bid abstract.xls
XLS spreadsheet 2 MB Posted
- Solicitation number
- W912HN-09-B-0025
About this file
Bid Abstract
View the file
Other files
| File | Type | Posted |
|---|---|---|
| amd 0005 conform.pdf | ||
| amd 0005.pdf | ||
| amd 0004.pdf | ||
| amd 0004 conform.pdf | ||
| amd 0003 conform.pdf | ||
| amd 0003.pdf | ||
| SAS_13A-B_RockRev_Plans.pdf | ||
| amd 0002.pdf | ||
| amd 0002 conform.pdf | ||
| amd 0001.pdf | ||
| SPECIFICATIONS.pdf | ||
| SAS_13ARockRev_Plans.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TOTAL 0001-0018
| IFB NO: W912HN-09-B-0025 | BID ABSTRACT | ||||||||||||||||||||||||
| Bid Opening Date: 23 Sep 2009 10:00 a.m. / PROJECT: Disposal Area 13A AND 13B, Rock Revetment, Jasper County, SC | COREY | ||||||||||||||||||||||||
| IGE | WECC, INC. | Corey Engerprises, Inc. | GRAND CONSTRUCTION INC. | CHEOAH CONSTRUCITON CO .INC. | ASHRIDGE INC. | ||||||||||||||||||||
| ITEM NO | SUPPLIES/SERVICES | EST QTY | EST QTY | EST QTY | EST QTY | EST QTY | EST QTY | EST QTY | EST QTY | ITEM NO | SUPPLIES/SERVICES | EST QTY | U/P | TOTAL | U/P | TOTAL | U/P | TOTAL | |||||||
| 0001 | BASE -- Site 13B-1 Deliver, Stockpile, and Place Armor Stone | 0001 | Site 14B-1 Deliver, Stockpile, and Place Armor Stone | ||||||||||||||||||||||
| 0001AA | BASE --Deliver and Stockpile Armor Stone, First 25,420 Tons | 25,420 | TN | $ 50.00 | $ 1,271,000.00 | $ 84.20 | $ 2,140,364.00 | $ 75.00 | $ 1,906,500.00 | 0001AA | Deliver and Stockpile Armor Stone, First 3,480 tons | 25,420 | $52.00 | $1,321,840.00 | $85.55 | $2,174,681.00 | $44.61 | $1,133,986.20 | |||||||
| 0001AB | BASE --Deliver and Stockpile Armor Stone, All over 25,420 tons | 2,550 | TN | $ 50.00 | $ 127,500.00 | $ 84.40 | $ 215,220.00 | $ 74.75 | $ 190,612.50 | 0001AB | Deliver and Stockpile Armor Stone, All over 3,480 tons | 2,550 | $52.00 | $132,600.00 | $85.55 | $218,152.50 | $44.61 | $113,755.50 | |||||||
| 0001BA | BASE -- Armor Stone Template Placement, First 25,420 Tons | 25,420 | TN | $ 80.00 | $ 2,033,600.00 | $ 46.00 | $ 1,169,320.00 | $ 28.75 | $ 730,825.00 | 0001BA | Armor Stone Template Placement, First 3,480 tons | 25,420 | $78.00 | $1,982,760.00 | $5.05 | $128,371.00 | $50.00 | $1,271,000.00 | |||||||
| 0001BB | BASE -- Armor Stone Template Placement, All Over 25,420 Tons | 2,550 | TN | $ 80.00 | $ 204,000.00 | $ 44.60 | $ 113,730.00 | $ 28.75 | $ 73,312.50 | 0001BB | Armor Stone Template Placement, All over 3,480 tons | 2,550 | $78.00 | $198,900.00 | $5.05 | $12,877.50 | $1.00 | $2,550.00 | |||||||
| 0002 | BASE -- Site 13B-1 Deliver, Stockpile, and Place Type 1 Riprap | 0002 | Site 14B-1 Deliver, Stockpile, and Place Type 1 Riprap | ||||||||||||||||||||||
| 0002AA | BASE -- Deliver and StockpileType 1 Riprap Underlayer, 9,700 | 9700 | TN | $ 50.00 | $ 485,000.00 | $ 70.10 | $ 679,970.00 | $ 69.00 | $ 669,300.00 | 0002AA | Deliver & Stockpile Type 1 Riprap Underlayer, First 780 tons | 9700 | $47.00 | $455,900.00 | $77.80 | $754,660.00 | $40.60 | $393,820.00 | |||||||
| 0002AB | BASE -- Deliver and Stockpile Type 1 Riprap Underlayer, | ||||||||||||||||||||||||
| All over 9,700 Tons | 970 | TN | $ 50.00 | $ 48,500.00 | $ 70.70 | $ 68,579.00 | $ 69.00 | $ 66,930.00 | 0002AB | Deliver & Stockpile Type 1 Riprap Underlayer, All over 780 tons | 970 | $47.00 | $45,590.00 | $77.80 | $75,466.00 | $40.60 | $39,382.00 | ||||||||
| 0002BA | BASE -- Type 1 Riprap Template Placement, First 9,700 Tons | 9700 | TN | $ 70.00 | $ 679,000.00 | $ 31.20 | $ 302,640.00 | $ 30.00 | $ 291,000.00 | 0002BA | Type 1 Riprap Template Placement, First 780 tons | 9700 | $78.00 | $756,600.00 | $5.20 | $50,440.00 | $40.00 | $388,000.00 | |||||||
| 0002BB | BASE - Type 1 Riprap Template Placement, over 9,700 | 970 | TN | $ 70.00 | $ 67,900.00 | $ 31.50 | $ 30,555.00 | $ 30.00 | $ 29,100.00 | 0002BB | Type 1 Riprap Template Placement, All over 780 tons | 970 | $78.00 | $75,660.00 | $5.20 | $5,044.00 | $1.00 | $970.00 | |||||||
| 0003 | BASE -- Site 13B-1 Deliver, Stockpile, and Place GA DOT #4 | 0003 | Site 14B-1 Deliver, Stockpile, and Place GADOT #4 | ||||||||||||||||||||||
| 0003AA | BASE -- Deliver and Stockpile GADOT #4 Bedding Stone, First 5,200 tons | 5200 | TN | $ 44.00 | $ 228,800.00 | $ 53.50 | $ 278,200.00 | $ 57.50 | $ 299,000.00 | 0003AA | Deliver & Stockpile GADOT#4 Bedding Stone, First 550 tons | 5200 | $33.00 | $171,600.00 | $51.10 | $265,720.00 | $28.62 | $148,824.00 | |||||||
| 0003AB | BASE -- Deliver and Stockpile GADOT #4 Bedding Stone, All over 5200 | 1,230 | TN | $ 44.00 | $ 54,120.00 | $ 52.50 | $ 64,575.00 | $ 57.50 | $ 70,725.00 | 0003AB | Deliver & Stockpile GADOT#4 Bedding Stone, All over 550 tons | 1,230 | $33.00 | $40,590.00 | $51.10 | $62,853.00 | $28.62 | $35,202.60 | |||||||
| 0003BA | BASE -- GADOT #4 Bedding Stone Template Placement,First 5,200 Tons | 5,200 | TN | $ 53.00 | $ 275,600.00 | $ 33.50 | $ 174,200.00 | $ 31.00 | $ 161,200.00 | 0003BA | GADOT #4 Bedding Stone Template Placement, First 550 tons | 5,200 | $78.00 | $405,600.00 | $5.60 | $29,120.00 | $52.25 | $271,700.00 | |||||||
| 0003BB | BASE -- GADOT #4 Bedding Stone Template Placement, All over 5,200 | 1,230 | TN | $ 53.00 | $ 65,190.00 | $ 29.10 | $ 35,793.00 | $ 31.00 | $ 38,130.00 | 0003BB | GADOT #4 Bedding Stone Template Placement, All over 550 tons | 1,230 | $78.00 | $95,940.00 | $5.60 | $6,888.00 | $1.00 | $1,230.00 | |||||||
| 0004 | BASE -- Site 13B-1 Deliver, Stockpile, and Place GADOT #4 Top of Slope | 0004 | Site 14B-1 Deliver, Stockpile, and Place GADOT #4 Top of Slope | ||||||||||||||||||||||
| 0004AA | BASE -- Deliver and Stockpile GADOT #4 Filter Stone, First 1,910 Tons | 1,910 | $ 44.00 | $ 84,040.00 | $ 52.80 | $ 100,848.00 | $ 67.00 | $ 127,970.00 | 0004AA | Deliver & Stockpile GADOT #4 Filter Stone, First 150 tons | 1,910 | $33.00 | $63,030.00 | $51.10 | $97,601.00 | $28.62 | $54,664.20 | ||||||||
| 0004AB | BASE -- Deliver and Stockpile GADOT #4 Filter Stone, All over 1,910 Tons | 200 | $ 44.00 | $ 8,800.00 | $ 52.80 | $ 10,560.00 | $ 67.00 | $ 13,400.00 | 0004AB | Delivery & Stockpile GADOT #4 Filter Stone, All over 150 tons | 200 | $33.00 | $6,600.00 | $51.10 | $10,220.00 | $28.62 | $5,724.00 | ||||||||
| 0004BA | BASE -- GADOT #4 Filter Stone Template Placement, First 1,910 Tons | 1910 | $ 53.00 | $ 101,230.00 | $ 25.70 | $ 49,087.00 | $ 31.00 | $ 59,210.00 | 0004BA | GADOT #4 Filter Stone Template Placement, First 150 tons | 1910 | $78.00 | $148,980.00 | $7.70 | $14,707.00 | $52.25 | $99,797.50 | ||||||||
| 0004BB | BASE -- GADOT #4 Filter Stone Template Placement, All over 1,910 Tons | 200 | $ 53.00 | $ 10,600.00 | $ 26.80 | $ 5,360.00 | $ 31.00 | $ 6,200.00 | 0004BB | GADOT #3 Filter Stone Template Placement, All over 150 tons | 200 | $78.00 | $15,600.00 | $7.70 | $1,540.00 | $1.00 | $200.00 | ||||||||
| 0005 | BASE -- Site 13B-1 Install Silt Fencing | 0005 | Site 14B-1 Install SCDOT Type A Silt Fencing | ||||||||||||||||||||||
| 0005AA | BASE -- Silt Fence. First 2,500 LF | 2500 | LF | $ 3.30 | $ 8,250.00 | $ 2.30 | $ 5,750.00 | $ 2.75 | $ 6,875.00 | 0005AA | Silt Fence Type A, First 300 linear feet | 2500 | $4.00 | $10,000.00 | $2.40 | $6,000.00 | $2.00 | $5,000.00 | |||||||
| 0005AB | BASE -- Silt Fence, Over 2500 LF | 400 | LF | $ 3.30 | $ 1,320.00 | $ 2.30 | $ 920.00 | $ 2.75 | $ 1,100.00 | 0005AB | Silt Fence Type A, All over 300 linear feet | 400 | $4.00 | $1,600.00 | $2.40 | $960.00 | $2.00 | $800.00 | |||||||
| 0006 | BASE --Grassing Site 13B-1 | 7 | AC | $ 2,530.00 | $ 17,710.00 | $ 1,560.00 | $ 10,920.00 | $ 4,750.00 | $ 33,250.00 | 0006 | Grassing Site 14B-1 | 7 | $1,902.00 | $13,314.00 | $1,020.00 | $7,140.00 | $1,450.00 | $10,150.00 | |||||||
| 0007 | BASE -- Agricultural Lime Site 13B-1 | 21 | TN | $ 110.00 | $ 2,310.00 | $ 84.00 | $ 1,764.00 | $ 55.00 | $ 1,155.00 | 0007 | Agricultural Lime Site 14B-1 | 21 | $278.00 | $5,838.00 | $150.00 | $3,150.00 | $60.00 | $1,260.00 | |||||||
| 0008 | BASE -- Fertilizer, Nitrogen Site 13B-1 | 0.7 | TN | $ 830.00 | $ 581.00 | $ 790.00 | $ 553.00 | $ 770.00 | $ 539.00 | 0008 | Fertilizer, Nitrogen Site 14B-1 | 0.7 | $1,300.00 | $910.00 | $814.00 | $569.80 | $300.00 | $210.00 | |||||||
| 0009 | BASE -- Fertilizer, Mixed Grade Site 13B-1 | 4.2 | TN | $ 740.00 | $ 3,108.00 | $ 790.00 | $ 3,318.00 | $ 880.00 | $ 3,696.00 | 0009 | Fertilizer, Mixed Grade Site 14B-1 | 4.2 | $1,500.00 | $6,300.00 | $1,050.00 | $4,410.00 | $500.00 | $2,100.00 | |||||||
| 0010 | OPTION 1 -- Site 13A-3 Deliver, Stockpile, and Place Armor Stone | 0010 | Site 14B-2 Deliver, Stockpile, and Place Armor Stone | ||||||||||||||||||||||
| 0010AA | OPTION 1 -- Deliver and Stockpile Armor Stone, | ||||||||||||||||||||||||
| First 40,100 Tons | 40,100 | TN | $ 50.00 | $ 2,005,000.00 | $ 77.80 | $ 3,119,780.00 | $ 75.00 | $ 3,007,500.00 | 0010AA | Deliver & Stockpile Armor Stone, First 86,240 tons | 40,100 | $52.00 | $2,085,200.00 | $80.75 | $3,238,075.00 | $44.61 | $1,788,861.00 | ||||||||
| 0010AB | OPTION 1 -- Deliver and Stockpile Armor Stone, All over 40,100 Tons | 4,010 | TN | $ 50.00 | $ 200,500.00 | $ 77.40 | $ 310,374.00 | $ 74.75 | $ 299,747.50 | 0010AB | Deliver & Stockpile Armor Stone, All over 86,240 tons | 4,010 | $52.00 | $208,520.00 | $80.75 | $323,807.50 | $44.61 | $178,886.10 | |||||||
| 0010BA | OPTION 1 -- Armor Stone Template Placement, First 40,100 Tons | 40,100 | TN | $ 70.00 | $ 2,807,000.00 | $ 33.70 | $ 1,351,370.00 | $ 28.75 | $ 1,152,875.00 | 0010BA | Armor Stone Template Placement, First 86,240 tons | 40,100 | $78.00 | $3,127,800.00 | $4.85 | $194,485.00 | $25.00 | $1,002,500.00 | |||||||
| 0010BB | OPTION 1 -- Armor Stone Template Placement, All over 40,100 Tons | 4,010 | TN | $ 70.00 | $ 280,700.00 | $ 32.70 | $ 131,127.00 | $ 28.75 | $ 115,287.50 | 0010BB | Armor Stone Template Placement, All over 86,240 tons | 4,010 | $78.00 | $312,780.00 | $4.85 | $19,448.50 | $1.00 | $4,010.00 | |||||||
| IGE | WECC, INC. | Corey Engerprises, Inc. | GRAND CONSTRUCTION INC. | CHEOAH CONSTRUCITON CO .INC. | ASHRIDGE INC. | ||||||||||||||||||||
| ITEM NO | SUPPLIES/SERVICES | EST QTY | EST QTY | EST QTY | EST QTY | EST QTY | EST QTY | EST QTY | EST QTY | ITEM NO | SUPPLIES/SERVICES | EST QTY | U/P | TOTAL | U/P | TOTAL | U/P | TOTAL | |||||||
| 0011 | OPTION 1 -- Site 13A-3 Deliver, Stockpile, and Place Type 1 Riprap | 0011 | Site 14B-2 Deliver, Stockpile, and Place Type 1 Riprap | ||||||||||||||||||||||
| 0011AA | OPTION 1 -- Deliver and Stockpile Type 1 Riprap Underlayer, First 15,200 Tons | 15,200 | TN | $ 50.00 | $ 760,000.00 | $ 66.50 | $ 1,010,800.00 | $ 69.00 | $ 1,048,800.00 | 0011AA | Deliver & Stockpile Type 1 Riprap Underlayer, First 19,340 tons | 15,200 | $47.00 | $714,400.00 | $73.45 | $1,116,440.00 | $40.60 | $617,120.00 | |||||||
| 0011AB | OPTION 1 -- Deliver and Stockpile Type 1 Riprap Underlayer, Over 15,200 | 1,520 | TN | $ 50.00 | $ 76,000.00 | $ 67.00 | $ 101,840.00 | $ 69.00 | $ 104,880.00 | 0011AB | Deliver & Stockpile Type 1 Riprap Underlayer, All over 19,340 tons | 1,520 | $47.00 | $71,440.00 | $73.45 | $111,644.00 | $40.60 | $61,712.00 | |||||||
| 0011BA | OPTION 1 -- Type 1 Riprap Template Placement, First 15,200 Tons | 15,200 | TN | $ 60.00 | $ 912,000.00 | $ 31.20 | $ 474,240.00 | $ 30.00 | $ 456,000.00 | 0011BA | Type 1 Riprap Template Placement, First 19,340 tons | 15,200 | $78.00 | $1,185,600.00 | $4.60 | $69,920.00 | $20.00 | $304,000.00 | |||||||
| 0011BB | OPTION 1 -- Type 1 Riprap Template Placement, All over 15,200 | 1,520 | TN | $ 60.00 | $ 91,200.00 | $ 31.20 | $ 47,424.00 | $ 30.00 | $ 45,600.00 | 0011BB | Type 1 Riprap Template Placement, All over 19,340 tons | 1,520 | $78.00 | $118,560.00 | $4.60 | $6,992.00 | $1.00 | $1,520.00 | |||||||
| 0012 | OPTION 1 -- Site 13A-3 Deliver, Stockpile, and Place GADOT #4 | 0012 | Site 14B-2 Deliver, Stockpile, and Place GADOT #4 | ||||||||||||||||||||||
| 0012AA | OPTION 1 -- Deliver and Stockpile GADOT #4 Bedding Stone, First 8,200 Tons | 8,200 | TN | $ 44.00 | $ 360,800.00 | $ 49.20 | $ 403,440.00 | $ 57.50 | $ 471,500.00 | 0012AA | Deliver & Stockpile GADOT #4 Bedding Stone, First 16,170 tons | 8,200 | $33.00 | $270,600.00 | $48.25 | $395,650.00 | $28.62 | $234,684.00 | |||||||
| 0012AB | OPTION 1 -- Deliver and Stockpile GADOT #4 Bedding Stone, All over 8,200 Tons | 1,230 | TN | $ 44.00 | $ 54,120.00 | $ 49.80 | $ 61,254.00 | $ 57.50 | $ 70,725.00 | 0012AB | Deliver & Stockpile GADOT #4 Bedding Stone, All over 16,170 tons | 1,230 | $33.00 | $40,590.00 | $48.25 | $59,347.50 | $28.62 | $35,202.60 | |||||||
| 0012BA | OPTION 1 -- GADOT #4 Bedding Stone Template Placement, First 8,200 Tons | 8,200 | TN | $ 43.00 | $ 352,600.00 | $ 27.70 | $ 227,140.00 | $ 31.00 | $ 254,200.00 | 0012BA | GADOT #4 Bedding Stone Template Placement, First 16,170 tons | 8,200 | $78.00 | $639,600.00 | $5.30 | $43,460.00 | $52.25 | $428,450.00 | |||||||
| 0012BB | OPTION 1 -- GADOT #4 Bedding Stone Template Placement, All over 8,200 Tons | 1,230 | TN | $ 43.00 | $ 52,890.00 | $ 27.70 | $ 34,071.00 | $ 31.00 | $ 38,130.00 | 0012BB | GADOT #4 Bedding Stone Template Placement, All over 16,170 tons | 1,230 | $78.00 | $95,940.00 | $5.30 | $6,519.00 | $1.00 | $1,230.00 | |||||||
| 0013 | OPTION 1 -- Site 13A-3 Deliver, Stockpile, and Place GADOT #4 Top of Slope | 0013 | Site 14B-2 Deliver, Stockpile, and Place GADOT #4 Top of Slope | ||||||||||||||||||||||
| 0013AA | OPTION 1 -- Deliver and Stockpile GADOT #4 Filter Stone, First 2,100 Tons | 2,100 | TN | $ 44.00 | $ 92,400.00 | $ 49.40 | $ 103,740.00 | $ 67.00 | $ 140,700.00 | 0013AA | Deliver & Stockpile GADOT #4 Filter Stone, First 4,070 tons | 2,100 | $33.00 | $69,300.00 | $48.25 | $101,325.00 | $28.62 | $60,102.00 | |||||||
| 0013AB | OPTION 1 -- Deliver and Stockpile GADOT #4 Filter Stone Template, over 2,100 | 210 | TN | $ 44.00 | $ 9,240.00 | $ 49.80 | $ 10,458.00 | $ 67.00 | $ 14,070.00 | 0013AB | Deliver & Stockpile GADOT #4 Filter Stone, All over 4,070 tons | 210 | $33.00 | $6,930.00 | $48.25 | $10,132.50 | $28.62 | $6,010.20 | |||||||
| 0013BA | OPTION 1 -- GADOT #4 Filter Stone Template Placement, First 2,100 Tons | 2,100 | TN | $ 44.00 | $ 92,400.00 | $ 27.70 | $ 58,170.00 | $ 31.00 | $ 65,100.00 | 0013BA | Template Placement GADOT #4 Filter Stone, First 4,070 tons | 2,100 | $78.00 | $163,800.00 | $6.60 | $13,860.00 | $52.25 | $109,725.00 | |||||||
| 0013BB | OPTION 1 -- GADOT #4 Filter Stone Template Placement, All over 2,100 Tons | 210 | TN | $ 44.00 | $ 9,240.00 | $ 28.60 | $ 6,006.00 | $ 31.00 | $ 6,510.00 | 0013BB | Template Placement GADOT #4 Filter Stone, All over 4,070 tons | 210 | $78.00 | $16,380.00 | $6.60 | $1,386.00 | $1.00 | $210.00 | |||||||
| 0014 | OPTION 1 -- Site 13A-3 Install Type A Silt Fencing | 0014 | Site 14B-2 Install SC DOT Silt Fencing | ||||||||||||||||||||||
| 0014AA | OPTION 1 -- Silt Fence Type A First 3,300 Linear Feet | 3,300 | LF | $ 3.30 | $ 10,890.00 | $ 2.30 | $ 7,590.00 | $ 2.75 | $ 9,075.00 | 0014AA | Silt Fence, First 6,500 linear feet | 3,300 | $4.00 | $13,200.00 | $1.15 | $3,795.00 | $2.00 | $6,600.00 | |||||||
| 0014AB | OPTION 1 -- Silt Fence Type A, Over 3,300 lf | 500 | LF | $ 3.30 | $ 1,650.00 | $ 2.30 | $ 1,150.00 | $ 2.75 | $ 1,375.00 | 0014AB | Silt Fence, All over 6,500 linear feet | 500 | $4.00 | $2,000.00 | $1.15 | $575.00 | $2.00 | $1,000.00 | |||||||
| 0015 | OPTION 1 -- Grassing Site 13A-3 | 8 | AC | $ 2,530.00 | $ 20,240.00 | $ 1,560.00 | $ 12,480.00 | $ 4,750.00 | $ 38,000.00 | 0015 | Grassing Site 14B-2 | 8 | $1,902.00 | $15,216.00 | $1,020.00 | $8,160.00 | $1,200.00 | $9,600.00 | |||||||
| 0016 | OPTION 1 -- Agricultural Lime Site 13A-3 | 24 | TN | $ 110.00 | $ 2,640.00 | $ 84.00 | $ 2,016.00 | $ 55.00 | $ 1,320.00 | 0016 | Agricultural Lime Site 14B-2 | 24 | $278.00 | $6,672.00 | $150.00 | $3,600.00 | $50.00 | $1,200.00 | |||||||
| 0017 | OPTION 1 -- Fertilizer, Nitrogen Site 13A-3 | 0.8 | TN | $ 825.00 | $ 660.00 | $ 790.00 | $ 632.00 | $ 770.00 | $ 616.00 | 0017 | Fertilizer, Nitrogen Site 14B-2 | 0.8 | $1,300.00 | $1,040.00 | $814.00 | $651.20 | $300.00 | $240.00 | |||||||
| 0018 | OPTION 1 -- Fertilizer, Mixed Grade Site 13A-3 | 4.8 | TN | $ 740.00 | $ 3,552.00 | $ 790.00 | $ 3,792.00 | $ 880.00 | $ 4,224.00 | 0018 | Fertilizer, Mixed Grade Site 14B-2 | 4.8 | $1,500.00 | $7,200.00 | $1,050.00 | $5,040.00 | $450.00 | $2,160.00 | |||||||
| 0019 | Option 2 -- Site 13A-1 Deliver, Stockpile, and Place Armor Stone | 0019 | Option 2 -- Site 13A-1 Deliver, Stockpile, and Place Armor Stone | ||||||||||||||||||||||
| 0019AA | Option 2 -- Deliver and Stockpile Armor Stone, First 24,600 | 24,600 | TN | $ 50.00 | $ 1,230,000.00 | $ 77.60 | $ 1,908,960.00 | $ 75.00 | $ 1,845,000.00 | 0019AA | Option 2 -- Deliver and Stockpile Armor Stone, First 24,600 | 24,600 | $52.00 | $1,279,200.00 | $76.00 | $1,869,600.00 | $44.61 | $1,097,406.00 | |||||||
| 0019AB | Option 2 -- Deliver and Stockpile Armor Stone, over 24,600 | 2,460 | TN | $ 50.00 | $ 123,000.00 | $ 77.60 | $ 190,896.00 | $ 74.75 | $ 183,885.00 | 0019AB | Option 2 -- Deliver and Stockpile Armor Stone, over 24,600 | 2,460 | $52.00 | $127,920.00 | $76.00 | $186,960.00 | $44.61 | $109,740.60 | |||||||
| 0019BA | Option 2 -- Armor Stone Template Placement, First 24,600 Tons | 24600 | TN | $ 66.00 | $ 1,623,600.00 | $ 33.40 | $ 821,640.00 | $ 28.75 | $ 707,250.00 | 0019BA | Option 2 -- Armor Stone Template Placement, First 24,600 Tons | 24600 | $72.00 | $1,771,200.00 | $4.25 | $104,550.00 | $22.25 | $547,350.00 | |||||||
| 0019BB | Option 2 -- Armor Stone Template Placement, All over 24,600 Tons | 2460 | TN | $ 66.00 | $ 162,360.00 | $ 33.40 | $ 82,164.00 | $ 28.75 | $ 70,725.00 | 0019BB | Option 2 -- Armor Stone Template Placement, All over 24,600 Tons | 2460 | $72.00 | $177,120.00 | $4.25 | $10,455.00 | $1.00 | $2,460.00 | |||||||
| IGE | WECC, INC. | Corey Engerprises, Inc. | GRAND CONSTRUCTION INC. | CHEOAH CONSTRUCITON CO .INC. | ASHRIDGE ING. | ||||||||||||||||||||
| ITEM NO | SUPPLIES/SERVICES | EST QTY | EST QTY | EST QTY | EST QTY | EST QTY | EST QTY | EST QTY | EST QTY | ITEM NO | SUPPLIES/SERVICES | EST QTY | U/P | TOTAL | U/P | TOTAL | U/P | TOTAL | |||||||
| 0020 | Option 2 -- Site 13A-1 Deliver, Stockpile, and Place Type 1 Riprap | $ - 0 | $ - 0 | 0020 | Option 2 -- Site 13A-1 Deliver, Stockpile, and Place Type 1 Riprap | $0.00 | |||||||||||||||||||
| 0020AA | Option 2 -- Deliver and Stockpile Type 1 Riprap Underlayer, First 9,300 Tons | 9,300 | TN | $ 50.00 | $ 465,000.00 | $ 66.40 | $ 617,520.00 | $ 69.00 | $ 641,700.00 | 0020AA | Option 2 -- Deliver and Stockpile Type 1 Riprap Underlayer, First 9,300 Tons | 9,300 | $47.00 | $437,100.00 | $69.10 | $642,630.00 | $40.60 | $377,580.00 | |||||||
| 0020AB | Option 2 -- Deliver and Stockpile Type 1 Riprap Underlayer, All over 9,300 Tons | 930 | TN | $ 50.00 | $ 46,500.00 | $ 67.00 | $ 62,310.00 | $ 69.00 | $ 64,170.00 | 0020AB | Option 2 -- Deliver and Stockpile Type 1 Riprap Underlayer, All over 9,300 Tons | 930 | $47.00 | $43,710.00 | $69.10 | $64,263.00 | $40.60 | $37,758.00 | |||||||
| 0020BA | Option 2 -- Type 1 Riprap Template Placement, First 9,300 Tons | 9,300 | TN | $ 55.00 | $ 511,500.00 | $ 31.10 | $ 289,230.00 | $ 30.00 | $ 279,000.00 | 0020BA | Option 2 -- Type 1 Riprap Template Placement, First 9,300 Tons | 9,300 | $72.00 | $669,600.00 | $4.20 | $39,060.00 | $52.25 | $485,925.00 | |||||||
| 0020BB | Option 2 -- Type 1 Riprap Template Placement, All over 9,300 tons | 930 | TN | $ 55.00 | $ 51,150.00 | $ 31.10 | $ 28,923.00 | $ 30.00 | $ 27,900.00 | 0020BB | Option 2 -- Type 1 Riprap Template Placement, All over 9,300 tons | 930 | $72.00 | $66,960.00 | $4.20 | $3,906.00 | $1.00 | $930.00 | |||||||
| 0021 | Option 2 -- Site 13A-1 Deliver, Stockpile, and Place GADOT #4 | $ - 0 | 0021 | Option 2 -- Site 13A-1 Deliver, Stockpile, and Place GADOT #4 | $0.00 | ||||||||||||||||||||
| 0021AA | Option 2 -- Deliver and Stockpile, GADOT #4 Bedding Stone, First 5,000 Tons | 5,000 | TN | $ 44.00 | $ 220,000.00 | $ 59.80 | $ 299,000.00 | $ 57.50 | $ 287,500.00 | 0021AA | Option 2 -- Deliver and Stockpile, GADOT #4 Bedding Stone, First 5,000 Tons | 5,000 | $33.00 | $165,000.00 | $45.40 | $227,000.00 | $28.62 | $143,100.00 | |||||||
| 0021AB | Option 2 -- Deliver and Stockpile GADOT #4 Bedding Stone, All over 5,000 Tons | 750 | TN | $ 44.00 | $ 33,000.00 | $ 59.80 | $ 44,850.00 | $ 57.50 | $ 43,125.00 | 0021AB | Option 2 -- Deliver and Stockpile GADOT #4 Bedding Stone, All over 5,000 Tons | 750 | $33.00 | $24,750.00 | $45.40 | $34,050.00 | $28.62 | $21,465.00 | |||||||
| 0021BA | Option 2 -- GADOT #4 Bedding Stone Template Placement, First 5,000 Tons | 5,000 | TN | $ 38.00 | $ 190,000.00 | $ 28.30 | $ 141,500.00 | $ 31.00 | $ 155,000.00 | 0021BA | Option 2 -- GADOT #4 Bedding Stone Template Placement, First 5,000 Tons | 5,000 | $72.00 | $360,000.00 | $4.05 | $20,250.00 | $52.25 | $261,250.00 | |||||||
| 0021BB | Option 2 -- GADOT #4 Bedding Stone Template Placement, First 5,000 Tons | 750 | TN | $ 38.00 | $ 28,500.00 | $ 28.30 | $ 21,225.00 | $ 31.00 | $ 23,250.00 | 0021BB | Option 2 -- GADOT #4 Bedding Stone Template Placement, First 5,000 Tons | 750 | $72.00 | $54,000.00 | $4.05 | $3,037.50 | $1.00 | $750.00 | |||||||
| 0022 | Option 2 -- Site 13A-1 Deliver, Stockpile, and Place GADOT #4 Top of Slope | $ - 0 | $ - 0 | 0022 | Option 2 -- Site 13A-1 Deliver, Stockpile, and Place GADOT #4 Top of Slope | ||||||||||||||||||||
| 0022AA | Option 2 -- Deliver and Stockpile GADOT #4 Filter Stone, First 2,300 | 1,300 | TN | $ 44.00 | $ 57,200.00 | $ 50.10 | $ 65,130.00 | $ 67.00 | $ 87,100.00 | 0022AA | Option 2 -- Deliver and Stockpile GADOT #4 Filter Stone, First 2,300 | 1,300 | $33.00 | $42,900.00 | $45.40 | $59,020.00 | $28.62 | $37,206.00 | |||||||
| 0022AB | Option 2 -- Deliver and Stockpile GADOT #4 Filter Stone, All over 1,300 Tons | 130 | TN | $ 44.00 | $ 5,720.00 | $ 50.10 | $ 6,513.00 | $ 67.00 | $ 8,710.00 | 0022AB | Option 2 -- Deliver and Stockpile GADOT #4 Filter Stone, All over 1,300 Tons | 130 | $33.00 | $4,290.00 | $45.40 | $5,902.00 | $28.62 | $3,720.60 | |||||||
| 0022BA | Option 2 -- Placement GADOT # Filter Stone, First 1, 300 Tons | 1,300 | TN | $ 38.00 | $ 49,400.00 | $ 23.80 | $ 30,940.00 | $ 31.00 | $ 40,300.00 | 0022BA | Option 2 -- Placement GADOT # Filter Stone, First 1, 300 Tons | 1,300 | $72.00 | $93,600.00 | $5.05 | $6,565.00 | $52.25 | $67,925.00 | |||||||
| 0022BB | Option 2 -- Placement GADOT #4 Filter Stone, | 130 | TN | $ 38.00 | $ 4,940.00 | $ 25.40 | $ 3,302.00 | $ 31.00 | $ 4,030.00 | 0022BB | Option 2 -- Placement GADOT #4 Filter Stone, | 130 | $72.00 | $9,360.00 | $5.05 | $656.50 | $1.00 | $130.00 | |||||||
| 0023 | Option 2 -- Site 13A-1 Install SCDOT Silt Fencing | $ - 0 | $ - 0 | 0023 | Option 2 -- Site 13A-1 Install SCDOT Silt Fencing | $0.00 | |||||||||||||||||||
| 0023AA | Option 2 -- Silt Fence First 2,200 Linear Feet | 2,200 | LF | $ 3.30 | $ 7,260.00 | $ 2.30 | $ 5,060.00 | $ 2.75 | $ 6,050.00 | 0023AA | Option 2 -- Silt Fence First 2,200 Linear Feet | 2,200 | $4.00 | $8,800.00 | $1.95 | $4,290.00 | $2.00 | $4,400.00 | |||||||
| 0023AB | Option 2 -- Silt Fence All over 2,200 Linear Feet | 330 | LF | $ 3.30 | $ 1,089.00 | $ 2.30 | $ 759.00 | $ 2.75 | $ 907.50 | 0023AB | Option 2 -- Silt Fence All over 2,200 Linear Feet | 330 | $4.00 | $1,320.00 | $1.95 | $643.50 | $2.00 | $660.00 | |||||||
| 0024 | Option 2 -- Grassing Site 13A-1 | 5 | AC | $ 2,530.00 | $ 12,650.00 | $ 1,560.00 | $ 7,800.00 | $ 4,750.00 | $ 23,750.00 | 0024 | Option 2 -- Grassing Site 13A-1 | 5 | $1,902.00 | $9,510.00 | $1,020.00 | $5,100.00 | $1,200.00 | $6,000.00 | |||||||
| 0025 | Option 2 -- Agricultural Lime Site 13A-1 | 15 | TN | $ 110.00 | $ 1,650.00 | $ 84.00 | $ 1,260.00 | $ 55.00 | $ 825.00 | 0025 | Option 2 -- Agricultural Lime Site 13A-1 | 15 | $278.00 | $4,170.00 | $150.00 | $2,250.00 | $50.00 | $750.00 | |||||||
| 0026 | Option 2 -- Fertilizer, Nitrogen Site 13A-1 | 0.5 | TN | $ 824.00 | $ 412.00 | $ 790.00 | $ 395.00 | $ 770.00 | $ 385.00 | 0026 | Option 2 -- Fertilizer, Nitrogen Site 13A-1 | 0.5 | $1,300.00 | $650.00 | $814.00 | $407.00 | $300.00 | $150.00 | |||||||
| 0027 | Option 2 -- Fertilizer, Mixed Grade Site 13A-1 | 3 | TN | $ 740.00 | $ 2,220.00 | $ 790.00 | $ 2,370.00 | $ 880.00 | $ 2,640.00 | 0027 | Option 2 -- Fertilizer, Mixed Grade Site 13A-1 | 3 | $1,500.00 | $4,500.00 | $1,050.00 | $3,150.00 | $400.00 | $1,200.00 | |||||||
| 0028 | Option 3 -- Deliver, Stockpile, and Place Armor Stone | $ - 0 | $ - 0 | 0028 | Option 3 -- Deliver, Stockpile, and Place Armor Stone | ||||||||||||||||||||
| 0028AA | Option 3 -- Deliver and Stockpile Armor Stone, First 19,400 Tons | 19400 | TN | $ 50.00 | $ 970,000.00 | $ 77.50 | $ 1,503,500.00 | $ 75.00 | $ 1,455,000.00 | 0028AA | Option 3 -- Deliver and Stockpile Armor Stone, First 19,400 Tons | 19400 | $52.00 | $1,008,800.00 | $83.00 | $1,610,200.00 | $44.61 | $865,434.00 | |||||||
| 0028AB | Option 3 -- Deliver and Stockpile Armor Stone, | 1,940 | TN | $ 50.00 | $ 97,000.00 | $ 77.50 | $ 150,350.00 | $ 74.75 | $ 145,015.00 | 0028AB | Option 3 -- Deliver and Stockpile Armor Stone, | 1,940 | $52.00 | $100,880.00 | $83.00 | $161,020.00 | $44.61 | $86,543.40 | |||||||
| 0028BA | Option 3 -- Armor Stone Template Placement, First 19,400 Tons | 19,400 | TN | $ 70.00 | $ 1,358,000.00 | $ 32.70 | $ 634,380.00 | $ 28.75 | $ 557,750.00 | 0028BA | Option 3 -- Armor Stone Template Placement, First 19,400 Tons | 19,400 | $72.00 | $1,396,800.00 | $4.40 | $85,360.00 | $32.50 | $630,500.00 | |||||||
| 0028BB | Option 3 -- Armor Stone Template Placement, All over 19,400 Tons | 1,940 | TN | $ 70.00 | $ 135,800.00 | $ 32.70 | $ 63,438.00 | $ 28.75 | $ 55,775.00 | 0028BB | Option 3 -- Armor Stone Template Placement, All over 19,400 Tons | 1,940 | $72.00 | $139,680.00 | $4.40 | $8,536.00 | $1.00 | $1,940.00 | |||||||
| 0029 | Option 3 -- Site 13A-2 Deliver, Stockpile, and Place Type 1 Riprap | $ - 0 | $ - 0 | $ - 0 | 0029 | Option 3 -- Site 13A-2 Deliver, Stockpile, and Place Type 1 Riprap | |||||||||||||||||||
| 0029AA | Option 3 -- Deliver and Stockpile Type 1 Riprap Underlayer, First 7,300 Tons | 7,300 | TN | $ 50.00 | $ 365,000.00 | $ 66.60 | $ 486,180.00 | $ 69.00 | $ 503,700.00 | 0029AA | Option 3 -- Deliver and Stockpile Type 1 Riprap Underlayer, First 7,300 Tons | 7,300 | $47.00 | $343,100.00 | $75.60 | $551,880.00 | $40.60 | $296,380.00 | |||||||
| 0029AB | Option 3 -- Deliver and Stockpile Type 1 Riprap Underlayer, All over 7,300 Tons | 730 | TN | $ 50.00 | $ 36,500.00 | $ 66.90 | $ 48,837.00 | $ 69.00 | $ 50,370.00 | 0029AB | Option 3 -- Deliver and Stockpile Type 1 Riprap Underlayer, All over 7,300 Tons | 730 | $47.00 | $34,310.00 | $75.60 | $55,188.00 | $40.60 | $29,638.00 | |||||||
| 0029BA | Option 3 -- Type 1 Riprap Template Placement, First 7,300 Tons | 7,300 | TN | $ 60.00 | $ 438,000.00 | $ 30.40 | $ 221,920.00 | $ 30.00 | $ 219,000.00 | 0029BA | Option 3 -- Type 1 Riprap Template Placement, First 7,300 Tons | 7,300 | $72.00 | $525,600.00 | $4.90 | $35,770.00 | $52.25 | $381,425.00 | |||||||
| 0029BB | Option 3 -- Type 1 Riprap Template Placement, All over 7500 | 730 | TN | $ 60.00 | $ 43,800.00 | $ 30.40 | $ 22,192.00 | $ 30.00 | $ 21,900.00 | 0029BB | Option 3 -- Type 1 Riprap Template Placement, All over 7500 | 730 | $72.00 | $52,560.00 | $4.90 | $3,577.00 | $1.00 | $730.00 | |||||||
| 0030 | Option 3 -- Site 13A-2 Deliver, Stockpile, and Place GADOT #4 | $ - 0 | $ - 0 | $ - 0 | 0030 | Option 3 -- Site 13A-2 Deliver, Stockpile, and Place GADOT #4 | |||||||||||||||||||
| 0030AA | Option 3 -- Deliver and Stockpile GADOT #4 Bedding Stone, First 4,000 Tons | 4,000 | TN | $ 44.00 | $ 176,000.00 | $ 49.30 | $ 197,200.00 | $ 57.50 | $ 230,000.00 | 0030AA | Option 3 -- Deliver and Stockpile GADOT #4 Bedding Stone, First 4,000 Tons | 4,000 | $33.00 | $132,000.00 | $49.70 | $198,800.00 | $28.62 | $114,480.00 | |||||||
| 0030AB | Option 3 -- Deliver and Stockpile GADOT #4 Bedding Stone All over 4,000 Tons | 600 | TN | $ 44.00 | $ 26,400.00 | $ 49.80 | $ 29,880.00 | $ 57.50 | $ 34,500.00 | 0030AB | Option 3 -- Deliver and Stockpile GADOT #4 Bedding Stone All over 4,000 Tons | 600 | $33.00 | $19,800.00 | $49.70 | $29,820.00 | $28.62 | $17,172.00 | |||||||
| 0030BA | Option 3 -- GADOT #4 Bedding Stone Template Placement, First 4,000 Tons | 4,000 | TN | $ 43.00 | $ 172,000.00 | $ 26.90 | $ 107,600.00 | $ 31.00 | $ 124,000.00 | 0030BA | Option 3 -- GADOT #4 Bedding Stone Template Placement, First 4,000 Tons | 4,000 | $72.00 | $288,000.00 | $5.60 | $22,400.00 | $52.25 | $209,000.00 | |||||||
| 0030BB | Option 3 -- GADOT #4 Bedding Stone Template Placement, | 600 | TN | $ 43.00 | $ 25,800.00 | $ 28.50 | $ 17,100.00 | $ 31.00 | $ 18,600.00 | 0030BB | Option 3 -- GADOT #4 Bedding Stone Template Placement, | 600 | $72.00 | $43,200.00 | $5.60 | $3,360.00 | $1.00 | $600.00 | |||||||
| IGE | WECC, INC. | Corey Engerprises, Inc. | GRAND CONSTRUCTION INC. | CHEOAH CONSTRUCITON CO .INC. | ASHRIDGE | ||||||||||||||||||||
| ITEM NO | SUPPLIES/SERVICES | EST QTY | EST QTY | EST QTY | EST QTY | EST QTY | EST QTY | EST QTY | EST QTY | ITEM NO | SUPPLIES/SERVICES | EST QTY | U/P | TOTAL | U/P | TOTAL | U/P | TOTAL | |||||||
| 0031 | Option 3 -- Site 13A-2 Deliver, Stockpile, and Place GADOT #4 Top of Slope | $ - 0 | $ - 0 | $ - 0 | 0031 | Option 3 -- Site 13A-2 Deliver, Stockpile, and Place GADOT #4 Top of Slope | |||||||||||||||||||
| 0031AA | Option 3 -- Deliver and Stockpile GADOT #4 Filter Stone, First 1,000 Tons | 1,000 | TN | $ 44.00 | $ 44,000.00 | $ 50.10 | $ 50,100.00 | $ 67.00 | $ 67,000.00 | 0031AA | Option 3 -- Deliver and Stockpile GADOT #4 Filter Stone, First 1,000 Tons | 1,000 | $33.00 | $33,000.00 | $49.70 | $49,700.00 | $28.62 | $28,620.00 | |||||||
| 0031AB | Option 3 -- Deliver and Stockpile GADOT #4 Filter Stone, All over 1,000 Tons | 100 | TN | $ 44.00 | $ 4,400.00 | $ 50.10 | $ 5,010.00 | $ 67.00 | $ 6,700.00 | 0031AB | Option 3 -- Deliver and Stockpile GADOT #4 Filter Stone, All over 1,000 Tons | 100 | $33.00 | $3,300.00 | $49.70 | $4,970.00 | $28.62 | $2,862.00 | |||||||
| 0031BA | Option 3 -- Placement GADOT #4 Filter Stone, First 1,000 Tons | 1,000 | TN | $ 43.00 | $ 43,000.00 | $ 25.50 | $ 25,500.00 | $ 31.00 | $ 31,000.00 | 0031BA | Option 3 -- Placement GADOT #4 Filter Stone, First 1,000 Tons | 1,000 | $72.00 | $72,000.00 | $7.15 | $7,150.00 | $52.25 | $52,250.00 | |||||||
| 0031BB | Option 3 -- Placement GADOT #4 Filter Stone, All over 1,000 Tons | 100 | TN | $ 43.00 | $ 4,300.00 | $ 25.60 | $ 2,560.00 | $ 31.00 | $ 3,100.00 | 0031BB | Option 3 -- Placement GADOT #4 Filter Stone, All over 1,000 Tons | 100 | $72.00 | $7,200.00 | $7.15 | $715.00 | $1.00 | $100.00 | |||||||
| 0032 | Option 3 -- Site 13A-2 Install SCDOT Silt Fencing | $ - 0 | $ - 0 | $ - 0 | 0032 | Option 3 -- Site 13A-2 Install SCDOT Silt Fencing | |||||||||||||||||||
| 0032AA | Option 3 -- Silt Fence | 1600 | LF | $ 3.30 | $ 5,280.00 | $ 2.30 | $ 3,680.00 | $ 2.75 | $ 4,400.00 | 0032AA | Option 3 -- Silt Fence | 1600 | $4.00 | $6,400.00 | $1.95 | $3,120.00 | $2.00 | $3,200.00 | |||||||
| 0032AB | Option 3 -- Silt Fence All over 1,600 lf | 300 | LF | $ 3.30 | $ 990.00 | $ 2.30 | $ 690.00 | $ 2.75 | $ 825.00 | 0032AB | Option 3 -- Silt Fence All over 1,600 lf | 300 | $4.00 | $1,200.00 | $1.95 | $585.00 | $2.00 | $600.00 | |||||||
| 0033 | Option 3 -- Grassing Site 13A-2 | 4 | AC | $ 2,530.00 | $ 10,120.00 | $ 1,560.00 | $ 6,240.00 | $ 4,750.00 | $ 19,000.00 | 0033 | Option 3 -- Grassing Site 13A-2 | 4 | $1,902.00 | $7,608.00 | $1,020.00 | $4,080.00 | $1,200.00 | $4,800.00 | |||||||
| 0034 | Option 3 -- Agricultural Lime Site 13A-2 | 12 | TN | $ 110.00 | $ 1,320.00 | $ 84.00 | $ 1,008.00 | $ 55.00 | $ 660.00 | 0034 | Option 3 -- Agricultural Lime Site 13A-2 | 12 | $278.00 | $3,336.00 | $150.00 | $1,800.00 | $50.00 | $600.00 | |||||||
| 0035 | Option 3 -- Fertilizer, Nitrogen Site 13A-2 | 0.4 | TN | $ 825.00 | $ 330.00 | $ 790.00 | $ 316.00 | $ 770.00 | $ 308.00 | 0035 | Option 3 -- Fertilizer, Nitrogen Site 13A-2 | 0.4 | $1,300.00 | $520.00 | $814.00 | $325.60 | $300.00 | $120.00 | |||||||
| 0036 | Option 3 -- Fertilizer, Mixed Grade Site 13A-2 | 2.4 | TN | $ 740.00 | $ 1,776.00 | $ 790.00 | $ 1,896.00 | $ 880.00 | $ 2,112.00 | 0036 | Option 3 -- Fertilizer, Mixed Grade Site 13A-2 | 2.4 | $1,500.00 | $3,600.00 | $1,050.00 | $2,520.00 | $400.00 | $960.00 | |||||||
| $ 22,760,848.00 | $ 21,152,444.00 | $ 20,180,182.50 | $24,707,074.00 | $15,799,506.10 | $14,771,159.50 | ||||||||||||||||||||
| Corrected | |||||||||||||||||||||||||
| Math error | Corrected Math | ||||||||||||||||||||||||
| Error |