15R12Ph2vol1.pdf

PDF 7 MB Posted

Attached to
Replace Pierce Terrace Elementary School Federal contract opportunity
Solicitation number
W912HN-15-R-0012
Issued by
Department of the Army Corps of Engineers Engineering District Savannah

About this file

SPEC PH2 Vol 1 Amd 5

View the file

Other files for this federal contract opportunity

Other files attached to Replace Pierce Terrace Elementary School, newest first.
File Type Posted
amd_6.pdf PDF
amd5.pdf PDF
W912HN-15-R-0012_AMD4.PDF PDF
15R12Ph2vol2.pdf PDF
Amd4.pdf PDF
15R12Ph2vol1.pdf PDF
amd3.pdf PDF
15R12Ph2vol1.pdf PDF
W912HN-15-R-0012_AMD2.PDF PDF
15R12Ph2vol1.pdf PDF
15R12Ph2vol2.pdf PDF
W912HN-15-R-0012_FIO_AMD2.pdf PDF
AMD2.pdf PDF
amd1.pdf PDF
W912HN-15-R-0012_Solicitation.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(Revised by Amendment 0002)

Fort Jackson, South Carolina

Solicitation Number

W912HN-15-R-0012

Replace Pierce Terrace Elementary School Volume 1 of 2: Sections 00010 through 00800 and Technical Provisions - Divisions 01 - 02

PN AM00035

March 2016

*2 PHASE TWO OF TWO PHASE

DESIGN/BUILD SUBMITTAL PROCEDURE

This acquisition is being solicited on an unrestricted basis as full and open competition, but contains a HubZone Price Evaluation Preference

U.S. ARMY ENGINEER DISTRICT, SAVANNAH

CORPS OF ENGINEERS

100 WEST OGLETHORPE AVENUE

SAVANNAH, GEORGIA 31401-3640

US Army Corps of Engineers Savannah District

Table of Contents - Page 1

PROJECT TABLE OF CONTENTS

SPECIFICATIONS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 33 16 DESIGN AFTER AWARD

01 33 29.10 LEED(TM) DOCUMENTATION

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS)

01 45 35 SPECIAL INSPECTION FOR SEISMIC-RESISTING SYSTEMS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19.11 INDOOR AIR QUALITY (IAQ) MANAGEMENT

01 57 20.00 10 ENVIRONMENTAL PROTECTION

01 62 35.10 RECYCLED/RECOVERED/BIOBASED MATERIALS

01 74 19.10 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMITTALS

01 83 16.10 EXTERIOR ENCLOSURE PERFORMANCE REQUIREMENTS

02 41 00 DEMOLITION

APPENDICES

Appendix A School Program Requirements Appendix B Not Used Appendix C Room Data Sheets Appendix D Acoustical Requirements Appendix E Sustainable Design Information Appendix F Utilities Points of Contact DPW Utility Rates Appendix G Subsurface Exploration Report Finding of No Significant Impact Wetlands Preliminary Jurisdictional Determination Appendix H AHERA Survey Asbestos Survey Reports Appendix I Fire Protection: Fire Flow Tests Appendix J Site Communications Services Connection Location Appendix K Specification 1140 00 Food Service Equipment Appendix L Life Cycle Cost Analysis Fuel Cost Information Appendix M Gymnasium and Play Court Floor Graphics Appendix N Fort Jackson Installation Design Guide Appendix O Context Photos Key Context Photo Thumbnails Appendix P Erosion Control Appendix Q Geothermal Test Loop Installation and Thermal Conductivity

Test Appendix R Fort Jackson Stormwater Runoff Requirements Appendix S DDESS Antiterrorism, Security & Safety Office Construction

Guide DoDEA Security Engineering Design/ Planning Baseline DDESS Lockdown Shelter-In-Place Requirements

Table of Contents - Page 2

Appendix T Supplementary Instructions to the Savannah District Design Manual for Military Construction

Appendix U DoDEA Approved Software Appendix V Environmental Condition of Property Report

-- End of Project Table of Contents --

W912HN-15-R-0012

W912HN-15-R-0012-0005

Tw o Phase Design Build to Replace Pierce Terrace Elementary School, Project # AM00035, Fort Jackson, SC

Andrew K. Page andrew .k.page@usace.army.mil

(912) 652-5900

This acquisition is being solicited on an unrestricted basis as full and open competition, but contains a HubZone Price Evaluation Preference

This acquisition w ill be aw arded utilizing the Best Value Trade-Off methodology in accordance w ith FAR 15.101-1

The proposal of the successful Offeror shall be incorporated by reference upon aw ard of the contract.

IAW DFARS 236.204 Disclosure of Magnitude, the magnitude of construction is betw een $10M and $25M.

CCL - Construction Cost Limitation for Design and Construction Costs: The contract aw ard for design and construction shall not exceed $22,253,000 for this project. Offerors are under no obligation to approach this amount. How ever, the Government w ill not be able to make an aw ard, if the dollar amount set for this project is exceeded.

ANDREW K PAGE 912-652-5900

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

07-Oct-2015

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________730 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________0 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________12 May 2016 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______180 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

US ARMY ENGINEER DISTRICT, SAVANNAH

100 WEST OGLETHORPE AVE.

SAVANNAH GA 31401-3640

W912HN

PAGE OF PAGES

1 OF

CODE W912HN

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

SEE SCHEDULE

SEE SCHEDULE

SAVANNAH GA 31401

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

Section 00 01 15 - List of Drawing Sheets

WAGE DETERMINATION

General Decision Number: SC160035 02/19/2016 SC35

Superseded General Decision Number: SC20150035

State: South Carolina

Construction Type: Building

County: Richland County in South Carolina.

http://www.wdol.gov/dba.aspx

Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Primary Facility - Construct Elementary School to 5-foot Line

FOB: Destination

NET AMT

0002 1 Job Supporting Facilities - Site Preparation and Development Including Utilities, Clearing, Grading, Paving, Landscaping, Site furnishings, Complete, exclusive of all other work listed separately.

0003 1 Job Demo of Existing SchoolFOB: Destination

0004 1 Job Design of SchoolFOB: Destination

0005 1 Job OPTION Provide Full Brick Exterior Skin - Assume the low slope roof with parapet wall adjusted to meet base requirements

0006 1 Job OPTION Provide Parent Loop CanopyFOB: Destination

0007 1 Job OPTION Provide 100% Standing Seam Metal RoofFOB: Destination

0008 1 Job OPTION AmphitheaterFOB: Destination

0009 1 Job OPTION Provide Walking TrailFOB: Destination

0010 1 Job OPTION Provide Proximity Card Access ControlFOB: Destination

0011 1 Job OPTION Provide Sod in Lieu of Seeded Areas at Play Field

0012 1 Job OPTION Provide Bus Loop CanopyFOB: Destination

0013 1 Job OPTION Provide Partical Fabric Canopy at Playground Play Sets

0014 1 Job OPTION Provide Loop Electrical FeedFOB: Destination

0015 1 Job OPTION Provide Concrete Walkway to Housing Area of Westside

0016 1 Job Contractor Manpower Reporting (CMR) - Contractor Manpower Reporting

(CMR) is a one-time charge and there should be no direct charge for recurring reporting. The Contractor is referred to the CMR website for further instructions:

https://cmra/army/mil. This may be a charge covered in overhead and therefore not separately priced, in which case you may enter “NSP”

Section 00 20 00 - Instructions for Procurement

INSTRUCTIONS FOR PROCUREMENT

ADDITIONAL NOTES TO OFFERORS:

1. Offerors must insert a price on all numbered items of the CLIN Schedule. Failure to do so may result in the offer being unacceptable.

2. Contract performance time is a maximum of 730 calendar days after receipt of Notice to Proceed (NTP) for the new school construction.

Note: a separate NTP is required before demolition of the existing school is allowed to start, which will be issued approximately 4 to 9 months after the Beneficial Occupancy Date of the new Pierce Terrace Elementary School. The Demolish portion shall be completed in a maximum of 180 calendar days.

3. LIQUIDATED DAMANGES: $4,086.00 Per Day.

4. Monthly anticipated adverse weather delay days for Fort Jackson, SC are provided as follows:

MONTHLY ANTICIPATED ADVERSE WEATHER DELAY

WORKDAYS BASED ON 5-DAY WORK WEEK

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

8 9 6 4 5 6 11 9 5 4 5 6

5. General Decision Number: SC35 – Dated 02/19/2016 applies to this contract (see Section 00 01 15) The Wage Decision may be subject to change prior to award. All proposed pricing shall include the most current wage rates. All Offerors are encouraged to review wage rates established by the Department of Labor prior to submitting proposals.

6. QUALITY CONTROL SYSTEM (QCS): Any contract award resulting from this solicitation will require the mandatory use of the automated Quality Control System.

7. SECURITY REQUIREMENTS: Increased security at military installations may require vehicle and personnel registration, as well as 100% ID checks and random vehicle searches.

8. “(1) Offerors are advised that employees of the firms identified below may serve as non-government advisors in the source selection process. These individuals will be authorized access only to those portions of the proposal data and discussions that are necessary to enable them to perform their respective duties. Such firms are expressly prohibited from competing on the subject acquisition.

Jacobs Government Services Company 1100 N Glebe Rd, Ste 500 Arlington, VA 22201-5785

(571) 218-1000

(2) In accomplishing their duties related to the source selection process, the aforementioned firms may require access to proprietary information contained in the offerors' proposals.

Therefore, pursuant to FAR 9.505-4, these firms must execute an agreement with each offeror that states that they will (1) protect the offerors’ information from unauthorized use or disclosure for as long as it remains proprietary and (2) refrain from using the information for any purpose other than that for which it was furnished. To expedite the evaluation process, each offeror must contact the above companies to effect execution of such an agreement prior to the submission of proposals. Each offeror shall submit copies of the agreement with their proposal.

TECHNICAL MATTERS:

Technical inquiries are to be submitted via Bidder Inquiry in ProjNet at www.projnet.org/projnet. All questions regarding this Request for Proposal (RFP) must be submitted in writing via Bidder Inquiry in ProjNet within no less than 10 calendar days prior to the date established in the RFP for receipt of proposals. The Government reserves the right to decline addressing questions received less than 10 calendar days prior to receipt of proposals.

If an Offeror believes the requirements in this Request for Proposal contain an error, omission, or are otherwise unsound, the Offeror shall immediately notify the Contract Specialist in writing with supporting rationale. The Offer is reminded that the Government reserves the right to award this Request for Proposal based on the initial proposal, as received, without discussion.

To submit and review bid inquiry items, Offerors will need to be a current registered user or self-register into the system. To self-register, go to web page, click BID tab, select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, your e-mail address, and click login. Fill in all required information and click create user. Verify all information on the next screen is correct and click continue. From this page you may view all bidder inquiries or add inquiry.

Offerors will receive an acknowledgement of their question via e-mail, followed by an answer to their question after it has been processed by our technical team.

W912HN-15-R-0012

Replace Pierce Terrace Elementary School Fort Jackson, SC Project No. AM00035 Phase I Bidder Inquiry Key: 3Z94D8-FYYTXR Phase II Bidder Inquiry Key: JNJD5U-3MM766

Section 00 21 00 - Instructions

INSTRUCTIONS

SECTION V

SECTION 00 21 00

PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS NOTES:

A SUBMISSION IN RESPONSE TO PHASE II IS NOT REQUIRED AS PART

OF THE PHASE I PROPOSAL. A PHASE II PROPOSAL WILL BE

REQUESTED FROM ONLY THE OFFERORS SELECTED BY THE

CONTRACTING OFFICER TO SUBMIT PROPOSALS FOR PHASE II.

THE PHASE II SUBMISSION AND EVALUATION CRITERIA MAY BE

SUBJECT TO CHANGE PRIOR TO THE PHASE II SOLICITATION BEING

ISSUED.

1. OVERVIEW.

1.1 This Request for Proposal (RFP) solicits for a firm fixed price (FFP) contract using a two (2) Phase Selection Process for the Pierce Terrace Elementary School Replacement at Fort Jackson, SC.

1.2 The purpose of the Source Selection plan is to establish a uniform evaluation procedure for the technical evaluation of proposals by the Source Selection Evaluation Board (SSEB) and the development of the Best Value Decision by the Source Selection Authority (SSA) using the Trade-Off Process (See Federal Acquisition Regulation 15.101-1). In as much as the proposal shall describe the capability of the Offeror to perform the resulting contract, the proposal should be specific and complete in every detail as well as be prepared simply and economically, providing a straightforward and concise description of capabilities to satisfactorily perform the contract.

1.3 For the purposes of this solicitation, the Government will utilize the Two (2) Phase Selection Process for this Design Build project. In Phase I of the two phase design-build selection procedure, interested Offerors submit certain specified performance capability proposals for review and consideration by the Government.

1.4 The Government will evaluate the performance capability proposals in accordance with the criteria described herein and will select up to five (5) of the most highly qualified Offerors to participate in Phase II. In Phase II of this process, the Government will evaluate both technical capability and price. The technical and cost proposals of the selected contractors will be reviewed by the Government. The technical information in the Phase II proposal will be reviewed and evaluated by the Government in accordance with the evaluation criteria set out in this section. The final evaluation ratings used for comparison, selection, and award will reflect both the ratings received in Phase I and the evaluation ratings received in Phase II.

1.5 Only those Offeror’s who receive a written notification from the Savannah District Contracting Officer that the firm has been selected to participate in Phase II of this solicitation are invited to submit a Phase II proposal. The Government intends to announce the name of Offerors selected for Phase II in the FEDBIZOPS website. An Offeror that does not want this information released must provide a written notification and explanation of its objections to release of the information. Those Offerors selected for Phase II will be provided the technical requirements package for the contract.

1.6 Outline of Factors per Phase:

Phase I:

FACTOR 1-1 Relevant Specialized Experience

FACTOR 1-2 Past Performance

FACTOR 1-3 Technical Approach Narrative

FACTOR 1-4 Small Business Participation Plan

PHASE II:

PRICE

FACTOR 2-1 Design Technical.

SUB-FACTOR 2-1-1: Building Function and Aesthetics:

SUB-FACTOR 2-1-2: Quality of Building Systems:

SUB-FACTOR 2-1-3: Site Design:

2. GENERAL INSTRUCTIONS

2.1 Firms formally organized as design-build entities, design firms and construction contractors that have associated specifically for performance of this contract, consortia of firms, or any other interested parties may submit proposals. A design firm or construction contractor may offer more than one proposal by entering into more than one association. Associations may be joint ventures or include key team subcontractors. Any legally organized Offeror may submit a proposal.

2.2 Contractor Team Arrangements. Contractor Team Arrangements are considered an arrangement in which (1) two or more companies form a partnership or joint venture to act as a potential prime contractor; or (2) a potential prime contractor agrees with one or more other companies to have them act as its subcontractors under a specified Government contract or acquisition program. In accordance with FAR Subpart 9.6, the Government will recognize the integrity and validity of contractor team arrangements;

provided, the arrangements are identified and company relationships are fully disclosed in the offer. The Offeror shall identify the major or critical aspects of the requirement to be performed by those identified in the Contractor Team Arrangement. The submission must contain a narrative that clearly explains the relevance to a particular factor of information concerning a company that is part of a Contractor Team Arrangement. The Government will consider the adequacy of this explanation in deciding the relevance of the information to this procurement. Any narrative provided should be incorporated into the Offeror’s proposal at Tab D.

2.3 Notwithstanding the specific requirements of any other area of the RFP, information submitted about any company other than the Offeror, whether a predecessor company, affiliated company, subsidiary (including wholly owned subsidiaries), or subcontractors that will perform major or critical aspects of this requirement, or other associated business, WILL NOT be evaluated for any factor unless the proposal contains a detailed narrative explaining why this submitted information is relevant to this acquisition. The Government will consider the adequacy of this explanation in deciding the relevance and weight, if any, of the information to this procurement. Where information about a subcontractor is properly submitted and given significant weight during the evaluation, the failure of the Offeror to actually perform with that subcontractor may be grounds for termination for default. Any narrative provided should be incorporated into the Offeror’s proposal at Tab D.

2.4 Offerors shall submit their proposal to the address shown in Paragraph 3.1 below.

2.5 Proposals are due no later than the time and date specified in Paragraph 3.1 below.

2.6 Other General Review:

Debarred List: Offerors will be checked against the List of Parties Excluded from Federal Procurement and Nonprocurement Programs. Any Offeror who is listed will be eliminated without further consideration.

Minor Informalities: Proposals will be checked for minor informalities or irregularities. The Source Selection Authority/Contracting Officer will follow guidance at FAR 14.405 when resolving minor informalities or irregularities. The Source Selection Authority/Contracting Officer either will give the Offeror an opportunity to cure any defect resulting from a minor informality or irregularity or waive the defect, whichever is to the advantage of the Government.

3. PROPOSALS

ELECTRONIC PROPOSAL SUBMISSION IS REQUIRED THROUGH THE WEBSITE

LISTED BELOW. ELECTRONIC SUBMISSION SENT VIA EMAIL OR FACSIMILE WILL

NOT BE ACCEPTED. HAND CARRIED PROPOSAL SUBMISSION IS NOT

AUTHORIZED.

3.1 DIRECTIONS FOR SUBMITTING PROPOSALS

In an effort to reduce paperwork and reduce cost, all proposals shall be submitted electronically. All submissions shall be in Adobe PDF format.

Offerors may use compressions utility software such as WinZip or PKZip to reduce file size and facilitate transmission.

Title the file(s) in the following format:

W912HN-15-R-0012_COMPANY NAME_ VOLUME I

W912HN-15-R-0012_COMPANY NAME_ VOLUME II

Submit proposals electronically via the AMRDEC SAFE website at:

https://safe.amrdec.army.mil/SAFE/Welcome.aspx. At the AMRDEC SAFE website select the link: I do not have a CAC or this machine is not configured to read my CAC and I would like to access SAFE as a Guest User, to register, access the site and submit your proposal(s).

[Note: It has been reported that documents are more quickly uploaded into the AMRDEC SAFE website when using a Firefox web browser. The Government cannot verify that this is true and offers no guarantee that Offerors will have more success utilizing any particular browser.]

When your proposal is submitted via the AMRDEC SAFE website, the website will provide notification of the submittal to the Government recipients. When completing the information for transmittal at the AMRDEC SAFE website, you will be required to enter e-mail addresses for the recipients. For this solicitation, the recipients will be the Contracting Officer and Contract Specialist. The Contract Specialist for this project is Mr. Andrew K. Page, whose e-mail address is Andrew.K.Page@usace.army.mil. The Contracting Officer for this project is Ms. Nina Crow, whose e-mail address is Nina.G.Crow@usace.army.mil. These e-mail addresses are the ones you will enter as recipients.

In addition, after uploading your documents, you will be required to verify your email address before AMRDEC will send notification to the Government recipients. This is a very important step – even if you successfully upload your proposal to AMRDEC SAFE, notification will not be sent to the Government until you verify your email address, which may result in the rejection of your proposal for lateness. Follow the instructions on the AMRDEC website and the confirmation emails you receive from AMRDEC.

Phase I Proposal Due Date and Time:

Request For Proposal No: W912HN-15-R-0012 Due Date of Proposal: November 10, 2015 Time by which Proposals are Due: 2:00 P.M. (Eastern time)

Title of Project: Pierce Terrace Elementary School Replacement Ft. Jackson, SC

The date and time of delivery will be established by the time of receipt of the e-mail notification to the Contract Specialist and Contracting Officer by the AMRDEC SAFE website, not by the date and time of uploading of the proposal into the AMRDEC SAFE website. Do not assume that electronic communication is instantaneous – in fact, it can take several minutes or even hours in some cases. Please make allowances for delays in transmittal. If an electronic submission is uploaded minutes before the deadline but notification is not actually received in the recipients’ e-mail inboxes until after the deadline, the submission will be considered late.

The Government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient of proposals. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided.

GENERAL PROPOSAL FORMAT:

3.2 Title Page. Include the title of the solicitation, solicitation number, Offeror name, and date of the submittal.

3.3 Table of Contents. Each volume of the proposal shall contain a detailed table of contents. Any materials submitted but not required by this solicitation (such as company brochures) shall be relegated to appendices.

3.4 Electronic Matter Submissions. Written material shall be on 8 ½ x 11 size pages in no less than a 10 pitch or 10 font. Page limitations, where specified in the RFP, shall be considered a maximum. Pages in excess of any specified limitation shall not be evaluated.

3.5. Number of Copies. Offerors SHALL submit an electronic version (PDF Format) of the original Volume I and Volume II. Offerors SHALL submit only two files in PDF format (i.e. Volume I and Volume II). These two files should be named in a specific format: Solicitation Number, Offerors Company and the volume (e.g. W912HN-15-R- 0012_USACE_Volume I.pdf).

3.6 Drawings. For Offerors invited to participate in Phase II, drawings submitted for the proposal may be done with any CADD software available to the Offeror. However, the drawings for 60% and Final design submittals will be done and submitted in the latest version of AutoCadd format only.

3.7 Tabs. See paragraph 10 for Phase II specific tabbing requirements. Phase I proposal shall be organized and tabbed as follows:

PHASE I VOLUME I

TAB A – Standard Form 1442, completed and signed by authorized individual(s) of the Offeror. Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal.

TAB B - Section 00 45 00 – Representations and Certifications. For Offerors interested in submitting proposals as a Service Disabled Veteran Owned Small Businesses, you are requested to submit the Department of Veteran Affairs (VA) Verification Letter verifying that your business has been approved as such and added to the verified Veteran business database at www.VetBiz.gov. The Government reserves the right to rely on other sources to confirm SDVOSB status if the Offeror has not been approved through the VA.

TAB C – Proposal Data Sheet – See Attachment 1 provided at the end of this section.

Offerors should ensure telephone number; fax number, e-mail address and DUNS number are all included. The DUNS number provided will be used to access Contractor Performance Assessment Reporting System (CPARS) data. If a separate DUNS has been created for a joint venture (J-V) it must be submitted. A DUNS number shall also be provided for each company identified in any other proposed association of firms or Contractor Team Arrangement. The Offeror should also submit their Tax ID number on the proposal data sheet.

TAB D – Teaming Agreements and Narratives, if applicable (See paragraphs 2.2 and 2.3).

PHASE I VOLUME II

TAB D –Teaming Agreement (Duplicate of Volume I)

TAB E – FACTOR 1-1 Relevant Specialized Experience

TAB F – FACTOR 1-2 Past Performance

TAB G – FACTOR 1-3 Technical Approach Narrative

TAB H – FACTOR 1-4 - Small Business Participation Plan

4. PHASE I—TAB E—FACTOR 1-1 –RELEVANT SPECIALIZED EXPERIENCE

4.1 SUBMISSION REQUIREMENTS.

4.1.1 The prime contractor and the design firm(s) (or prime contractor if design is to be self-performed) shall each demonstrate recent, relevant experience on similar projects.

The prime contractor will use Attachment 3 at the end of this section. The prime contractor shall submit no more than five (5) projects. If more than five (5) projects are submitted, only the first five (5) will be evaluated. The design firm will submit this information in accordance with 4.1.2 below. Offerors may identify state and local government and private contracts that are similar to the Government’s requirements.

Design firms may list prime contractors they have worked for or government, private or commercial customers. If projects were design-build, so identify them. If the Offeror is a joint venture, each firm shall provide information, demonstrating experience relevant to their role on this project in Tab D. If any firm has multiple functions or divisions, limit the project examples to those performed by the division, unit or team member submitting the offer. For construction team member: Submit projects that are currently well underway (fully designed and at least 50% construction progress completed) or construction substantially completed within five (5) years preceding the date of this Solicitation. For Design team member: Submit projects that currently fully designed and not necessarily in construction within five (5) years preceding the date of this Solicitation.

4.1.2 The Offeror shall demonstrate the capability of the design team member to perform design work as required under this contract using the Standard Form 330 (SF330). The Offeror is required to complete ALL sections of Part I and Part II of the SF330. Directions for the Standard Form 330 can be found at Attachment 4. The Government will evaluate the completed SF330.

4.1.2.1 Specialized Experience and Technical Competence. No more than five

(5) total project examples may be submitted for the entire design team, even if the proposed Architect-Engineer Firm represents the combining of two or more companies. If more than five (5) projects are submitted, only the first five

(5) will be evaluated. Projects shall be identified in Section F of the SF330.

4.1.2.2 Staffing and Professional Qualifications. In Section E of the SF330, provide professional qualifications, experience similar to this procurement (see

4.1.3 and 4.1.4) and professional registration for the following disciplines:

a. Architect (required)

b. Structural Engineer (required)

c. Mechanical Engineer (required)

d. RCDD Communications (required)

e. Acoustical Engineer (required)

4.1.3 Projects submitted under this factor will be considered similar to this procurement if they are similar in complexity, type, scope and magnitude. For example, a similar project is an elementary, middle or high school, a size of 76,000 square feet of gross space or greater with a value or cost of $19,000,000.

4.1.4 Projects that contain any of the following features contain similar work as that found in this procurement.

4.1.4.1 Public, Private or Government school Facilities preK-12 with 21st century features as outlined below. Other academic type facilities that can demonstrate the below features will be considered.

4.1.4.2 Day-lighting Elements.

4.1.4.3 Acoustical design elements with acoustical consultant involved.

4.1.4.4 High tech wireless communication with audio and web conferencing

4.1.4.5 Significant Information Technology (IT) operational areas

4.1.4.6 Automated PA and Mass notification system integrated with phone system

4.1.4.7 Experience in installing operable partitions of 30' minimum length in any type facility.

4.1.4.8 Experience in constructing buildings with 60' minimum clear spans in any type of facility

4.1.4.9 College/Corporate Cafeteria or Dining Facility

4.1.4.10 ATFP design and construction experience

4.1.4.11 Parking area to accommodate required traffic patterns of loading and unloading high volume of children and special needs children throughout a day.

4.1.5 The Offeror may provide a supplemental narrative, not to exceed five (5) pages, explaining how any corporate experience that is directly related to the similar features above is applicable to this project and how the Government will benefit from this experience. The Offeror should describe any previous teaming experience between current team members, if not described in Attachment 2 and 3. Offeror may describe design-build experience on other type projects.

4.2 EVALUATION CRITERIA.

4.2.1 The Government will evaluate the extent of experience of the prime contractor and design firms in design, construction or design-build of projects similar to this procurement. For the prime or construction team member, experience on the projects identified through the use of Attachment 3 will receive more consideration than experience provided in the supplemental narrative. The Government may place greater importance on projects performed as a prime contractor than as a subcontractor, depending upon overall role and relevancy of the project. Federal Government project experience will not be rated inherently more important than non-Federal Government project experience.

4.2.2 The Government reserves the right to verify the experience record of cited projects or other recent projects by reviewing the Corps of Engineers Construction Contractor (or Architect-Engineer) Appraisal Support System (CCASS/ACASS), other DOD, such as Contractor Performance Assessment Reporting System (CPARS) or Government appraisal systems or by contacting owners or references. The Government may check any or all cited references to verify supplied information.

4.2.3 The relevant experience of key personnel of other than the design firm proposed for this project pursuant to 4.1.2.2. will not be evaluated or considered under this factor.

4.2.4 Previous design-build experience is not necessary. The Government may consider previous design-build experience a strength, even if the experience is on different type projects than this project. Similarly, the Government may consider previous recent teaming experience among the team members as value added, even if on different type design and/or construction projects than this project.

4.2.5 If the Offeror cannot provide information concerning recent, relevant experience on similar projects or the Offeror has no relevant experience, a determination will be made as to the risk this lack of experience presents to the Government and the Offeror will be given an appropriate rating for this factor.

5. PHASE I—TAB F—FACTOR 1-2 - PAST PERFORMANCE

5.1. The Offeror and its design team shall demonstrate a record of performance on recent, relevant projects using the Past Performance Questionnaire Summary Sheet, Attachment 2 and the Past Performance Questionnaire, Attachment 3 at the end of this section. Offerors may submit up to 5 projects for the construction team member and 5 projects for the design team member. These projects may be the same projects submitted for Factor 1-1. The Past Performance Questionnaire (PPQ) is provided for the offeror or its team members to submit to the client (Point of Contact) for each relevant project submitted. Offeror must ensure correct phone numbers and email addresses are provided for the client. Completed PPQs must be submitted with your proposal by the specified closing date and time. Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the Offeror is unable to obtain a completed PPQ from a point of contact for a project(s) before proposal closing date, the Offeror shall complete blocks 1 – 5 of the PPQ and submit it with the proposal. Please note that, at a minimum, this first page of the PPQ must contain sufficient information for the government to determine the relevancy of the project. In addition, this will provide contract and client information for the respective project(s). The Government may call and confirm information provided by the Offeror on the PPQs with the points of contact, to the extent necessary to verify the information in the PPQ or to obtain additional information. The Government reserves the right to interview other individuals if the point of contact is not available. By exception, the client may request, submission of questionnaires directly to the Government’s point of contact (Contract Specialist), Andrew Page. Request may be made via email to Andrew.K.Page@usace.army.mil. This request must be coordinated by the client in advance not later than 5 business days before the proposal due date. PPQ’s submitted directly to the Contract Specialist shall be mailed via trackable means (certified US Mail, FedEx, UPS). If the PPQ fails to arrive before the closing date and time, or if the information on the PPQ is insufficient to determine the Offeror name and appropriate solicitation number, it will not be considered.

Offerors are cautioned that the information submitted pertaining to a project shall be limited to the PPQ form and shall contain enough information to determine relevancy of a project. Likewise, Project Information submitted in a format other than or in lieu of the PPQ (to include CCASS /ACASS/CPARS) will not be considered.

Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

Offerors may submit PPQ submitted on other procurements.

In addition to the PPQ, the Offeror’s proposal shall include the Past Performance Questionnaire Summary Sheet (Attachment 2) to provide a summary of the PPQs included and/or submitted to clients. The summary sheet at a minimum shall include the following: 1) Project name; 2) Team member submitting the project; 3) Contract Number; 4) Construction percent completed at the time of the solicitation; 5) Scheduled completion date; and 6) Indicate if the project was design-bid-build, design-build or CMS at Risk.

The Offeror may include performance recognition documents received within the last five (5) years for only the projects submitted, such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition. Performance recognition documents shall not exceed eight (8) documents for the entire team.

Offerors should identify state and local government and private contracts that are similar to the Government’s requirements described in 5.1.2 and 5.2.2. If the Offeror is a joint venture, each firm shall provide information, demonstrating experience relevant to their expected role on this contract. If any firm has multiple functions or divisions, limit the project examples to those performed by the division, unit or team member submitting the offer.

5.1.2. Offeror shall submit projects with a minimum value of no less than $19,000,000 and demonstrate new construction work. Projects shall be similar in scope and magnitude of effort and complexities as this solicitation requires. For construction team member: Submit projects that are currently well underway (fully designed and at least 50% construction progress completed) or construction substantially completed within five (5) years preceding the date of this Solicitation. For Design team member:

Submit projects that currently fully designed and not necessarily in construction within five (5) years preceding the date of this Solicitation. Projects that meet this criterion will be evaluated on how relevant they are compared to the effort to be acquired through this procurement. Reference paragraph 5.2.2 for specific characteristics of relevant projects.

5.1.3. Where a project was awarded as a task order or delivery order under an IDIQ type contract, Offerors are cautioned to submit information specific to the task or delivery order considered relevant to the requirements of this RFP, rather than the umbrella contract. For purposes of this Request for Proposal, if the Offeror represents the combining of two or more companies in a Contractor Team Arrangement as defined in paragraph 2.2 above, no more than five (5) total project examples may be submitted for the entire team. If an Offeror submits more than five (5) total project examples, only the first five (5) will be evaluated. Offerors are advised to submit projects wherein the Offeror, or proposed team members, played a significant role and to clearly define those roles.

5.1.4 If any firm has multiple functions or divisions, limit the project examples to those performed by the division, unit or team member submitting the offer.

5.1.5 While the Government may elect to consider data from other sources, the Offeror must provide detailed, current, accurate and complete past performance information for evaluation by the Government.

5.1.6 The experience and/or past performance of individuals will NOT be considered under this factor.

5.2 EVALUATION CRITERIA:

5.2.1 Past Performance Evaluation. The past performance evaluation results in an assessment of the Government’s confidence in the ability of the Offeror to meet the solicitation requirements. The past performance evaluation considers each Offeror’s demonstrated record of performance on recent and relevant projects that involve a similar scope and magnitude of effort and complexities as this solicitation requires. One performance confidence assessment rating is assigned for each Offeror after evaluating the Offeror’s recent past performance, focusing on performance that is relevant to the contract requirements.

5.2.2 Relevancy Evaluation: Projects must have the minimum value of $19,000,000 and demonstrate new construction type work as referenced in paragraph 5.1.2.

Projects that meet the criteria in 5.1.2 will be evaluated to determine how relevant the projects are compared to the effort to be acquired through this solicitation. Aspects of relevant projects include similarity of scope, type of work, complexity, contract type, and the degree of subcontracting or teaming proposed by the Offeror. Projects will be evaluated using, but not limited to, the characteristics identified below. The characteristics identified are not intended to be a comprehensive list. However, projects that meet the criteria in 5.1.2 and that also include the criteria below may be considered more relevant. The project description in section 4 of the PPQ shall include the characteristics of the projects.

Design Build experience Schools, Kindergarten through Grade 12, or other academic type facilities Projects with the following features:

30’ or greater open spans with operable walls.

Acoustical design elements with acoustical consultant involved.

High tech wireless communication with audio and web conferencing.

5.2.3 The Government will not consider multiple projects, such as individual task orders, combined to meet the minimum value.

5.2.4 Relevancy. There are four levels of relevancy as shown in the following Table.

With respect to relevancy, more relevant past performance will typically be a stronger predictor of future success and have more influence on the past performance confidence assessment than past performance of lesser relevance.

Past Performance Relevancy Ratings.

Ratings Definitions Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.

Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Somewhat Relevant

Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.

Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

5.2.5 The Government will evaluate the Offeror's past performance using the sources available to it including but not limited to: the example projects identified by the Offeror and submitted on the PPQs and any additional information received from references, CPARS, ACASS, and CCASS or other sources. Offerors may be provided an opportunity to address any negative past performance information about which the Offeror has not previously had an opportunity to respond if such information is determined to impact the rating to be assessed.

5.2.6 The Government will consider past performance of the prime construction contractor (or the prime contractor if design is to be self-performed) and the design firm.

If a firm has multiple functions or divisions, the Government will only evaluate the past performance of the unit or division submitting the offer. The Government may also consider the past performance information submitted on any other team member.

However, in accordance with paragraphs 2.2 and 2.3, above, the consideration and weight given to past performance information concerning other than the prime contractor will be based on the extent of involvement of the team member in the project and the adequacy of the proposal in identifying and addressing such arrangements and roles. Past performance information submitted on a team member who does not perform a major or critical role on the project or whose role has not been clearly or adequately described as required will not be considered. Where the Government views an Offeror’s role, or that of its team members, if any, as not significant or as not clearly defined, the Government reserves the right to view this lack of involvement, or clarity, as affecting the determination of relevancy and the usefulness of the information in determining a confidence rating despite the quality of recent, relevant past performance information.

5.2.7 Other Sources. In addition to the above, the Government may review any other sources other than those provided by the Offeror for evaluating past performance.

These other sources may include but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the proposal on the Proposal Data Sheet, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.

The Government will also consider available CCASS ratings on relevant projects submitted by the Offeror under this factor and may consider up to five (5) additional CCASS ratings on recent, relevant projects as needed to evaluate past performance for any team member. The Government will consider available ACASS ratings on all relevant projects submitted by the Offeror under Factor 1-2, Past Performance, and may consider up to five (5) additional ACASS ratings on recent, relevant projects as needed to evaluate past performance.

5.2.8 Confidence Assessment. The past performance record will be evaluated to determine how well the contractor performed on past projects. The Government will consider the relevant past performance information, source of this information, context of the data, and general trends in contractor performance on recent projects to reach a performance confidence assessment using the ratings in 5.2.10.

5.2.9 If no recent/relevant performance record is available or the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned this factor will be assigned a rating of “Unknown Confidence (Neutral).

5.2.10 Confidence Ratings

5.2.11.1 SUBSTANTIAL CONFIDENCE - Based on the Offeror’s recent/relevant performance record, the Government has a high expectation that the Offeror will successfully perform the required effort.

5.2.11.2 SATISFACTORY CONFIDENCE - Based on the Offeror’s

recent/relevant performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort.

5.2.11.3 LIMITED CONFIDENCE - Based on the Offeror’s recent/relevant performance record, the Government has a low expectation that the Offeror will successfully perform the required effort.

5.2.11.4 NO CONFIDENCE - Based on the Offeror’s recent/relevant performance record, the Government has no expectation that the Offeror will successfully perform the required effort.

5.2.11.5 UNKNOWN CONFIDENCE (NEUTRAL) - No recent/relevant

performance record is available or the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.

TAB G - FACTOR 1-3: TECHNICAL APPROACH NARRATIVE

7. PHASE I—TAB G—FACTOR 1-3 - TECHNICAL APPROACH NARRATIVE

7.1 SUBMISSION REQUIREMENTS: This information considers the Offeror’s intended technical approach to design and construction of the type school specified in the RFP.

Limit the submission to ten (10) pages or less, clearly describing the technical approach to execution of the contract.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .