Savannah Harbor Georgia and South Carolina Sediment Basin Tide Gate Removal
Solicitation number
W912HN-16-B-0004
Issued by

About this file

W912HN-16-B-0004 AMD5 SPECS VOL1

View the file

Other files

File Type Posted
Abstract1_-_W912HN-16-B-0004_-_SH_Tide_Gate_Removal.pdf PDF
16B04vol1.pdf PDF
16B04vol1.pdf PDF
amd6.pdf PDF
W912HN-16-B-0004_AMD5.pdf PDF
amd5.pdf PDF
amd4.pdf PDF
16B04vol1.pdf PDF
amd3.pdf PDF
W912HN-16-B-0004_AMD3.pdf PDF
16B04vol1.pdf PDF
W912HN-16-B-0004_Amd2.pdf PDF
amd2.pdf PDF
16B04vol2.pdf PDF
16B04vol1.pdf PDF
16B04vol1.pdf PDF
amd1.pdf PDF
FIO-_Tide_Gate_As-Built_Drawings.zip ZIP file
16B04vol1.pdf PDF
W912HN-16-B-0004.pdf PDF
16B04vol2.pdf PDF
Synopsis_-_W912HN-16-B-0004_-_SH_Tide_Gate_Removal.pdf PDF
Synopsis_-_W912HN-16-B-0004_-_SH_Tide_Gate_Removal.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Savannah Harbor, Georgia and South Carolina

Solicitation Number

W912HN-16-B-0004

Sediment Basin Tide Gate Removal Volume 1 of 2: Specification Divisions 01 through 35

PN 113006

June 2016

U.S. ARMY ENGINEER DISTRICT, SAVANNAH

CORPS OF ENGINEERS

100 WEST OGLETHORPE AVENUE

SAVANNAH, GEORGIA 31401-3640

US Army Corps of Engineers Savannah District

Sediment Basin Tide Gate Removal 16B04 Savannah Harbor, GA & SC

(Revised by Amendment 0002)

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 11 00.10 37 SPECIAL CONTRACT REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 35 29.13 HEALTH, SAFETY, AND EMERGENCY RESPONSE PROCEDURES FOR

CONTAMINATED SITES

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS)

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL

02 65 00 STORAGE TANKS REMOVAL

02 82 13.00 10 ASBESTOS ABATEMENT

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 41 16 TEMPORARY METAL SHEET PILING/COFFERDAM

31 62 19 AIDS TO NAVIGATION (ATONs)

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 05 34 MARSH PLANTING

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 20 23 DREDGING

35 31 19 STONE SHORELINE PROTECTION

APPENDICES

Appendix A TIDEGATE CONDITION SURVEY Appendix B ENVIRONMENTAL STUDIES Appendix C SURVEY MONUMENT DATASHEETS

*2 Appendix D SUBSURFACE INVESTIGATIONS

-- End of Project Table of Contents --

W912HN-16-B-0004-0005

Solicitation for Savannah Harbor Georgia and South Carolina Sediment Basin Tide Gate Removal

The Solicitation is Unrestricted. All responsible bidders are encouraged to participate.

Contractor must be registered in the System for Aw ard Management (w w w .sam.gov)

The Construction Magnitude is betw een $25,000,000.00 and $100,000,000.00

Contractual POC is Addison Layfield at 912-652-5416 Email: addison.g.layfield@usace.army.mil

X

ADDISON G LAYFIELD 912-652-5416

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

14-Jun-2016

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________450 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________10 Aug 2016 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

US ARMY CORPS OF ENGINEERS

100 WEST OGLETHORPE AVE.

SAVANNAH GA 31401-3640

W912HN

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912HN-16-B-0004

Section 00 00 00 - Procurement and Contracting Requirements

Amendment 0001 Changes

A. CONTRACT CHANGES:

1) Section 00 73 00 – Supplementary Conditions – Wage Determinations for dredging has been added.

2) Section 00 73 00 – Supplementary Conditions – Delivery Information - Period of

Performance is hereby adjusted from 365 calendar days to 450 calendar days.

3) Section 00 73 00 – Supplementary Conditions – Clause 52.211-10 is hereby updated to include the adjusted Period of Performance from 365 calendar days to 450 calendar days.

4) Section 00 73 00 – Supplementary Conditions – Clause 52.223-9 is hereby updated to reflect the proper location for estimate submittals.

5) Section 00 73 00 – Supplementary Conditions – Additional Contract Requirements –

Designated Billing Office is hereby updated.

6) The site visit sign-in roster will be posted as a separate attachment.

B. TECHNICAL SPECIFICATION CHANGES: The revised Sections listed below (revised by Amendment No. 0001) are hereby added to and made a part of the solicitation. Revised or added information is underlined and deleted information is struck out. Revisions can be located in the appropriate volume of specifications by searching for an asterisk and amendment number (i.e., *1).

Revised Sections 01 11 00.10 37 01 57 19

In Attachment 1 to Section 007300, the Endangered Species Watch Plan Format has been replaced in its entirety.

C. CONTRACT DRAWINGS:

Sheet G-001 with Revision 1 dated 24 June 2016 is hereby added to and made a part of the Contract Drawings. Sheet RE100 is hereby deleted from the Contract Drawings.

Amendment 0002 Changes

A. CONTRACT CHANGES:

1) CLIN 0003 within the Bid Schedule has been revised in order to incorporate the cost of placement of the excavated stone.

2) The bid opening has been extended until 2:00 p.m.Eastern Time, 28 July 2016.

B. TECHNICAL SPECIFICATION CHANGES: The revised and added Sections listed below (revised and added by Amendment No. 0002) are hereby added to and made a part of the solicitation. Revised or added information is underlined and deleted information is struck out. Revisions can be located in the appropriate volume of specifications by searching for an asterisk and amendment number (i.e., *1).

Revised Sections Added Section

01 50 00 Appendix D 01 57 19 35 20 23

C. CONTRACT DRAWINGS:

Sheets G-001, GC101, CS101, CB101, CE502 and CB103 with Revision 1 dated 01 July 2016 are hereby added to and made a part of the Contract Drawings. Sheets RE100 and CB102 are hereby deleted in their entirety

Note: Amendment 0001 listed Sheet G-001 as revised, but it was inadvertently not uploaded with the other Amendment 0001 documents. Sheet G-001 has been revised to indicate the changes are in accordance with Amendment 0002.

Amendment 0003 Changes A. CONTRACT CHANGES: No Changes

B. TECHNICAL SPECIFICATION CHANGES: The revised Sections listed below (revised by Amendment No. 0003) are hereby added to and made a part of the solicitation. Revised or added information is underlined and deleted information is struck out. Revisions can be located in the appropriate volume of specifications by searching for an asterisk and amendment number (i.e., *1).

Revised Sections 01 11 00.10 37 31 41 16

C. CONTRACT DRAWINGS:

Sheet G-001 with Revision 2 dated 11 July 2016 is hereby added to and made a part of the Contract Drawings. Sheet B-305 dated 11 July 2016 is hereby added to and made a part of the Contract Drawings.

Amendment 0004 Changes

A. CONTRACT CHANGES: The bid opening has been extended until 2:00 p.m.Eastern Time, 3 August 2016.

B. TECHNICAL SPECIFICATION CHANGES: No Changes

C. CONTRACT DRAWINGS: No Changes

Amendment 0005 Changes A. CONTRACT CHANGES: The bid opening has been extended until 2:00 p.m.Eastern

Time, 10 August 2016.

B. TECHNICAL SPECIFICATION CHANGES: No Changes

C. CONTRACT DRAWINGS: Sheets B-302, B-303, and B-304 with Revision 1 dated 28 July 2016 are hereby added to and made a part of the Contract Drawings.

Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Mobilization and Demobilization

Mobilization and demobilization activities include those associated with waterborne equipment and supplies typically used in dredging activities.

FOB: Destination

NET AMT

0002 1 Job Demolition

Demolition activities include installation of erosion, sedimentation and pollution control measures and removal and disposal of the tide gate structure across the Back River channel down to the concrete sill at elevation -9.5 ft MLLW.

Demolition of the tide gate requires and includes removal and disposal of the tide gate wing walls, piers, walkway, handrails, conduit, lighting, machinery, as well as removal of building structures (to include asbestos materials) and building foundations, septic tank, radio tower, asphalt paving, pier, dock, dolphins, fencing, power poles, stone monument and other ancillary features on both the Georgia and South Carolina sides of the river. This CLIN includes removal and salvage of steel gates, which are stacked on the Georgia side. Disposal of all materials will require haul off-site with the exception of the concrete tide gate structure which is to be placed within the areas identified in the Back River as shown on the plan sheets.

Provide the credit amount here $________________ of the salvagable material.

This credit shall be accounted for in the total amount for this CLIN.

0003 1 Job Remove, Stockpile, & Replace Stone - Georgia & South Carolina Side

Activities include removal of stone currently lining the banks adjacent to the tide gate structure and stockpile on site within the limits of construction. This stone will be placed on the new embankment as shown in the plan sheets.

0004 1 Job Petroleum Contaminated Soil Collection/Disposal - Georgia Side

Activities include collection, removal and disposal of petroleum contaminated soil/groundwater on the Georgia Side of the earthen embankment. Activities associated with the task in this CLIN include sampling and testing as outlined in the specifications regarding soil and groundwater contamination.

0005 1 Job Storage Tanks Removal and Disposal - Georgia Side

Activities include removal and disposal of underground and aboveground storage tanks located on the Georgia side of the tide gate structure. These tanks are located in the vicinity of the equipment building and petroleum contaminated soil described in CLIN 0004. Activities associated with the task in this CLIN include sampling and testing as outlined in the specifications regarding storage tanks.

0006 1 Job Tide Gate Earthen Embankment Removal - Georgia Side

Activities include removal of non-contaminated soils on the Georgia side to elevations shown in the plan sheets. These materials are to be placed in the disposal areas designated on the plan sheets.

0007 1 Job Tide Gate Earthen Embankment Removal - South Carolina Side

Activities include removal of non-contaminated soils on the South Carolina side to elevations shown in the plan sheets. These materials are to be placed in the disposal areas designated on the plan sheets.

Purchase, Deliver and Stockpile Type 1 Riprap - Georgia Side

DO NOT BID THIS CLIN. SEE SUBCLINS 0008AA AND 0008AB

0008AA 28,730 Ton Rip Rap - Georgia Side

First 28,730 Tons purchase, delivery and stockpile of Type 1 Riprap for placement on the Georgia side. Payment for placement of stockpiled material will be made as specified in CLIN 0009.

0008AB 5,070 Ton Rip Rap - Georgia Side

All over 28,730 Tons, delivery and stockpile of Type 1 Riprap. Payment for placement of stockpiled material will be made as specified in CLIN 0009.

Placement Type 1 Riprap - Georgia Side

DO NOT BID THIS CLIN. SEE SUBCLINS 0009AA AND 0009AB

0009AA 28,730 Ton Rip Rap - Georgia Side

First 28,730 Tons placement of Type 1 Riprap on the Georgia side as specified by the sections and details shown in the plan sheets.

0009AB 5,070 Ton Rip Rap - Georgia Side

All over 28,730 Tons placement of Type 1 Riprap on the Georgia side as specified by the sections and details shown in the plan sheets.

Purchase, Deliver and Stockpile Bedding Stone GDOT #4 - Georgia Side

DO NOT BID THIS CLIN. SEE SUBCLINS 0010AA AND 0010AB

0010AA 8,120 Ton Bedding Stone GDOT #4 - Georgia Side

First 8,120 Tons purchase, delivery and stockpile of bedding stone (GDOT #4) for placement on the Georgia side. Payment for placement of stockpiled material will be made as specified in CLIN 0012.

0010AB 2,030 Ton Bedding Stone GDOT #4 - Georgia Side

All over 8,120 Tons purchase, delivery and stockpile of bedding stone (GDOT #4).

Payment for placement of stockpiled material will be made as specified in CLIN 0012.

Placement Bedding Stone GDOT #4 - Georgia Side

DO NOT BID THIS CLIN. SEE SUBCLINS 0011AA AND 0011AB

0011AA 8,120 Ton Placement Bedding Stone - Georgia Side

First 8,120 Tons placement of bedding stone (GDOT #4) on the Georgia side as specified by the sections and details shown in the plan sheets.

0011AB 2,030 Ton Placement Bedding Stone - Georgia Side

All over 8,120 Tons placement of bedding stone (GDOT #4) on the Georgia side as specified by the sections and details shown in the plan sheets.

Purchase, Deliver and Stockpile Type 1 Riprap - South Carolina Side

DO NOT BID THIS CLIN. SEE SUBCLINS 0012AA AND 0012AB

0012AA 25,500 Ton Rip Rap - South Carolina Side

First 25,500 Tons purchase, delivery and stockpile of Type 1 Riprap for placement on the South Carolina side. Payment for placement of stockpiled material will be made as specified in CLIN 0013.

0012AB 4,500 Ton Rip Rap - South Carolina Side

All over 25,500 Tons purchase, delivery and stockpile of Type 1 Riprap. Payment for placement of stockpiled material will be made as specified in CLIN 0013.

Placement Type 1 Riprap - South Carolina Side

DO NOT BID THIS CLIN. SEE SUBCLINS 0013AA AND 0013AB

0013AA 25,500 Ton Rip Rap - South Carolina Side

First 25,500 Tons placement of Type 1 Riprap on the South Carolina side as

0013AB 4,500 Ton Rip Rap - South Carolina Side

All over 25,500 Tons placement of Type 1 Riprap on the South Carolina side as

Purchase, Deliver and Stockpile Bedding Stone GDOT #4 - South Carolina Side

DO NOT BID THIS CLIN. SEE SUBCLINS 0014AA AND 0014AB

0014AA 7,560 Ton Bedding Stone GDOT #4 - South Carolina

First 7,560 Tons purchase, delivery and stockpile of bedding stone (GDOT #4) for placement on the South Carolina side. Payment for placement of stockpiled material will be made as specified in CLIN 0015.

0014AB 1,890 Ton Bedding Stone GDOT #4 - South Carolina

All over 7,560 Tons purchase, delivery and stockpile of bedding stone (GDOT #4).

Payment for placement of stockpiled material will be made as specified in CLIN 0015.

Placement Bedding Stone GDOT #4 - South Carolina Side

DO NOT BID THIS CLIN. SEE SUBCLINS 0015AA AND 0015AB

0015AA 7,560 Ton Placement Bedding Stone - South Carolina

First 7,560 Tons placement of bedding stone (GDOT #4) on the South Carolina side as specified by the sections and details shown in the plan sheets.

0015AB 1,890 Ton Placement Bedding Stone - South Carolina

All over 7,560 Tons placement of bedding stone (GDOT #4) on the South Carolina side as specified by the sections and details shown in the plan sheets.

Purchase, Deliver and Stockpile Type I Riprap for Apron - Georgia & South

Carolina Side

DO NOT BID THIS CLIN. SEE SUBCLINS 0016AA AND 0016AB

0016AA 20,400 Ton Riprap for Apron - Both Sides

First 20,400 Tons purchase, delivery and stockpile of Type I riprap for placement as the apron on the Georgia and South Carolina side of the tide gate structure.

Payment for placement of stockpiled material will be made as specified in CLIN 0017.

0016AB 5,100 Ton Riprap for Apron - Both Sides

All over 20,400 Tons purchase, delivery and stockpile of Type I riprap for apron.

Payment for placement of stockpiled material will be made as specified in CLIN 0017.

Placement Type I Riprap for Apron - Georgia & South Carolina Side

DO NOT BID THIS CLIN. SEE SUBCLINS 0017AA AND 0017AB

0017AA 20,400 Ton Riprap for Apron - Both Sides

First 20,400 Tons placement of Type 1 Riprap as the apron on the Georgia and South Carolina side as specified by the sections and details shown in the plan sheets.

0017AB 5,100 Ton Riprap for Apron - Both Sides

All over 20,400 Tons placement of Type 1 Riprap as the apron on the Georgia and South Carolina side as specified by the sections and details shown in the plan sheets.

0018 1 Job Construct Western Maintenance Access Ramp - South Carolina Side

This activity includes construction of a maintenance access ramp on the South Carolina side upstream of the tide gate structure as shown in the plan sheets and described in the specifications. The maintenance access ramp should be a closed cell anchored articulated concrete block mat suitable for the marine environment.

0019 1 Job Aids to Navigation (ATON's)

Activity includes furnishment, delivery and installation of aids to navigation to include signage and support structures as shown in the plan sheets.

Section 00 21 13 - Instructions to Bidders

NOTES TO BIDDERS

BID SCHEDULE SUMMARY

SAVANNAH HARBOR GEORGIA AND SOUTH CAROLINA SEDIMENT BASIN TIDE GATE

REMOVAL

Offerors must insert a price on all numbered items of the CLIN Schedule (Both Unit Prices and CLIN Totals). Failure to do so will disqualify the Offeror.

*Also ensure to complete the credit amount within the description of CLIN 0002.

**round all priced line items (0001 through 0019) to two (2) decimal places**

TOTAL BID (Items 0001-0019) $__________________________

PRE-AWARD INFORMATION

Contract shall be awarded to the responsible prospective contractors. Before award, to be determined responsible, a prospective contractor must furnish:

THE FOLLOWING INFORMATION MUST BE SUBMITTED WITH BID

a. Current Financial Statement

b. Unit and Total Pricing for all items

c. Bid Bond Guarantee per FAR 52.228-1. Failure to provide a bid bond guarantee per FAR 52.228-1 could render your proposal nonresponsive.

d. Subcontracting Plan in accordance with FAR 52.219-9 Alt I (FOR LARGE BUSINESSES ONLY)

SUBMISSION OF BIDS

ELECTRONIC SUBMISSION OF BIDS, TO INCLUDE E-MAIL AND FACSIMILE

TRANSMISSIONS, IS NOT AUTHORIZED.

The Government will not be responsible for bids delivered to any location or to anyone other than those designated to receive bids on its behalf as indicated below. Bids shall not be addressed to any specific person. Any bids hand-delivered between 1:00pm and 2:00pm on the due date shall only be delivered to the bid opening room at:

GSA Bldg, Room 301 124 Barnard Street Savannah, Georgia 31402

All bids must be clearly identified with the bidder’s name and address. To ensure timely and proper handling, the lower left corner of the outermost wrapper should indicate the following:

Invitation for Bid No: W912HN-16-B-0004 Due Date of Bids: 14 July 3 August 10 August 2016 Time by which Bids are due: 2:00 P.M. (E.T.)

Title of Project: Savannah Harbor Georgia and South Carolina Sediment Basin Tide Gate Removal

Bids delivered prior to one hour before bid opening must be delivered only by U.S. Mail, including U.S. Express Mail, Federal Express or United Parcel Service to the address as indicated below. The date and time of delivery established by these carriers is not the official time of receipt by the Government. Security Guards posted at the loading dock entry for the building do not receive bids and will contact Mailroom personnel. Once Mailroom personnel are available, the bid will be processed by the Security Guards using established security procedures and subsequently picked up by Mailroom personnel. After receipt by the Mailroom personnel, a record will be made of the receipt of the bid. Completion of these actions will constitute delivery of the bid by the date and time designated for receipt of bids. Bidders are responsible for allowing sufficient time for the bid to be processed for receipt and are cautioned that sufficient time may be as much as 24 hours prior to the date and time designated for receipt of bids. Bids sent by U.S Mail, U.S. Express Mail, Federal Express and United Parcel Service are required to be sent to 100 West Oglethorpe Avenue, Savannah Georgia 31401.

Bidders must allow sufficient time to complete security screening to gain admittance to the GSA Building Room 301. The Government will not be responsible for bids delivered to any location or to anyone other than those designated to receive bids on its behalf. Bidders are responsible for ensuring bids are submitted so as to reach the location designated for receipt of bids.

QUALITY CONTROL SYSTEM (QCS): Any contract award resulting from this solicitation will require the mandatory use of the automated Quality Control System. Please see Section 014501 for additional information.

TECHNICAL MATTERS: Submit technical inquiries and questions relating to this solicitation via Bidder Inquiry in ProjNet at (https://www.projnet.org) at least 10 calendar days prior to the date established in the IFB for receipt of bids.

If a Bidder believes that the requirements in this Invitation for Bid contain an error, omission, or are otherwise unsound; immediately notify the Contract Specialist in writing with supporting rationale. The Government reserves the right to award this Information for Bid based on the initial bid, as received, without discussion.

To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment or question will receive an acknowledgement via email, followed by an answer after it has been processed by our technical team. All timely questions and approved answers will be made available through ProjNet. Approved answers to all timely questions will also be posted on the FedBizOps in the form of a report generated from ProjNet as soon as the comment/question entering period is over and answers are all finalized.

W912HN-16-B-0004

Savannah Harbor Georgia and South Carolina Sediment Basin Tide Gate Removal Bidder Inquiry Key: 36T2G6-4GG938

Specific Instructions for Initial ProjNet Bid Inquiry Access:

1. From the ProjNet home page, click on Quick Add on the upper right side of the screen.

2. Identify the Agency as USACE.

3. Key. Enter the Bidder Inquiry Key listed above.

4. Email. Enter the email address you would like to use for communication.

5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.

6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

Specific Instructions for Future ProjNet Bid Inquiry Access:

Steps 1 through 3: same as above.

4. Email. Enter the email address you used to register previously in ProjNet.

5. Click Continue. A page will then open asking for the answer to your Secret Question.

6. Enter your Secret Answer and click Login. Once this is completed, you are logged into the system.

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management JUL 2013 52.214-3 Amendments To Invitations For Bids DEC 1989 52.214-4 False Statements In Bids APR 1984 52.214-5 Submission Of Bids MAR 1997 52.214-6 Explanation To Prospective Bidders APR 1984 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids NOV 1999 52.214-12 Preparation Of Bids APR 1984 52.214-18 Preparation of Bids-Construction APR 1984 52.214-19 Contract Award-Sealed Bidding-Construction AUG 1996 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.219-2 Equal Low Bids OCT 1995 52.232-13 Notice Of Progress Payments APR 1984 52.247-6 Financial Statement APR 1984

252.204-7004 Alt A System for Award Management Alternate A FEB 2014 252.215-7007 Notice of Intent to Resolicit JUN 2012 252.215-7008 Only One Offer OCT 2013

CLAUSES INCORPORATED BY FULL TEXT

52.211-5000 EVALUATION OF SUBDIVIDED ITEMS

Item Nos. 0008, 0009, 0010, 0011, 0012, 0013, 0014, 0015, 0016, and 0017 are subdivided into two or more estimated quantities and are to be separately priced. The Government will evaluate each of these items on the basis of total price of its sub-items.

(End of clause)

52.214-15 PERIOD FOR ACCEPTANCE OF BIDS (APR 1984)

In compliance with the solicitation, the bidder agrees, if this bid is accepted within 60 calendar days from the date specified in the solicitation for receipt of bids, to furnish any or all items upon which prices are bid at the price set opposite each item, delivered at the designated point(s), within the time specified in the Schedule.

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.

(End of provision)

52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY

2014)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

Jasper County, SC 29.8%

6.9%

Chatham County, GA 30.6%

6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is GA Chatham; SC Jasper counties for Savannah Harbor

52.225-11 BUY AMERICAN--CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (FEB

2016)

(a) Definitions. As used in this clause--

Caribbean Basin country construction material means a construction material that--

(1) Is wholly the growth, product, or manufacture of a Caribbean Basin country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a Caribbean Basin country into a new and different construction material distinct from the materials from which it was transformed.

Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply (including construction material) that is--

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4)such as agricultural products and petroleum products.

Component means an article, material, or supply incorporated directly into a construction material.

Construction material means an article, material, or supply brought to the construction site by the Contractor or subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.

Materials purchased directly by the Government are supplies, not construction material.

Cost of components means--

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Designated country means any of the following countries:

(1) A World Trade Organization Government Procurement Agreement (WTO GPA) country (Armenia, Aruba, Austria, Belgium, Bulgaria, Canada, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hong Kong, Hungary, Iceland, Ireland, Israel, Italy, Japan, Korea (Republic of), Latvia, Liechtenstein, Lithuania, Luxembourg, Malta, Montenegro, Netherlands, New Zealand, Norway, Poland, Portugal, Romania, Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Taiwan or United Kingdom);

(2) A Free Trade Agreement (FTA) country (Australia, Bahrain, Canada, Chile, Colombia, Costa Rica, Dominican Republic, El Salvador, Guatemala, Honduras, Korea (Republic of), Mexico, Morocco, Nicaragua, Oman, Panama, Peru, or Singapore);

(3) A least developed country (Afghanistan, Angola, Bangladesh, Benin, Bhutan, Burkina Faso, Burundi, Cambodia, Central African Republic, Chad, Comoros, Democratic Republic of Congo, Djibouti, Equatorial Guinea, Eritrea, Ethiopia, Gambia, Guinea, Guinea-Bissau, Haiti, Kiribati, Laos, Lesotho, Liberia, Madagascar, Malawi, Mali, Mauritania, Mozambique, Nepal, Niger, Rwanda, Samoa, Sao Tome and Principe, Senegal, Sierra Leone, Solomon Islands, Somalia, South Sudan, Tanzania, Timor-Leste, Togo, Tuvalu, Uganda, Vanuatu, Yemen, or Zambia); or

(4) A Caribbean Basin country (Antigua and Barbuda, Aruba, Bahamas, Barbados, Belize, Bonaire, British Virgin Islands, Curacao, Dominica, Grenada, Guyana, Haiti, Jamaica, Montserrat, Saba, St. Kitts and Nevis, St. Lucia, St.

Vincent and the Grenadines, Sint Eustatius, Sint Maarten, or Trinidad and Tobago).

Designated country construction material means a construction material that is a WTO GPA country construction material, an FTA country construction material, a least developed country construction material, or a Caribbean Basin country construction material.

Domestic construction material means--

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if--

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

Foreign construction material means a construction material other than a domestic construction material.

Least developed country construction material means a construction material that--

(1) Is wholly the growth, product, or manufacture of a least developed country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a least developed country into a new and different construction material distinct from the materials from which it was transformed.

“Free Trade Agreement country construction material” means a construction material that—

(1) Is wholly the growth, product, or manufacture of a Free Trade Agreement (FTA) country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a FTA country into a new and different construction material distinct from the materials from which it was transformed.

“Least developed country construction material” means a construction material that—

(1) Is wholly the growth, product, or manufacture of a least developed country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a least developed country into a new and different construction material distinct from the materials from which it was transformed.

United States means the 50 States, the District of Columbia, and outlying areas.

WTO GPA country construction material means a construction material that--

(1) Is wholly the growth, product, or manufacture of a WTO GPA country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a WTO GPA country into a new and different construction material distinct from the materials from which it was transformed.

(b) Construction materials.

(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). In addition, the Contracting Officer has determined that the WTO GPA and Free Trade Agreements (FTAs) apply to this acquisition. Therefore, the Buy American restrictions are waived for designated country construction materials.

(2) The Contractor shall use only domestic or designated country construction material in performing this contract, except as provided in paragraphs (b)(3) and (b)(4) of this clause.

(3) The requirement in paragraph (b)(2) of this clause does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:

[Contracting Officer to list applicable excepted materials or indicate ``none'']

(4) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(3) of this clause if the Government determines that--

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the restrictions of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute.

(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(4) of this clause shall include adequate information for Government evaluation of the request, including--

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(4)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction material description Unit of measure Quantity Price (dollars) \1\ Item 1:

Foreign construction material Domestic construction material Item 2:

Foreign construction material Domestic construction material \1\ Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).

List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.

Include other applicable supporting information.

52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT-- CONSTRUCTION MATERIALS UNDER

TRADE AGREEMENTS (MAY 2014)

(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American -- Construction Materials Under Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).

(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers. (1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested-- (i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:

U.S. Army Corps of Engineers, Savannah District Attn: CECT-SAS-E (Bruce Helms) 100 West Oglethorpe Avenue Savannah, GA 31401-3604

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for—

June 23, 2016, 10:00AM to 11:30 AM (Eastern Time)

(c) Participants will meet at--

117 W Tidegate Way Savannah, GA 31401 (32° 5'38.56"N, 81° 4'53.15"WLat/Long)

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov/far or https://farsite.hill.af.mil

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any DFARS (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

APPARENT CLERICAL MISTAKES

(a) For the purpose of initial evaluations of bids, the following will be utilized in the resolving arithmetic discrepancies found on the face of bidding schedule as submitted by the bidder:

(1) Obviously misplaced decimal points will be corrected;

(2) Discrepancy between unit price and extended price, the unit price will govern;

(3) Apparent errors in extension of unit prices will be corrected;

(4) Apparent errors in addition of lump-sum and extended prices will be corrected.

(b) For the purpose of bid evaluation, the government will proceed on the assumption that the bidder intends his bid to be evaluated on basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.

(c) These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.

(End of statement)

Section 00 45 00 - Representations and Certifications

52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (APR…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .