About this file

Amd 4

View the file

Other files

File Type Posted
Abstract1_-_W912HN-16-B-0004_-_SH_Tide_Gate_Removal.pdf PDF
16B04vol1.pdf PDF
16B04vol1.pdf PDF
amd6.pdf PDF
W912HN-16-B-0004_AMD5.pdf PDF
16B04vol1.pdf PDF
amd5.pdf PDF
16B04vol1.pdf PDF
amd3.pdf PDF
W912HN-16-B-0004_AMD3.pdf PDF
16B04vol1.pdf PDF
W912HN-16-B-0004_Amd2.pdf PDF
amd2.pdf PDF
16B04vol2.pdf PDF
16B04vol1.pdf PDF
16B04vol1.pdf PDF
amd1.pdf PDF
FIO-_Tide_Gate_As-Built_Drawings.zip ZIP file
16B04vol1.pdf PDF
W912HN-16-B-0004.pdf PDF
16B04vol2.pdf PDF
Synopsis_-_W912HN-16-B-0004_-_SH_Tide_Gate_Removal.pdf PDF
Synopsis_-_W912HN-16-B-0004_-_SH_Tide_Gate_Removal.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation W912HN-16-B-0004 Savannah Harbor Georgia and South Carolina Sediment Basin Tide Gate Removal is amended as follow s:

The Bid Opening date and time is changed from 2:00pm ET, 28 July 2016 to 2:00pm ET, 3 August 2016. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 20-Jul-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HN-16-B-0004

X 9B. DATED (SEE ITEM 11)

14-Jun-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-Jul-2016

CODE

US ARMY CORPS OF ENGINEERS

100 WEST OGLETHORPE AVE.

SAVANNAH GA 31401-3640

W912HN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912HN-16-B-0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SUMMARY OF CHANGES

SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

The following have been modified:

Amendment 0001 Changes

A. CONTRACT CHANGES:

1) Section 00 73 00 – Supplementary Conditions – Wage Determinations for dredging has been added.

2) Section 00 73 00 – Supplementary Conditions – Delivery Information - Period of

Performance is hereby adjusted from 365 calendar days to 450 calendar days.

3) Section 00 73 00 – Supplementary Conditions – Clause 52.211-10 is hereby updated to include the adjusted Period of Performance from 365 calendar days to 450 calendar days.

4) Section 00 73 00 – Supplementary Conditions – Clause 52.223-9 is hereby updated to reflect the proper location for estimate submittals.

5) Section 00 73 00 – Supplementary Conditions – Additional Contract Requirements –

Designated Billing Office is hereby updated.

6) The site visit sign-in roster will be posted as a separate attachment.

B. TECHNICAL SPECIFICATION CHANGES: The revised Sections listed below (revised by Amendment No. 0001) are hereby added to and made a part of the solicitation. Revised or added information is underlined and deleted information is struck out. Revisions can be located in the appropriate volume of specifications by searching for an asterisk and amendment number (i.e., *1).

Revised Sections 01 11 00.10 37 01 57 19

In Attachment 1 to Section 007300, the Endangered Species Watch Plan Format has been replaced in its entirety.

C. CONTRACT DRAWINGS:

Sheet G-001 with Revision 1 dated 24 June 2016 is hereby added to and made a part of the Contract Drawings. Sheet RE100 is hereby deleted from the Contract Drawings.

Amendment 0002 Changes

A. CONTRACT CHANGES:

1) CLIN 0003 within the Bid Schedule has been revised in order to incorporate the cost of placement of the excavated stone.

2) The bid opening has been extended until 2:00 p.m.Eastern Standard Time, 28 July 2016.

B. TECHNICAL SPECIFICATION CHANGES: The revised and added Sections listed below (revised and added by Amendment No. 0002) are hereby added to and made a part of the solicitation. Revised or added information is underlined and deleted information is struck out. Revisions can be located in the appropriate volume of specifications by searching for an asterisk and amendment number (i.e., *1).

Revised Sections Added Section 01 50 00 Appendix D 01 57 19 35 20 23

C. CONTRACT DRAWINGS:

Sheets G-001, GC101, CS101, CB101, CE502 and CB103 with Revision 1 dated 01 July 2016 are hereby added to and made a part of the Contract Drawings. Sheets RE100 and CB102 are hereby deleted in their entirety

Note: Amendment 0001 listed Sheet G-001 as revised, but it was inadvertently not uploaded with the other Amendment 0001 documents. Sheet G-001 has been revised to indicate the changes are in accordance with Amendment 0002.

Amendment 0003 Changes A. CONTRACT CHANGES: No Changes

B. TECHNICAL SPECIFICATION CHANGES: The revised Sections listed below (revised by Amendment No. 0003) are hereby added to and made a part of the solicitation. Revised or added information is underlined and deleted information is struck out. Revisions can be located in the appropriate volume of specifications by searching for an asterisk and amendment number (i.e., *1).

Revised Sections 01 11 00.10 37 31 41 16

C. CONTRACT DRAWINGS:

Sheet G-001 with Revision 2 dated 11 July 2016 is hereby added to and made a part of the Contract Drawings. Sheet B-305 dated 11 July 2016 is hereby added to and made a part of the Contract Drawings.

Amendment 0004 Changes

A. CONTRACT CHANGES:

1) The bid opening has been extended until 2:00 p.m.Eastern Standard Time, 3 August 2016.

B. TECHNICAL SPECIFICATION CHANGES: No Changes

C. CONTRACT DRAWINGS: No Changes

SECTION 00 10 00 - SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE

The required response date/time has changed from 28-Jul-2016 02:00 PM to 03-Aug-2016 02:00 PM.

The contractor period of performance end date has increased by 85 days from 365 days to 450 days.

SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS

The following have been modified:

NOTES TO BIDDERS

BID SCHEDULE SUMMARY

SAVANNAH HARBOR GEORGIA AND SOUTH CAROLINA SEDIMENT BASIN TIDE GATE

REMOVAL

Offerors must insert a price on all numbered items of the CLIN Schedule (Both Unit Prices and CLIN Totals). Failure to do so will disqualify the Offeror.

*Also ensure to complete the credit amount within the description of CLIN 0002.

**round all priced line items (0001 through 0019) to two (2) decimal places**

TOTAL BID (Items 0001-0019) $__________________________

PRE-AWARD INFORMATION

Contract shall be awarded to the responsible prospective contractors. Before award, to be determined responsible, a prospective contractor must furnish:

THE FOLLOWING INFORMATION MUST BE SUBMITTED WITH BID

a. Current Financial Statement

b. Unit and Total Pricing for all items

c. Bid Bond Guarantee per FAR 52.228-1. Failure to provide a bid bond guarantee per FAR 52.228-1 could render your proposal nonresponsive.

d. Subcontracting Plan in accordance with FAR 52.219-9 Alt I (FOR LARGE BUSINESSES ONLY)

SUBMISSION OF BIDS

ELECTRONIC SUBMISSION OF BIDS, TO INCLUDE E-MAIL AND FACSIMILE

TRANSMISSIONS, IS NOT AUTHORIZED.

The Government will not be responsible for bids delivered to any location or to anyone other than those designated to receive bids on its behalf as indicated below. Bids shall not be addressed to any specific person. Any bids hand-delivered between 1:00pm and 2:00pm on the due date shall only be delivered to the bid opening room at:

GSA Bldg, Room 301 124 Barnard Street Savannah, Georgia 31402

All bids must be clearly identified with the bidder’s name and address. To ensure timely and proper handling, the lower left corner of the outermost wrapper should indicate the following:

Invitation for Bid No: W912HN-16-B-0004 Due Date of Bids: 14 July 3 August 2016 Time by which Bids are due: 2:00 P.M. (E.T.)

Title of Project: Savannah Harbor Georgia and South Carolina Sediment Basin Tide Gate Removal

Bids delivered prior to one hour before bid opening must be delivered only by U.S. Mail, including U.S. Express Mail, Federal Express or United Parcel Service to the address as indicated below. The date and time of delivery established by these carriers is not the official time of receipt by the Government. Security Guards posted at the loading dock entry for the building do not receive bids and will contact Mailroom personnel. Once Mailroom personnel are available, the bid will be processed by the Security Guards using established security procedures and subsequently picked up by Mailroom personnel. After receipt by the Mailroom personnel, a record will be made of the receipt of the bid. Completion of these actions will constitute delivery of the bid by the date and time designated for receipt of bids. Bidders are responsible for allowing sufficient time for the bid to be processed for receipt and are cautioned that sufficient time may be as much as 24 hours prior to the date and time designated for receipt of bids. Bids sent by U.S Mail, U.S. Express Mail, Federal Express and United Parcel Service are required to be sent to 100 West Oglethorpe Avenue, Savannah Georgia 31401.

Bidders must allow sufficient time to complete security screening to gain admittance to the GSA Building Room 301. The Government will not be responsible for bids delivered to any location or to anyone other than those designated to receive bids on its behalf. Bidders are responsible for ensuring bids are submitted so as to reach the location designated for receipt of bids.

QUALITY CONTROL SYSTEM (QCS): Any contract award resulting from this solicitation will require the mandatory use of the automated Quality Control System. Please see Section 014501 for additional information.

TECHNICAL MATTERS: Submit technical inquiries and questions relating to this solicitation via Bidder Inquiry in ProjNet at (https://www.projnet.org) at least 10 calendar days prior to the date established in the IFB for receipt of bids.

If a Bidder believes that the requirements in this Invitation for Bid contain an error, omission, or are otherwise unsound; immediately notify the Contract Specialist in writing with supporting rationale. The Government reserves the right to award this Information for Bid based on the initial bid, as received, without discussion.

To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment or question will receive an acknowledgement via email, followed by an answer after it has been processed by our technical team. All timely questions and approved answers will be made available through ProjNet. Approved answers to all timely questions will also be posted on the FedBizOps in the form of a report generated from ProjNet as soon as the comment/question entering period is over and answers are all finalized.

W912HN-16-B-0004

Savannah Harbor Georgia and South Carolina Sediment Basin Tide Gate Removal Bidder Inquiry Key: 36T2G6-4GG938

Specific Instructions for Initial ProjNet Bid Inquiry Access:

1. From the ProjNet home page, click on Quick Add on the upper right side of the screen.

2. Identify the Agency as USACE.

3. Key. Enter the Bidder Inquiry Key listed above.

4. Email. Enter the email address you would like to use for communication.

5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.

6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

Specific Instructions for Future ProjNet Bid Inquiry Access:

Steps 1 through 3: same as above.

4. Email. Enter the email address you used to register previously in ProjNet.

5. Click Continue. A page will then open asking for the answer to your Secret Question.

6. Enter your Secret Answer and click Login. Once this is completed, you are logged into the system.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .