W912HN-08-B-0021 Conformed thru Amendment 0003.pdf

PDF 577 KB Posted

Attached to
Maintenance of Dredged Material Containment Areas
Solicitation number
W912HN-08-B-0021
Issued by

About this file

Revised front-end.

View the file

Other files

File Type Posted
amd 0010.pdf PDF
amd 0010 conform.pdf PDF
amd 0009.pdf PDF
amd 0009 conform.pdf PDF
W912HN-08-B-0021 Amendment 0008.pdf PDF
amd 0007 _2_.pdf PDF
amd 0007 conform _2_.pdf PDF
amd 0006 _2_.pdf PDF
amd 0006 conformed.pdf PDF
amd 0005.pdf PDF
amd 0005 conform.pdf PDF
amd 0004 conform.pdf PDF
amd 0004.pdf PDF
Amendment 0003.pdf PDF
W912HN-09-B-0021-0001.pdf PDF
W912HN-09-B-0021 Conformed Copy.pdf PDF
W912HN-09-B-0021-0002.pdf PDF
SPECIFICATIONS.pdf PDF
W912HN-08-B-0021_Plans.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912HN-08-B-0021-0003

Contract Specialist: Laney Parker (912) 652-5654 E-Mail elaine.d.parker@usace.army.mil

Indefinite Delivery Indefinite Quantity Contract for Maintenance of Dredged Material Containment Areas for Savannah and Brusw ick Harbor, Georgia

HUBZONE SET-ASIDE: Competition w ill be 100% Set-Aside for Historically Underutilized Businesses (HUBZone) Certif ied Construction Firms.

Bids from other than HUBZone Small Business Concerns w ill not be considered. Bidders must be eligible as determined by the Small Business Administration and appear on the List of Qualif ied HUBZone Small Business concerns located at SBA's w ebsite http:w w w .sba.gov/hubzone

X

SANDRA B MEYERS 912/652-5324

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

07-Jan-2009

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________Section 00800

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________18 Feb 2009 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

US ARMY ENGINEER DISTRICT SAVANNAH

100 W OGLETHORPE AVENUE

SAVANNAH GA 31401-3640

W912HN

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

01:30 PM (hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912HN-08-B-0021

Section 00010 - Solicitation Contract Form

NOTICE TO OFFERORS

HAND-CARRIED OR MAILED BIDS:

All bids must be clearly identified with the contractor’s name and address. To ensure timely and proper handling, the lower left corner of the outermost wrapper should indicate the Invitation for Bids (IFB) No., Bid Opening Date and Time, and Title of Project.

The Government will not be responsible for bids delivered to any location or to anyone other than those designated to receive bids on its behalf as indicated below.

Bids delivered by commercial carrier and those sent by U.S. Mail, including U.S. Express Mail, must be addressed as indicated below. Bids shall not be addressed to any specific person.

U.S. Army Engineer District, Savannah

ATTN: CECT-SAS-CT-PS

100 West Oglethorpe Avenue Savannah, Georgia 31401-3640

Mailroom personnel on the first floor of 100 West Oglethorpe Avenue must receive bids sent by U.S. Mail or delivered by commercial carrier by the time specified in Block 13 of the SF1442 for receipt of bids.

Bidders are cautioned that bids sent via United States Postal Service Express Mail are first delivered to the Savannah District Post Office Box instead of 100 West Oglethorpe Avenue, “the office designated for receipt of bids” therefore, allow sufficient mailing time.

Hand-carried bids also must be delivered to mailroom personnel on the first floor of 100 West Oglethorpe Avenue by the time specified in Block 13 of SF1442 for receipt of bids.

Bidders are cautioned that there is no parking in or around the building, therefore, when hand delivering bids sufficient time should be allowed for transporting of bid packages from your vehicle to mailroom personnel.

TECHNICAL MATTERS: Technical inquiries are to be submitted via Bidder Inquiry in ProjNet at www.projnet.org\projnet

All questions regarding this Invitation for Bids (IFB) must be submitted in writing via Bidder Inquiry in ProjNet within no less than 10 calendar days prior to the date established in the IFB for bid opening. The Government reserves the right to decline addressing questions received less than 10 calendar days prior to bid opening date.

If a Bidder believes that the requirements in this IFB contain an error, omission, or are otherwise unsound; the Bidder shall immediately notify the Contract Specialist in writing with supporting rationale.

To submit and review bid inquiry items, Bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.

From this page you may view all bidder inquiries or add inquiry.

Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

W912HN-08-B-0021

Indefinite Delivery Indefinite Quantity Contract, Maintenance of Dredged Material Containment Areas, Savannah Harbor and Brunswick Harbor Bidder Inquiry Key 1UHPXO-XAMT5K

FACSIMILE MODIFICATIONS OF PROPOSALS ARE NOT AUTHORIZED.

NOTE: Issuance of Task Orders. As the requirements of the Corps of Engineers are defined, the Contracting Officer will notify the Contractor of a requirement through the issuance of a Request for Proposal (RFP) Letter.

The RFP Letter will provide the Contractor with a description of the services to be provided for the prospective task order. The Corps of Engineers will then negotiate with the Contractor the proposed effort and the time period for performing the work. The Task Order price will be negotiated utilizing the Contract Rate Schedule in Section 00010.

Work will only be ordered through the issuance of individual task orders. All task orders issued will be for the services specified therein, and will be in accordance with the fixed rates established in Section 00010 of the Schedule.

The Contracting Officer’s Representative does not have authority to modify any provision of this contract. Any request for deviation from the terms of this contract or any task orders issued hereunder must be submitted to the Contracting Officer for contractual action.

A DD Form 1155 will be issued for each task order. Each task order will include:

(1) Date of task order; contract number; task order number; task order price or performance data accounting and appropriation data; and any other pertinent information. Delivery or performance shall be specified in each task order issued hereunder.

(2) The specific Scope of Work related to the work covered by the task order and any other special technical requirements, instructions, or clearances.

NOTES:

a. Quantities are estimated and are to be used for evaluation purposes only.

b. The contract will be a firm fixed price Indefinite Delivery Indefinite Quantity type contract consisting of a base year period and two one-year option periods. The contract maximum amount per year is $2,000,000.00 for the base year period and a maximum of $2,000,000.00 for each two one-year option periods.

c. The contract minimum guaranteed amount is $5,000.00 for the base year period.

d. All prices listed herein are to include all materials and labor required to provide a complete furnished product.

e. Sizes listed for equipment are the minimum acceptable sizes to be used in performing the work for this contract.

The Government does not guarantee that the sizes listed will be most efficient to complete the required work or that the sizes listed will be large enough to perform required work in task orders.

f. An hour defined as an hour of satisfactory performance of work meeting specified requirements as specified requirements as determined by the Contracting Officer.

g. NOTE: Section 700 - Contract Clauses includes 52.228-13 “ALTERNATIVE PAYMENT PROTECTIONS (Jul 2000)”, and 52.228-15 “PERFORMANCE & PAYMENT BONDS – CONSTRUCTION (Jul 2000)”. Bonding requirements shall be applied at the individual task order level. For task orders between $25,000 and $100,000, FAR Clause 52.228-13 shall apply. For task orders exceeding $100,000, FAR 52.228-15 shall apply.

h. All prices listed herein are to include all materials and labor required to provide a complete furnished product

i. Sizes listed for equipment are the minimum acceptable sizes to be used in performing the work for this contract.

The Government does not guarantee that the sizes listed will be most efficient to complete the required work or that the sizes listed will be large enough to perform required work in task orders.

TOTAL BASE PERIOD – CLINS 0001 THROUGH 0101----------------------------$________________

TOTAL OPTION PERIOD 1 – CLINS 0102 THROUGH 0202---------------------------$________________

TOTAL OPTION PERIOD 2 – CLINS 0203 THROUGH 0303---------------------------$________________

TOTAL – CLINS 0001 THROUGH 0303 $________________

BASE PERIOD:

ITEM NO SUPPLIES/SERVICES ESTIMATED

QUANTITY

UNIT UNIT PRICE EST AMOUNT

0001 20 Trips $_________ $____________ Mobilization/Demobilization to Savannah Harbor

(Base Period)

UNIT UNIT PRICE EST AMOUNT

0002 5 Trips $__________ $____________ Mobilization/Demobilization to Jones/Oysterbed Island to Include Interior Bird

Islands on Jones/Oyserbed Island (Base Period)

UNIT UNIT PRICE EST AMOUNT

0003 5 Trips $__________ $____________ Mobilization/Demobilization to Disposal 2A

UNIT UNIT PRICE EST AMOUNT

0004 3 Trips $__________ $____________ Mobilization/Demobilization to Andrews

Island - Brunswick Harbor (Base Period)

ITEM NO SUPPLIES/SERVICES MAX

UNIT UNIT PRICE MAX AMOUNT

0005 3 Trips Mobilization/Demobilization from

Savannah Harbor to Interior Bird Islands in Disposal Areas 12A, 12B, 13A, 13B, 14A, and 14B (Base Period)

UNIT UNIT PRICE EST AMOUNT

0006 3 Trips $__________ $____________ Mobilization/Demobilization from Savannah Harbor to Offshore Bird Island

(Tomkins Island) (Base Period)

UNIT UNIT PRICE EST AMOUNT

0007 3 Trips $__________ $____________ Mobilization/Demobilization from Brunswick Harbor to Offshore Bird Island

UNIT UNIT PRICE EST AMOUNT

0008 500 Hours $__________ $____________ Pontoon Rotary Ditcher With Winch Truck - Furnish all Labor, Materials, and

Equipment to Operate Equipment (Base Period)

UNIT UNIT PRICE EST AMOUNT

0009 745 Acre $__________ $____________ Mowing- During Mowing Season (16 Jul-31 - 31 Mar) Furnish all Labor, Materials, and Equipment to Perform Mowing (Base Period)

UNIT UNIT PRICE EST AMOUNT

0010 265 Acre $__________ $____________ Mowing- During Non-Mowing Season ( 1 Apr- 15 Jul) Furnish all Labor, Materials, and Equipment to Perform Mowing (Base Period)

UNIT UNIT PRICE EST AMOUNT

DELETED

UNIT UNIT PRICE EST AMOUNT

0012 100 Hours $__________ $___________ Tractor with Tree Cutter (able to cut trees up to 6" diameter) (Minimum of 80

HP) Furnish all Labor, Materials and Equipment to Perform Tree Cutting

UNIT UNIT PRICE EST AMOUNT

0013 600 Hours $__________ $____________ Tractor Dozer (D5 or equivalent)-Furnish all Labor, Materials and Equipment to

Operate Dozer (Base Period)

UNIT UNIT PRICE EST AMOUNT

0014 200 Hours $__________ $___________ Front-End Loader (Minimum 2 Cubic Yards) Furnish all Labor, Materials and

Equipment to Operate Loader (Base Period)

UNIT UNIT PRICE EST AMOUNT

0015 200 Hours $__________ $____________ Highway Dump Truck (Minimum 12 CubicYards) - Furnish all Labor, Materials and Equipment to Operate Truck (Base Period)

UNIT UNIT PRICE EST AMOUNT

0016 200 Hours $__________ $____________ Off Road Dump Truck (minimum 25-ton) - Furnish all Labor, Materials and

Equipment to Operate Truck (Base Period)

UNIT UNIT PRICE EST AMOUNT

0017 600 Hours $__________ $____________ Excavator (Minimum 1.5 Cubic Yard Bucket with Thumb Attachment with

Heavy Duty Tree Cutter, etc.) (Minimum 175 HP) Furnish all Labor, Materials and Equipment to Operate Excavator (Base Period)

UNIT UNIT PRICE EST AMOUNT

0018 300 Hours $__________ $____________ Long-Reach Excavator (Minimum 0.5 Cubic Yards) with 6' Root Rake and

Minimum 0.5 Cubic Yard Ditching Bucket - Furnish all Labor, Materials and Equipment to Operate Excavator (Base Period)

UNIT UNIT PRICE EST AMOUNT

0019 100 Hours $__________ $____________ Motor Grader (Minimum 150 HP) Furnish All Labor, Materials and Equipment to

Operate Motor Grader (Base Period)

UNIT UNIT PRICE EST AMOUNT

0020 1,200 Hours $__________ $____________ Tractor (Minimum 230 HP) with Pan (Minimum 15 Cubic Yard) Furnish all

Labor, Materials and Equipment to Operate Tractor w/Pan (Base Period)

UNIT UNIT PRICE EST AMOUNT

0021 100 Hours $__________ $____________ Rubber Tired Backhoe/Loader (Minimum 75 HP) (Minimum 24" Backhoe

Bucket and 2 Cubic Yard Loader Bucket) - Furnish all Labor, Materials and Equipment to Operate Tractor w/Backhoe/Loader (Base Period)

UNIT UNIT PRICE EST AMOUNT

0022 100 Hours $__________ $____________ Tractor (minimum 115 HP)with Disc Harrows (minimum 16” cutting width)-

Furnish all Labor, Materials and Equipment to Operate Tractor w/disc harrows

UNIT UNIT PRICE EST AMOUNT

0023 500 Acre $__________ $____________ Stripping - Furnish all Labor, Materials, and Equipment to perform Stripping

Operations (Base Period)

UNIT UNIT PRICE EST AMOUNT

0024 500 Acre $__________ $____________ Clearing Interior of Disposal Areas-- Complete (Base Period)

UNIT UNIT PRICE EST AMOUNT

0025 500 Acre $__________ $____________ Clearing, Grubbing and Burning of Interior of Disposal Areas- Complete

UNIT UNIT PRICE EST AMOUNT

0026 20 Acre $__________ $____________ Furnish all Labor, Materials and Equipment for Permanent Grassing

UNIT UNIT PRICE EST AMOUNT

0027 20 Acre $_________ $___________ Furnish all Labor, Materials and Equipment for Temporary Grassing

UNIT UNIT PRICE EST AMOUNT

0028 20 Acre $__________ $____________ Furnish all Labor, Materials and Equipment for Marsh Grass Planting

UNIT UNIT PRICE EST AMOUNT

0029 250 Linear Foot

Furnish all Labor, Materials Equipment to Install Silt Fence (GA DOT Type A)

UNIT UNIT PRICE EST AMOUNT

0030 250 Linear Foot

Furnish all Labor, Materials and Equipment to Install Silt Fence (GA DOT Type C) (Base Period)

UNIT UNIT PRICE EST AMOUNT

0031 50 Ton $__________ $____________ Furnish all Labor, Materials and Equipment for Armor Stone (Base Period)

UNIT UNIT PRICE EST AMOUNT

0032 50 Ton $__________ $____________ Furnish all Labor, Materials and Equipment for GA DOT Type #1 Rip Rap

UNIT UNIT PRICE EST AMOUNT

0033 50 Ton $__________ $____________ Furnish all Labor, Materials and Equipment for GA DOT Type #3 Rip Rap

UNIT UNIT PRICE EST AMOUNT

0034 50 Ton $__________ $____________ Furnish all Labor, Materials and Equipment for GA DOT Size #4 Coarse

Aggregate (Base Period)

UNIT UNIT PRICE EST AMOUNT

0035 10 Cubic Yard

Furnish all Labor, Materials and Equipment for Concrete Grout (Base Period)

UNIT UNIT PRICE EST AMOUNT

0036 50 Ton $__________ $____________ Armor Stone, Materials Only (Base Period)

UNIT UNIT PRICE EST AMOUNT

0037 50 Ton $__________ $___________ GA DOT Type #1 Rip Rap, Materials Only (Base Period)

UNIT UNIT PRICE EST AMOUNT

0038 50 Ton $________ $____________ GA DOT Type #3 Rip Rap, (Materials Only) (Base Period)

UNIT UNIT PRICE EST AMOUNT

0039 50 Ton $__________ $___________ GA DOT Size #4 Coarse Aggregate, Materials Only (Base Period)

UNIT UNIT PRICE EST AMOUNT

0040 120 Linear Foot

Weir Stoplogs (Base Period)

UNIT UNIT PRICE EST AMOUNT

0041 10 Square Foot

Repair Weir Riser, Complete, Labor, Materials and Equipment (Base Period)

UNIT UNIT PRICE EST AMOUNT

0042 10 Linear Foot

Metal Catwalk Repair, Complete -Labor, Materials and Equipment (Base Period)

UNIT UNIT PRICE EST AMOUNT

0043 10 Linear Foot

Metal Catwalk Extensions, Complete, Labor, Materials and Equipment

UNIT UNIT PRICE EST AMOUNT

0044 2 Each $__________ $____________ Install New Weir, Complete, Labor, Materials and Equipment (Base Period)

UNIT UNIT PRICE EST AMOUNT

0045 10 Linear Foot

Install New Weir Riser Unit Extensions, Complete, Labor, Materials and Equipment (Base Period)

UNIT UNIT PRICE EST AMOUNT

0046 50 Linear Foot

Install New Weir Catwalk, Complete Labor, Materials and Equipment (Base Period)

UNIT UNIT PRICE EST AMOUNT

0047 50 Square Foot

Install New Vinyl Sheet Piles, Complete Labor, Materials and Equipment (Base Period)

UNIT UNIT PRICE EST AMOUNT

0048 2 Each $___________ $____________ Install New Safety Climb, Complete, Labor, Materials and Equipment (Base Period)

UNIT UNIT PRICE EST AMOUNT

0049 2 Each $___________ $____________ Install New Weir Foundation-Concrete Slab with Pilings, Complete, Labor, Materials and Equipment (Base Period)

UNIT UNIT PRICE EST AMOUNT

0050 2 Each $__________ $____________ Install New Flange and Galvanized Ring, Labor, Materials and Equipment

UNIT UNIT PRICE EST AMOUNT

0051 2 Each $___________ $____________ Install New Elbow with Flanges and Galvanized Rings, Complete, Labor, Materials and Equipment (Base Period)

UNIT UNIT PRICE EST AMOUNT

0052 400 Linear Foot

Removal and Replacement of 48" HDPE Outfall Pipes, Complete, Labor, Materials and Equipment (Base Period)

UNIT UNIT PRICE EST AMOUNT

0053 10 Hours $__________ $____________ Tamping (Base Period)

UNIT UNIT PRICE EST AMOUNT

0054 10 Cubic Yard

Removal of Unstable Material and Replacement with Select Granular Material for installation of 48" HDPE Outfall Pipes, Complete, Labor, Materials and

UNIT UNIT PRICE EST AMOUNT

0055 10 Hours $__________ $_____________ 6" Sump Pump (Base Period)

UNIT UNIT PRICE EST AMOUNT

0056 50 Acre $__________ $_____________ Burning (Base Period)

UNIT UNIT PRICE EST AMOUNT

0057 20 Days $__________ $_____________ Forced Air Burner/Air Curtain

UNIT UNIT PRICE EST AMOUNT

0058 100 Linear Foot

48”Polyethylene Pipe, Materials Only

UNIT UNIT PRICE EST AMOUNT

0059 100 Linear Foot

30” Polyethylene Pipe, Materials Only

UNIT UNIT PRICE EST AMOUNT

0060 100 Linear Foot

24” Polyethylene Pipe, Materials Only

UNIT UNIT PRICE EST AMOUNT

0061 100 Linear Foot

18” Polyethylene Pipe, Materials Only

UNIT UNIT PRICE EST AMOUNT

0062 100 Linear Foot

12” Polyethylene Pipe, Materials Only

UNIT UNIT PRICE EST AMOUNT

0063 2 Each $__________ $____________ 48” Polyethylene Pipe Fusing - Furnish all Labor, Materials, and Equipment to perform Polyethylene Pipe Fusing Operations (per joint) (Base Period)

UNIT UNIT PRICE EST AMOUNT

0064 2 Each $__________ $____________ 30” Polyethylene Pipe Fusing - Furnish all Labor, Materials, and Equipment to

UNIT UNIT PRICE EST AMOUNT

0065 2 Each $__________ $____________ 24” Polyethylene Pipe Fusing - Furnish all Labor, Materials, and Equipment to

UNIT UNIT PRICE EST AMOUNT

0066 2 Each $__________ $____________ 18” Polyethylene Pipe Fusing - Furnish all Labor, Materials, and Equipment to

UNIT UNIT PRICE EST AMOUNT

0067 2 Each $__________ $_____________ 12” Polyethylene Pipe Fusing - Furnish all Labor, Materials, and Equipment to

UNIT UNIT PRICE EST AMOUNT

0068 100 Square Yard

Geotextile Fabric - Furnish all Labor, Materials, and Equipment to Install Geotextile Fabric (Base Period)

UNIT UNIT PRICE EST AMOUNT

0069 50 Ton $__________ $____________ Lime

UNIT UNIT PRICE EST AMOUNT

0070 2 Ton $__________ $____________ Fertilizer

UNIT UNIT PRICE EST AMOUNT

0071 100 Acre $__________ $____________ Herbicide/Rodeo - Ground Application Including Labor, Materials and

UNIT UNIT PRICE EST AMOUNT

0072 30 Acre $__________ $____________ Herbicide/Rodeo - Aerial (Helicopter) Application Including Labor, Materials and Equipment (Base Period)

UNIT UNIT PRICE MAX AMOUNT

0073 550 Acre Application of a non-selective pre-emergent approved for aquatic use to include all labor, materials, and equipment (Base Period)

UNIT UNIT PRICE EST AMOUNT

0074 30 Pound $__________ $____________ Amdro

UNIT UNIT PRICE EST AMOUNT

0075 10 Pound $__________ $____________ Orthene

UNIT UNIT PRICE EST AMOUNT

0076 100 Acre $__________ $____________ Herbiciding with Boom Sprayer (Rodeo) - Furnish all Labor, Materials, and

Equipment to Herbicide Disposal Areas including Slopes (Base Period)

UNIT UNIT PRICE EST AMOUNT

0077 100 Hours $__________ $__________ Welding, Burning and Cutting

Furnish all Labor, Equipment and Materials (Base Period)

UNIT UNIT PRICE EST AMOUNT

0078 80 Hours $__________ $____________ Laborer - Chatham and Effingham Counties, Georgia (Base Period)

UNIT UNIT PRICE EST AMOUNT

0079 80 Hours $__________ $____________ Laborer -Glynn County, Georgia

UNIT UNIT PRICE EST AMOUNT

0080 80 Hours $__________ $____________ Laborer -Jasper County, South Carolina

UNIT UNIT PRICE EST AMOUNT

0081 5 Trips $__________ $___________ Transportation of Personnel to Jones/Oysterbed Island (Base Period)

UNIT UNIT PRICE EST AMOUNT

0082 5 Trips $__________ $____________ Transportation of Personnel to Savannah Harbor Offshore Bird Island

UNIT UNIT PRICE EST AMOUNT

0083 5 Trips $__________ $____________ Transportation of Personnel to Brunswick Harbor Offshore Bird Island

UNIT UNIT PRICE EST AMOUNT

0084 25 Days $__________ $____________ Crane Barge, Inland (capable of placing up to 10,000 lb rock 60 feet from barge), including mobilization/demobilization, labor, and attendant plants (tugboat and minimum 30’x120’material barge with spuds) (Base Period)

UNIT UNIT PRICE EST AMOUNT

DELETED

UNIT UNIT PRICE EST AMOUNT

0086 10 Hours $__________ $____________ Electrician, Apprentice- Chatham and Effingham Counties, Georgia

UNIT UNIT PRICE EST AMOUNT

0087 10 Hours $__________ $____________ Electrician, Apprentice- Glynn County, Georgia (Base Period)

UNIT UNIT PRICE EST AMOUNT

0088 10 Hours $__________ $____________ Electrician, Apprentice - Jasper County, South Carolina (Base Period)

UNIT UNIT PRICE EST AMOUNT

0089 10 Hours $__________ $____________ Electrician, Journeyman-Chatham and Effingham Counties, Georgia

UNIT UNIT PRICE EST AMOUNT

0090 10 Hours $__________ $____________ Electrician, Journeyman- Glynn County, Georgia (Base Period)

UNIT UNIT PRICE EST AMOUNT

0091 10 Hours $__________ $____________ Electrician, Journeyman-Jasper County, South Carolina (Base Period)

UNIT UNIT PRICE EST AMOUNT

0092 10 Hours $__________ $____________ Pipefitter, Apprentice- Chatham and Effingham Counties, Georgia (Base Period)

UNIT UNIT PRICE EST AMOUNT

0093 10 Hours $__________ $____________ Pipefitter, Apprentice- Glynn County, Georgia (Base Period)

UNIT UNIT PRICE EST AMOUNT

0094 10 Hours $__________ $____________ Pipefitter, Apprentice- Jasper County, South Carolina

UNIT UNIT PRICE EST AMOUNT

0095 10 Hours $___________ $_____________ Pipefitter, Journeyman- Chatham and Effingham Counties, Georgia (Base Period)

UNIT UNIT PRICE EST AMOUNT

0096 10 Hours $__________ $____________ Pipefitter, Journeyman - Glynn County, Georgia

UNIT UNIT PRICE EST AMOUNT

0097 10 Hours $__________ $____________ Pipefitter, Journeyman- Jasper County, South Carolina

UNIT UNIT PRICE MAX AMOUNT

0098 30 Acre Maintain Interior Bird Islands in

Disposal Areas 12A, 12B, 13A, 13B, 14A and 14B, including all Labor, Materials and Equipment, clearing, and burning (Base Period)

UNIT UNIT PRICE EST AMOUNT

0099 12 Acre $__________ $____________ Maintain Interior Bird Islands in Jones/Oysterbed Island Disposal Area, including all Labor, Materials and Equipment, clearing and burning (Base Period)

UNIT UNIT PRICE EST AMOUNT

0100 4 Acre $__________ $____________ Maintain Tomkins Island Offshore Bird Island (Savannah Harbor) , including all

Labor, Materials and Equipment, clearing and burning (Base Period)

UNIT UNIT PRICE EST AMOUNT

0101 10 Acre $__________ $____________ Maintain Brunswick Harbor Offshore Bird Island including all Labor, Materials, and Equipment, clearing and burning (Base Period)

UNIT UNIT PRICE EST AMOUNT

0102 20 Trips $__________ $____________ OPTION Mobilization/Demobilization to Savannah Harbor

(Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0103 5 Trips $_________ $____________ OPTION Mobilization/Demobilization to Jones/Oysterbed Island to include Interior Bird

Islands on Jones/Oysterbed Island (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0104 5 Trips $__________ $____________ OPTION Mobilization/Demobilization to Disposal Area 2A (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0105 3 Trips $__________ $___________ OPTION Mobilization/Demobilization to Andrews Island - Brunswick Harbor

UNIT UNIT PRICE MAX AMOUNT

0106 3 Trips OPTION Mobilization/Demobilization from from Savannah Harbor to Interior Bird Islands in Disposal Areas 12A, 12B, 13A, 13B, 14A, and 14B (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0107 3 Trips $__________ $____________ OPTION Mobilization/Demobilization from Savannah Harbor to Offshore Bird Island

(Tomkins Island) (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0108 3 Trips $__________ $____________ OPTION Mobilization/Demobilization from Brunswick Harbor to Offshore Bird Island

UNIT UNIT PRICE EST AMOUNT

0109 500 Hours $__________ $_____________ OPTION Pontoon Rotary Ditcher With Winch Truck-Furnish all Labor, Materials, and

Equipment to Operate Equipment (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0110 745 Acre $__________ $____________ OPTION Mowing- During Mowing Season (16 Jul-31 Mar) Furnish all Labor, Materials, and Equipment to Perform Mowing (Option Period 1)

UNIT UNIT PRICE ESTAMOUNT

0111 265 Acre $__________ $____________ OPTION Mowing- During Non-Mowing Season (1 Apr- 15 Jul) Furnish all Labor, Materials, and Equipment to Perform Mowing (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

OPTION DELETED

UNIT UNIT PRICE EST AMOUNT

0113 100 Hours $__________ $____________ OPTION Tractor with Tree Cutter (able to cut trees up to 6" diameter) (Minimum of 80

UNIT UNIT PRICE EST AMOUNT

0114 600 Hours $__________ $____________ OPTION Tractor Dozer (D5 or equivalent)-Furnish all Labor, Materials and Equipment to

Operate Dozer (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0115 200 Hours $__________ $____________ OPTION Front-End Loader (Minimum 2 Cubic Yards) Furnish all Labor, Materials and

Equipment to Operate Loader (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0116 200 Hours $_________ $___________ OPTION Highway Dump Truck(Minimum 12 Cubic Yards) - Furnish all Labor, Materials and Equipment to Operate Truck (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0117 200 Hours $__________ $____________ OPTION Off Road Dump Truck (Minimum 25-ton) - Furnish all Labor, Materials and

Equipment to Operate Truck (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0118 600 Hours $__________ $____________ OPTION Excavator (Minimum 1.5 Cubic Yard Bucket with Thumb Attachment with and Equipment to Operate Excavator (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0119 300 Hours $__________ $____________ OPTION Long-Reach Excavator (Minimum 0.5 Cubic Yards) with 6' Root Rake and

Equipment to Operate Excavator (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0120 100 Hours $__________ $____________ OPTION Motor Grader (Minimum 150 HP) Furnish All Labor, Materials and Equipment to

Operate Motor Grader (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0121 1,200 Hours $__________ $____________ OPTION Tractor (Minimum 230 HP) with Pan (Minimum 15 Cubic Yard) Furnish all

Labor, Materials and Equipment to Operate Tractor w/Pan (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0122 100 Hours $___________ $_____________ OPTION Rubber Tired Backhoe/Loader (Minimum 75 HP) (Minimum 24" Backhoe

Equipment to Operate Tractor w/Backhoe/Loader (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0123 100 Hours $__________ $____________ OPTION Tractor (minimum 115 HP) with Disc Harrows (Minimum 16’ cutting width)-

Furnish all Labor, Materials and Equipment to Operate Tractor w/Disc Harrows

UNIT UNIT PRICE EST AMOUNT

0124 500 Acre $__________ $____________ OPTION Stripping - Furnish all Labor, Materials, and Equipment to Perform Stripping

Operations (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0125 500 Acre $__________ $____________ OPTION Furnish all Labor, Materials, and Equipment for Clearing Interior of Disposal

Areas- Complete (Option Period 1)

UNIT UNIT PRICE ESTAMOUNT

0126 500 Acre $__________ $____________ OPTION Furnish all Labor, Materials,and Equipment for Clearing, Grubbing and Burning of Interior of Disposal Areas- Complete (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0127 20 Acre $__________ $____________ OPTION Furnish all Labor, Materials and Equipment for Permanent Grassing

UNIT UNIT PRICE EST AMOUNT

0128 20 Acre $__________ $____________ OPTION Furnish all Labor, Materials, and Equipment for Temporary Grassing

UNIT UNIT PRICE EST AMOUNT

0129 20 Acre $_________ $____________ OPTION Furnish all Labor, Materials and Equipment for Marsh Grass Planting

UNIT UNIT PRICE EST AMOUNT

0130 250 Linear Foot

OPTION Furnish all Labor, Materials, and Equipment to Install Silt Fence (GA DOT Type A) (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0131 250 Linear Foot

OPTION Furnish all Labor, Materials, and Equipment to Install Silt Fence (GA DOT Type C) (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0132 50 Ton $__________ $____________ OPTION Furnish all Labor, Materials, and Equipment for Armor Stone (Option Period 1

UNIT UNIT PRICE EST AMOUNT

0133 50 Ton $__________ $____________ OPTION Furnish all Labor, Materials, and Equipment for GA DOT Type #1 Rip Rap

UNIT UNIT PRICE EST AMOUNT

0134 50 Ton $__________ $____________ OPTION Furnish all Labor, Materials, and Equipment for GA DOT Type #3 Rip Rap

UNIT UNIT PRICE EST AMOUNT

0135 50 Ton $__________ $____________ OPTION Furnish all Labor, Materials, and Equipment for GA DOT Size #4 Coarse

Aggregate (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0136 10 Cubic Yard

OPTION Furnish all Labor, Materials, and Equipment for Concrete Grout (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0137 50 Ton $__________ $____________ OPTION Armor Stone, Materials Only

UNIT UNIT PRICE EST AMOUNT

0138 50 Ton $__________ $____________ OPTION GA DOT Type #1 Rip Rap, Materials Only (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0139 50 Ton $__________ $____________ OPTION GA DOT Type #3 Rip Rap, Materials Only (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0140 50 Ton $__________ $____________ OPTION GA DOT Size #4 Coarse Aggregate, Materials Only

UNIT UNIT PRICE EST AMOUNT

0141 120 Linear Foot

OPTION Weir Stoplogs (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0142 10 Square Foot

OPTION Repair Weir Riser, Complete, Labor, Materials and Equipment (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0143 10 Linear Foot

OPTION Metal Catwalk Repair, Complete, Labor, Materials and Equipment

UNIT UNIT PRICE EST AMOUNT

0144 10 Linear Foot

OPTION Metal Catwalk Extensions, Complete, Labor, Materials and Equipment

UNIT UNIT PRICE EST AMOUNT

0145 2 Each $__________ $____________ OPTION Install New Weir, Complete, Labor, Materials and Equipment (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0146 10 Linear Foot

OPTION Install New Weir Riser Unit Extensions, Complete, Labor, Materials and Equipment (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0147 50 Linear Foot

OPTION Install New Weir Catwalk, Complete, Labor, Materials and Equipment (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0148 50 Square Foot

OPTION Install New Vinyl Sheet Piles, Complete, Labor, Materials and Equipment

UNIT UNIT PRICE EST AMOUNT

0149 2 Each $__________ $____________ OPTION Install New Safety Climb, Complete, Labor, Materials and Equipment

UNIT UNIT PRICE EST AMOUNT

0150 2 Each $__________ $____________ OPTION Install New Weir Foundation-Concrete Slab with Pilings, Labor, Materials and

UNIT UNIT PRICE EST AMOUNT

0151 2 Each $__________ $____________ OPTION Install New Flange and Galvanized Ring, Complete, Labor, Materials and

UNIT UNIT PRICE EST AMOUNT

0152 2 Each $__________ $____________ OPTION Install New Elbow with Flanges andGalvanized Rings, Complete, Labor, Materials and Equipment (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0153 400 Linear Foot

OPTION Removal and Replacement of 48" HDPE Outfall Pipes, Complete, Labor, Materials and Equipment (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0154 10 Hours $__________ $_____________ OPTION Tamping

(Option PerIod 1)

UNIT UNIT PRICE EST AMOUNT

0155 10 Cubic Yard

OPTION Removal of Unstable Material and Replacement with Select Granular Material for installation of 48" HDPE Outfall Pipes, Complete, Labor, Materials and

UNIT UNIT PRICE EST AMOUNT

0156 10 Hours $_________ $____________ OPTION 6" Sump Pump (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0157 50 Acre $__________ $____________ OPTION Burning

UNIT UNIT PRICE EST AMOUNT

0158 20 Days $__________ $___________ OPTION Forced Air Burner/Air Curtain

UNIT UNIT PRICE EST AMOUNT

0159 100 Linear Foot

OPTION 48” Polyethylene Pipe, Materials Only

UNIT UNIT PRICE EST AMOUNT

0160 100 Linear Foot

OPTION 30” Polyethylene Pipe, Materials Only

UNIT UNIT PRICE EST AMOUNT

0161 100 Linear Foot

OPTION 24” Polyethylene Pipe, Materials Only

ITEM NO SUPPLIES/SERVICES ESTMATED

UNIT UNIT PRICE EST AMOUNT

0162 100 Linear Foot

OPTION 18” Polyethylene Pipe, Materials Only

UNIT UNIT PRICE EST AMOUNT

0163 100 Linear Foot

OPTION 12” Polyethylene Pipe, Materials Only

UNIT UNIT PRICE EST AMOUNT

0164 2 Each $__________ $____________ 48” Polyethylene Pipe Fusing - Furnish all Labor, Materials, and Equipment to perform Polyethylene Pipe Fusing Operations (per joint) (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0165 2 Each $_________ $____________ OPTION 30”Polyethylene Pipe Fusing - Furnish all Labor, Materials, and Equipment to

UNIT UNIT PRICE ESTAMOUNT

0166 2 Each $__________ $____________ OPTION 24” Polyethylene Pipe Fusing - Furnish all Labor, Materials, and Equipment to

UNIT UNIT PRICE EST AMOUNT

0167 2 Each $__________ $____________ OPTION 18” Polyethylene Pipe Fusing - Furnish all Labor, Materials, and Equipment to

UNIT UNIT PRICE EST AMOUNT

0168 2 Each $__________ $____________ OPTION 12” Polyethylene Pipe Fusing - Furnish all Labor, Materials, and Equipment to

UNIT UNIT PRICE EST AMOUNT

0169 100 Square Foot

OPTION Geotextile Fabric - Furnish all Labor, Materials, and Equipment to Install Geotextile Fabric (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0170 50 Ton $__________ $____________ OPTION Lime

UNIT UNIT PRICE EST AMOUNT

0171 2 Ton $__________ $____________ OPTION Fertilizer

UNIT UNIT PRICE EST AMOUNT

0172 100 Acre $__________ $____________ OPTION Furnish all Labor, Materials, and Equipment for Herbicide/Rodeo - Ground

Application (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0173 30 Acre $__________ $____________ OPTION Furnish all Labor, Materials, and Equipment for Herbicide/Rodeo - Aerial

(Helicopter) Application (Option Period 1)

UNIT UNIT PRICE MAX AMOUNT

0174 55 Acre OPTION Application of a non-selective equipment (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0175 30 Pound $__________ $____________ OPTION Amdro

UNIT UNIT PRICE EST AMOUNT

0176 10 Pound $__________ $____________ OPTION Orthene

UNIT UNIT PRICE EST AMOUNT

0177 500 Acre $__________ $____________ OPTION Herbiciding with Boom Sprayer (Rodeo) - Furnish all Labor, Materials, and

Equipment to Herbicide Disposal Areas including Slopes (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0178 80 Hours $__________ $____________ OPTION Welding, Burning and Cutting,- Labor, Equipment, and Materials

UNIT UNIT PRICE EST AMOUNT

0179 80 Hours $__________ $_____________ OPTION Laborer -Chatham and Effingham Counties, Georgia

UNIT UNIT PRICE EST AMOUNT

0180 80 Hours $__________ $__________ OPTION Laborer- Glynn County, Georgia (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0181 80 Hours $___________ $_____________ OPTION Laborer - Jasper County, South Carolina

UNIT UNIT PRICE EST AMOUNT

0182 5 Trips $__________ $____________ OPTION Transportation of Personnel to Jones/Oysterbed Island

UNIT UNIT PRICE EST AMOUNT

0183 5 Trips $__________ $_____________ OPTION Transportation of Personnel to Savannah Harbor Offshore Bird Island

UNIT UNIT PRICE EST AMOUNT

0184 5 Trips $__________ $____________ OPTION Transportation of Personnel to Brunswick Harbor Offshore Bird Island

UNIT UNIT PRICE EST AMOUNT

0185 25 Days $__________ $____________ OPTION Crane Barge, Inland (capable of placing up to 10,000 lb rock 60 feet from barge), including mobilization/demobilization, labor, and attendant plant (tugboat and minimum 30’x120’ material barge with spuds)

UNIT UNIT PRICE EST AMOUNT

UNIT UNIT PRICE EST AMOUNT

0187 10 Hours $__________ $____________ OPTION Electrician, Apprentice- Chatham and Effingham Counties, Georgia

UNIT UNIT PRICE EST AMOUNT

0188 10 Hours $__________ $____________ OPTION Electrician, Apprentice- Glynn County, Georgia (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0189 10 Hours $__________ $____________ OPTION Electrician, Apprentice-Jasper County, South Carolina

UNIT UNIT PRICE EST AMOUNT

0190 10 Hours $__________ $____________ OPTION Electrician, Journeyman-Chatham and Effingham Counties, Georgia

UNIT UNIT PRICE EST AMOUNT

0191 10 Hours $__________ $____________ OPTION Electrician, Journeyman- Glynn County, Georgia (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0192 10 Hours $__________ $___________ OPTION Electrician, Journeyman -Jasper County, South Carolina (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0193 10 Hours $_________ $____________ OPTION Pipefitter, Apprentice - Chatham and Effingham Counties, Georgia

UNIT UNIT PRICE EST AMOUNT

0194 10 Hours $__________ $____________ OPTION Pipefitter, Apprentice- Glynn County, Georgia (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0195 10 Hours $__________ $____________ OPTION Pipefitter, Apprentice- Jasper County, South Carolina (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0196 10 Hours $__________ $____________ OPTION Pipefitter, Journeyman- Chatham and Effingham Counties, Georgia

UNIT UNIT PRICE EST AMOUNT

0197 10 Hours $__________ $____________ OPTION Pipefitter, Journeyman- Glynn County, Georgia

UNIT UNIT PRICE EST AMOUNT

0198 10 Hours $__________ $____________ OPTION Pipefitter, Journeyman- Jasper County, South Carolina (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0199 30 Acre $_________ $____________ OPTION Maintain Interior Bird Islands in Disposal Areas 12A, 12B, 13B, 14A and 14B, including all Labor, Materials and Equipment, Mobilization/Demobilization., Clearing, Burning, and Herbiciding (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0200 12 Acre $__________ $___________ OPTION Maintain Interior Bird Islands in Jones/Oysterbed Island Disposal Area, including all Labor, Materials and Equipment, clearing and burning (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0201 4 Acre $__________ $____________ OPTION Maintain Tomkins Island Offshore Bird Island (Savannah Harbor) , including all

Labor, Materials and Equipment, clearing and burning (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0202 10 Acre $___________ $___________ OPTION Maintain Brunswick Harbor Offshore Bird Island, including all Labor, Materials, and Equipment, clearing and burning (Option Period 1)

UNIT UNIT PRICE EST AMOUNT

0203 20 Trips $__________ $____________ OPTION Mobilization/Demobilization to Savannah Harbor (Option Period 2)

UNIT UNIT PRICE EST AMOUNT

0204 5 Trips $___________ $____________ OPTION Mobilization/Demobilization to Jones /Oysterbed Island to include Interior Bird

Islands on Jones/Oysterbed Island (Option Period 2)

UNIT UNIT PRICE EST AMOUNT

0205 5 Trips $__________ $____________ OPTION Mobilization/Demobilization to Disposal Area 2A

(Option Period 2)

UNIT UNIT PRICE EST AMOUNT

0206 3 Trips $__________ $____________ OPTION Mobilization/Demobilization to Andrews Island - Brunswick Harbor

UNIT UNIT PRICE MAX AMOUNT

0207 3 Trips OPTION Mobilization/Demobilization from

Savannah Harbor to Interior Bird Islands in Disposal Areas, 12A, 12B, 13A, 13B, 14A, and 14B (Option Period 2)

UNIT UNIT PRICE EST AMOUNT

0208 3 Trips $__________ $____________ OPTION Mobilization/Demobilization from Savannah Harbor to Offshore Bird Island

(Tomkins Island) (Option Period 2)

UNIT UNIT PRICE EST AMOUNT

0209 3 Trips $__________ $____________ OPTION Mobilization/Demobilization from Brunswick Harbor to Offshore Bird Island

UNIT UNIT PRICE EST AMOUNT

0210 500 Hours $__________ $____________ OPTION Pontoon Rotary Ditcher With Winch Truck - Furnish all Labor, Materials, and

Equipment to Operate Equipment (Option Period 2)

UNIT UNIT PRICE EST AMOUNT

0211 745 Acre $__________ $____________ OPTION Mowing- During Mowing Season (16 Jul-31 Mar) Furnish all Labor, Materials, and Equipment to Perform Mowing (Option Period 2)

UNIT UNIT PRICE EST AMOUNT

0212 265 Acre $__________ $____________ OPTION Mowing- During Non-Mowing Season (1 Apr- 15 Jul) - Furnish all Labor, Materials, and Equipment to Perform Mowing (Option Period 2)

UNIT UNIT PRICE EST AMOUNT

UNIT UNIT PRICE EST AMOUNT

0214 100 Hours $__________ $____________ OPTION Tractor with Tree Cutter (able to cut trees up to 6" diameter) (Minimum of 80

UNIT UNIT PRICE EST AMOUNT

0215 600 Hours $__________ $____________ OPTION Tractor Dozer (D5 or equivalent)-Furnish all Labor, Materials and Equipment to

Operate Dozer (Option Period 2)

UNIT UNIT PRICE EST AMOUNT

0216 200 Hours $__________ $____________ OPTION Front-End Loader (Minimum 2 Cubic Yards) Furnish all Labor, Materials and

Equipment to Operate Loader (Option Period 2)

UNIT UNIT PRICE EST AMOUNT

0217 200 Hours $__________ $____________ OPTION Highway Dump Truck (Minimum 12 Cubic Yards) - Furnish all Labor, Materials and Equipment to Operate Truck (Option Period 2)

UNIT UNIT PRICE EST AMOUNT

0218 200 Hours $__________ $____________ OPTION Off Road Dump Truck (minimum 25-ton) - Furnish all Labor, Materials and

Equipment to Operate Truck (Option Period 2)

UNIT UNIT PRICE EST AMOUNT

0219 600 Hours $__________ $____________ OPTION Excavator (Minimum 1.5 Cubic Yard Bucket with Thumb Attachment with and Equipment to Operate Excavator (Option Period 2)

UNIT UNIT PRICE EST AMOUNT

0220 300 Hours $__________ $____________ OPTION Long-Reach Excavator (Minimum 0.5 Cubic Yards) with 6' Root Rake and

Equipment to Operate Excavator (Option Period 2)

UNIT UNIT PRICE EST AMOUNT

0221 100 Hours $__________ $____________ OPTION Motor Grader (Minimum 150 HP) Furnish All Labor, Materials and Equipment to

Operate Motor Grader (Option Period 2)

UNIT UNIT PRICE EST AMOUNT

0222 1,200 Hours $__________ $____________ OPTION Tractor (Minimum 230 HP) with Pan (Minimum 15 Cubic Yard) Furnish all

Labor, Materials and Equipment to Operate Tractor w/Pan (Option Period 2)

UNIT UNIT PRICE EST AMOUNT

0223 100 Hours $__________ $____________ OPTION Rubber Tired Backhoe/Loader (Minimum 75 HP) (Minimum 24" Backhoe

Equipment to Operate Tractor w/Backhoe/Loader (Option Period 2)

UNIT UNIT PRICE EST AMOUNT

0224 100 Hours $__________ $____________ OPTION Tractor (minimum 115 HP) with disc harrows (minimum 16”cutting width)-

Furnish all Labor, Materials and Equipment to Operate Tractor w/disc harrows

UNIT UNIT PRICE EST AMOUNT

0225 500 Acre $__________ $__________ OPTION Stripping - Furnish all Labor, Materials, and Equipment to perform Stripping

Operations (Option Period 2)

UNIT UNIT PRICE EST AMOUNT

0226 500 Acre $__________ $____________ OPTION Furnish all Labor, Materials, and Equipment for Clearing Interior of Disposal

Areas- Complete (Option Period 2)

UNIT UNIT PRICE EST AMOUNT

0227 500 Acre $___________ $____________ OPTION Furnish all Labor, Materials, and Equipment for Clearing, Grubbing and Burning of Interior of Disposal Areas- Complete (Option Period 2)

UNIT UNIT PRICE EST AMOUNT

0228 20 Acre $__________ $____________ OPTION Furnish all Labor, Materials, and Equipment for Permanent Grassing

UNIT UNIT PRICE EST AMOUNT

0229 20 Acre $__________ $____________ OPTION Furnish all Labor, Materials, and Equipment for Temporary Grassing

UNIT UNIT PRICE EST AMOUNT

0230 20 Acre $__________ $____________ OPTION Furnish all Labor, Materials, and Equipment for Marsh Grass Planting

UNIT UNIT PRICE EST AMOUNT

0231 250 Linear Foot

Type A) (Option Period 2)

UNIT UNIT PRICE EST AMOUNT

0232 250 Linear Foot

Type C) (Option Period 2)

UNIT UNIT PRICE EST AMOUNT

0233 50 Ton $__________ $___________ OPTION Furnish all Labor, Materials, and Equipment for Armor Stone (Option Period 2)

UNIT UNIT PRICE EST AMOUNT

0234 50 Ton $__________ $____________ OPTION Furnish all Labor, Materials and Equipment for GA DOT Type #1 Rip Rap

UNIT UNIT PRICE EST AMOUNT

0235 50 Ton $__________ $____________ OPTION Furnish all Labor, Materials, and Equipment for GA DOT Type #3 Rip Rap

UNIT UNIT PRICE EST AMOUNT

0236 50 Ton $__________ $____________ OPTION Furnish all Labor, Materials, and Equipment for GA DOT Size #4 Coarse

Aggregate (Option Period 2)

UNIT UNIT PRICE EST AMOUNT

0237 10 Cubic Yard

OPTION Furnish all Labor, Materials, and Equipment for Concrete Grout

UNIT UNIT PRICE EST AMOUNT

0238 50 Ton $__________ $_____________ OPTION Armor Stone, Materials Only

UNIT UNIT PRICE EST AMOUNT

0239 50 Ton Miles

OPTION GA DOT Type #1 Rip Rap, Materials Only (Option Period 2)

UNIT UNIT PRICE EST AMOUNT

0240 50 Ton $__________ $____________ OPTION GA DOT Type #3 Rip Rap, Materials Only (Option Period 2)

UNIT UNIT PRICE EST AMOUNT

0241 50 Ton $__________ $____________ OPTION GA DOT Size #4 Coarse Aggregate, Materials Only (Option Period 2)

UNIT UNIT PRICE EST AMOUNT

0242 120 Linear Foot

OPTION Weir Stoplogs (Option Period 2)

UNIT UNIT PRICE EST AMOUNT

0243 10 Square Foot

OPTION Repair Weir Riser, Complete, Labor, Materials and Equipment (Option Period 2)

UNIT UNIT PRICE EST AMOUNT

0244 10 Linear Foot

OPTION Metal Catwalk Repair, Complete, Labor, Materials and Equipment

UNIT UNIT PRICE EST AMOUNT

0245 10 Linear Foot

OPTION Metal Catwalk Extensions, Complete, Labor, Materials and Equipment

UNIT UNIT PRICE EST AMOUNT

0246 2 Each $__________ $____________ OPTION Install New Weir, Complete, Labor, Materials and Equipment (Option Period 2)

UNIT UNIT PRICE EST AMOUNT

0247 10 Linear Foot

OPTION Install New Weir Riser Unit Extensions, Complete, Labor, Materials and Equipment (Option Period 2)

UNIT UNIT PRICE EST AMOUNT

0248 50 Linear Foot

OPTION Install New Weir Catwalk, Complete, Labor, Materials and Equipment

UNIT UNIT PRICE EST AMOUNT

0249 50 Square Foot

OPTION Install New Vinyl Sheet Piles, Complete, Labor, Materials and Equipment

UNIT UNIT PRICE EST AMOUNT

0250 2 Each $__________ $____________ OPTION Install New Safety Climb,Complete, Labor, Materials and Equipment

UNIT UNIT PRICE EST AMOUNT

0251 2 Each $__________ $____________ OPTION Install New Weir Foundation-Concrete Slab with Pilings, Complete, Labor, Materials and Equipment (Option Period 2)

UNIT UNIT PRICE EST AMOUNT

0252 2 Each $__________ $____________ OPTION Install New Flange and Galvanized Ring, Complete, Labor, Materials and

UNIT UNIT PRICE EST AMOUNT

0253 2 Each $__________ $____________ OPTION Install New Elbow with Flanges and Galvanized Rings, Complete, Labor, Materials and Equipment (Option Period 2)

UNIT UNIT PRICE EST AMOUNT

0254 400 Linear Foot

OPTION Removal and Replacement of 48" HDPE Outfall Pipes, Complete, Labor, Materials and Equipment (Option Period 2)

UNIT UNIT PRICE EST AMOUNT

0255 10 Hours $__________ $____________ OPTION Tamping (Option Period 2)

UNIT UNIT PRICE EST AMOUNT

0256 10 Cubic Yard

OPTION Removal of Unstable Material and Replacement with Select Granular Material for installation of 48" HDPE Outfall Pipes, Complete, Labor,…

This is the start of the file's text. The full file is on GovTribe.