About this file
Amd 4
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| amd_6.pdf | ||
| amd5.pdf | ||
| 15R12Ph2vol1.pdf | ||
| 15R12Ph2vol1.pdf | ||
| 15R12Ph2vol2.pdf | ||
| W912HN-15-R-0012_AMD4.PDF | ||
| 15R12Ph2vol1.pdf | ||
| amd3.pdf | ||
| 15R12Ph2vol2.pdf | ||
| W912HN-15-R-0012_FIO_AMD2.pdf | ||
| AMD2.pdf | ||
| W912HN-15-R-0012_AMD2.PDF | ||
| 15R12Ph2vol1.pdf | ||
| amd1.pdf | ||
| W912HN-15-R-0012_Solicitation.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Please see the changes as described in the Summary of Changes
1. CONTRACT ID CODE PAGE OF PAGES
J 1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Apr-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HN-15-R-0012
X 9B. DATED (SEE ITEM 11)
07-Oct-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Apr-2016
CODE
US ARMY ENGINEER DISTRICT, SAVANNAH
100 WEST OGLETHORPE AVE.
SAVANNAH GA 31401-3640
W912HN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HN-15-R-0012
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SUMMARY OF CHANGES
A. CONTRACT CHANGES:
A time extension has been granted. Phase II Proposals are now due May 12, 2016 at 2:00pm EST. This has been reflected on both the SF1442 and within Section 00 21 00.
Site Visit minutes and attendance sheet are provided.
Clause 52.217-5 has been added to Section 00 22 16
Within Phase II of Section 00 21 00, it was noted that when assigning Tabs, Tab F was skipped.
Consider Tab F omitted.
Factor 2-2 (Key Subcontractors) has been removed. USACE Savannah District has determined that while evaluation of this factor might disclose differences between offerors, the evaluation would not support a meaningful comparison and discrimination between and among competing offers in accordance with FAR 15.304(b). Removing this Factor adjusts the Phase II Evaluation Standards paragraph from 13.5 to 13.4. Paragraph 16.2 is adjusted to remove reference to Factor 2-2 in the Relative Importance of Factors.
In addition to the removal of Factor 2-2, Paragraph 13.2.1.2.2 Mechanical Systems has been altered to remove the last sentence that read “Provide certified letter that states the energy savings that the building as a whole will achieve as measured by LEED EA Credit 1 Optimize Energy Performance. – see 01 11 00 for goals.”
In Section 00 20 00, Paragraph B has been altered to remove the phrase “Note: This requirement shall flow down to all Subcontractors.” Phase II Offerors were provided this already, but Section 00 20 00 has also been altered to add the Phase II ProjNet Inquiry Key JNJD5U-3MM766. The ability to ask questions via ProjNet has been extended through May 2, 2016.
Section 00 20 00 Paragraph 2 has changed to read “2. Contract performance time is a maximum of 730 calendar days after receipt of Notice to Proceed (NTP) for the new school construction Note: a separate NTP is required before demolition of the existing school is allowed to start, which will be issued approximately 4 to 9 months after the Beneficial Occupancy Date of the new Pierce Terrace Elementary School. The Demolish portion shall be completed in a maximum of 180 calendar days.”
Similarly, 52.211-10 (Commencement, Prosecution, and Completion of Work) located in Section
00 73 00 has been changed to read “The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 730 Calendar Days after receipt of Notice to Proceed (NTP) for the new construction portion of this project. The time stated for completion shall include final cleanup of the premises.
A separate NTP is required before demolition of the existing school is allowed to start, which will be issued approximately 4 to 9 months after the Beneficial Occupany Date of the new Pierce Terrace Elementary School. The Demolish portion shall be completed in a maximum of 180 calendar days.”
Below is a list of documents that have been sent to the 5 Offerors participating in Phase II. If you are one of the 5 and have not received one or more of these documents, please contact the Contract Specialist, Andrew K. Page, at andrew.k.page@usace.army.mil :
3/31/16 AMRDEC - Ft Jackson Hazardous Substance Management Plan (HSMP).
3/31/16 AMRDEC - Storm water data for Pierce Terrace School Project from the DPW of Ft.
Jackson.
3/31/16 AMRDEC - IDG for Ft. Jackson 3/30/2016 email - Pierce Terrace ES As-built building sections. pdf 3/25/16 email - Pierce Terrace Survey.pdf 3/25/16 email - Finishes (DoDEA Ed Specs) 20 Dec 2012.pdf This had the acoustical requirements requested in RFI.
3/21/2016 Fed-Ex - CD of Jackson Pierce Terrace CADD files.
B. TECHNICAL SPECIFICATION CHANGES: The revised Sections listed below (revised by Amendment No. 0004) are hereby added to and made a part of the solicitation. Revised or added information is underlined and deleted information is struck out. Revisions can be located in the appropriate volume of specifications by searching for an asterisk and amendment number (i.e., *1).
Revised Sections 01 11 00 Appendix D
C. CONTRACT DRAWINGS – File No. 730-46-01:
Sheets A-101A, A-101B, A-101C, A-101D, and A-401 with Revision 1 dated 11 April 2016 are hereby added to and made a part of the Contract Drawings.