amd 0003.pdf
PDF 33 KB Posted
- Solicitation number
- W912HN-09-B-0025
About this file
SF 30 - Summary of Changes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| bid abstract.xls | XLS spreadsheet | |
| amd 0005 conform.pdf | ||
| amd 0005.pdf | ||
| amd 0004.pdf | ||
| amd 0004 conform.pdf | ||
| amd 0003 conform.pdf | ||
| SAS_13A-B_RockRev_Plans.pdf | ||
| amd 0002.pdf | ||
| amd 0002 conform.pdf | ||
| amd 0001.pdf | ||
| SPECIFICATIONS.pdf | ||
| SAS_13ARockRev_Plans.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
W912HN-09-B-0025, Erosion Control Disposal Areas 13A and 13B, Rock Revetment, Jasper County, South Carolina.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Sep-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HN-09-B-0025
X 9B. DATED (SEE ITEM 11)
24-Aug-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Sep-2009
CODE
U.S. ARMY ENGINEER DISTRICT, SAVANNAH
100 WEST OGLETHORPE AVE
SAVANNAH GA 31401-3640
W912HN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HN-09-B-0025
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
A. CONTRACT REVISIONS: None
B. TECHNICAL SPECIFICATIONS REVISIONS:
SECTION 31 11 00 – CLEARING AND GRUBBING
Delete existing Page 2 in its entirety and replace with revised enclosed like-numbered Page.
NOTE:
Text that is added or revised by this amendment is replaced in its entirety printed in bold.
The text changes may have necessitated reformatting of subsequent text or pages. If this is the case, those pages have also been issued as amended pages but are not underlined or bold text.
C. DRAWING REVISIONS: None
(End of Summary of Changes)
Encl As stated
Disposal Areas 13A and 13B Rock Revetment W912HN-09-B-0025 Savannah Harbor, Jasper County, SC
SECTION 31 11 00
CLEARING AND GRUBBING
PART 1 GENERAL
1.1 SUMMARY
The work covered by this section consists of furnishing all plant, labor, and materials and performing all operations in connection with clearing, grubbing and other incidental earthwork as may be necessary to clear and grub within borrow area and the Erosion Control Structure sites as shown on the contract drawings and as hereinafter specified, and directed by the Contracting Officer. This section covers clearing and grubbing required for the borrow area, and for erosion control structure locations as shown on the drawings and specified herein. There will be no separate payment for clearing, grubbing, and stripping in this contract.
1.2 GENERAL REQUIREMENTS
1.2.1 General
This work shall consist of clearing and grubbing, removing and disposing of all vegetation and debris within the area of the erosion control structures, the fill and backfill areas behind the proposed structures, and the borrow site or as directed by the Contracting Officer. A visit to the site is recommended to determine the extent of the work. Actual acres within the borrow areas and the two erosion control locations to be cleared are to be determined by the Contractor. All prospective bidders are expected to visit the site to establish the method of clearing and to determine the equipment needed to complete the work.
1.2.2 Staging Areas and Site Access
The rock staging areas have been identified on plates D02, D15 and D19.
The tide gate area staging area may be accessed by roadway or water. The roadway access gate will be locked at all times except when required to be opened for the immediate passage of manpower, equipment and/or deliveries.
The Contractor shall provide and install a Number 5 lock to the access gate and maintain strict control over the ingress and egress of personnel, equipment and vendors. A Contractor failure to comply with the gate closed and locked policy will be considered a contract default event, recorded, and furnished to the Contracting Officer for disposition. The staging areas located on plates D02, D15 and D19 shall be used for stockpiling rock as directed by the Contracting Officer
PART 2 PRODUCTS
(Not Used)
SECTION 31 11 00 Page 2 (Revised by Amendment No. 0003)
File details come from the government source that posted it. Updated .