This document package includes a solicitation for a federal construction project and related bidder questions and answers.
The solicitation is for a Company Operations Facility project at Fort Benning, Georgia. The solicitation was posted on July 16, 2020 with a bid opening date of August 19, 2020 at 2:00pm Eastern Time. The project includes one drawing file and three specifications files. The solicitation is issued by the Department of the Army Corps of Engineers Engineering District Savannah.
The related document contains 37 questions submitted by bidders and the corresponding answers provided by the agency. The questions seek clarification on aspects of the drawings, specifications, materials, and responsibilities of private utility companies involved in the project.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Project Number: 89006, Company Operations Facility, Fort Benning, Georgia. The purpose of this amendment is to revise the Solicitation as outlined below .
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Aug-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912HN20B3012
X 9B. DATED (SEE ITEM 11)
16-Jul-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Aug-2020
CODE
USACE - SAVANNAH DISTRICT
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
W912HN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HN20B3012
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0002
A. CONTRACT CHANGES: ProjNet Bidder Questions and Governement Responses Report added.
B. TECHNICAL SPECIFICATION CHANGES: The revised Section listed below (revised by Amendment No. 0002) IS hereby added to and made a part of the solicitation. Revised or added information is underlined and deleted information is struck out. Revisions can be located in the appropriate volume of specifications by searching for an asterisk and amendment number (i.e., *1).
Revised Section 07 21 13
C. CONTRACT DRAWINGS – File No. 141-85-01:
Sheets S-502, A-201, A-541, A-543, andA-600, with Revision 1 dated 10 August 2020 are hereby added to and made a part of the Contract Drawings.
(End of Summary of Changes)
UNCLASSIFIED\\FOR OFFICIAL USE ONLY
Bid Inquiry Contractor Report All Inquiries
Project: Company Operations Building Review: PN89006-Co Ops Facility (00001) (sorted by CommentID ) Displaying 37 inquiries.
Id Discipline Sheet Detail Spec
8723075 Architectural A-300
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Building Section on A-300 indicates masonry and sheetrock walls that are full height. The wall types on A-540 show masonry walls that are either 10' high or 12' high with sheetrock to underside of deck and sheetrock walls that extend to only 6" above ceiling height. Please clarify this discrepancy.
On: Jul 23 2020.
Government Response. . The NOTE FLOOR PLAN A-111 and the WALL TYPES A-540 define the requirements. Follow these sheets. There is no discrepancy since the building sections do not define the wall types. On: Jul 29 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8724330 Interior Design I-100 Note 2 12 50 00.13
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Page 1-100- Note 2 indicates that the furniture listed and shown is GFGI however 12 50 00.13 seems to indicate that all furniture is CfCi. Is all furniture shown on I-100 and listed in Spec 12 50 00.13 to be Government Furnished and Government Installed?
On: Jul 24 2020.
Government Response. . All furniture is GFGI. On: Jul 24 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8724334 Interior Design I-100 10 51.13
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Are the lockers shown in 10 51 13 to be Government Furnished and Government Installed?
On: Jul 24 2020.
Government Response. . Lockers are GFGI. On: Jul 28 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8724338 Equipment A-111 Note 10
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Is the refrigerator GFGI?. If so, please provide specification.
On: Jul 24 2020.
Government Response. . Refrigerator is GFGI. On: Jul 24 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8724368 Equipment A-610 Note 10 12 48 13
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
On A-610, Note 10 the walk off mat is GFGI, however Spec 12 48 13 shows a entrance floor mat grate and frame. Is the floor mat GFGI, or is it a grate and frame supplied by the contractor?
On: Jul 24 2020.
Page 1 of 8ProjNet: Logged In User
8/13/2020https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAl...
Government Response. . There is no plan for a recessed floor mat, spec section 12 48 13 will be removed. On: Jul 29 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8730846 Construction Management 01 45 00
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
What will be the requirement for on site oversight of the project? Per specification section 01 45 00 3.4.1 Personnel Requirements there shall be a CQC organization made up of a Safety and Health Manager,CQC System Manager, and sufficient number of additional qualified personnel to ensure safety and Contract compliance.
On past projects the prime contractor has been allowed to have a dedicated multi-hat Quality Control / Site Safety and Health Officer and a Superintendent with regard to on site prime contractor personnel.
Please provide more detail with regard to the required on site personnel.
On: Jul 28 2020.
Government Response. . As listed in the spec. The CQC System Manager is assigned as CQC System Manager but has duties as project superintendent in addition to quality control. The Safety and Health Manger is a separate person. Other on site personnel will be clarified by amendment. On: Jul 29 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8730983 General 01 78 00
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
It appears per the specification requirement that the record file CAD and PDF documents are the responsibility of the contractor. Spec Section 2.1 RECORD DRAWINGS states Prepare the CAD drawing files in AutoCAD Release 2013 format compatible with a Windows 7 operating system.
What software format will the current design drawings be in that will be distributed to the contractor for record drawing preparation.
On: Jul 28 2020.
Government Response. . Current drawings are in Autodesk Revit with a small number in Autodesk AutoCAD. On: Jul 29 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8734003 Interior Design 12 21 000 and 12 32 00
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Per previous answers about furniture and fixtures, as well as floor mats to be removed from spec, are the Manufactured Wood Casework and Window Blinds to be GFGI as well?
On: Jul 30 2020.
Government Response. . The FFE package does not include Casework and Window Blinds, they are part of the building Structural Interiors and shall be contractor furnished and contractor installed. On: Jul 31
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8739133 Civil CG-111 and CG-201
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
1. Sheet CG-111 and CG-201 show connecting 6" PVC to 15" RCP at all clean out locations and 2 downspout locations. Is it acceptable to core a hole in the RCP to insert the 6" PVC and then plaster around the hole to seal it?
If not, what is the acceptable method?
On: Aug 03 2020.
Government Response. . Please see Section 33 40 00 Storm Drainage Utilities for jointing and mortar requirements. On: Aug 04 2020
Page 2 of 8ProjNet: Logged In User
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8739138 Civil CG-501
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Due to the shallow depths of storm MH #1 and #2, they cannot be pre-fabricated structures and will need to be built onsite using bricks and mortar. Please advise if this is acceptable.
On: Aug 03 2020.
Government Response. . See drawing CG501, Detail 3 showing storm sewer manholes as "precast or Cast-in-place" as acceptable. On: Aug 04 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8739144 Building Design & Engineering 01 33 29
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The spec section 01 33 29 references a great deal of during and post construction documentation to meet TPC requirements. Much of which will require government involvement from both a field and DOR perspective. This will carry a great burden of cost. Was it the intent to include this specification or was this specification included in the project requirements in error?
On: Aug 03 2020.
Government Response. . As a new construction MILCON project, the requirements in the specification are Army directed. On: Aug 03 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8739238 Architectural 07-21-13
Comment Classification: UNCLASSIFIED (U)
Paragraph 3.6.3 Insulation Under Slab. No insulation has been found on drawings. Is under slab insulation Required?
On: Aug 03 2020.
Government Response. . Under slab insulation is not shown on the drawings and is not required. On:
Aug 04 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8739241 Architectural A-541 8/A541
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Reference Detail 8/A541-What is the spacing for the Wall Bracing located on each side of the masonry wall?
On: Aug 03 2020.
Government Response. . The spacing for the wall bracing on each side of the wall is 8 ft OC. The structural detail on S-502 will be changed to address this, the architectural detail will reference structural On: Aug 06 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8739246 Architectural A-543 4/A543
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Detail A/543 shows Foundation Waterproofing. No specification are listed for Waterproofing. Please clarify
On: Aug 03 2020.
Government Response. . This detail is intended to show the air barrier condition at the bottom of the wall. Disregard the note for foundation waterproofing. It is not specified because it is not required. On: Aug 04 2020
Current Request Status: Request Closed
Page 3 of 8ProjNet: Logged In User
Information for this report is procurement sensitive.
8739252 Architectural A-600
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Door Schedule list Door # 100A as 6' wide x 4' 7" height. Is this door size correct?
On: Aug 03 2020.
Government Response. . Door 100A is door type C. As shown on the door types (sheet A-500), door type C is 7'-0" high. Disregard the height on the schedule. This door is not 4'-7" high. On: Aug 04 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8739353 Site CG111
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
1. Sheet CG-111 and CG-201 show connecting 6" PVC to 15" RCP at all cleanout locations and 2 downspout locations. Is it acceptable to core a hole in the RCP to insert the 6" PVC and then plaster around the hole to seal it?
If not, what is the acceptable method?
On: Aug 03 2020.
Government Response. . See Section 33 40 00 Storm Drainage Utilities for jointing and mortar requirements. On: Aug 04 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8739491 Fire Protection/Life Safety FA110
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The offices show audio devices only. Will the offices shown with guest chairs be required to have audio and visual devices?
On: Aug 03 2020.
Government Response. . The offices only require audio notification devices, and do not require visual notification per UFC 3-600-01 9-18.6.3, i. and j. On: Aug 06 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8740244 Fire Protection/Life Safety A-111
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Drawing A-111 note 8 references a Knox box to be installed. Is the fire department furnishing the key to be installed in the Knox box at completion?
On: Aug 03 2020.
Government Response. . Note 8 also indicates that: CONTRACTOR TO COORDINATE REQUIREMENTS WITH THE FIRE DEPARTMENT. On: Aug 06 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8740248 Fire Protection/Life Safety A-111
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Drawing A-111 Note 8 references a Knox box. Does this Knox box need to have a supervisory notifier installed?
On: Aug 03 2020.
Government Response. . The Knox Box will be supervised as detailed on the Fire Alarm Input/Output Matrix FA501, Sheet Keynote 3 on EP601, and Sheet Keynote 6 on EP110. On: Aug 06 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8740250 Architectural A-500
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Page 4 of 8ProjNet: Logged In User
3Drawing A-500 show a detail for a transition from rubber sports flooring to concrete. The finish schedule doesn't show sports flooring getting installed. Is sports flooring to be installed?
On: Aug 03 2020.
Government Response. . These are included for reference only, and the note with these details indicates: REFER TO FINISH SCHEDULE FOR FLOORING TYPES. On: Aug 06 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8740252 Architectural I-100
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Drawing I-100 references LK-1 TA 50 lockers. Do we need to include concrete locker pads for this installation?
On: Aug 03 2020.
Government Response. . The description for LK-1 TA-50 Locker is on sheet I-101, and it indicates:
INDIVIDUAL 4" LEVELABLE KICK BASE. No concrete locker pads are noted or required. On: Aug 06 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8741852 Architectural A540 and A610
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
On sheet A540 it calls for cement board behind wall tile. On sheet A610, it calls for MR board behind wall tile.
Please clarify board type behind wall tile.
On: Aug 04 2020.
Government Response. . Follow the wall types on sheet A540, as these supersede the note on A610.
On: Aug 06 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8744494 Civil CG501
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
CG501 Drywell. What material is the pipe made out of? What diameter is the pipe? What is bank run gravel?
On: Aug 05 2020.
Government Response. . Necessary information is shown in the drawings. On: Aug 06 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8744504 Civil CG111
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please clarify roof drain connections. Plans show PVC tying into RCP. Details don't show RCP. Please clarify how the roof drains and cleanouts tie to RCP.
On: Aug 05 2020.
Government Response. . Please see Section 33 40 00 Storm Drainage Utilities for jointing and mortar requirements. On: Aug 06 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8745387 Other 00 21 13
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
01 21 13 Notes to Bidders Item 2 states "Bidders are required to submit a bid guarantee for this project in accordance with FAR clause 52.228-1, Bid Guarantee.An electronic copy of the bid guarantee must be submitted with the electronic bid submission. Also the original bid guarantee must be mailed to USACE Savannah District, CECT- SAS-E Nikisha Cook." Our question is that in the past the hard copy bid guarantee had to arrive to the designated
Page 5 of 8ProjNet: Logged In User office prior to the bid close date. Is the hard copy required to be delivered to Ms. Cook prior to the close date with regard to this solicitation?
On: Aug 05 2020.
Government Response. . None On: Aug 05 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8747312 Architectural 5051 A-610
Comment Classification: UNCLASSIFIED (U)
A610 shows a clear sealer for CONC designated areas. Will a specification be issued?
On: Aug 06 2020.
Government Response. . REFER TO SPEC SECTION 09 90 00 FOR CONCRETE SEALER. On: Aug 06
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8747487 General Section 00 21 13 Instructions to
Bidders
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
In Section 00 21 13 - Instructions to Bidders, page 5 of 48 (10 of PDF), 2. BASIS FOR AWARD:
*Current Financial Statement (e.g. the last three years financial statement, Annual Reports, Dunn and Bradstreet ratings and/or number, etc.). Please clarify if the government is requesting the offeror provide only the most Current Financial Statement that includes income/balance sheet? Or is the government requesting the offeror provide the last three years financial statement, Annual Reports and D/B ratings? Please specify what documents the government is requesting.
On: Aug 06 2020.
Government Response. . Offerors must provide the last 3 years of financial statements. This will include any/all documents that make up the financial statement to include Annual Reports, Dun and Bradstreet ratings and/or number, etc) Provide a list of all current contracts held, total dollar value, award date, anticipated completion, performance and payment bond amount. On: Aug 06 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8747529 Utilities Engineering Utility Drawings Drawings Drawings
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The drawing sheets describe work to be performed by private utility companies (Columbus Water Works, Flint Electric, Liberty Gas). Do we include the effort/cost for this work in our bid to USACE or is the work being performed under separate contracts between the government and the private utility companies?
On: Aug 06 2020.
Government Response. . Do not include in your bid any work that is being performed by the private utility companies. Private utility work will be under separate contracts between the government and the private utility companies. On: Aug 06 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8749226 Structural S-502
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Detail S-502 – what is the spacing on these braces? Is it one per wall, every 4' or some other spacing?
On: Aug 06 2020.
Government Response. . The spacing for the wall bracing on each side of the wall is 8 ft OC. The structural detail on S-502 will be changed to address this. On: Aug 07 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
Page 6 of 8ProjNet: Logged In User
8749230 Civil CU-101 CU-101
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
1) Who installs the Post Indicator Valve (PIV) shown on CU101 – Contractor or Columbus Water Works?
2) Fire Suppression subs usually take the fire main from 1' above finished floor. Can Columbus Utilities bring the fire main to this point in lieu of 5' outside the building?
3) Who installs the fire hydrants shown on CU101 – Contractor or Columbus Water Works?
Please advise what utility costs if any the general contractor is responsible for covering.
On: Aug 06 2020.
Government Response. . 1) Columbus Water Works
2) Demarcation line is 5 ft outside the building
3) Columbus Water Works
4) GC is responsible for all utilities except those performed by the private utility companies. See also bid inquirie 8747529 On: Aug 06 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8749234 Other 01 50 00
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please advise to the utility rates required for 01 50 00 specifications.
On: Aug 06 2020.
Government Response. . Electric $0.10/kwh; Nat Gas $0.72/CCF; Water $5.24/KGal; Waste $8.01/KGal On: Aug 06 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8749236 Other 01 50 00
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please advise to what government office / warehouse facilities will be available to the contractors: as per 3.5.3 in specification 01 50 00?
On: Aug 06 2020.
Government Response. . No government office and warehouse facilities will be available to the Contractor's personnel. On: Aug 06 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8749239 Specifications 01 91 00.15
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please confirm access to electronic QC system is included and provided by the government and that there are no additional costs to the contractor.
On: Aug 06 2020.
Government Response. . Question is unclear - please be more specific. On: Aug 06 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8749243 Commissioning 01 91 00.15
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please advise if the commissioning agent is required to do the LEED BDC third party certification as per 01 91 00.15
On: Aug 06 2020.
Government Response. . In accordance with spec 01 91 00.15 10 section 1.8, the commissioning agent is required to perform both fundamental and envelope commissioning according to the requirements of
Page 7 of 8ProjNet: Logged In User
LEED v4 BD+C. The commissioning agent will be granted access to LEED-online and is required to file all required documentation in support of the fundamental commissioning prerequisite and enhanced commissioning option 2 envelope commissioning credit directly in LEED-online. On: Aug 07 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8749277 Other A-110 10 51 13
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Furnishings:
Please confirm that the furniture shown on I-100 & I-101 are to be furnished and installed by the contractor.
Example:
The TA-50 lockers & shark cage lockers are shown on the signage and finish plan but not shown on the floor plan (A-110). Please advise if these materials are to be furnished and installed by GC?
On: Aug 06 2020.
Government Response. . See revision in Amendment 001. On: Aug 06 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8752181 Specifications CD111 Specification 02-28-00
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Spec Section 02-82-00 Asbestos Remediation, Paragraph 1.3.1 Line # 8 states "the asbestos work includes the demolition and removal of asbestos containing materials (ACM) identified in the ACM Survey Report for Building 5015 which is governed by 40 CFR 763." The ACM Survey has not been found, will onr be furnished? What type of asbestos is involved?
On: Aug 07 2020.
Government Response. . Survey is located near the end of Volume 3 of the specifications. On: Aug 07
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8752255 Specifications CD111 02-83-00
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Specification Section 02-83-00 Lead Remediation Paragraph 1.3 states "Construction Activities impacting PWL or material containing lead, cadium, chromium which are covered by this specification include the demolition or removal of material containing lead, cadium, chromium as indicated in the HAZMAT report." Have been unable to locate a HAZMAT report. Will one be furnished or can you identify the location, if I have missed it?
On: Aug 07 2020.
Government Response. . Report is located near the end of Volume 3 of the specifications. On: Aug 07
Current Request Status: Request Closed
Information for this report is procurement sensitive.
Report Complete
UNCLASSIFIED\\FOR OFFICIAL USE ONLY
Patent 11/892,984 ProjNet property of ERDC since 2004.
Page 8 of 8ProjNet: Logged In User
| B.08 W912HN20B30120002.pdf |
| B.08 Projnet Bidder Inquiries.pdf |