amd 0005.pdf

PDF 23 KB Posted

Attached to
Recovery--Z--Bank Protection Disposal Areas 13A and 13B
Solicitation number
W912HN-09-B-0025
Issued by

About this file

SF 30 - Summary of Changes.

View the file

Other files

File Type Posted
bid abstract.xls XLS spreadsheet
amd 0005 conform.pdf PDF
amd 0004.pdf PDF
amd 0004 conform.pdf PDF
amd 0003 conform.pdf PDF
amd 0003.pdf PDF
SAS_13A-B_RockRev_Plans.pdf PDF
amd 0002.pdf PDF
amd 0002 conform.pdf PDF
amd 0001.pdf PDF
SPECIFICATIONS.pdf PDF
SAS_13ARockRev_Plans.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

W92HN-09-B-0025, Erosion Control Disposal Areas 13A and 13B, Rock Revetment, Jasper County, South Carolina

See Page 2

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Sep-2009

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HN-09-B-0025

X 9B. DATED (SEE ITEM 11)

24-Aug-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Sep-2009

CODE

US ARMY ENGINEER DISTRICT SAVANNAH

100 W OGLETHORPE AVENUE

SAVANNAH GA 31401-3640

W912HN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912HN-09-B-0025

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

W912HN-09-B-0025, Erosion Control, Disposal Areas 13A and 13B, Rock Revetment, Savannah Harbor, Jasper County, South Carolina.

The following items are applicable to this modification:

A. CONTRACT CHANGES:

Section 00010 – Solicitation Contract Form is revised to read as follows:

BID MODIFICATIONS MAY BE SENT ELECTRONICALLY TO sandra.b.meyers@usace.army.mil

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 23-Sep-2009 11:00 AM to 24-Sep-2009 11:00 AM.

SUBCLIN 0001AA

The CLIN extended description has changed from First 43,600 Tons to First 25,420 Tons.

The pricing detail quantity has decreased by 18,180.00 from 43,600.00 to 25,420.00.

SUBCLIN 0001AB

The CLIN extended description has changed from Stone, All over 43,600 Tons to Stone, All over 25,420 Tons.

The pricing detail quantity has decreased by 1,810.00 from 4,360.00 to 2,550.00.

SUBCLIN 0001BA

The CLIN extended description has changed from First 43,600 Tons to First 25,420 Tons.

The pricing detail quantity has decreased by 18,180.00 from 43,600.00 to 25,420.00.

SUBCLIN 0001BB

The CLIN extended description has changed from All over 43,600 Tons to All over 25,420 Tons.

The pricing detail quantity has decreased by 1,810.00 from 4,360.00 to 2,550.00.

SUBCLIN 0002AA

The CLIN extended description has changed from Riprap Underlayer, First 9,900 Tons to Riprap Underlayer, First 9,700 Tons.

The pricing detail quantity has decreased by 200.00 from 9,900.00 to 9,700.00.

SUBCLIN 0002AB

The CLIN extended description has changed from Riprap Underlayer, All over 9,900 Tons to Riprap Underlayer, All over 9,700 Tons.

W912HN-09-B-0025

The pricing detail quantity has decreased by 20.00 from 990.00 to 970.00.

SUBCLIN 0002BA

The CLIN extended description has changed from Placement, First 9,900 Tons to Placement, First 9,700 Tons.

The pricing detail quantity has decreased by 200.00 from 9,900.00 to 9,700.00.

SUBCLIN 0002BB

The CLIN extended description has changed from Placement, All over 9,900 Tons to Placement, All over 9,700 Tons.

The pricing detail quantity has decreased by 20.00 from 990.00 to 970.00.

SUBCLIN 0003AA

The CLIN extended description has changed from Bedding Stone, First 8,200 Tons to Bedding Stone, First 5,200 Tons.

The pricing detail quantity has decreased by 3,000.00 from 8,200.00 to 5,200.00.

SUBCLIN 0003AB

The CLIN extended description has changed from Bedding Stone, All over 8,200 Tons to Bedding Stone, All over 5,200 Tons.

SUBCLIN 0003BA

The CLIN extended description has changed from Template Placement, First 8,200 Tons to Template Placement, First 5,200 Tons.

The pricing detail quantity has decreased by 3,000.00 from 8,200.00 to 5,200.00.

SUBCLIN 0032AA

The CLIN extended description has changed from First 1,700 Linear Feet to First 1,600 Linear Feet.

The pricing detail quantity has decreased by 100.00 from 1,700.00 to 1,600.00.

SUBCLIN 0032AB

The CLIN extended description has changed from All over 1,700 Linear Feet to All over 1,600 Linear Feet.

B. TECHNICAL SPECIFICATIONS REVISIONS: None

C. DRAWING REVISIONS: None

File details come from the government source that posted it. Updated .