaluate the past performance and experience of the unit or division submitting the offer.”
Through common ownership of an Alaska Native Corporation (ANC), companies managed by the ANC are allowed to use the experience of the leadership, workforce, and project examples of sister companies to respond to RFPs and in contract performance when those sister firms will have meaningful involvement in contract performance. This approach has been successfully implemented and is clearly supported by Government Accounting Office (GAO) rulings including File B-401560.3, B-401560.4, B-409187, B-409187.2, B-409187.3, and B-409196. B-290482
| Please revise the solicitation to allow use of affiliate experience when meaningful involvement has been demonstrated. | The Instructions to Offerors are clear and provide sufficient detail, except for the entry-gate screening outlined in #2. Although, Section M - Evaluation Factors for Award, paragraph C. Evaluation Criteria does not match the required submittals of the Instructions to Offerors | “If a firm has multiple functions or division, the Government will only evaluate the past performance and experience of the unit or division submitting the offer.” Can the government provide additional clarification regarding this factor? Recommend when an Offeror is a Native American Tribally Owned, Hawaiian Native Owned, or Alaskan Native Corporation, that relevant past experience projects from a sister company be acceptable if the offerer provided meaningful involvement during those projects? | Please consider a change in the Factor 2 - Past Performance requirement for submittal of a PPQ only. It is requested that we be allowed to submit a 1–2-page project write-up, plus attach any existing PPQ or CPARS evaluation. This will give the evaluator a better picture of the technical details about the projects and explain the relevance of the contractors past performance capabilities to meet USACE needs. It will also eliminate the need to obtain a new PPQ to highlight a specific MATOC requirement, or to update one completed prior to beneficial completion of the project, where the applicable government personnel knowledgeable of the project and the bidder’s performance is no longer available due to retirement, or is no longer serving in a government position. | PPQs will be required. 3 PPQs only. Carl to look at the proposed tech eval stuff. Carl to clear up entry-gate criteria. Dave to make a note that the attachment 5 is to be filled out and not the table on page 4. | ||||
| 2. Are the entry-gate instructions and criteria clear and achievable? | Not clear. HSRC is a very specific methodology and is often deemed cost-prohibitive for sites. Subsequently, many sites elected to utilize Advanced Site Characterization in lieu of HRSC. In addition, the requirement to have an HRSC study accepted on a project that is valued at more than $1.5 million is very restrictive. Finally, there is no mention in the IDIQ PWS or in the seed project PWS for this methodology. Is this required for the seed project? If so, it should be included in the seed project PWS to ensure that all offerors are evaluated fairly, since the cost difference could be significant if utilizing any other methodology in lieu of HRSC. If this is a desired capability on future task orders, we recommend that the entry gate requirement be modified to remove the project dollar value and consideration be given that this experience could be provided by a team subcontractor, as long as the company is performing other meaningful services in support of the seed project. | it isn’t clear what is to be provided by Contractor to meet this criterion and what is considered acceptable by government. | Entry gate not achievable for most 8(a)s. Can a subcontractor be used to meet entry-gate? | Please clarify whether entry-gate screening criteria can be met using with team subcontractor experience, or whether a formal teaming arrangement, such as a Joint Venture or Mentor Protégé, is required for use of a team member project. As written, DAWSON cannot achieve the entry-gate screening criteria. Our High- Resolution Site Characterization project experience is valued at less than $1M involving development of an installation-wide conceptual site model supporting a PFAS investigation. The investigation, environmental sequence stratigraphy, and reporting did not require or seek regulatory concurrence. | The entry-gate instructions are clear and achievable, and we believe that we meet these criteria. | The government requires evidence, in the form of a state regulatory letter, of a site at which the offeror performed an HRSC study of at least $1.5 million in the last 7 years. This requirement is restrictive to 8(a) small businesses and will significantly reduce the number of businesses capable of participating/competing. We request that this requirement be modified to accommodate a greater field of competitors. | ||
| Additionally, the past performance requirements, in terms of magnitude, may reduce the level of 8(a) competition, and we would ask that the government review and address those as well. | Please clarify if the $1.5M value refers to the total contract value or the HRSC work value. Please define acceptable HRSC technologies. Does HRSC include these: MIP, HPT, CPT, LIF, SVE design, FLUTe, borehole geophysics, packer testing? Section L and Section M [Pages 75 & 112] - Requiring HRSC experience within the last 7 years accepted by a state regulator is restrictive. As an alternative, we suggest documentation of acceptance by client (could be state or federal acceptance by providing a contact or approval of deliverable since a regulatory letter may not have been a requirement for a particular project). Additionally, suggest clarification of the entry-gate criteria specifying acceptable HRSC technologies. | The entry-gate instructions and criteria are clear. It in an effort to be achievable, it is requested that the project value be reduced to $1 Million. | • | Instructions/criteria are clear. Tehama has the technical expertise, but do not have regulatory review letters for projects that suit this requirement. | Yes | Yes, criteria are achievable, but it is not clear how we will demonstrate it. The state regulatory letter may not specifically state that a HRSC study was completed – should we include back-up, such as the report it refers to? Also, please be aware that projects that used HRSC may not use that exact terminology to reference the high-resolution work. For instance, terms such as “advanced profiling” or “vertical aquifer profiling” may be used. | The entry-gate instructions are clear, and LDKJV has used high-resolution site characterization at multiple sites at Fort Jackson to refine injection intervals as part of the remedial actions. However, inclusion of the entry-gate requirement really indicates that Factor 2 – Past Performance is more important than Factor 1 – Technical Approach. | Please consider a two-phase approach that includes the Entry Gate Screening as Phase 1. Those who pass the screening will provide technical and pricing proposals later as Phase 2. Alternatively, consider removing the screening as a criterion and use the technical approach and qualifications as the criteria for awards. |
| The entry-gate requirement for contractors to submit evidence in the form of a state regulatory letter of a site it performed work within the last 7 years where an HRSC study was accepted AND the project value must be greater than $1.5 million is very restrictive for an 8(a) procurement and will significantly limit the field of competitors. We request this requirement at least be modified to remove the project dollar value if not removed in its entirety. | Criteria to meet the entry-gate screening is NOT clearly stated in the draft-RFP. The second and third sentences of Section L.D.1.b. appear to be the only statements to provide guidance on what is required to achieve the entry-gate criteria. This guidance appears to require only an acceptance letter from a state regulatory agency that the firm submitted a High-Resolution Site Characterization Study that was valued >$1.5M. It appears that this letter is intended to be Tab 7 of Volume I, but the documents required indicate “Proof of the ability to meet entry-gate screening criteria”. Is the “Proof” the acceptance letter | Can either member of a Mentor Protégé JV provide the entry gate submittal or, if in a Mentor Protégé JV, would it need to be a project performed by the entire JV. | Yes | Carl to clarify HRSC and maybe remove the $1.5M threshold. Tabled for now | ||||
| 3. Does the seed project provide enough information for offerors to submit technical proposals for evaluation for the overall MATOC? | While the PWS is detailed, significant additional information would be required in order for offerors to prepare not only a sound technical approach but more importantly a realistic and justifiable price for performing this work. The PWS references several documents that were created (reference Seed Task Section 8.0 References. At a minimum, USACE should provide these documents as Government-Furnished Information (GFI) to ensure all offerors have the same information. | In the Seed Project, there is no reference indicating the results of the 2019 Supplemental RI are detailed in a published report. To properly evaluate the prior consultants CSM and whether the monitoring wells proposed in that program and completed were adequate to achieve the delineation objectives, that data must be available for review. Further the evaluation criteria for the technical approach (Page 111 of 115) require a clearly defined vertical CSM. - The PWS should indicate whether all reports cited in the Seed Project are available to the bidders to technically evaluate the appropriateness and completeness of the current CSM including the prior information it was based upon and achieve the Due Diligence and use of Existing Data as objectives required by the contract (Page 103 of 115). -For bidders who are currently approved in FUDSCHEM, access to project data in FUDSCHEM would allow for a more efficient and thorough data review upon which to establish a 3-dimensional understanding of the Site geology, associated hydrogeology, and extent of solvent impacts in groundwater as required by the Seed Project PWS - Deliverables include a Final RI report incorporating previous investigations with new findings, therefore access to existing electronic data in the proposal stage would allow bidders to understand the current status of that data and the effort needed to incorporate previous findings. -The Seed Proposal requires submittal of a FS. The Factor 1 Technical | ||||||
| Approach evaluation criteria (Page 111 of 115) favors proposals that demonstrate ability to develop alternatives that include new and innovative technologies that reduce life cycle costs. It is customary in many EPA regions to have an initial submittal that includes ARARs, RAOs, and PRGs with an initial screening of technologies document for concurrence prior to developing, assembling, and conducting a detailed evaluation of alternatives to ensure all appropriate technologies have been considered and retained for evaluation. Innovative technologies, by their nature, typically do not have published performance and cost data and require thoughtful evaluation in a FS. -The List of Submittals (Page 101 of 115) indicates a Draft FS report is due 21 days after acceptance of the RI Report. This timeframe appears inadequate to achieve the technical and quality objectives for the FS. Further, the PWS indicates the FS detailed evaluation will include all 9 criteria of the NCP(Page 97 of 115). The NCP threshold and balancing criteria include the 7 criteria normally completed in a Feasibility Study, the last being cost. The bidder can recommend a preferred alternative but cannot complete criteria 8 and 9 which are the Modifying Criteria: State and Community Acceptance. Please clarify FS Criteria. -Further the FS objectives, encompass “all contaminated media” at Site 2A, yet the investigation appears limited to groundwater nature and extent. It would be helpful if the documents cited in the PWS provided release area/source area characterization data so that a determination could be made if said data is adequate for source area remedial evaluation or whether additional source area investigations are needed. | Yes | Except for the provision of historical documents, in particular the Final Strategic Optimization Technical Memorandum for Former Camp Sibert Attalla, the seed project Performance Work Statement provides adequate information for development of a technical proposal. | The seed project is confusing in the sense that it references a chemical agent storage area, munition constituents in soil, and documents prepared by the EMCX. Since MMRP does not appear to be an environmental remediation service outlined in this MATOC solicitation, we suggest that MMRP references be removed from the seed project. | |||||
| Additionally, the Period of Performance is unrealistic due to legal reviews, signature requirements, and public meetings associated with the FS, PP, and ROD. Suggest that the seed project POP be changed to five years instead of three years. | it may be beneficial to | |||||||
| hold a site visit for offerors to assess the conditions at the seed project site. | Please provide the "Strategic Optimization Technical Memorandum for Site 2A" (September 2021) prepared by the USACE Environmental Munitions Center of Expertise (EMCX) referenced in Task 1 of the seed project. Can USACE please provide a list of the data gaps that need investigating or provide a document for review that identifies the data gaps? Section L, Attachment 6 Seed Project PWS, 7.0 [page 106] - Please consider extending the period of performance from 36 months to 60 months. It is our experience that ROD can get delayed in legal review and that 36 months may be sufficient to complete the project. | The background information provided is brief. It would be beneficial if the Draft PWS included Government Furnished Information of the historical reports and data. Additionally, the PWS indicates that this Task Order will be Performance Based; clarification on milestones is essential for cost estimating. | • | Yes, the seed project provides enough information for offeror to submit a technical proposal. | Yes, with the current exception of having the previous investigation reports and recommendations and proposed remedies from Tech Memo (September 2021) that should also be addressed and incorporated into the RI Report as applicable to the approved investigation approach. It is presumed that all relevant historical investigations reports will be made available. | No, there is not enough information. • | As written, it is unclear if the seed project solely includes chlorinated solvents or if it also includes chemical agents which are not included in the contract statement of work. | |
| • | Please provide site acreage and conceptual site model. Provision of prior site documents referenced in the RFP (i.e., SI, RI, EE/CA, SSFR, tech memo, and evaluation reports) will be critical to understanding the project and developing the scope of work for the Seed Project. | |||||||
| • | Page 94 of 115: It is unclear if both a Work Plan and separate UFP-QAPP will be needed, or if the referenced Work Plan is a UFP-QAPP. Our experience is that the UFP-QAPP worksheets are sufficient to lay out the conceptual site model, rationale for sampling, and sampling design. Having two separate documents could result in unnecessary duplication of information. The Risk Assessment Work Plan could be prepared as an appendix to the UFP-QAPP. | |||||||
| • | Page 95 of 115: The last sentence in the second paragraph appears to be incomplete. | it is difficult to provide any further discussion on the adequacy of the information provided on the seed project until the Strategic Optimization Technical Memorandum for Site 2A from 2021 and historical documents listed under Section 8.0 References are provided as Government furnished information. LDKJV suggests these documents should be provided as soon as possible to allow bidders an adequate amount of time to review the data and determine data gaps. Some items related to the review periods for documents listed in Table 5−1 require clarification: |
• How will CESAS and CESAW reviews be conducted? Will all deliverables be reviewed by CESAS and then by CESAW, or can concurrent reviews be conducted?
• Will USACE Environmental Munitions Center of Expertise (EMCX) be involved in reviewing any deliverables? Will EMCX reviews be conducted in between the USACE Districts and the regulators?
• Is the 60-day review schedule for the regulators realistic based on previous document reviews for Camp Sibert? Review times on LDKJV projects in Alabama have routinely required well over 60 days. It is unclear whether the 3 meetings are in-person or virtual. This content needs to be clarified. no response We have the following comments/questions on the seed project PWS:
In Section 2.0, Background, Page 92. Please confirm the pending work is perceived as a groundwater study only. We understand that soil impacts and CWM have been delineated and remediated where appropriate. Has soil and CWM remediation been approved by the primary and secondary regulatory oversight? We expect that while it is no longer a media of concern, contingencies will need to be in place for detection of CWM.
What is the current RAC Score Risk Assessment Code (RAC) for area 2A?
What is the confidence level that all residual CWM has been removed / mitigated in area 2A?
In Section 4.0, Tasks, Task 2: Remedial Investigation (RI) Field Work Completion/Reporting, Page 96. This section indicates that the contractor should incorporate previous investigations with new findings. We expect that previous progress reports, technical memos, files and data from the incomplete RI and all other reports will be provided to the respondents? What is the timing for providing these files?
In Section 4.0, Tasks, Task 4: Proposed Plan, Page 97. What has been the public interest / involvement with the activities at the Site. Is there an active public outreach effort? Who is responsible for coordination with the public outreach, if any?
What is the anticipated level PPE for subsurface work associated with RI completion?
In Section 4.0, Tasks 4: Deliverables (All Inclusive). For project deliverables, who will be the client review team? Will the regulatory review team include both the EPA and ADEM? Who is the lead regulatory agency? Is there a pledged turnaround time from the client review team and the regulatory review team for the deliverables?
Is High Resolution Site Characterization a required element of the RI?
In Section 4.0, Tasks, Task 3: Feasibility Study, Page 97. This task states “The FS will evaluate all alternatives against the 9 evaluation criteria….” Can the government specify whether there will be a list of alternatives at minimum to be evaluated in the FS?
Will PFAS be evaluated as part of the RI/FS?
Request that the government provide the report "Strategic Optimization Technical Memorandum for Site 2A (September 2021)" – this is an important guiding document for this site.
Please provide documents or links for all previous reports submitted/completed for the seed project. If electronic copies of site reports/documents are not provided by the government, it is recommended that access to the AR (local library) is granted to make copies (usually with electronic copies available) during the site walk.
In Section 5.0 Submittals, Table 5-2, Submittal Guidance, Page 102. Please clarify the approach bidders should take to substantiate a technical determination that the RI/FS 36-month period of performance (POP) is sufficient. The contractor’s independent assessment of the site may warrant a different POP, depending on conditions that may be encountered. No – not as presented in the draft without the supporting documents as listed below.
Offerors will require access to all documentation relating to Site 2A that were accessible to, or delivered by, the contracted party conducting the 2019 RI. Additionally, all data, figures, and field logs would need to be accessible to all bidders or an incumbent bidder will have an unfair advantage in the cost and technical approach development.
Page 94, section 4 objectives reference a Strategic Optimization Technical Memorandum for Site 2A (September 2021) prepared by USACE. Will this be provided to offerors so we can address the recommendations for additional site investigation in our technical and pricing proposal?
| Page 111, Section C number 2 states that the technical approach must result in a clearly defined vertical conceptual site model. Will government require 3-D conceptual site visualization? | Carl to inlcude GFI | ||||||
| 4. Does the price information (both instructions and evaluation) provide enough information for offerors to understand what to submit and how price will be evaluated between the MATOC rates submitted and the price proposal for the seed project? | In the Instructions to Offerors for Factor 1, Technical Approach, offerors are required to prepare a milestone payment schedule without cost. We request clarification if we are also to submit a milestone payment schedule with cost as part of the price proposal. | Yes | Yes | Yes. DAWSON understands that government will compare seed project pricing to the government-calculated Total Evaluated Price (TEP). Proposed MATOC rates will be used for pricing labor on the seed project. Both MATOC rates and the seed project pricing will be used in evaluation of the proposal. | Yes | Yes, assuming that the government clarifies and expands on the labor categories | |
| required for submission. | Yes | Tanaq-MES looks forward to providing competitive submittals, either through Low-Cost Technically Acceptable or Best-Value Trade-Off procurement processes, as appropriate, for RTOPs issued by the Savannah District. While we encourage the use of Best-Value procurements on projects that require extensive technical experience and expertise (as with the performance of PFAS RIs and/or remediation), Tanaq-MES is confident that the team can provide cost-competitive pricing for all RTOPs. | • | In general, the labor categories are appropriate for technical professionals. Additional field labor categories (e.g., SSHP, QC lead, equipment operators, and possibly UXO staff) are also suggested. | Yes | Currently, it is unclear how price will be evaluated between the MATOC rates submitted and the price proposal for the seed project. It would be helpful to have two separate evaluation explanations – one for the MATOC and one for the seed project. | The instructions for the Price Proposal in Section L (page 78 and 115) are clear that Volume II should include Attachment 4 Proposal Schedule (for the seed project) and Attachment 5 Discipline Rates (for the MATOC). The Draft RFP does not clearly state Attachment 5 is the same as Section B and provides the binding labor rates for the MATOC. Section L does not state the labor rates in Attachment 5 must be used in pricing the seed project, but Section M identifies this requirement. LDKJV recommends allowing offerors to use discounted labor rates for the seed project compared to binding labor rates for the MATOC. In addition, it appears offerors do not need to provide backup pricing for the seed project, such as subcontractor quotes, but the evaluation criteria in Section M discusses ramifications of providing insufficient detail. The evaluation of the Price Proposal in Section M does not clearly state how the two tables included in Volume II will be used to award the seed task order or determine the firms receiving the MATOC. Language provided for Factor 3 is more geared to the award of a task order and not for a MATOC. Several items that require clarification are listed below: |
• Item a: Please clarify how USACE intends to “use data, external to the offeror’s proposal, such as, but not limited to, field pricing reports, industry information, Government estimates, same or similar DoD contracts, and commercial data”.
• Item a: The Total Evaluated Price is simply the Government estimate for the seed project since all CLINs in Attachment 4 Proposal Schedule are listed as Base Award. In addition, how will the Government estimate be used in the evaluation process? Will bidders with pricing significantly lower or higher than the Government estimate be eliminated from consideration?
• Item a: Please clarify how Attachment 5 Discipline Rates (for the MATOC) will be used in the evaluation of the MATOC beyond indicating these labor rates need to be used in pricing the seed project.
• Items b and c: The discussions of reasonableness and unbalanced pricing do not indicate how the MATOC will be evaluated. Will this evaluation include pricing for the seed project in Attachment 4 or will labor rates in Attachment 5 be evaluated as well?
• Item d: How can USACE determine insufficient details were provided when Section L simply requires completed tables for pricing the seed project (Attachment 4) and labor rates for the MATOC (Attachment 5)?
| • Item f: Evaluating the Price Volume separately is important, but this item should explain how Factor 1 – Technical Approach will be evaluated with the pricing in Attachment 4 to award the seed task order. | no response | no response | “Contract award will be made to the responsible Offeror whose proposal represents the best value to the Government utilizing the Tradeoff process described in FAR 15.101-1.” Will all task orders be evaluated by utilizing the same evaluation criteria? | Yes, award will be made to responsible offerors whose proposal represents the best value. | no price for MPS | ||||||
| 5. Is the MATOC Discipline table representative of all required labor disciplines that may be required for task orders under this MATOC? | modified to include senior, mid-level, and junior categories for all disciplines. This will ensure that offerors have options from which they can choose to build their pricing for the seed project and for future task orders. We recognize that offerors will be allowed to propose additional disciplines as required; however, these may be significantly different among bidders. As a result, it will be difficult for USACE to evaluate bidders fairly, if one bidder sticks to the list provided, and a second bidder utilizes other labor categories for the seed task. | This seems appropriate for professional services associated with Remedial Investigations and Feasibility Studies but additional disciplines for remediation should be included including excavator operator, Superintendent, Site Safety and Health Officer, etc. | Should have the option to add disciplines. | The MATOC Discipline Rate Schedule provides a comprehensive list of | |||||||
| disciplines adequate to support the seed project and similar scopes of work. | Please consider adding a Historian and a Senior Chemist to the Labor Discipline table. | No. Additional clarification would be greatly beneficial. | Please confirm that Geologist and HydroGeologist rates should be included in the Geoscientist discipline. Should we assume Senior Level for the Biologist, Chemist, Archaeologist, and Risk Assessor? Propose adding a Database Manager rate. | Safety & Health Manager, Site Safety and Health Officer, Senior/Mid/Junior Hydrogeologist, Human Health Risk Assessor, Ecological Risk Assessor, Contract Manager, Quality Control Manager, Senior/Mid/Junior Environmental Technician, Senior/Mid/Junior Chemist, Senior/Mid/Junior Biologist, Senior/Mid/Junior Archaeologist, Geophysicist, Historian/Researcher, Construction Foreman, Construction Operator, Site Superintendent/Supervisor, Senior/Mid/Junior GIS Specialist, Geophysicist, break out Geoscientist to Senior/Mid/Junior Geologist, and Senior/Mid/Junior Scientist. | • | In general, the labor categories are appropriate for technical professionals. Additional field labor categories (e.g., SSHP, QC lead, equipment operators, and possibly UXO staff) are also suggested. | Yes, but may want to consider adding Site Safety Officer (e.g., if working under a CIH). | If the seed task includes chemical agent avoidance or characterization, please include munitions response discipline categories. Please include Contractor Quality Control Supervisor (CQCS), Safety and Health Manager (SHM), and Site Health and Safety Officer (SSHO), Community Relations Specialist | The disciplines provided in Schedule B do not include quality related position, and the seniority of some of the following labor categories should be clarified or divided into two labor classifications: Biologist, Chemist, Archeologist, and Risk Assessor. Disciplines provided in Schedule B do not include field staff such as Site Superintendents and Forman for large remedial actions. The craft labor associated with remedial actions should not be included in Schedule B and should be addressed at the task order level based on wage rate determinations. Regardless of the number of labor categories provided, task order specific labor categories may be required for specialized experience. | Recommend adding Archeological Technician, Project Coordinator, H&S Officer (field), QC Officer, Technical Editor, Data Validator, Estimator | The Discipline Table lists very generic disciplines that are not defined within RFP. |
The primary concerns are:
(1) How to assess a discipline such as “Senior Engineer” where this could be a Civil, Electrical, Mechanical, Structural, or Environmental Engineer that could have significantly different labor rates besides educational requirements to achieve the necessary requirements of the PWS.
| (2) Disciplines such as Engineer, Geoscientist, and Scientist are very generic. Firms will be blending a very large pool of candidates for these generic categories that will not represent the true nature of rates. | The labor discipline tables appear to be representative of the task orders we believe will be awarded under this MATOC. | No – suggest adding Site Superintendent, Heavy Equipment Operator, Site Safety & Health Officer, and Quality Control Specialist. | Carl to send out list for disciplines again. | ||||||||||||||||
| 6. Does industry recommend that the MATOC level PWS include Cultural Resource Support in the event archeological sites are found during any task order work? | Yes | Yes this has been required as part of our other similar Task Orders, so we recommend be included in the PWS for future task orders for remediation tasks (not RIs and FSs). Recognizing the seed task order involves drilling which typically doesn’t impact archeological resources, it is not necessary for that. | Yes | DAWSON recommends that cultural resource support be included in the MATOC PWS in the event that cultural/archaeological discoveries during execution of task orders. DAWSON has the capability and experience to support activities associated with cultural resources. | Yes | Yes | Absolutely. Including Cultural Resource Support in the MATOC PWS will ensure that cultural resources considerations are included at the planning level. If such services are needed at any time during execution of an individual task order, the awardee will have cultural resource support on hand thus ensuring timely completion of such tasks within project schedules. Also, doing so will create a streamlined one-stop ordering process so that additional acquisitions are not required to complete a task order. | It is recommended that the MATOC level PWS include Cultural Resource Support to streamline procurement should a cultural resource issue become apparent during Task Order execution. | • | This effort is often required and should be included in the MATOC. | Yes, particularly as a Discipline for Archeologist is currently included. | Yes, please include Cultural Resource Support if previous site work indicates archeological sites or artifacts may be present. | Cultural resource support should be addressed at the task order level. LDKJV has found that local specialty companies can address cultural resource concerns more cost-effectively. | Yes, we do recommend providing archeological services as part of this scope. | Yes | We believe that Cultural Resource Support should be included in the MATOC | Recommend not including Cultural Resource Support and removing the discipline of Archeologist from MATOC Schedule B/Attachment 5. | Carl to update the PWS | |
| 7. Please provide comments on how profit, Overhead, and G&A will be applied in the notes within section B under the discipline rate schedule. | RFP Section B, Contract Line Item Schedule - MATOC Binding Rates, Note 3 states that Overhead and G&A is allowable on labor rates only and is not acceptable for Other Direct Costs, Subcontracting Costs, or Travel Costs. Note 7 further states that subcontracting costs shall include profit only. FAR 31.203 expressly states “(d) Once an appropriate base for allocating indirect costs has been accepted, the contractor shall not fragment the base by removing individual elements. All items properly includable in an indirect cost base shall bear a pro rata share of indirect costs irrespective of their acceptance as Government contract costs. For example, when a cost input base is used for the allocation of G&A costs, the contractor shall include in the base all items that would properly be part of the cost input base, whether allowable or unallowable, and these items shall bear their pro rata share of G&A costs.” As noted, G&A is an expressly allowable cost under the FAR, and since this is an 8(a) set-aside, disallowing these costs could be an undue burden on contractors. As such we request that G&A and profit be allowable per the FAR on ODCs and Subcontracts, and G&A only be allowable on Travel. | CEV Comment – a) Page 4 of 115, The table title says MATOC binding rates, yet in notes there is reference to other costs tables (“Hourly Labor Rate (Firm Fixed Price)” table, and “completed Schedule B”). Can you clarify that it is all referring to the same table on page 4? |
b) Also, can you confirm that in “Note 2: labor rates shall be burdened with Labor, OH and G&A” is referring to the fully burdened labor rates table on page 4?
c) We believe that a separate G&A rate should be applied to ODCs and Subcontractor costs on the rate schedule. Clear and Reasonable. DAWSON generally applies overhead and G&A (in many cases at a reduced rate) to ODCs and subcontractors. By not allowing overhead and G&A, the government is effectively preventing contractors from recouping the administrative costs necessary to source, purchase, and process all costs for the contract, including Travel and ODCs. FAR 31.203 expressly states ".......". Applying G&A on Travel and ODCs is a usual and customary business practice, and the FAR language is structured to allow contractors to track costs in logical cost groupings and allocate them in a rational manner to the benefiting contracts. We have no comments regarding profit, Overhead, and G&A at this time. Overhead, profit, and G&A will be included in the rates supplied in the rate schedule. Rates listed will be fully burdened. Without more detailed information regarding future task orders, exact percentages for profit, overhead, and G&A are impossible to calculate at this time. Schedule B, Notes 3, 5, 6, and 7 state that Overhead and G&A are not allowed on ODCs, Subcontracting, or Travel. This restriction puts an unacceptable financial burden on contractors who incur substantial risk on subcontractors, ODCs and travel costs for a performance-based contract and significant costs to comply with government procurement requirement. Contractors recover costs associated with procurement management and compliance through overhead and G&A. – Please consider revising to allow Overhead and G&A on ODCs, Subcontracting and Travel. Profit, Overhead, and G&A will be calculated using General Accounting Practices using the most recent accounting period and projected fiscal year after award of the contract. In accordance with FAR Part 31, we will identify, but will not include any unallowable or unallocable costs in the overhead. A summary similar to the below could be included: Fringe Benefit Rate (%): _________ (Applied to Direct Labor) General OH Rate (%): __________ (Applied to Direct Labor, Indirect, and Other Direct Costs) Total OH Rate (%): _________ (Applied to Direct Labor, Indirect, and Other Direct Costs) Proposed Annual Escalation (%): ________ (Applied to Direct Labor) Profit is typically negotiated at the Task Order level depending on the level of effort. • Overhead should be included in the labor rates provided in Attachment 5. G&A and profit are applied to the subtotal of labor, ODCs, and Subcontractors (G&A first applied and the profit to the total including G&A). G&A and overhead costs are associated with our annually reviewed management, financial, and/or other expenses incurred as part of the overall “cost of doing business percentages.
Profit or fee, we calculate as a percentage of the total estimated, and will be added to the actual cost to perform the work which includes fringe, overhead and G&A costs.
Escalation will then be applied to future contract years to account for changes in the economy and market volatility. We use the Department of Labor Consumer Price Index (CPI) Applying G&A on Travel and ODCs is a usual and customary business practice. Please consider allowing G&A on ODCs and Travel (see Note 3). FAR 31.203 expressly states “(d) Once an appropriate base for allocating indirect costs has been accepted, the contractor shall not fragment the base by removing individual elements. All items properly includable in an indirect cost base shall bear a pro rata share of indirect costs irrespective of their acceptance as Government contract costs. For example, when a cost input base is used for the allocation of G&A costs, the contractor shall include in the base all items that would properly be part of the cost input base, whether allowable or unallowable, and these items shall bear their pro rata share of G&A costs.” The notes associated with MATOC binding rates are clear, but the stipulations on G&A will require many bidders, including LDKJV, to operate against their Defense Contract Audit Agency (DCAA)-approved accounting practices. For example, the DCAA-approved accounting practice for KEMRON is predicated on a total cost input accounting system that includes applying G&A to subcontractor costs, and the provisional labor rates established each year with DCAA are predicated on G&A costs being applied to labor, subcontractors, materials, travel, and other direct costs. Other USACE districts have issued MATOCs with similar limitations on the application of G&A, but the majority of USACE districts do not have restrictions limiting G&A to only labor, while other districts simply rely on competitive fixed price bids to ensure adequate pricing. If G&A restrictions are not removed, firms with total cost input accounting systems will have individuals with direct support functions, such as accounts payable and accounts receivable, charge time directly to projects under this MATOC instead of being included in the G&A.
The notes on applying overhead (OH) to only labor costs is typical with other USACE districts. LDKJV maintains separate Home Office and Field OH rates and will use a unified labor rate in preparing Section B.
The notes associated with applying fee are easily understood and LDKJV concurs with Note 4 that profit should be applied at the task order level. The limitation of not allowing fee on travel costs in Note 5 also has been adopted by other USACE districts. Regarding the evaluation, we do not agree with removing profit or G&A on travel, ODCs, and subcontractors. These adders are part of our DCAA approved rates and should be included in the costs for these items. We understand per the Q&A on Projnet, this stipulation may be addressed in the final RFP. We strongly encourage considering amending this pricing requirement. no response G&A will be included in the labor rate. G&A will be added to travel, other direct costs, and subcontractor costs. Profit will be added to labor, travel, other direct costs, and subcontractor costs. The notes in Schedule B state: a) OH, Fringe, and G&A costs will be included in the discipline labor rates; and, b) Overhead and G&A shall be included in labor rates only. This cost is not acceptable for Other Direct Costs (ODC’s), Subcontracting Costs, or Travel Costs.
This is contrary to: 1) the accepted method used by industry, 2) USACE SAV’s prior solicitations/awards including the ERS awarded in 2018, and 3) guidance provided in the SBA’s 7[j] Management and Technical Assistance program used to train 8(a) participants.
The difference is not allowing G&A to be included in ODC’s, Subcontracting cost, and travel cost. Our interpretation of FAR 31.203 is that these types of direct costs are burdened with G&A rates. The application of G&A to ODCs and subcontractor costs is part of our standard accounting procedures which we must follow. Our company develops rates yearly based on the expected cost and basis for the upcoming year. The accepted method of cost recovery; as stated above, is shown in the below table where the rate is applied to the cost categories listed in the basis.
Can you provide specific guidance or interpretation on how G&A costs are not applicable to ODC or subcontract costs in a fixed firm price contract? Does USACE plan to include a “Rate” table to identify the G&A rate applicable to the costs other than the labor rates provided in schedule B? ?????/